Loading...
HomeMy WebLinkAbout20040390 Ver 1_Certification of Completion_20070726/,g,~s DWQ Project No.: Applicant: Project Name: Certificate of Completion aT ~ 6 ~ ~~ County: ~~'~~Oir~~ /~~ .~~~0,~~4 d~ ~~~~ Date of Issuance of 401 Water Quality Certification: .s/~/~~~ ~~ Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North C;aiolina Division of Water Quality, 1621 Mail Service Center, Raleigh, NC, 27699-1621. This form may be returned to -DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicants Certifacatio I, ~C~~~ ~ f ro h'~ / ,hereby state-that, to the best of my abilities, due caze and diligence was used in the observation of the construction such,that the construction was observed to be built within substantial compliance and intent of ~ e 401 Water Quality Certification and Buffer Rules, the approv plans an~~pecifications, and~tl}e~ supporting materials.:, •, .,,_, ~ .n ,,, -, Q , E :- ~~ ~` Agent's, Date: rod d ;~k 1{ ~~'.C 5~44.~,.. pp~~ ~~~ ~ ~4i11 ~ ~ X007 ~-,r ,r - , ,w~>~~:. ~tii 11 'v`VC I~ItP3tr.: i1 yTl1`'ri ~~ ~7 f3~2~ ~ z ., I, ~--~ ,hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature_ Date: If this project was designed by a Certified Professional I, ~ , as a duly registered Professional (i.e:, Engineer, Landscape Architect, Surveyor, etc.) in the State of North Cazolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due Gaze and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Registration No.: Date: