Loading...
HomeMy WebLinkAboutSR 2755 (6) McLeansville Road Grade Separation over NCRR Railroad McLeansville, Guilford County, NC STIP Project No. P-5204 FINDING OF NO SIGNIFICANT IMPACT Submitted Pursuant to the National Environmental Policy Act 42 USC 4332(2)(c) US Department of Transportation Federal Railroad Administration and North Carolina Department of Transportation Rail Division NOVEMBER 2013 McLeansville Road Grade Separation – Guilford County, NC  1 STIP Project P‐5204 ‐ Finding of No Significant Impact     FEDERAL RAILROAD ADMINISTRATION Finding of No Significant Impact (FONSI) for the McLeansville Road Grade Separation McLeansville, Guilford County, NC STIP Project No. P-5204 Background Information The North Carolina Department of Transportation (NCDOT) Rail Division, in conjunction with the Federal Railroad Administration (FRA), proposes to construct a grade separation carrying McLeansville Road (SR 2819) over the North Carolina Railroad (NCRR) right-of- way (Project). This Project is identified as Project P-5204 in the North Carolina State Transportation Improvement Program (STIP). The proposed McLeansville Road Grade Separation Project is a component of the Piedmont Improvement Program (PIP), an initiative by the NCDOT, the Norfolk Southern Railway (NS) and the NCRR to improve passenger and freight railroad operations along the NCRR Piedmont Corridor from Raleigh to Charlotte. The NCRR Piedmont Corridor consists of the Greensboro to Charlotte portion of the NS Mainline from Washington, DC and Atlanta, and the Greensboro to Raleigh portion of the NCRR H-line. The PIP primarily consists of railroad capacity projects and crossing safety projects that will facilitate the introduction of up to six daily round trip (12 daily) passenger trains along the Raleigh to Charlotte Piedmont Corridor. Procedural History The Project is included in the NCDOT 2012-2018 STIP as project number P-5204. Funding for this Project is anticipated to come from the American Recovery and Reinvestment Act (ARRA). NCDOT published the McLeansville Road Grade Separation over NCRR Railroad Environmental Assessment (EA) in March 2013. The Greensboro Urban Area Metropolitan Planning Organization (GUAMPO) 2035 Long Range Transportation Plan (LRTP) Update is now in effect (as of April 1, 2013). This current version of the LRTP includes the Project (GUAMPO Web site: www.greensboro- nc.gov/index.aspx?page=3480). Statement of Purpose and Need The purpose of the Project is to improve vehicular mobility, vehicular and train safety, and the efficiency of train traffic in the area around the McLeansville Road at-grade crossing of the NCRR track in Guilford County, North Carolina. This Project also will facilitate and support future increased passenger rail service for the NCRR Piedmont Corridor. NCDOT McLeansville Road Grade Separation – Guilford County, NC  2 STIP Project P‐5204 ‐ Finding of No Significant Impact     proposes to increase the service on the NCRR Piedmont Corridor between Raleigh and Charlotte from the current three daily round trips to six. The McLeansville Road and Carmon Road at-grade crossings, and the Bullard & Black private at-grade crossing each cross both a main line track and a siding track within the limits of the Project. Trains waiting on the siding track have the potential to block these at-grade crossings while other trains pass on the main line. Alternatively, train crews can disconnect the train cars on the siding into two sections, with one section on either side of the road crossings. Both of these options result in undesirable operating conditions for both trains and vehicular traffic. At present, traffic along McLeansville Road and Carmon Road traveling through the at- grade railroad crossing must stop for passing trains and trains parked on the siding tracks. Typically, six passenger trains and 5 to 10 freight trains per day operate through the Project area and cross McLeansville Road. In addition, sometimes trains on the siding track can block the crossing for up to an hour. These operations contribute to vehicular delays and have a negative effect on traffic flow. Providing a grade separation for the at-grade McLeansville Road crossing and closing the Carmon Road crossing and the Bullard & Black private crossing1 will eliminate the potential for vehicle/train collisions, which will improve safety for both road and rail traffic. Alternatives Considered NCDOT considered a reasonable range of alternatives for the proposed action, as described in the McLeansville Road Grade Separation STIP Project P-5204 Environmental Assessment (EA) (March, 2013). Alternatives studied in detail in the EA included the No- Build Alternative and two Build Alternatives (referred to as “Build Alternative A” and “Build Alternative B”) with three service road options. Build Alternative A with Service Road 1b is the Preferred/Selected Alternative, as identified in the EA. Build Alternative A with Service Road 1b is the alternative selected in this FONSI (the Selected Alternative). The alternatives are described below. Preferred/Selected Alternative. Figure 1 shows the Preferred/Selected Alternative on an aerial photograph. The Preferred/Selected Alternative closes the public Carmon Road at-grade railroad crossing and the Bullard & Black private at-grade railroad crossing. A grade-separated bridge over the railroad tracks will be provided at McLeansville Road. This alternative realigns McLeansville Road to construct the grade separation over the railroad tracks approximately 120 feet west of the existing at-grade crossing. The total length of the McLeansville Road realignment is approximately 2,400 feet. The intersection of McLeansville Road and Frieden Church Road will be designed so that a traffic signal could be installed in the future. The new roadway segment will have two 12-foot travel lanes and an 8-foot shoulder with four feet of the shoulder paved. The paved shoulder is 1 The Bullard & Black private crossing is recommended for closure as part of the Private Crossing Safety Initiative - Crossing Evaluations and Recommendations, Next Generation High Speed Rail Program, NC Railroad/Norfolk Southern Railroad Charlotte to Raleigh (prepared by Gannett Fleming for NCDOT, October 2003). McLeansville Road Grade Separation – Guilford County, NC  3 STIP Project P‐5204 ‐ Finding of No Significant Impact     consistent with the Greensboro Urban Area Bicycle, Pedestrian & Greenway Master Plan and the 2035 LRTP, which recommends paved shoulders on McLeansville Road to accommodate bicycles. The design speed for McLeansville Road is 50 miles per hour (mph), with a planned posted speed of 45 mph. The bridge over the railroad tracks will accommodate the two existing tracks (the mainline track and the siding track) plus provide room for the potential future construction of two additional mainline tracks to the north of the existing tracks. The bridge will be approximately 135 feet long. Existing Bethel Church Road will be realigned near McLeansville Road to relocate the Bethel Church Road/McLeansville Road intersection farther south. The existing location conflicts with the alignment of the new bridge. The new Bethel Church Road/McLeansville Road intersection is approximately 350 south of the existing intersection. The north end of existing Bethel Church Road will be closed with a cul-de-sac. The Bethel Church Road realignment is approximately 1,600 feet long. The realigned Bethel Church Road crosses an unnamed stream that runs north-south through the Project area. NCDOT chose the stream crossing location to minimize impacts to the stream and adjacent wetlands. The realigned segment of Bethel Church Road will be a 2-lane roadway with 12-foot lanes and an 8-foot shoulder with two feet of the shoulder paved. The existing Bethel Church Road also is a 2-lane roadway, but has no paved shoulder. The design speed for the new Bethel Church Road is 40 miles per hour (mph), with a planned posted speed of 35 mph. The existing Hines Andrews Road will be extended a short distance, approximately 350 feet, to tie into the new Bethel Church Road. The extension will have two 12-foot travel lanes and an 8-foot unpaved shoulder. For the two properties that currently use the Bullard & Black private at-grade railroad crossing, a new service road will be constructed to connect the properties to Hines Andrews Road. The Preferred/Selected Alternative service road begins where state maintenance ends on Hines Andrews Road. It extends north between parcels #0117696 and #0117609. At the southern boundary of parcel #0117696, the road turns eastward and travels around the southern and western boundaries of the property to end at the southeast corner of parcel #0117764. Other Alternatives Studied in Detail. Other alternatives studied in detail in the EA include: the No-Build Alternative; Build Alternative B with Service Road Options 1a, 1b, and 2; and Build Alternative A with Service Road Options 1a and 2. Build Alternative B is similar to Build Alternative A, except that the new grade separation over the NCRR railroad tracks would be constructed to the east of the existing at-grade crossing. The No-Build Alternative has not been selected because it would not meet the Project’s purpose and need. ? ? ? ¹½ !© îî kj kj kj kj At - G r a d e Ra i l r o a d C r o s s i n g to B e C l o s e d Pr i v a t e A t - G r a d e Ra i l r o a d C r o s s i n g to B e C l o s e d Pr o p o s e d Gr a d e - S e p a r a t e d Cr o s s i n g At - G r a d e Ra i l r o a d C r o s s i n g Re m a i n s O p e n No O u t l e t Se r v i c e R o a d Op t i o n 1 b F R I E D E N C H U R C H R D KNOXRD M C L E A N S V I L L E R D BETHEL CH U RC H R D HARVEST RD B I R C H C R E E K R D CARMON RD D A N B R O O K D R OW RD R A N H U R S T R D E A S T H U R S T R D HINES ANDREWS RD D ALLENWOODRD O A K V I L L E C TMc L e a n s v i l l e B a p t i s t Ch u r c h & C e m e t e r y Mc L e a n s v i l l e E l e m e n t a r y S c h o o l Mc L e a n s v i l l e F i r e D e p t . St a t i o n 4 7 Mc L e a n s v i l l e P o s t O f f i c e Ga i l M o s e l e y A g e n c y , I n c . Mc L e a n s v i l l e C o m m u n i t y C e n t e r Mc L e a n s v i l l e V i l l a g e S h o p p i n g C e n t e r NC O n e M a p McL_EA_PreferredAlternative.mxd AKB 11.04.2013 ST I P P r o j e c t N o . P - 5 2 0 4 Mc L E A N S V I L L E R O A D S R - 2 8 1 9 GR A D E S E P A R A T I O N Gu i l f o r d C o u n t y , N C 0 6 0 0 30 0 Fe e t Le g e n d Pr o j e c t S t u d y A r e a Pr o p o s e d A l t A C e n t e r l i n e Pr o p o s e d A l t A B r i d g e Pr o p o s e d A l t A R i g h t o f W a y kj No t a b l e F e a t u r e s îî Ch u r c h !© Fi r e S t a t i o n ¹½ Sc h o o l Ra i l r o a d De l i n e a t e d S t r e a m s De l i n e a t e d W e t l a n d s De l i n e a t e d O p e n W a t e r St r e a m s Po n d s Vo l u n t a r y A g r i c u l t u r a l D i s t r i c t Pa r c e l s ? Ex i s t i n g A t - G r a d e R a i l r o a d Cr o s s i n g t o b e C l o s e d ? At - G r a d e R a i l r o a d Cr o s s i n g R e m a i n s O p e n WSo u r c e : G u i l f o r d C o u n t y , N C O n e m a p Ae r i a l P h o t o : A r c G I S I m a g e S e r v i c e 20 1 0 - O r t h o i m a g e r y Ma p P r i n t e d N o v e m b e r 2 0 1 3 FI G U R E 1 PR E F E R R E D / SE L E C T E D AL T E R N A T I V E McLeansville Road Grade Separation – Guilford County, NC  5 STIP Project P‐5204 ‐ Finding of No Significant Impact     Build Alternative B with Service Road Options 1a, 1b, or 2 have been eliminated because these alternatives would be more expensive, have one additional residential relocation, and greater stream impacts compared to the Preferred/Selected Alternative. Build Alternative A with Service Road Option 1a has been eliminated because Service Road Option 1a would bisect a property and separate a residence on parcel #0117710 from the free-standing garage on the property. Build Alternative A with Service Road Option 2 has been eliminated because Service Road Option 2 impacts a small storage building on parcel #011760 and may impact a wetland area at the end of Hines Andrews Road. This alternative also would be more expensive than the Preferred/Selected Alternative. Other Alternatives Considered but Eliminated from Study. Other alternatives considered but eliminated from detailed evaluation in the EA and study included an alternative that would close all at-grade crossings in the Project study area, and alternatives that would build a grade-separated crossing farther west or east of existing McLeansville Road than Build Alternatives A and B. These alternatives were eliminated from further consideration when NCDOT determined they would not meet the purpose and need for the Project and/or were not reasonable due to cost, impacts, or community disruption. Summary of the Selected Alternative’s Environmental Effects Discussions of the environmental impacts associated with the Project are located in Chapter 4 of the EA. The potential environmental effects of the Preferred/Selected Alternative are summarized in Table 1. Table 1. Summary of Impacts from the Preferred/Selected Alternative Impact Area  EA Chapter  Sections with  More Detail  Summary of Impact Proposed Mitigation  Cost   (2013 dollars)  Updated since the  EA.  All alternatives  would show a similar  change in cost.  2.2.3 Construction Cost ‐ $7,804,500  Right‐of‐Way Cost ‐ $1,006,400  Utility Cost ‐ $164,200  TOTAL COST – $8,975,100  Not applicable  Consistency with  Land Use and  Transportation  Local Plans  4.1.1 No Impact.  The Preferred/Selected  Alternative is consistent with area land use  and transportation plans.    Not applicable.  Relocations 4.1.2 Minor Impact.  The Preferred/Selected  Alternative will require three (3) residential  relocations and one (1) business relocation.  NCDOT will use three programs to  minimize the inconvenience of  relocation: Relocation Assistance,  Relocation Moving Payments, and  Relocation Replacement Housing  Payments or Rent Supplement.  These  programs are in accordance with the  Uniform Relocation Assistance and Real  Property Acquisition Policies Act of  1970.  Comparable replacement  housing is available in the Project area  McLeansville Road Grade Separation – Guilford County, NC  6 STIP Project P‐5204 ‐ Finding of No Significant Impact     Table 1. Summary of Impacts from the Preferred/Selected Alternative Impact Area  EA Chapter  Sections with  More Detail  Summary of Impact Proposed Mitigation  for displaced homeowners and tenants.  Communities and  Neighborhoods  4.1.3 Minor Positive Effect and Minor Impact.   Existing communities and neighborhoods  will not be divided internally or from one  another by physical or psychological barriers  as a result of the Preferred/Selected  Alternative.    The grade separation and the wider paved  shoulders to be constructed on McLeansville  Road will provide improved access between  the residences south of the railroad tracks  and the McLeansville Service Core area  north of the railroad tracks.   The Preferred/Selected alternative will also  result in minor access changes for some  properties along Bethel Church Road and  the Bullard & Black private railroad crossing  Not applicable.  Environmental  Justice  4.1.4 No Impact.  The Preferred/Selected  Alternative will not result in  disproportionately high and adverse effects  to any low‐income or minority populations  because there are no concentrations of  minority or low‐income populations in the  Project study area.  Not applicable.  Community  Services   4.1.5 Minor Impact.  There will be a minor direct  property impact to the McLeansville Fire  Station frontage along Frieden Church Road.   The Preferred/Selected Alternative will  result in Indirect impacts to fire/EMS  response services due to slightly increased  response times and school transportation  due to rerouting of buses with the closure of  the Carmon Road at‐grade railroad crossing.   However, the grade‐separated crossing at  McLeansville Road will provide a reliable  crossing of the railroad tracks that is always  open.    The closing of the Carmon Road at‐grade  railroad crossing will require minor  rerouting of buses making stops on Carmon  Road and Knox Road.  Currently there are  three buses with stops in the area.    Not applicable.  Public Health 4.1.5  4.2.6  No Impact.  No impacts to public health are  anticipated during construction of the  Preferred/Selected Alternative.  The Project  is not expected to have impacts to  hazardous material sites.  Not applicable.  McLeansville Road Grade Separation – Guilford County, NC  7 STIP Project P‐5204 ‐ Finding of No Significant Impact     Table 1. Summary of Impacts from the Preferred/Selected Alternative Impact Area  EA Chapter  Sections with  More Detail  Summary of Impact Proposed Mitigation  Public Safety 4.1.5 Positive Effect.  There will be a public safety  benefit with a grade‐separating  McLeansville Road and closing the Carmon  Road and Bullard & Black at‐grade crossings,  eliminating the possibility of train/auto  collisions at these locations.    Not applicable.  Recreational  Opportunities  4.1.5 No Impact.  There are no public or private  recreational facilities in the Project study  area.  The grade separation and the wider  paved shoulders to be constructed on  McLeansville Road will provide improved  pedestrian/bicycle access between the  residences south of the railroad tracks and  the McLeansville Service Core area north of  the railroad tracks.   Not applicable.  Possible Barriers to  the Elderly and  Handicapped  4.1.3  4.1.5  No Impact.  Construction of the  Preferred/Selected Alternative is not  anticipated to result in barriers to the  elderly and handicapped populations.  Not applicable.  Section 4(f) and  Section 6(f)  Resources  4.1.5 No impact.  There are no Section 4(f) or  Section 6(f) resources in the  Preferred/Selected Alternative study area.  Not applicable.  Economic Effects  and Energy Use  4.1.6 Minor Positive Effect and Minor Impact.   The Project study area does not contain  mineral resources or quarries or energy  resource activities.  The Project will not result in any major  economic gains or losses in the area.   However, the Preferred/Selected Alternative  will displace one business, which may have a  minor temporary economic impact in the  area until the business is reestablished.  The  Project also will support construction jobs  temporarily during construction.  The Preferred/Selected Alternative will  result in a temporary increase in energy use  during the construction phase.  However,  completion of the crossing closures will  result in more efficient train operations as  trains using the siding will not have to  uncouple to allow vehicles to pass through.   The grade separation will improve vehicle  operations and eliminate the need for  vehicles to idle while waiting for trains to  pass through the at‐grade crossings.  The business relocation will receive  compensation and assistance in  accordance with the Federal Uniform  Relocation Assistance and Real Property  Acquisition Policies Act and the North  Carolina Relocation Assistance Act.  McLeansville Road Grade Separation – Guilford County, NC  8 STIP Project P‐5204 ‐ Finding of No Significant Impact     Table 1. Summary of Impacts from the Preferred/Selected Alternative Impact Area  EA Chapter  Sections with  More Detail  Summary of Impact Proposed Mitigation  Noise and  Vibration  4.2.1 Positive Impact. The Preferred/Selected  Alternative will decrease train horn noise  due to the removal of the at‐grade crossings  at McLeansville Road, private Bullard &  Black, and Carmon Road.  No vibration  impacts are anticipated due to the  Preferred/Selected Alternative.     Not applicable.  Air Quality 4.2.2 No Impact.  No air quality impacts are  anticipated due to the Preferred/Selected  Alternative. Guilford County is designated as  an attainment area for all criteria pollutants   Not applicable.  Farmland 4.2.3 Minor Impact.  The Preferred/Selected  Alternative will impact 11.6 acres of prime  and statewide important farmland soils.   However, there will be no significant impact  on protected farmland soil as defined under  the Farmland Protection Policy Act.    Not applicable, in accordance with the  Farmland Protection Policy Act.  Utilities 4.2.4 Minor Impact.  The Preferred/Selected  Alternative is anticipated to require  relocation of electrical power lines, sewer  lines, and water lines.    NCDOT will coordinate with all utility  providers during final design and  construction to prevent damage to  utility systems and to minimize  disruption and degradation of utility  service to local customers.  Aesthetics and  Design Quality  4.2.5 Minor Impact.  Minor changes in the visual  landscape will occur as a result of the  Project.    It is NCDOT policy to replace or  compensate for landscaping impacted  by Project construction.   Hazardous Waste  and Construction  Waste Disposal  4.2.6 Minor Impact.  The Preferred/Selected  Alternative requires right of way from the  front of the McLeansville Fire Station and  the Lynn’s Furniture Gallery property.  Both  sites are anticipated to have a low potential  for geoenvironmental impacts.    The NCDOT Geoenvironmental Unit will  complete further assessments prior to  right of way acquisition, as necessary,  and implement remediation actions as  needed  Flood Hazards and  Floodplain  Management  4.2.7 No Impact.  There are no floodplains or  floodways in the Project study area.  Not applicable.  Historic  Architectural and  Archaeological  Resources  4.3 No Impact.  There are no significant historic  architectural or archaeological resources  within the Preferred/Selected Alternative  study area, as confirmed by the State  Historic Preservation Officer.    Not applicable.  McLeansville Road Grade Separation – Guilford County, NC  9 STIP Project P‐5204 ‐ Finding of No Significant Impact     Table 1. Summary of Impacts from the Preferred/Selected Alternative Impact Area  EA Chapter  Sections with  More Detail  Summary of Impact Proposed Mitigation  Ecological Systems  (Biotic  Communities and  Wildlife)  4.4.1 Minor Impact.  Permanent impacts will  occur to 6.6 acres of mesic mixed hardwood  forest and 13.0 acres of  maintained/disturbed areas for the  Preferred/Selected Alternative.     Temporary impacts to downstream habitat  may occur from increased sediment during  construction.  Temporary impacts to downstream  habitat will be minimized by the  implementation of stringent erosion  and sediment control measures in  accordance with NCDENR regulations  and NCDOT Best Management Practices  for the Protection of Surface Waters.  Water Quality 4.4.2 Minor Impact.  Project activities such as  clearing and grubbing, riparian canopy  removal, in‐water construction, fertilizer  and pesticide use for revegetation,  redirection of surficial groundwater flows  could impact surface water resources in the  absence of appropriate Best Management  Practices (BMPs).  Prior to construction, an erosion and  sedimentation control plan will be  developed in accordance with NCDENR  regulations and NCDOT Best  Management Practices for the  Protection of Surface Waters.  Jurisdictional  Resources  (wetlands,  streams, and  ponds) and Jordan  Lake Riparian  Buffer Rules  4.4.3 Minor Impact.  The Preferred/Selected  Alternative preliminary design will impact  approximately 0.05 acre of wetlands due to  the realignment of Bethel Church Road.   There will be a total of 355 linear feet of  stream impacts to two streams:   approximately 148 linear feet for an  intermittent stream and approximately 207  linear feet of a perennial stream.   Approximately .02 acres of pond PA will be  impacted.  The Preferred/Selected Alternative will  impact approximately 0.40 acres of Jordan  Lake Riparian Buffers around one stream.   Road crossings that impact greater than 150  lf or one‐third acre of riparian buffer are  allowable with mitigation.  NCDOT will apply for a USACE  Nationwide 14 Permit for impacts to  jurisdictional areas.  Compensatory  mitigation through the NCDENR  Ecosystem Enhancement Program may  be required for this Project.  The USACE  will make the final determination on  the Section 404 permit type.    For impacts to riparian buffers, the  NCDWQ will issue a mitigation  determination that specifies the  required area and location of  mitigation.  Mitigation may be met by  payment of a compensatory mitigation  fee to the Riparian Buffer Restoration  Fund, donation of real property or of an  interest in real property, or restoration  or enhancement of a non‐forested  riparian buffer.   Protected Species 4.4.4 No Impact.  The Preferred/Selected  Alternative will not impact any federally‐ protected species.  USFWS lists only one  Federally protected species in Guilford  County and NCDOT found no occurrences of  that species in the Project area.  Not applicable.  Indirect and  Cumulative Effects  4.5 Minor Impact.  Minor indirect impacts to  water quality may occur due to stormwater  runoff.    Some vehicular traffic will experience longer  travel times due to the crossing closure at  Carmon Road.  However, the Project will  provide a grade‐separated crossing that is  always open; never blocked by passing  trains or trains waiting on the siding track.  Indirect effects to water quality that  may occur from the Project due to  stormwater runoff will be minimized  through implementation of NCDOT’s  Best Management Practices for the  Protection of Surface Waters and  conformance to the Jordan Lake Buffer  Rules.  McLeansville Road Grade Separation – Guilford County, NC  10 STIP Project P‐5204 ‐ Finding of No Significant Impact     Table 1. Summary of Impacts from the Preferred/Selected Alternative Impact Area  EA Chapter  Sections with  More Detail  Summary of Impact Proposed Mitigation  Regionally, improvements to efficiency of  train operations will occur.  Trains will no  longer be faced with delays from the  uncoupling of trains at the siding track in  order to let vehicles pass.    There are no local cumulative effects  anticipated due to this Project.  From a  regional perspective, the Project, together  with others planned and programmed along  the corridor as part of the PIP and the  SEHSR, will result in a beneficial cumulative  transportation effect for schedule reliability,  increased train speeds, and overall rail  capacity and safety improvements.  Construction  Impacts  4.6 Minor Impact.  Temporary impacts could  occur to air quality, noise, waste generation,  maintenance of traffic, water quality, and  wildlife.        The contractor will be responsible for  controlling dust at the Project site and  at areas affected by the construction.  Earth removal, grading, hauling, paving,  and pile driving activities will generate  noise.  Where practicable, NCDOT will  limit construction activities to weekday  and daytime in the vicinity of  residences.  Waste generated during construction  will be properly disposed of in  accordance with State and local  regulations.  Maintenance of traffic and sequencing  of construction will be planned and  scheduled so as to minimize traffic  delays within the Project area.  NCDOT  will coordinate with Guilford County  Schools regarding bus routes.   Water quality impacts will be minimized  by utilizing Best Management Practices  and standard NCDOT procedures during  construction.  Impacts to wildlife will be minimized as  much as possible by restricting land  clearing and construction operations  within the Project’s right of way.   NCDOT will encourage the contractor to  locate off‐site staging and stockpiling to  disrupt the least amount of natural  habitat area.      McLeansville Road Grade Separation – Guilford County, NC  11 STIP Project P‐5204 ‐ Finding of No Significant Impact     Errata in the Environmental Assessment After the EA was published, NCDOT discovered that some streams and ponds were incorrectly designated as being subject to the Jordan Lake Riparian Buffer Rules. In accordance with the Jordan lake Riparian Buffer rules 915A NCAC 02B.0267), waters subject to the buffer rules are streams, lakes, ponds and reservoirs depicted on the most recent Natural Resource Conservation Service (NRCS) soil survey or the most recent US Geological Survey (USGS) topographic quadrangle map, or a map approved by the Geographic Information Coordinating Council (GIC) and the NC Environmental Management Commission (EMC). Jordan Lake Riparian Buffers are shown on Figure 4-1 and Figure 4-2 of the EA, and impacts to riparian buffers are presented in Table 4-6 of the EA. Corrected Figure 4-1 and Figure 4-2 are included in Appendix A of this FONSI. The corrected figures remove the buffers from Pond PA and Streams SF, SG, and SD. EA Table 4-6 is updated in Table 2 below. Table 2.  REVISED EA TABLE 4‐6 ‐ Impacts to Riparian Buffers  Buffer Area1 Build   Alternative A  Build  Alternative B  Service Road  1a  Service Road  1b  Service Road  2  Zone 1 (acres) 0.23 0.62 0.23 0.74 ‐‐ ‐‐ ‐‐  Zone 2 (acres) 0.17 0.46  0.17 0.51 ‐‐ ‐‐ ‐‐  Total   Zone 1 + Zone 2 (acres 0.40 1.08 0.40 1.25 ‐‐ ‐‐ ‐‐  1.  Impacts based on preliminary design construction limits plus a 25‐foot buffer expanding the construction limits.    As shown in Table 2, the corrected riparian buffer impacts are the same for all build alternatives. This does not change the decision to select Build Alternative A with Service Road 1b as the Preferred/Selected Alternative, as the other reasons to select this alternative remain valid. Public and Agency Coordination Circulation of the Environmental Assessment. The EA was published in March 2013, and circulated for review to federal, state, regional, and local agencies, NCRR, Norfolk Southern Corporation, and Amtrak. The EA and the Design Public Hearing Map showing the location and design of the Project were made available for public review at the NCDOT Division 7 office at 1584 Yanceyville Street, Greensboro, NC, and the City of Greensboro Transportation Department Melvin Municipal Office Building (3rd floor) at 300 West Washington Street, Greensboro, NC. The EA and Design Public Hearing Map also were available for review and download on the NCDOT Web site: www.ncdot.gov/projects/publicmeetings/. Public Hearing. A Design Public Hearing for the proposed Project was held on June 13, 2013, from 4:00 pm to 7:00 pm, at the Mt Pleasant United Methodist Church Fellowship McLeansville Road Grade Separation – Guilford County, NC  12 STIP Project P‐5204 ‐ Finding of No Significant Impact     Hall, located at 5120 Burlington Road, Greensboro, North Carolina. Appendix B includes the Public Notice and the handout provided to attendees. The Public Hearing was held as an informal open house to answer questions and receive comments regarding the EA and the location and design of the Project. Design Public Hearing Maps presenting the Project design as well as environmental constraints were available for viewing. Copies of the EA also were available. Approximately 69 people attended the Design Public Hearing. Six comment forms were submitted at the Hearing. Fifteen additional comment forms/emails were received after the Public Hearing. Most attendees supported the Project. Common concerns are addressed below, under “Public Comments Received on the Environmental Assessment.” Comments on the Project were accepted by NCDOT through June 28, 2013. Comments Received on the Environmental Assessment All comments received from agencies and the public during the public review period were reviewed and considered. Comment letters received from agencies, and responses to each comment, are included in Appendix C. All public comment forms/emails received are included in Appendix D, with responses for each comment. Agency Comments Received. Comment letters were received from NCDOT Statewide Planning Branch, EPA, NC Department of Cultural Resources State Historic Preservation Office, and the following divisions of the North Carolina Department of Environment and Natural Resources (NCDENR): Winston-Salem Regional Office Land Quality Division, Division of Water Quality, and the Division of Emergency Management Floodplain Management Program. Most agencies stated they had no comment on the Project. None of the comments received required a change in the Project. Public Comments Received. Twenty-one comment forms/emails were submitted. None of the comments received resulted in a change in the Project. Twelve of the 21 commenters requested that the Gail Mosely Nationwide Insurance office at the northeast corner of the existing McLeansville Road/Bethel Church Road intersection be relocated. These commenters are employees or customers of the insurance agency. Commenters expressed concerns about safety, access, visibility, and adverse impact on the business. NCDOT is currently evaluating whether or not driveway access to the Gail Mosely Nationwide Insurance Agency property can be provided without disrupting the property’s existing septic system. The final determination will be made during the right-of-way acquisition phase of the Project. If the driveway access cannot be replaced cost effectively, then NCDOT will work with the property owner regarding compensation or purchase in accordance with the Uniform Relocation Assistance and Real Property Acquisition Policies Act. Two citizens provided comments (see letters c-01 and c-22 in Appendix D) regarding the pond at 5419 McLeansville Road (the pond near the McLeansville Road intersection with Birch Creek Road). A small area of this pond, approximately 0.02 acre, may be McLeansville Road Grade Separation – Guilford County, NC  13 STIP Project P‐5204 ‐ Finding of No Significant Impact     permanently impacted by the Preferred/Selected Alternative. A temporary easement around the pond is proposed during construction. The fill slope for the new McLeansville Road encroaches slightly on the bottom of the fill slope for the pond’s dam. Impacts during construction may include temporarily draining the pond. NCDOT will coordinate with the property owner during the right of way and construction phases regarding impacts to the pond and to ensure the pond’s dam is outside of the McLeansville Road right of way. Some of the property owners that would have the roadway access to their properties provided by the proposed Preferred/Selected Alternative’s Service Road Option 1b attended the Public Hearing indicated they were interested in potentially voluntarily selling their property to NCDOT in lieu of having a service road. As noted in Section 2.2.1 of the EA, the service road options are subject to change during final design based on coordination with affected property owners. NCDOT is currently evaluating the costs of providing the service road compared to purchasing the parcels landlocked by the closure of the Bullard & Black private at-grade railroad crossing and continuing to coordinate with the property owners. The most cost effective solution will be implemented. This is a detail commonly resolved during the final design process, after the NEPA process is completed. This FONSI discloses the maximum impacts that could occur in the Preferred/Selected Alternative service road corridor with construction of the service road. Environmental Commitments During the NEPA process, commitments are made to avoid, minimize, or mitigate project impacts. Commitments result from public comment or through the requirements of, or agreements with, environmental resource and regulatory agencies. The determination that project implementation will not have a significant impact on the environment is predicated on these commitments made to protect the environment. NCDOT will comply with applicable federal and state requirements and regulations, such as; Section 404 Individual Permit Conditions, Nationwide Permit Conditions, Regional Conditions, and State Consistency Conditions; NCDOT Guidelines for Best Management Practices for the Protection of Surface Waters, General Certification Conditions, and Section 401 Conditions of Certification; and the Endangered Species Act. Other special Project commitments have been agreed to by the NCDOT, as follows.  During construction activities, NCDOT will coordinate with Guilford County Schools regarding bus routes. McLeansville Road Grade Separation – Guilford County, NC  14 STIP Project P‐5204 ‐ Finding of No Significant Impact     Conclusion FRA finds that the impacts of the Preferred/Selected Alternative, as assessed in the McLeansville Road Grade Separation STIP Project P-5204 Environmental Assessment (March, 2013) and this Finding of No Significant Impact satisfy the requirements of FRA’s Procedures for Considering Environmental Impacts, and that the Project will not have a significant impact on the quality of the human or natural environment following the implementation of identified mitigation measures. For the reasons described in this FONSI, FRA concurs in NCDOT’s selection of Build Alternative A with Service Road 1b, including the environmental commitments/mitigation measures reflected in this document. Joseph C. Szabo, Administrator Date Federal Railroad Administration McLeansville Road Grade Separation – Guilford County, NC  15 STIP Project P‐5204 ‐ Finding of No Significant Impact     FRA Contact Person John Winkle Environmental Protection Specialist Federal Railroad Administration 1200 New Jersey Avenue, SE, RM W38-311 Washington, DC 20590 202-493-6067 List of Persons and Organizations Preparing the FONSI Ryan White, PE NC Department of Transportation – Rail Division 1548 Mail Service Center Raleigh, NC 27699-1548 919-733-7245 x266 Jill Gurak, PE, AICP Project Director Atkins 1616 East Millbrook Road, Suite 310 Raleigh, NC 27609 919-431-5298   McLeansville Road Grade Separation – Guilford County, NC   STIP Project P‐5204 ‐ Finding of No Significant Impact     APPENDIX A REVISED FIGURE 4-1 AND FIGURE 4-2 FROM THE ENVIRONMENTAL ASSESSMENT WA SA WB WC SB SI WJ WK SJ WOSDSDSD WNWMWL WD SD WE SE WF WG SF SG SB SB WH PB PA WU SG SA SF F R I E D E N C HURCH RD M C L E A N S V I L L E R D BETHEL CHURCH RD HARVEST RD HINES ANDREWS RDDANBROOK D R R A N H U R S T R D E A S T H U R S T R D C O R N E R H O U S E R D BIRCH CREEK RD NC OneMap McL_FONSI_JurisdResourceImpacts.mxd AKB 09.30.2013 Source: Guilford County GIS, NCDOT; Aerial: NCOnemap 2010 Orthoimagery;Map Printed September 2013 STIP Project No. P-5204 McLEANSVILLE ROAD SR-2819 GRADE SEPARATIONGuilford County, NC0300150FeetLegendProject Study Area Delineated Streams (S_)Delineated Wetlands (W_)Delineated Open Water (P_)Jordan Watershed Buffer Zone 1 - 30 Foot Zone 2 - 20 Foot Proposed Alt A Centerline Proposed Alt A Slope Stakes Proposed Alt A Right of Way Railroad Streams Ponds W Figure 4-1ALTERNATIVE A JURISDICTIONAL RESOURCE IMPACTS REVISED WA SA WB WC SB SI WJ WK SJ WOSDSDSD WNWMWL WD SD WE SE WF WG SF SG SB SB WH PB PA WU SG SA SF F R I E D E N C HURCH RD M C L E A N S V I L L E R D BETHEL CHURCH RD HARVEST RD HINES ANDREWS RDDANBROOK D R R A N H U R S T R D E A S T H U R S T R D C O R N E R H O U S E R D BIRCH CREEK RD NC OneMap McL_FONSI_JurisdResourceImpacts.mxd AKB 09.30.2013 Figure 4-2Source: Guilford County GIS, NCDOT; Aerial: NCOnemap 2010 Orthoimagery;Map Printed September 2013 STIP Project No. P-5204 McLEANSVILLE ROAD SR-2819 GRADE SEPARATIONGuilford County, NC ALTERNATIVE B JURISDICTIONAL RESOURCE IMPACTS REVISED0300150FeetLegendProject Study Area Delineated Streams (S_)Delineated Wetlands (W_)Delineated Open Water (P_)Jordan Watershed Buffer Zone 1 - 30 Foot Zone 2 - 20 Foot Proposed Alt B Centerline Proposed Alt B Slope Stakes Proposed Alt B Right of Way Railroad Streams Ponds W McLeansville Road Grade Separation – Guilford County, NC STIP Project P-5204 - Finding of No Significant Impact APPENDIX B PUBLIC HEARING MATERIALS NOTICE OF A DESIGN PUBLIC HEARING FOR THE PROPOSED GRADE-SEPARATION OF MCLEANSVILLE ROAD (STATE ROAD 2918) OVER THE NORTH CAROLINA RAILROAD (NCRR) IN MCLEANSVILLE TIP P-5204 Guilford County The North Carolina Department of Transportation proposes to construct a bridge on McLeansville Road (S.R. 2918) over the North Carolina Railroad (NCRR) tracks. As a result, Bethel Church Road will be realigned to connect with McLeansville Road south of its current intersection. In addition, the existing at-grade railroad crossings at and Carmon Road to the east and the private Bullard & Black crossing between McLeansville Road and Carmon Road will be closed. Alternate access will be provided. Additional right-of-way acquisition and the relocation of homes and businesses will be required for this project. Right-of-way acquisition is scheduled to begin this September, with construction scheduled to begin in September 2014. However, those dates could change. The purpose of the project is to improve vehicular mobility and safety and the efficiency of train traffic in the area around the McLeansville Road at-grade crossing of the NCRR. The project will also facilitate and support future increased passenger rail service for the NCRR Piedmont Corridor. NCDOT proposes to add six daily round trips to this corridor between Raleigh and Charlotte. NCDOT will hold an informal, open house-style design public hearing for the above-mentioned project on Thursday, June 13, 2013, from 4 until 7 p.m. at the Mt. Pleasant United Methodist Church – Fellowship Hall, located at 5120 Burlington Road, Greensboro. The purpose of the hearing is to provide information regarding the design and location of the proposed project, and to obtain public input. Interested citizens may drop by at any time during the mentioned hours. NCDOT representatives will be available at the meeting to answer questions and receive comments. The opportunity to submit written comments or questions also will be provided. Comments and information received will be taken into consideration as work on the project develops. There will not be a formal presentation. A map showing the design and a copy of the approved environmental document (Environmental Assessment) are available for public review at the NCDOT Division 7 Office located at 1584 Yanceyville St., Greensboro and the City of Greensboro-Transportation Department, Melvin Municipal Office Building (3rd floor) - 300 West Washington St., Greensboro. The maps are available online at http://www.ncdot.gov/projects/publicmeetings/. For more information, contact Jamille Robbins, NCDOT Human Environment Section, at 1598 Mail Service Center, Raleigh, 27699-1598, by phone: (919) 707-6085, by fax: (919) 212-5785, or by email: jarobbins@ncdot.gov. Additional comments may be submitted until June 28, 2013. NCDOT will provide auxiliary aids and services under the Americans with Disabilities Act for disabled persons who want to participate in this workshop. Anyone requiring special services should contact Robbins as early as possible so that arrangements can be made. Persons who speak Spanish and do not speak English, or have a limited ability to read, speak or understand English, may receive interpretive services upon request prior to the meeting by calling 1-800- 481-6494. NOTICE OF A DESIGN PUBLIC HEARING FOR THE PROPOSED GRADE-SEPARATION OF MCLEANSVILLE ROAD (STATE ROAD 2918) OVER THE NORTH CAROLINA RAILROAD (NCRR) IN MCLEANSVILLE TIP P-5204 Guilford County The North Carolina Department of Transportation proposes to construct a bridge on McLeansville Road (S.R. 2918) over the North Carolina Railroad (NCRR) tracks. As a result, Bethel Church Road will be realigned to connect with McLeansville Road south of its current intersection. In addition, the existing at-grade railroad crossings at and Carmon Road to the east and the private Bullard & Black crossing between McLeansville Road and Carmon Road will be closed. Alternate access will be provided. Additional right-of-way acquisition and the relocation of homes and businesses will be required for this project. Right-of-way acquisition is scheduled to begin this September, with construction scheduled to begin in September 2014. However, those dates could change. The purpose of the project is to improve vehicular mobility and safety and the efficiency of train traffic in the area around the McLeansville Road at-grade crossing of the NCRR. The project will also facilitate and support future increased passenger rail service for the NCRR Piedmont Corridor. NCDOT proposes to add six daily round trips to this corridor between Raleigh and Charlotte. NCDOT will hold an informal, open house-style design public hearing for the above-mentioned project on Thursday, June 13, 2013, from 4 until 7 p.m. at the Mt. Pleasant United Methodist Church – Fellowship Hall, located at 5120 Burlington Road, Greensboro. The purpose of the hearing is to provide information regarding the design and location of the proposed project, and to obtain public input. Interested citizens may drop by at any time during the mentioned hours. NCDOT representatives will be available at the meeting to answer questions and receive comments. The opportunity to submit written comments or questions also will be provided. Comments and information received will be taken into consideration as work on the project develops. There will not be a formal presentation. A map showing the design and a copy of the approved environmental document (Environmental Assessment) are available for public review at the NCDOT Division 7 Office located at 1584 Yanceyville St., Greensboro and the City of Greensboro-Transportation Department, Melvin Municipal Office Building (3rd floor) - 300 West Washington St., Greensboro. The maps are available online at http://www.ncdot.gov/projects/publicmeetings/. For more information, contact Jamille Robbins, NCDOT Human Environment Section, at 1598 Mail Service Center, Raleigh, 27699-1598, by phone: (919) 707-6085, by fax: (919) 212-5785, or by email: jarobbins@ncdot.gov. Additional comments may be submitted until June 28, 2013. NCDOT will provide auxiliary aids and services under the Americans with Disabilities Act for disabled persons who want to participate in this workshop. Anyone requiring special services should contact Robbins as early as possible so that arrangements can be made. Persons who speak Spanish and do not speak English, or have a limited ability to read, speak or understand English, may receive interpretive services upon request prior to the meeting by calling 1-800- 481-6494. NORTH CAROLINA DEPARTMENT OF TRANSPORTATION McLeansville Road Grade Separation over the North Carolina Railroad (NCRR) WBS Number 52400.1.STR02T2 TIP PROJECT P-5204 Guilford County Design Public Hearing 4:00 p.m. – 7:00 p.m. Mt. Pleasant United Methodist Church Fellowship Hall 5120 Burlington Road Greensboro, NC 27405 Thursday, June 13, 2013 Design Public Hearing P‐5204 ‐McLeansville Road Grade Separation Over the North Carolina Railroad PURPOSE OF PUBLIC HEARING Today’s hearing is another important step in the North Carolina Department of Transportation’s (NCDOT) procedure for making you, the public, a part of the project development process. The purpose of the hearing is to obtain public input on the design of the project. Planning and environmental studies on the highway project are provided in the planning and environmental document – Environmental Assessment (EA). Copies of that report together with today’s hearing maps are available for public review at the following locations:  NCDOT Highway Division 7 Office located at 1584 Yanceyville Street, Greensboro  City of Greensboro – Transportation Department, 300 West Washington Street, Room 321, Greensboro The map is also available online at: http://www.ncdot.gov/projects/McLeansvilleRoad/ YOUR PARTICIPATION Now that the opportunity is here, you are encouraged to participate by making your comments and/or questions a part of the public record. This may be done by writing them on the attached comment sheet. Several representatives of the North Carolina Department of Transportation are present. They will be happy to talk with you, explain the design to you and answer your questions. You may write your comments or questions on the comment sheet and leave it with one of the representatives or mail or email them by June 28, 2013 to the following address: Mr. Jamille Robbins NCDOT - Human Environment Section 1598 Mail Service Center Raleigh, NC 27699-1598 Email: jarobbins@ncdot.gov Everyone present is urged to participate in the proceedings. It is important, however, that THE OPINIONS OF ALL INDIVIDUALS BE RESPECTED REGARDLESS OF HOW DIVERGENT THEY MAY BE FROM YOUR OWN. Accordingly, debates, as such, are out of place at workshops. Also, the workshop is not to be used as a POPULAR REFERENDUM to determine the location and/or design by a majority vote of those present. Design Public Hearing P‐5204 ‐McLeansville Road Grade Separation Over the North Carolina Railroad WHAT IS DONE WITH THE INPUT? A post-workshop meeting will be conducted after the comment period has ended. NCDOT staff representing Planning, Design, Traffic Operations, Division, Right of Way, Public Involvement & Community Studies and others who play a role in the development of a project will attend this meeting. The project also will be reviewed with federal agencies such as the Federal Railroad Administration (FRA) and the US Army Corps of Engineers (USACE), as well as state agencies such as the NC Department of Environment and Natural Resources. When appropriate, local government staff will attend. All spoken and written issues are discussed at the post-hearing meeting. Most issues are resolved at the post-hearing meeting. The NCDOT considers safety, costs, traffic service, social impacts, and public comments in making decisions. Complex issues may require additional study and may be reviewed by higher management, Board of Transportation Members, and/or the Secretary of Transportation. Minutes of the post-hearing meeting will be summarized and are available to the public by noting your request on the attached comment sheet. WHAT HAPPENS NEXT Comments received from the hearing about the design of the proposed McLeansville Road Grade Separation Project will be reviewed at the post-hearing meeting and incorporated, where feasible, into the design plans for the project. The design plans will also be refined, including efforts to further reduce impacts to the human and natural environment. The project will then proceed to the right of way acquisition phase upon approval of the final environmental document. STATE-FEDERAL RELATIONSHIP This proposed Project may involve the use of Federal funds, and thus will be considered a Federal-Aid Project. Financing of this Project may come from Federal funds, including the American Recovery and Reinvestment Act (ARRA. The Board of Transportation is responsible for the selection and scheduling of projects, their location, design, and maintenance cost after construction. PURPOSE AND NEED OF PROJECT The purpose of the Project is to improve vehicular mobility and safety and the efficiency of train traffic in the area around the McLeansville Road at-grade crossing of the North Carolina Railroad (NCRR) in Guilford County, North Carolina. The McLeansville Road and Carmon Road at-grade crossings, and the Bullard and Black private at-grade crossing, cross both a main line track and a siding track. Trains waiting on the siding have the potential to block these at-grade crossings while other Design Public Hearing P‐5204 ‐McLeansville Road Grade Separation Over the North Carolina Railroad trains pass on the main line; or train crews must disconnect the train cars stored on the siding into two sections, with one section on either side of the road crossings. Both of these options result in undesirable operating conditions for both trains and vehicular traffic. At present, traffic along McLeansville Road and Carmon Road traveling through the at- grade railroad crossing must stop for passing trains and trains parked on the siding tracks. Typically, six passenger trains per day and 5-10 freight trains per day cross McLeansville Road. In addition, sometimes trains on the siding track can block the crossing for up to an hour. These operations contribute to vehicular delays and have a negative effect on traffic flow. The proposed Project is a component of the Piedmont Improvement Program (PIP), which is an initiative by the NCDOT, the Norfolk Southern Railway (NS) and NCRR to improve passenger and freight railroad operations along the NCRR Piedmont Corridor from Raleigh to Charlotte. The PIP primarily consists of railroad capacity projects and crossing safety projects that will facilitate the introduction of up to six daily round trip (12 daily) passenger trains along the Raleigh to Charlotte Piedmont Corridor. The proposed Project also is along the Preferred Alternative for the Southeast High Speed Rail Corridor (SEHSR). This corridor connects the northeastern states and Washington, DC through Richmond, Virginia to Raleigh and Charlotte, N.C. to Atlanta, GA. In Atlanta, the SEHSR extends southeast to Savannah, GA and Jacksonville, FL; and the Gulf Coast High Speed Rail corridor. Ultimately, the proposed Project will benefit the infrastructure for high-speed rail in the state of North Carolina. In the more immediate future, the proposed Project would enhance the efficiency and safety of both passenger and freight train movements. The proposed Project is consistent with the Long Range Transportation Plans for the local municipalities within the study area. Local governments within the Greensboro Urban Area Metropolitan Planning Organization, as well as NCDOT, have adopted this plan. PROJECT DESCRIPTION The Preferred Alternative for the Project includes the following:  Replace the at-grade rail crossing at McLeansville Road with a grade-separated crossing approximately 120 feet to the west of the existing crossing, increasing safety by eliminating train-vehicle conflicts and reducing train horn noise. This also will improve mobility for vehicles by removing the need to stop for passing trains and trains parked on the rail siding.  Close two other at-grade rail crossings: a public crossing at Carmon Road to the east and the Bullard and Black private crossing located between the McLeansville Road and Carmon Road railroad crossings for safety reasons. These closures also will reduce train horn noise. Design Public Hearing P‐5204 ‐McLeansville Road Grade Separation Over the North Carolina Railroad  As a consequence of constructing a grade separation at McLeansville Road, realign Bethel Church Road to reconnect to McLeansville Road approximately 350 feet south due to grade and sight distance considerations. In addition, construct a short extension of Hines Andrews Road to reconnect to the realigned Bethel Church Road. The north end of existing Bethel Church Road will be a cul- de-sac.  Provide a new service road access from Hines Andrews Road to the two residences that are currently accessed from Frieden Church Road via the Bullard and Black private railroad crossing. PROJECT INFORMATION Length: Street/Roadway ~ 0.67 miles Right of Way: Approximately 120 feet. 2-lane shoulder section with ditches. Access Control: None. Driveways can be connected to the roadway. Relocatees: Three residential relocations and one business relocation. Project Cost: $7,067,200 Current Schedule: The tentative schedule is shown below. A number of factors can affect a project schedule, so schedules are subject to change. Right of Way Acquisition – September 2013 Construction – Fall 2014 Completion – 2016 Map 1(attached) shows the location of the Project. At today's Design Public Hearing are boards with the Project Hearing Map showing the proposed design, roadway typical sections, and proposed construction detour routes. Design Public Hearing P‐5204 ‐McLeansville Road Grade Separation Over the North Carolina Railroad RIGHT-OF-WAY PROCEDURES After decisions are made regarding the final design, the proposed right-of-way limits will be staked in the ground. If you are an affected property owner, a Right-of-Way Agent will contact you and arrange a meeting. The agent will explain the plans and advise you as to how the project will affect you. The agent will inform you of your rights as a property owner. If permanent right of way is required, professionals who are familiar with real estate values will evaluate or appraise your property. The evaluations or appraisals will be reviewed for completeness and accuracy, and then the Right-of-Way Agent will make a written offer to you. The current market value of the property at its highest and best use when appraised will be offered as compensation. The Department of Transportation must: 1. Treat all owners and tenants equally. 2. Fully explain the owner’s rights. 3. Pay just compensation in exchange for property rights. 4. Furnish relocation advisory assistance. RELOCATION ASSISTANCE If you are a relocatee, that is, if your residence or business is to be acquired as part of the project, additional assistance in the form of advice and compensation is available. You will also be provided with assistance on locations of comparable housing and/or commercial establishments, moving procedures, and moving aid. Moving expenses may be paid for you. Additional monetary compensation is available to help homeowners cope with mortgage increases, increased value of comparable homes, closing costs, etc. A similar program is available to assist business owners. The Right- of-Way Agent can explain this assistance in greater detail. NOTE: PAMPHLETS SUMMARIZING RIGHT OF WAY AND RELOCATION PROCEDURES ARE AVAILABLE AT THE SIGN-IN TABLE. ? ? ? ¹½ !© îî hg hg hg hg At - G r a d e Ra i l r o a d C r o s s i n g to B e C l o s e d Pr i v a t e A t - G r a d e Ra i l r o a d C r o s s i n g to B e C l o s e d Pr o p o s e d Gr a d e - S e p a r a t e d Cr o s s i n g At - G r a d e Ra i l r o a d C r o s s i n g Re m a i n s O p e n No O u t l e t Se r v i c e R o a d Op t i o n 1 b F R I E D E N C H U R C H R D KNOXRD M C L E A N S V I L L E R D BETHEL CH U RC H R D HARVEST RD B I R C H C R E E K R D CARMON RD D A NB R O O K D R OW RD R A N H U R S T R D E A S T H U R S T R D HINES ANDREWS RD D ALLENWOODRD O A K V I L L E C TMc L e a n s v i l l e B a p t i s t Ch u r c h & C e m e t e r y Mc L e a n s v i l l e E l e m e n t a r y S c h o o l Mc L e a n s v i l l e F i r e D e p t . St a t i o n 4 7 Mc L e a n s v i l l e P o s t O f f i c e Ga i l M o s e l e y A g e n c y , I n c . Mc L e a n s v i l l e C o m m u n i t y C e n t e r Mc L e a n s v i l l e V i l l a g e S h o p p i n g C e n t e r McL_EA_PreferredAlternative.mxd AKB 01.29.2013 ST I P P r o j e c t N o . P - 5 2 0 4 Mc L E A N S V I L L E R O A D S R - 2 8 1 9 GR A D E S E P A R A T I O N Gu i l f o r d C o u n t y , N C 0 60 0 30 0 Fe e t Le g e n d Pr o j e c t S t u d y A r e a Pr o p o s e d A l t A C e n t e r l i n e Pr o p o s e d A l t A B r i d g e Pr o p o s e d A l t A R i g h t o f W a y hg No t a b l e F e a t u r e s îî Ch u r c h !© Fi r e S t a t i o n ¹½ Sc h o o l Ra i l r o a d De l i n e a t e d S t r e a m s De l i n e a t e d W e t l a n d s De l i n e a t e d O p e n W a t e r St r e a m s Po n d s Vo l u n t a r y A g r i c u l t u r a l D i s t r i c t Pa r c e l s ? Ex i s t i n g A t - G r a d e R a i l r o a d Cr o s s i n g t o b e C l o s e d ? At - G r a d e R a i l r o a d Cr o s s i n g R e m a i n s O p e n WSo u r c e : G u i l f o r d C o u n t y , N C O n e m a p Ae r i a l P h o t o : A r c G I S I m a g e S e r v i c e 20 1 0 - O r t h o i m a g e r y Ma p P r i n t e d J a n u a r y 2 0 1 3 PREF E R R E D AL T E R N A T I V E   TITLE VI PUBLIC INVOLVEMENT FORM Completing this form is completely voluntary. You are not required to provide the information requested in order to participate in this meeting. Meeting Type: Design Public Hearing Location: McLeansville, Guilford County Date: June 13, 2013 TIP No.: P-5204 Project Description: McLeansville Road Grade Separation over NCRR Railroad In accordance with Title VI of the Civil Rights Act of 1964 and related authorities, the North Carolina Department of Transportation (NCDOT) assures that no person(s) shall be excluded from participation in, denied the benefits of, or subjected to discrimination under any of the Department’s programs, policies, or activities, based on their race, color, national origin, disability, age, income, or gender. Completing this form helps meet our data collection and public involvement obligations under Title VI and NEPA, and will improve how we serve the public. Please place the completed form in the designated box on the sign-in table, hand it to an NCDOT official or mail it to the PDEA-Human Environment Section, 1598 Mail Service Center, Raleigh, NC 27699-1598. All forms will remain on file at the NCDOT as part of the public record. Zip Code: _____________________ Street Name: (i.e. Main Street) Gender: Male Female Age: Less than 18 45-64 18-29 65 and older 30-44 Total Household Income: Less than $12,000 $47,000 – $69,999 $12,000 – $19,999 $70,000 – $93,999 $20,000 – $30,999 $94,000 – $117,999 $31,000 – $46,999 $118,000 or greater Have a Disability: Yes No Race/Ethnicity: White Black/African American Asian American Indian/Alaskan Native Native Hawaiian/Pacific Islander Hispanic/Latino Other (please specify): _______________________ National Origin: (if born outside the U.S.) Mexican Central American: ____________________ South American: _____________________ Puerto Rican Chinese Vietnamese Korean Other (please specify): __________________ How did you hear about this meeting? (newspaper advertisement, flyer, and/or mailing) _______________________ _____________________________________________________________________________________________ For more information regarding Title VI or this request, please contact the NCDOT Title VI Section at (919) 508-1830 or toll free at 1-800-522-0453, or by email at slipscomb@ncdot.gov. Thank you for your participation! COMMENT SHEET McLeansville Road Grade Separation Over the North Carolina Railroad Design Public Hearing – June 13, 2013 TIP Project No. P-5204 Guilford County NAME: ADDRESS: EMAIL ADDRESS: COMMENTS AND/OR QUESTIONS: Comments may be mailed by June 28, 2013 to: Mr. Jamille Robbins, Public Involvement Group Leader NCDOT - Human Environment Section 1598 Mail Service Center Raleigh, NC 27699-1598 Phone: 919.707.6085 FAX: 919.212.5785 Email: jarobbins@ncdot.gov McLeansville Road Grade Separation – Guilford County, NC STIP Project P-5204 - Finding of No Significant Impact APPENDIX C AGENCY COMMENTS No r t h C a r o l i n a D e p a r t m e n t o f C u l t u r a l R e s o u r c e s St a t e H i s t o r i c P r e s e r v a t i o n O f f i c e Ra m o n a M . B a r t o s , A d m i n i s t r a t o r Go v e r n o r P a t M c C r o r y O f fice of Archives and History Se c r e t a r y S u s a n K l u t t z D e p u ty Secretary Kevin Cherry Lo c a t i o n : 1 0 9 E a s t J o n e s S t r e e t , R a l e i g h N C 2 7 6 0 1 Ma i l i n g A d d r e s s : 4 6 1 7 M a i l S e r v i c e C e n t e r , R a l e i g h N C 2 7 6 9 9 - 4 6 1 7 Telephone/Fax: (919) 807-6570/807-6599 Ma y 2 , 2 0 1 3 ME M O R A N D U M TO : M a r c H a m e l R a i l D i v i s i o n N C D e p a r t m e n t o f T r a n s p o r t a t i o n FR O M : R a m o n a M . B a r t o s SU B J E C T : F e d e r a l E n v i r o n m e n t a l A s s e s s m e n t , M c L e a n s v i l l e R o a d G r a d e S eparation, P-5204 G u i l f o r d C o u n t y , E R 1 1 - 2 3 5 4 Th a n k y o u f o r y o u r l e t t e r o f A p r i l 1 8 , t r a n s m i t t i n g t h e F e d e r a l E n v i r o n m e n t a l A s s e s s m e n t ( E A ) f o r t h e a bove pr o j e c t . W e b e l i e v e t h e E A a d e q u a t e l y a d d r e s s e s o u r c o n c e r n s f o r historic resources. Th e a b o v e c o m m e n t s a r e m a d e p u r s u a n t t o S e c t i o n 1 0 6 o f t h e N a t i o n a l H i s t oric Preservation Act and the Ad v i s o r y C ou n c i l o n H i s t o r i c P r e s e r v a t i o n ’ s R e g u l a t i o n s f o r C o m p l i a n c e w i t h S e c tion 106 codified at 36 CFR Pa r t 8 0 0 . Th a n k y o u f o r y o u r c o o p e r a t i o n a n d c o n s i d e r a t i o n . I f y o u h a v e q u e stions concerning the above comment, pl e a s e c o n t a c t R e n e e G l e d h i l l - E a r l e y , e n v i r o n m e n t a l r e v i e w c o o rdinator, at 919-807-6579. In all future co m m u n i c a t i o n c o n c e r n i n g t h i s p r o j e c t , p l e a s e c i t e t h e a b o v e - r e f e r e nced tracking number. cc : M a r y P o p e F u r r , N C D O T M a t t W i l k e r s o n , N C D O T        No v e m b e r 2 0 1 3 M c L e a n s v i l l e R o a d G r a d e S e p a r a t i o n O v e r N C R R       Ap p e n d i x  C – Agency Comments  Ta b l e  C‐1:   Ag e n c y  Co m m e n t s   DO C U M E N T   NO .   AG E N C Y   CO M M E N T   NO .   CO M M E N T   RE S P O N S E   A‐01   US E P A  Re g i o n  4  NE P A  Pr o g r a m   Of f i c e   1  EP A  ha s  co m p l e t e d  it s  re v i e w  of  th e  EA  fo r  P‐52 0 4 ,  Mc L e a n s v i l l e  Ro a d   G. S . ,  Gu i l f o r d  Co u n t y .    EP A  no t e s  th a t  th e  pr o p o s e d  pr o j e c t  is  ex p e c t e d   to  ha v e  mi n i m a l  im p a c t s  on  th e  hu m a n  an d  na t u r a l  en v i r o n m e n t .      Co m m e n t  no t e d .      2  EP A  re q u e s t s  th a t  NC D O T  co n t i n u e  to  ex p l o r e  op p o r t u n i t i e s  fo r  Se c t i o n   40 4  av o i d a n c e  an d  mi n i m i z a t i o n  me a s u r e s  to  ju r i s d i c t i o n a l  re s o u r c e s   du r i n g  th e  pe r m i t t i n g  ph a s e  fo r  th e  pr o j e c t .   NC D O T  wi l l  wo r k  wi t h  th e  US A C E  an d  NCDWQ during the permitting  ph a s e .      3  EP A  re q u e s t s  a co p y  of  th e  Fi n d i n g  of  No  Si g n i f i c a n t  Im p a c t  (F O N S I )   wh e n  it  be c o m e s  av a i l a b l e .   NC D O T  wi l l  pr o v i d e  EP A  a co p y  of  th e  FONSI.  A‐02   NC  De p t  of   Cu l t u r a l  Re s o u r c e s ,   St a t e  Hi s t o r i c   Pr e s e r v a t i o n  Of f i c e   1  We  be l i e v e  th e  EA  ad e q u a t e l y  ad d r e s s e s  ou r  co n c e r n s  fo r  hi s t o r i c   re s o u r c e s .   Co m m e n t  no t e d .   A‐03   NC  De p t .  of   Ad m i n i s t r a t i o n ,   St a t e   En v i r o n m e n t a l   Re v i e w   Cl e a r i n g h o u s e   1  Ac c o r d i n g  to  G. S .  11 3 A ‐10 ,  wh e n  a st a t e  ag e n c y  is  re q u i r e d  to  pr e p a r e   an  en v i r o n m e n t a l  do c u m e n t  un d e r  th e  pr o v i s i o n s  of  fe d e r a l  la w ,  th e   en v i r o n m e n t a l  do c u m e n t  me e t s  th e  pr o v i s i o n s  of  th e  St a t e   En v i r o n m e n t a l  Po l i c y  Ac t .    At t a c h e d  to  th i s  le t t e r  fo r  yo u r  co n s i d e r a t i o n   ar e  th e  co m m e n t s  ma d e  by  ag e n c i e s  in  th e  co u r s e  of  th i s  re v i e w .   If  an y  fu r t h e r  en v i r o n m e n t a l  re v i e w  do c u m e n t s  ar e  pr e p a r e d  fo r  th i s   pr o j e c t ,  th e y  sh o u l d  be  fo r w a r d e d  to  th i s  of f i c e  fo r  in t e r g o v e r n m e n t a l   re v i e w .   NC D O T  wi l l  su b m i t  th i s  FO N S I  to  th e  Environmental Review  Cl e a r i n g h o u s e .   A‐04   NC  De p t .  of   En v i r o n m e n t a l  an d   Na t u r a l  Re s o u r c e s   (N C D E N R )   ‐‐   No  co m m e n t s  in  le t t e r .   No  re s p o n s e  re q u i r e d .   A‐05   NC D E N R    ‐   Wi n s t o n ‐Sa l e m   Re g i o n a l  Of f i c e ,   La n d  Qu a l i t y  an d   US T s   1  Se d i m e n t a t i o n  an d  er o s i o n  co n t r o l  mu s t  be  ad d r e s s e d  in  ac c o r d a n c e   wi t h  NC D O T ’ s  ap p r o v e d  pr o g r a m .    Pa r t i c u l a r  at t e n t i o n  sh o u l d  be  gi v e n   to  de s i g n  an d  in s t a l l a t i o n  of  ap p r o p r i a t e  pe r i m e t e r  se d i m e n t  tr a p p i n g   de v i c e s  as  we l l  as  st a b l e  st o r m w a t e r  co n v e y a n c e s  an d  ou t l e t s .   As  di s c u s s e d  in  Se c t i o n  4. 4 . 2  of  th e  EA, an erosion and  se d i m e n t a t i o n  co n t r o l  pl a n  wi l l  be  developed prior to construction.   Th e  pl a n  wi l l  be  pr e p a r e d  in  ac c o r d a n c e  with the NC Department of  En v i r o n m e n t  an d  Na t u r a l  Re s o u r c e s  Division of Land Resource’s  pu b l i c a t i o n  Er o s i o n  an d  Se d i m e n t  Co n t r o l  Planning and Design  (r e v i s e d  Ma y  20 1 3 ) ( N C  Di v i s i o n  of  La n d  Resources Web site:   ht t p : / / p o r t a l . n c d e n r . o r g / w e b / l r / e r o s i o n ) and the NCDOT’s Best  Ma n a g e m e n t  Pr a c t i c e s  fo r  th e  Pr o t e c t i o n  of Surface Waters.   NC D W Q ’ s  mo s t  re c e n t  ve r s i o n  of  th e  Stormwater Best Management  Pr a c t i c e s  Ma n u a l  (N C D W Q  We b  si t e :    ht t p : / / p o r t a l . n c d e n r . o r g / w e b / w q / e s / s u / b m p ‐manual) also will be  ap p l i e d .          No v e m b e r 2 0 1 3 M c L e a n s v i l l e R o a d G r a d e S e p a r a t i o n O v e r N C R R       Ap p e n d i x  C – Agency Comments  Ta b l e  C‐1:   Ag e n c y  Co m m e n t s   DO C U M E N T   NO .   AG E N C Y   CO M M E N T   NO .   CO M M E N T   RE S P O N S E      2  No t i f i c a t i o n  of  th e  pr o p e r  re g i o n a l  of f i c e  is  re q u e s t e d  if  “o r p h a n ”   un d e r g r o u n d  st o r a g e  ta n k s  (U S T S )  ar e  di s c o v e r e d  du r i n g  an y  ex c a v a t i o n   op e r a t i o n .   NC D O T  wi l l  no t i f y  th e  DE N R  Wi n s t o n ‐Salem Regional Office if  “o r p h a n ”  US T s  ar e  di s c o v e r e d .   A‐06   NC D E N R  Di v i s i o n   of  Wa t e r  Qu a l i t y   Wi n s t o n ‐Sa l e m   Re g i o n a l  Of f i c e   1  Pr o j e c t  Sp e c i f i c  Co m m e n t s :   Li t t l e  Al a m a n c e  Cr e e k  an d  it s  un n a m e d  tr i b u t a r i e s  ar e  cl a s s  WS I V ;  NS W   wa t e r s  of  th e  St a t e .    NC D W Q  is  ve r y  co n c e r n e d  wi t h  se d i m e n t  an d   er o s i o n  im p a c t s  th a t  co u l d  re s u l t  fr o m  th i s  pr o j e c t .    NC D W Q   re c o m m e n d s  th a t  hi g h l y  pr o t e c t i v e  se d i m e n t  an d  er o s i o n  co n t r o l  BM P s   be  im p l e m e n t e d  to  re d u c e  th e  ri s k  of  nu t r i e n t  ru n o f f  to  Li t t l e  Al a m a n c e   Cr e e k  an d  it s  un n a m e d  tr i b u t a r i e s .    NC D W Q  re q u e s t s  th a t  ro a d  de s i g n   pl a n s  pr o v i d e  tr e a t m e n t  of  th e  st o r m  wa t e r  ru n o f f  th r o u g h  be s t   ma n a g e m e n t  pr a c t i c e s  as  de t a i l e d  in  th e  mo s t  re c e n t  ve r s i o n  of   NC D W Q ’ s  St o r m w a t e r  Be s t  Ma n a g e m e n t  Pr a c t i c e s .  As  di s c u s s e d  in  Se c t i o n  4. 4 . 2  of  th e  EA, an erosion and  se d i m e n t a t i o n  co n t r o l  pl a n  wi l l  be  developed prior to construction.   Th e  pl a n  wi l l  be  pr e p a r e d  in  ac c o r d a n c e  with the NC Department of  En v i r o n m e n t  an d  Na t u r a l  Re s o u r c e s  Division of Land Resource’s  pu b l i c a t i o n  Er o s i o n  an d  Se d i m e n t  Co n t r o l  Planning and Design  (r e v i s e d  Ma y  20 1 3 ) ( N C  Di v i s i o n  of  La n d  Resources Web site:   ht t p : / / p o r t a l . n c d e n r . o r g / w e b / l r / e r o s i o n ) and the NCDOT’s Best  Ma n a g e m e n t  Pr a c t i c e s  fo r  th e  Pr o t e c t i o n  of Surface Waters.   NC D W Q ’ s  mo s t  re c e n t  ve r s i o n  of  th e  Stormwater Best Management  Pr a c t i c e s  Ma n u a l  (N C D W Q  We b  si t e :    ht t p : / / p o r t a l . n c d e n r . o r g / w e b / w q / e s / s u / b m p ‐manual) also will be  ap p l i e d .      2  Th i s  pr o j e c t  is  wi t h i n  th e  Jo r d a n  La k e  Bu f f e r  Ba s i n .    Ri p a r i a n  bu f f e r   im p a c t s  sh a l l  be  av o i d e d  an d  mi n i m i z e d  to  th e  gr e a t e s t  ex t e n t  po s s i b l e   pu r s u a n t  to  15 A  NC A C  2B  .0 2 6 7 .   Ne w  de v e l o p m e n t  ac t i v i t i e s  lo c a t e d  in   th e  pr o t e c t e d  50 ‐fo o t  wi d e  ri p a r i a n  ar e a s  wi t h i n  th e  ba s i n  sh a l l  be   li m i t e d  to  “u s e s ”  id e n t i f i e d  an d  co n s t r u c t e d  in  ac c o r d a n c e  wi t h  NC A C   2B  .0 2 6 7 .   Bu f f e r  mi t i g a t i o n  ma y  be  re q u i r e d  fo r  bu f f e r  im p a c t s   re s u l t i n g  fr o m  ac t i v i t i e s  cl a s s i f i e d  as  “a l l o w a b l e  wi t h  mi t i g a t i o n ”  wi t h i n   th e  “T a b l e  of  Us e s ”  se c t i o n  of  th e  Bu f f e r  Ru l e s  or  re q u i r e  a va r i a n c e   un d e r  th e  Bu f f e r  Ru l e s .    A bu f f e r  mi t i g a t i o n  pl a n ,  in c l u d i n g  us e  of  th e  NC   Ec o s y s t e m  En h a n c e m e n t  Pr o g r a m ,  mu s t  be  pr o v i d e d  to  NC D W Q  pr i o r   to  ap p r o v a l  of  th e  Wa t e r  Qu a l i t y  Ce r t i f i c a t i o n .      NC D O T  wi l l  ob t a i n  al l  re q u i r e d  pe r m i t s  prior to Project construction  an d  wi l l  im p l e m e n t  mi t i g a t i o n .    As  discussed in Section 4.4.3 of the  EA ,  th e  pr e l i m i n a r y  de s i g n  of  th e  Pr e f e r r e d  Alternative will impact  ap p r o x i m a t e l y  1. 0 8  ac r e s  of  ri p a r i a n  buffer (0.62 acre of Zone 1 and  0. 4 6  ac r e  of  Zo n e  2) ,  wh i c h  is  ab o v e  the one‐third acre of impact  th a t  re q u i r e s  mi t i g a t i o n .      Du r i n g  fi n a l  de s i g n ,  th e  am o u n t  of  buffer area required will be  re c a l c u l a t e d ,  an d  NC D O T  wi l l  wo r k  with NCDWQ to determine  ap p r o p r i a t e  mi t i g a t i o n .       3  Al l  st o r m w a t e r  ru n o f f  sh a l l  be  di r e c t e d  as  sh e e t f l o w  th r o u g h  st r e a m   bu f f e r s  at  no n e r o s i v e  ve l o c i t i e s .   As  no t e d  in  Se c t i o n  3. 4 . 4 . 2  of  th e  EA ,  the Jordan Lake Buffer Rules  re q u i r e  di f f u s e  fl o w  be f o r e  st o r m w a t e r  runoff enters the buffer area  fr o m  an y  ne w  di t c h  or  ma n m a d e  co n v e y a n c e .        4  Ge n e r a l  Co m m e n t s :   Th e  en v i r o n m e n t a l  do c u m e n t  sh o u l d  pr o v i d e  a de t a i l e d  an d  it e m i z e d   pr e s e n t a t i o n  of  th e  pr o p o s e d  im p a c t s  to  we t l a n d s  an d  st r e a m s  wi t h   co r r e s p o n d i n g  ma p p i n g .    If  mi t i g a t i o n  is  ne c e s s a r y  as  re q u i r e d  by  15 A   NC A C  2H . 0 5 0 6 ( h ) ,  it  is  pr e f e r a b l e  to  pr e s e n t  a co n c e p t u a l  (i f  no t   fi n a l i z e d )  mi t i g a t i o n  pl a n  wi t h  th e  en v i r o n m e n t a l  do c u m e n t a t i o n .    Ap p r o p r i a t e  mi t i g a t i o n  pl a n s  wi l l  be  re q u i r e d  pr i o r  to  is s u a n c e  of  a 40 1   Wa t e r  Qu a l i t y  Ce r t i f i c a t i o n .   Se c t i o n  4. 4 . 3  of  th e  EA  pr o v i d e s  a de t a i l e d  presentation of the  po t e n t i a l  im p a c t s  to  ju r i s d i c t i o n a l  re s o u r c e s  for each build  al t e r n a t i v e ,  in c l u d i n g  a ma p  (E A  Fi g u r e s  4‐1 and 4‐2).  The potential  im p a c t s  to  ju r i s d i c t i o n a l  re s o u r c e s  fo r  the Preferred Alternative  pr e l i m i n a r y  de s i g n  ar e  0. 0 5  ac r e  of  wetlands, 0.02 acre of ponds,  an d  35 5  li n e a r  fe e t  of  st r e a m .    As  de s i g n s  are finalized impact  es t i m a t e s  wi l l  be  fu r t h e r  re f i n e d .    An  appropriate mitigation plan will  be  su b m i t t e d  to  NC D W Q  an d  th e  US A C E  during the permitting  ph a s e .    Fi n a l  de t e r m i n a t i o n s  on  co m p e n s a t o r y  mitigation will be  ma d e  by  th e  US A C E  an d  NC D W Q .          No v e m b e r 2 0 1 3 M c L e a n s v i l l e R o a d G r a d e S e p a r a t i o n O v e r N C R R       Ap p e n d i x  C – Agency Comments  Ta b l e  C‐1:   Ag e n c y  Co m m e n t s   DO C U M E N T   NO .   AG E N C Y   CO M M E N T   NO .   CO M M E N T   RE S P O N S E   A‐06   (c o n t i n u e d )   NC D E N R  Di v i s i o n   of  Wa t e r  Qu a l i t y   Wi n s t o n ‐Sa l e m   Re g i o n a l  Of f i c e   5  En v i r o n m e n t a l  im p a c t  st a t e m e n t  al t e r n a t i v e s  sh a l l  co n s i d e r  de s i g n   cr i t e r i a  th a t  re d u c e  th e  im p a c t s  to  st r e a m s  an d  we t l a n d s  fr o m   st o r m w a t e r  ru n o f f .    Th e s e  al t e r n a t i v e s  sh a l l  in c l u d e  ro a d  de s i g n s  th a t   al l o w  fo r  tr e a t m e n t  of  th e  st o r m w a t e r  ru n o f f  th r o u g h  be s t   ma n a g e m e n t  pr a c t i c e s  as  de t a i l e d  in  th e  mo s t  re c e n t  ve r s i o n  of   NC D O T ’ s  St o r m w a t e r  Be s t  Ma n a g e m e n t  Pr a c t i c e s  Ma n u a l , su c h  as   gr a s s e d  sw a l e s ,  bu f f e r  ar e a s ,  pr e f o r m e d  sc o u r  ho l e s ,  re t e n t i o n  ba s i n s ,   et c .   Se e  re s p o n s e  to  Co m m e n t s  1 an d  4 in this letter (A‐06).     6  Af t e r  th e  se l e c t i o n  of  th e  pr e f e r r e d  al t e r n a t i v e  an d  pr i o r  to  an  is s u a n c e   of  th e  40 1  Wa t e r  Qu a l i t y  Ce r t i f i c a t i o n ,  th e  NC D O T  is  re s p e c t f u l l y   re m i n d e d  th a t  th e y  wi l l  ne e d  to  de m o n s t r a t e  th e  av o i d a n c e  an d   mi n i m i z a t i o n  of  im p a c t s  to  we t l a n d s  (a n d  st r e a m s )  to  th e  ma x i m u m   ex t e n t  pr a c t i c a l .    In  ac c o r d a n c e  wi t h  th e  En v i r o n m e n t a l  Ma n a g e m e n t   Co m m i s s i o n ’ s  Ru l e s  {1 5 A  NC A C  2H . 0 5 0 6 ( h ) } ,  mi t i g a t i o n  wi l l  be  re q u i r e d   fo r  im p a c t s  of  gr e a t e r  th a n  1 ac r e  to  we t l a n d s .    In  th e  ev e n t  th a t   mi t i g a t i o n  is  re q u i r e d ,  th e  mi t i g a t i o n  pl a n  sh a l l  be  de s i g n e d  to  re p l a c e   ap p r o p r i a t e  lo s t  fu n c t i o n s  an d  va l u e s .    Th e  NC  Ec o s y s t e m  En h a n c e m e n t   Pr o g r a m  ma y  be  av a i l a b l e  fo r  us e  as  we t l a n d  mi t i g a t i o n .   Av o i d a n c e  an d  mi n i m i z a t i o n  me a s u r e s  were incorporated into the  pr e l i m i n a r y  en g i n e e r i n g  de s i g n s  fo r  the build alternatives, as  di s c u s s e d  in  Se c t i o n  4. 4 . 3  of  th e  EA .   During the final design and  pe r m i t t i n g  ph a s e s ,  ad d i t i o n a l  op p o r t u n i t i e s  for avoidance and  mi n i m i z a t i o n  wi l l  be  in v e s t i g a t e d .    The NCDOT will work with  NC D W Q  an d  th e  US A C E  to  id e n t i f y  and provide all required  mi t i g a t i o n  to  sa t i s f y  co m p e n s a t o r y  mitigation requirements for this  Pr o j e c t .           7  In  ac c o r d a n c e  wi t h  th e  En v i r o n m e n t a l  Ma n a g e m e n t  Co m m i s s i o n ’ s  Ru l e s   {1 5 A  NC A C  2H . 0 5 0 6 ( h ) } ,  mi t i g a t i o n  wi l l  be  re q u i r e d  fo r  im p a c t s  of   gr e a t e r  th a n  15 0  li n e a r  fe e t  to  an y  si n g l e  st r e a m .    In  th e  ev e n t  th a t   mi t i g a t i o n  is  re q u i r e d ,  th e  mi t i g a t i o n  pl a n  sh a l l  be  de s i g n e d  to  re p l a c e   ap p r o p r i a t e  lo s t  fu n c t i o n s  an d  va l u e s .    Th e  NC  Ec o s y s t e m  En h a n c e m e n t   Pr o g r a m  ma y  be  av a i l a b l e  fo r  us e  as  st r e a m  mi t i g a t i o n .   St r e a m  im p a c t s  ba s e d  on  th e  pr e l i m i n a r y  designs are detailed in  Ta b l e  4‐5 in  Se c t i o n  4. 4 . 3  of  th e  EA .   Two streams would be  im p a c t e d  by  th e  Pr e f e r r e d  Al t e r n a t i v e :   148 linear feet of  in t e r m i t t e n t  St r e a m  SF  an d  20 7  li n e a r  feet of perennial Stream SB.   Im p a c t s  wi l l  be  re c a l c u l a t e d  fo r  th e  final design.  The NCDOT will  wo r k  wi t h  NC D W Q  an d  th e  US A C E  during the permitting phase to  id e n t i f y  an d  pr o v i d e  al l  re q u i r e d  mi t i g a t i o n  to satisfy compensatory  mi t i g a t i o n  re q u i r e m e n t s  fo r  th i s  Pr o j e c t .      8  Fu t u r e  do c u m e n t a t i o n ,  in c l u d i n g  th e  40 1  Wa t e r  Qu a l i t y  Ce r t i f i c a t i o n   Ap p l i c a t i o n ,  sh a l l  co n t i n u e  to  in c l u d e  an  it e m i z e d  li s t i n g  of  th e  pr o p o s e d   we t l a n d  an d  st r e a m  im p a c t s  wi t h  co r r e s p o n d i n g  ma p p i n g .   NC D O T  wi l l  co n t i n u e  to  pr o v i d e  an  itemized listing of jurisdictional  re s o u r c e  im p a c t s  th r o u g h  th e  pe r m i t t i n g  phase of the Project.     9  NC D W Q  is  ve r y  co n c e r n e d  wi t h  se d i m e n t  an d  er o s i o n  im p a c t s  th a t   co u l d  re s u l t  fr o m  th i s  pr o j e c t .    NC D O T  sh a l l  ad d r e s s  th e s e  co n c e r n s  by   de s c r i b i n g  th e  po t e n t i a l  im p a c t s  th a t  ma y  oc c u r  to  th e  aq u a t i c   en v i r o n m e n t s  an d  an y  mi t i g a t i n g  fa c t o r s  th a t  wo u l d  re d u c e  th e  im p a c t s .   Se c t i o n  4. 4 . 1  of  th e  EA  di s c u s s e s  po t e n t i a l  impacts to the aquatic  en v i r o n m e n t .    Im p a c t s  wi l l  be  mi n i m i z e d  by the implementation of  st r i n g e n t  er o s i o n  co n t r o l  me a s u r e s .   See response to Comment 1 in  th i s  le t t e r  (A ‐06 ) .      10   An  an a l y s i s  of  cu m u l a t i v e  an d  se c o n d a r y  im p a c t s  an t i c i p a t e d  as  a re s u l t   of  th i s  pr o j e c t  is  re q u i r e d .    Th e  ty p e  an d  de t a i l  of  an a l y s i s  sh a l l  co n f o r m   to  th e  NC  Di v i s i o n  of  Wa t e r  Qu a l i t y  Po l i c y  on  th e  as s e s s m e n t  of   se c o n d a r y  an d  cu m u l a t i v e  im p a c t s  da t e d  Ap r i l  10 ,  20 0 4 .   In d i r e c t  an d  cu m u l a t i v e  ef f e c t s  ar e  discussed in Section 4.5 of the  EA .             No v e m b e r 2 0 1 3 M c L e a n s v i l l e R o a d G r a d e S e p a r a t i o n O v e r N C R R       Ap p e n d i x  C – Agency Comments  Ta b l e  C‐1:   Ag e n c y  Co m m e n t s   DO C U M E N T   NO .   AG E N C Y   CO M M E N T   NO .   CO M M E N T   RE S P O N S E   A‐06   (c o n t i n u e d )   NC D E N R  Di v i s i o n   of  Wa t e r  Qu a l i t y   Wi n s t o n ‐Sa l e m   Re g i o n a l  Of f i c e   11   NC D O T  is  re s p e c t f u l l y  re m i n d e d  th a t  al l  im p a c t s ,  in c l u d i n g  bu t  no t   li m i t e d  to ,  br i d g i n g ,  fi l l ,  ex c a v a t i o n  an d  cl e a r i n g ,  an d  ri p  ra p  to   ju r i s d i c t i o n a l  we t l a n d s ,  st r e a m s ,  an d  ri p a r i a n  bu f f e r s  ne e d  to  be   in c l u d e d  in  th e  fi n a l  im p a c t  ca l c u l a t i o n s .    Th e s e  im p a c t s ,  in  ad d i t i o n  to   an y  co n s t r u c t i o n  im p a c t s ,  te m p o r a r y  or  ot h e r w i s e ,  al s o  ne e d  to  be   in c l u d e d  as  pa r t  of  th e  40 1  Wa t e r  Qu a l i t y  Ce r t i f i c a t i o n  Ap p l i c a t i o n .   Al l  Pr o j e c t  im p a c t s  to  ju r i s d i c t i o n a l  resources, including short‐term  co n s t r u c t i o n  im p a c t s ,  wi l l  be  in c l u d e d  in the final impact calculations  pr o v i d e d  in  th e  pe r m i t  ap p l i c a t i o n s .      12   Wh e r e  st r e a m s  mu s t  be  cr o s s e d ,  NC D W Q  pr e f e r s  br i d g e s  be  us e d  in  li e u   of  cu l v e r t s .    Ho w e v e r ,  we  re a l i z e  th a t  ec o n o m i c  co n s i d e r a t i o n s  of t e n   re q u i r e  th e  us e  of  cu l v e r t s .    Pl e a s e  be  ad v i s e d  th a t  cu l v e r t s  sh o u l d  be   co u n t e r s u n k  to  al l o w  un i m p e d e d  pa s s a g e  by  fi s h  an d  ot h e r  aq u a t i c   or g a n i s m s .    Mo r e o v e r ,  in  ar e a s  wh e r e  hi g h  qu a l i t y  we t l a n d s  or  st r e a m s   ar e  im p a c t e d ,  a br i d g e  ma y  pr o v e  pr e f e r a b l e .    Wh e n  ap p l i c a b l e ,  NC D O T   sh o u l d  no t  in s t a l l  th e  br i d g e  be n t s  in  th e  cr e e k ,  to  th e  ma x i m u m  ex t e n t   po s s i b l e .   Cu l v e r t s  ar e  pr o p o s e d  at  th e  tw o  st r e a m s  crossed by the Preferred  Al t e r n a t i v e .    Cu l v e r t s  wi l l  be  bu r i e d  in accordance with the NCDOT  Hy d r a u l i c  Un i t ’ s  st a n d a r d s  an d  gu i d e l i n e s .   Drainage structures and  cr o s s i n g s  wi l l  be  re v i e w e d  by  th e  NC D W Q  and USACE during the  pe r m i t t i n g  pr o c e s s .      13   Wh e n e v e r  po s s i b l e ,  NC D W Q  pr e f e r s  sp a n n i n g  st r u c t u r e s .    Sp a n n i n g   st r u c t u r e s  us u a l l y  do  no t  re q u i r e  wo r k  wi t h i n  th e  st r e a m  or  gr u b b i n g  of   th e  st r e a m b a n k s  an d  do  no t  re q u i r e  st r e a m  ch a n n e l  re a l i g n m e n t .    Th e   ho r i z o n t a l  an d  ve r t i c a l  cl e a r a n c e s  pr o v i d e d  by  br i d g e s  sh a l l  al l o w  fo r   hu m a n  an d  wi l d l i f e  pa s s a g e  be n e a t h  th e  st r u c t u r e .    Fi s h  pa s s a g e  an d   na v i g a t i o n  by  ca n o e i s t s  an d  bo a t e r s  sh a l l  no t  be  bl o c k e d .    Br i d g e   su p p o r t s  (b e n t s )  sh o u l d  no t  be  pl a c e d  in  th e  st r e a m  wh e n  po s s i b l e .   Cu l v e r t s  ar e  pr o p o s e d  at  th e  tw o  st r e a m s  crossed by the Preferred  Al t e r n a t i v e .    Ne i t h e r  st r e a m  is  na v i g a b l e  by canoeists or boaters.  Dr a i n a g e  st r u c t u r e s  an d  cr o s s i n g s  will be reviewed by the NCDWQ  an d  US A C E  du r i n g  th e  pe r m i t t i n g  pr o c e s s .      14   Br i d g e  de c k  dr a i n s  sh a l l  no t  di s c h a r g e  di r e c t l y  in t o  th e  st r e a m .    St o r m w a t e r  sh a l l  be  di r e c t e d  ac r o s s  th e  br i d g e  an d  pr e ‐tr e a t e d  th r o u g h   si t e ‐ap p r o p r i a t e  me a n s  (g r a s s e d  sw a l e s ,  pr e ‐fo r m e d  sc o u r  ho l e s ,   ve g e t a t e d  bu f f e r s ,  et c . )  be f o r e  en t e r i n g  th e  st r e a m .    Pl e a s e  re f e r  to  th e   mo s t  cu r r e n t  ve r s i o n  of  NC D O T ’ s  St o r m w a t e r  Be s t  Ma n a g e m e n t   Pr a c t i c e s .     Th e  pr o p o s e d  gr a d e  se p a r a t i o n  br i d g e  is over railroad tracks.   Cu l v e r t s  ar e  pr o p o s e d  at  th e  tw o  st r e a m s  crossed by the Preferred  Al t e r n a t i v e .      15   Se d i m e n t  an d  er o s i o n  co n t r o l  me a s u r e s  sh o u l d  no t  be  pl a c e d  in   we t l a n d s  or  st r e a m s .   Se e  re s p o n s e  to  Co m m e n t  1 in  th i s  letter (A‐06).     16   Bo r r o w / w a s t e  ar e a s  sh o u l d  av o i d  we t l a n d s  to  th e  ma x i m u m  ex t e n t   pr a c t i c a l .    Im p a c t s  to  we t l a n d  in  bo r r o w / w a s t e  ar e a s  wi l l  ne e d  to  be   pr e s e n t e d  in  th e  40 1  Wa t e r  Qu a l i t y  Ce r t i f i c a t i o n  an d  co u l d  pr e c i p i t a t e   co m p e n s a t o r y  mi t i g a t i o n .   Th e  co n t r a c t o r  wi l l  be  re q u i r e d  to  ac q u i r e  applicable permits relative  to  bo r r o w  pi t s ,  if  ne e d e d ,  an d  to  co m p l y  with requirements for  bo r r o w  pi t s ,  de w a t e r i n g ,  an d  an y  te m p o r a r y  work conducted in  ju r i s d i c t i o n a l  ar e a s .      17   Th e  40 1  Wa t e r  Qu a l i t y  Ce r t i f i c a t i o n  ap p l i c a t i o n  wi l l  ne e d  to  sp e c i f i c a l l y   ad d r e s s  th e  pr o p o s e d  me t h o d s  fo r  st o r m w a t e r  ma n a g e m e n t .    Mo r e   sp e c i f i c a l l y ,  st o r m w a t e r  sh a l l  no t  be  pe r m i t t e d  to  di s c h a r g e  di r e c t l y  in t o   st r e a m s  or  su r f a c e  wa t e r s .   Th e  Se c t i o n  40 1  Wa t e r  Qu a l i t y  Ce r t i f i c a t i o n  application will include  pr o p o s e d  me t h o d s  fo r  st o r m w a t e r  management.  Appropriate  dr a i n a g e  st r u c t u r e s ,  su c h  as  bu t  no t  limited to culverts and ditches,  wi l l  be  in c l u d e d  as  pa r t  of  th e  Pr o j e c t  design in accordance with  NC D O T  st a n d a r d s .             No v e m b e r 2 0 1 3 M c L e a n s v i l l e R o a d G r a d e S e p a r a t i o n O v e r N C R R       Ap p e n d i x  C – Agency Comments  Ta b l e  C‐1:   Ag e n c y  Co m m e n t s   DO C U M E N T   NO .   AG E N C Y   CO M M E N T   NO .   CO M M E N T   RE S P O N S E   A‐06   (c o n t i n u e d )   NC D E N R  Di v i s i o n   of  Wa t e r  Qu a l i t y   Wi n s t o n ‐Sa l e m   Re g i o n a l  Of f i c e   18   Ba s e d  on  th e  in f o r m a t i o n  pr e s e n t e d  in  th e  do c u m e n t ,  th e  ma g n i t u d e  of   im p a c t s  to  we t l a n d s  an d  st r e a m s  ma y  re q u i r e  an  In d i v i d u a l  ap p l i c a t i o n   to  th e  Co r p s  of  En g i n e e r s  an d  co r r e s p o n d i n g  40 1  Wa t e r  Qu a l i t y   Ce r t i f i c a t i o n .    Pl e a s e  be  ad v i s e d  th a t  a 40 1  Wa t e r  Qu a l i t y  Ce r t i f i c a t i o n   re q u i r e s  sa t i s f a c t o r y  pr o t e c t i o n  of  wa t e r  qu a l i t y  to  en s u r e  th a t  wa t e r   qu a l i t y  st a n d a r d s  ar e  me t  an d  no  we t l a n d  or  st r e a m  us e s  ar e  lo s t .    Fi n a l   pe r m i t  au t h o r i z a t i o n  wi l l  re q u i r e  th e  su b m i t t a l  of  a fo r m a l  ap p l i c a t i o n   by  th e  NC D O T  an d  wr i t t e n  co n c u r r e n c e  fr o m  NC D W Q .    Pl e a s e  be  aw a r e   th a t  an y  ap p r o v a l  wi l l  be  co n t i n g e n t  on  ap p r o p r i a t e  av o i d a n c e  an d   mi n i m i z a t i o n  of  we t l a n d  an d  st r e a m  im p a c t s  to  th e  ma x i m u m  ex t e n t   pr a c t i c a l ,  th e  de v e l o p m e n t  of  an  ac c e p t a b l e  st o r m w a t e r  ma n a g e m e n t   pl a n ,  an d  th e  in c l u s i o n  of  ap p r o p r i a t e  mi t i g a t i o n  pl a n s  wh e r e   ap p r o p r i a t e .   NC D O T  wi l l  ob t a i n  al l  ap p l i c a b l e  pe r m i t s ,  including the Section  40 1 W a t e r  Qu a l i t y  Ce r t i f i c a t i o n  an d  the Section 404 permit.       19   If  co n c r e t e  is  us e d  du r i n g  co n s t r u c t i o n ,  a dr y  wo r k  ar e a  sh a l l  be   ma i n t a i n e d  to  pr e v e n t  di r e c t  co n t a c t  be t w e e n  cu r i n g  co n c r e t e  an d   st r e a m  wa t e r .    Wa t e r  th a t  in a d v e r t e n t l y  co n t a c t s  un c u r e d  co n c r e t e  sh a l l   no t  be  di s c h a r g e d  to  su r f a c e  wa t e r s  du e  to  th e  po t e n t i a l  fo r  el e v a t e d  pH   an d  po s s i b l e  aq u a t i c  li f e  an d  fi s h  ki l l s .   Al l  cu r r e n t l y  ap p r o v e d  be s t  ma n a g e m e n t  practices for erosion and  se d i m e n t a t i o n  co n t r o l  wi l l  be  in c l u d e d  in the approved erosion and  se d i m e n t a t i o n  co n t r o l  pl a n  an d  wi l l  be implemented during Project  co n s t r u c t i o n .      20   If  te m p o r a r y  ac c e s s  ro a d s  or  de t o u r s  ar e  co n s t r u c t e d ,  th e  si t e  sh a l l  be   gr a d e d  to  it s  pr e c o n s t r u c t i o n  co n t o u r s  an d  el e v a t i o n s .    Di s t u r b e d  ar e a s   sh a l l  be  se e d e d  or  mu l c h e d  to  st a b i l i z e  th e  so i l  an d  ap p r o p r i a t e  na t i v e   wo o d y  sp e c i e s  sh a l l  be  pl a n t e d .    Wh e n  us i n g  te m p o r a r y  st r u c t u r e s  th e   ar e a  sh a l l  be  cl e a r e d  bu t  no t  gr u b b e d .    Cl e a r i n g  th e  ar e a  wi t h  ch a i n   sa w s ,  mo w e r s ,  bu s h ‐ho g s ,  or  ot h e r  me c h a n i z e d  eq u i p m e n t  an d  le a v i n g   th e  st u m p s  an d  ro o t  ma t  in t a c t  al l o w s  th e  ar e a  to  re ‐ve g e t a t e  na t u r a l l y   an d  mi n i m i z e s  so i l  di s t u r b a n c e .   Te m p o r a r y  ac c e s s  ro a d s  an d  ha u l  ro a d s ,  other than public roads,  co n s t r u c t e d  or  us e d  in  co n n e c t i o n  with the Project shall be  co n s i d e r e d  a pa r t  of  th e  Pr o j e c t  an d  addressed in the erosion and  se d i m e n t a t i o n  co n t r o l  pl a n .          No v e m b e r 2 0 1 3 M c L e a n s v i l l e R o a d G r a d e S e p a r a t i o n O v e r N C R R       Ap p e n d i x  C – Agency Comments  Ta b l e  C‐1:   Ag e n c y  Co m m e n t s   DO C U M E N T   NO .   AG E N C Y   CO M M E N T   NO .   CO M M E N T   RE S P O N S E   A‐06   (c o n t i n u e d )   NC D E N R  Di v i s i o n   of  Wa t e r  Qu a l i t y   Wi n s t o n ‐Sa l e m   Re g i o n a l  Of f i c e   21   Un l e s s  ot h e r w i s e  au t h o r i z e d ,  pl a c e m e n t  of  cu l v e r t s  an d  ot h e r  st r u c t u r e s   in  wa t e r s  an d  st r e a m s  sh a l l  be  pl a c e d  be l o w  th e  el e v a t i o n  of  th e   st r e a m b e d  by  on e  fo o t  fo r  al l  cu l v e r t s  wi t h  a di a m e t e r  gr e a t e r  th a n  48   in c h e s ,  an d  20  pe r c e n t  of  th e  cu l v e r t  di a m e t e r  fo r  cu l v e r t s  ha v i n g  a  di a m e t e r  le s s  th a n  48  in c h e s ,  to  al l o w  lo w  fl o w  pa s s a g e  of  wa t e r  an d   aq u a t i c  li f e .    De s i g n  an d  pl a c e m e n t  of  cu l v e r t s  an d  ot h e r  st r u c t u r e s   in c l u d i n g  te m p o r a r y  er o s i o n  co n t r o l  me a s u r e s  sh a l l  no t  be  co n d u c t e d  in   a ma n n e r  th a t  ma y  re s u l t  in  di s ‐eq u i l i b r i u m  of  we t l a n d s  or  st r e a m b e d s   or  ba n k s ,  ad j a c e n t  to  or  up s t r e a m  an d  do w n s t r e a m  of  th e  ab o v e   st r u c t u r e s .    Th e  ap p l i c a n t  is  re q u i r e d  to  pr o v i d e  ev i d e n c e  th a t  th e   eq u i l i b r i u m  is  be i n g  ma i n t a i n e d  if  re q u e s t e d  in  wr i t i n g  by  NC D W Q .    If   th i s  co n d i t i o n  is  un a b l e  to  be  me t  du e  to  be d r o c k  or  ot h e r  li m i t i n g   fe a t u r e s  en c o u n t e r e d  du r i n g  co n s t r u c t i o n ,  pl e a s e  co n t a c t  NC D W Q  fo r   gu i d a n c e  on  ho w  to  pr o c e e d  an d  to  de t e r m i n e  wh e t h e r  or  no t  a pe r m i t   mo d i f i c a t i o n  wi l l  be  re q u i r e d .   Cu l v e r t s  wi l l  be  bu r i e d  in  ac c o r d a n c e  with the NCDOT Hydraulic  Un i t ’ s  st a n d a r d s  an d  gu i d e l i n e s .    Dr a i n a g e  structures and crossings  wi l l  be  re v i e w e d  by  th e  NC D W Q  an d  USACE during the permitting  pr o c e s s .      22   If  mu l t i p l e  pi p e s  or  ba r r e l s  ar e  re q u i r e d ,  th e y  sh a l l  be  de s i g n e d  to  mi m i c   th e  na t u r a l  st r e a m  cr o s s  se c t i o n  as  cl o s e l y  as  po s s i b l e  in c l u d i n g  pi p e s  or   ba r r e l s  at  fl o o d p l a i n  el e v a t i o n ,  fl o o d p l a i n  be n c h e s ,  an d / o r  si l l s  ma y  be   re q u i r e d  wh e r e  ap p r o p r i a t e .    Wi d e n i n g  th e  st r e a m  ch a n n e l  sh o u l d  be   av o i d e d .    St r e a m  ch a n n e l  wi d e n i n g  at  th e  in l e t  or  ou t l e t  en d  of   st r u c t u r e s  ty p i c a l l y  de c r e a s e s  wa t e r  ve l o c i t y  ca u s i n g  se d i m e n t   de p o s i t i o n  th a t  re q u i r e s  in c r e a s e  ma i n t e n a n c e  an d  di s r u p t s  aq u a t i c  li f e   pa s s a g e .   Cu l v e r t s  wi l l  be  bu r i e d  in  ac c o r d a n c e  with the NCDOT Hydraulic  Un i t ’ s  st a n d a r d s  an d  gu i d e l i n e s .    Dr a i n a g e  structures and crossings  wi l l  be  re v i e w e d  by  th e  NC D W Q  an d  USACE during the permitting  pr o c e s s .      23   If  fo u n d a t i o n  te s t  bo r i n g s  ar e  ne c e s s a r y ;  it  sh a l l  be  no t e d  in  th e   do c u m e n t .    Ge o t e c h n i c a l  wo r k  is  ap p r o v e d  un d e r  Ge n e r a l  40 1   Ce r t i f i c a t i o n  Nu m b e r  38 8 3 / N a t i o n w i d e  Pe r m i t  No .  6 fo r  Su r v e y   Ac t i v i t i e s .   If  ge o t e c h n i c a l  in v e s t i g a t i o n s  ar e  ne e d e d ,  subsurface investigations,  in c l u d i n g  bo r i n g s ,  wi l l  be  co n d u c t e d  in accordance with the current  NC D O T  Ge o t e c h n i c a l  Un i t ’ s  Gu i d e l i n e s  and Procedures Manual.     24   Se d i m e n t  an d  er o s i o n  co n t r o l  me a s u r e s  su f f i c i e n t  to  pr o t e c t  wa t e r   re s o u r c e s  mu s t  be  im p l e m e n t e d  an d  ma i n t a i n e d  in  ac c o r d a n c e  wi t h  th e   mo s t  re c e n t  ve r s i o n  of  No r t h  Ca r o l i n a  Se d i m e n t  an d  Er o s i o n  Co n t r o l   Pl a n n i n g  an d  De s i g n  Ma n u a l  an d  th e  mo s t  re c e n t  ve r s i o n  of  NC S 0 0 0 2 5 0 .   Th e  er o s i o n  an d  se d i m e n t a t i o n  co n t r o l  plan and stormwater  po l l u t i o n  pr e v e n t i o n  pl a n  wi l l  be  im p l e m e n t e d  and maintained  du r i n g  th e  co n s t r u c t i o n  of  th e  Pr o j e c t  in accordance with all  ap p l i c a b l e  la w s  an d  re g u l a t i o n s .      25   Al l  wo r k  in  or  ad j a c e n t  to  st r e a m  wa t e r s  sh a l l  be  co n d u c t e d  in  a dr y   wo r k  ar e a .    Ap p r o v e d  BM P  me a s u r e s  fr o m  th e  mo s t  cu r r e n t  ve r s i o n  of   NC D O T  Co n s t r u c t i o n  an d  Ma i n t e n a n c e  Ac t i v i t i e s  ma n u a l  su c h  as   sa n d b a g s ,  ro c k  be r m s ,  co f f e r d a m s  an d  ot h e r  di v e r s i o n  st r u c t u r e s  sh a l l   be  us e d  to  pr e v e n t  ex c a v a t i o n  in  fl o w i n g  wa t e r .   NC D O T  wi l l  im p l e m e n t  ap p r o v e d  be s t  management practices from  th e  mo s t  cu r r e n t  ve r s i o n  of  NC D O T ’ s  Construction and Maintenance  Ac t i v i t i e s  Ma n u a l .         No v e m b e r 2 0 1 3 M c L e a n s v i l l e R o a d G r a d e S e p a r a t i o n O v e r N C R R       Ap p e n d i x  C – Agency Comments  Ta b l e  C‐1:   Ag e n c y  Co m m e n t s   DO C U M E N T   NO .   AG E N C Y   CO M M E N T   NO .   CO M M E N T   RE S P O N S E   A‐06   (c o n t i n u e d )   NC D E N R  Di v i s i o n   of  Wa t e r  Qu a l i t y   Wi n s t o n ‐Sa l e m   Re g i o n a l  Of f i c e   26   Wh i l e  th e  us e  of  Na t i o n a l  We t l a n d  In v e n t o r y  (N W I )  ma p s ,  NC  Co a s t a l   Re g i o n  Ev a l u a t i o n  of  We t l a n d  Si g n i f i c a n c e  (N C ‐CR E W S )  ma p s  an d  so i l   su r v e y  ma p s  ar e  us e f u l  to o l s ,  th e i r  in h e r e n t  in a c c u r a c i e s  re q u i r e  th a t   qu a l i f i e d  pe r s o n n e l  pe r f o r m  on s i t e  we t l a n d  de l i n e a t i o n s  pr i o r  to  pe r m i t   ap p r o v a l .   As  di s c u s s e d  in  Se c t i o n  3. 4 . 4 . 1  of  th e  EA, jurisdictional resources  we r e  de l i n e a t e d  by  qu a l i f i e d  pe r s o n n e l .   The USACE and NCDWQ  ve r i f i e d  th e  de l i n e a t i o n s  on  Ma y  8,  2012.     27   He a v y  eq u i p m e n t  sh o u l d  be  op e r a t e d  fr o m  th e  ba n k  ra t h e r  th a n  in   st r e a m  ch a n n e l s  in  or d e r  to  mi n i m i z e  se d i m e n t a t i o n  an d  re d u c e  th e   li k e l i h o o d  of  in t r o d u c i n g  ot h e r  po l l u t a n t s  in t o  st r e a m s .    Th i s  eq u i p m e n t   sh a l l  be  in s p e c t e d  da i l y  an d  ma i n t a i n e d  to  pr e v e n t  co n t a m i n a t i o n  of   su r f a c e  wa t e r s  fr o m  le a k i n g  fu e l s ,  lu b r i c a n t s ,  hy d r a u l i c  fl u i d s ,  or  ot h e r   to x i c  ma t e r i a l s .   NC D O T  wi l l  im p l e m e n t  ap p r o v e d  be s t  management practices from  th e  mo s t  cu r r e n t  ve r s i o n  of  NC D O T ’ s  Construction and Maintenance  Ac t i v i t i e s  Ma n u a l .     28   Ri p r a p  sh a l l  no t  be  pl a c e d  in  th e  ac t i v e  th a l w e g  ch a n n e l  or  pl a c e d  in  th e   st r e a m b e d  in  a ma n n e r  th a t  pr e c l u d e s  aq u a t i c  li f e  pa s s a g e .    Bi o e n g i n e e r i n g  bo u l d e r s  or  st r u c t u r e s  sh o u l d  be  pr o p e r l y  de s i g n e d ,   si z e d  an d  in s t a l l e d .   Al l  ap p r o p r i a t e  me a s u r e s  wi l l  be  ta k e n  to protect streams and  aq u a t i c  li f e  ba s e d  on  NC D O T  st a n d a r d  practices and rules and  re g u l a t i o n s .      29   Ri p a r i a n  ve g e t a t i o n  (n a t i v e  tr e e s  an d  sh r u b s )  sh a l l  be  pr e s e r v e d  to  th e   ma x i m u m  ex t e n t  po s s i b l e .    Ri p a r i a n  ve g e t a t i o n  mu s t  be  re e s t a b l i s h e d   wi t h i n  th e  co n s t r u c t i o n  li m i t s  of  th e  pr o j e c t  by  th e  en d  of  th e  gr o w i n g   se a s o n  fo l l o w i n g  co m p l e t i o n  of  co n s t r u c t i o n .   Ap p r o p r i a t e  me a s u r e s  wi l l  be  ta k e n  to preserve and reestablish  ri p a r i a n  ve g e t a t i o n  to  th e  ma x i m u m  extent possible.  Final designs  wi l l  be  pr e p a r e d  in  ac c o r d a n c e  wi t h  permit conditions and best  ma n a g e m e n t  pr a c t i c e s  fr o m  NC D O T ’ s  toolbox, which recommends  th e  re e s t a b l i s h m e n t  of  ri p a r i a n  ve g e t a t i o n .   A‐07   NC  De p t  of   Cu l t u r a l  Re s o u r c e s ,   St a t e  Hi s t o r i c   Pr e s e r v a t i o n  Of f i c e   1  No  co m m e n t .   No  re s p o n s e  re q u i r e d .    Se e  le t t e r  A‐02 from HPO.  A‐08   NC D O T  St a t e w i d e   Pl a n n i n g   1  No  co m m e n t .   No  re s p o n s e  re q u i r e d .   A‐09   NC  Di v i s i o n  of   Em e r g e n c y   Ma n a g e m e n t ,   Fl o o d p l a i n   Ma n a g e m e n t   Pr o g r a m   1  No  co m m e n t .   No  re s p o n s e  re q u i r e d .     McLeansville Road Grade Separation – Guilford County, NC STIP Project P-5204 - Finding of No Significant Impact APPENDIX D PUBLIC COMMENTS  ', / / $ 5 .  # Q D W L R Q Z L G H  F R P ! - X Q H                     $ 0  ( ' 7  MD U R E E L Q V # Q F  J R Y !  02 6 ( / ( * # Q D W L R Q Z L G H  F R P !         BB B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B ,  D P  D  O R \ D O  F X V W R P H U  R I  1 D W L R Q Z L G H  D Q G  G R  P \  E X V L Q H V V  D W  W KH0FOHDQVYLOOHRIILFH 7 K H  S H U V R Q Q H O  W K H U H  L V  Z R Q G H U I X O  Z L W K  D Z H V R P H   S U R I H V V L R Q D O  DQGSURPSWFXVWRPHU V H U Y L F H  V N L O O V  D Q G  ,  ST R O N G L Y S U G G E S T t h a t N C D O T p u r c h a s e t h e i r b u i l d i n g so t h a t t h e y c a n m o v e t o a s a f e r , m o r e a c c e s s i b l e b u i l d i n g . Ni c o l e J u s t i c e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       No v e m b e r 2 0 1 3 M c L e a n s v i l l e R o a d G r a d e S e p a r a t i o n O v e r N C R R     Ap p e n d i x  D – Citizen Comments  Ta b l e  D‐1:   Ci t i z e n  Co m m e n t s   DO C U M E N T   NO .   CO M M E N T   NO .   CO M M E N T   RE S P O N S E   C‐01   1  I am  co n c e r n e d  ab o u t  th e  lo s s  of  va l u e  to  my  pr o p e r t y ,  pa r t i c u l a r l y  si g h t   li n e s  to  th e  po n d  [w h i c h ]  wi l l  be  bl o c k e d .    Th e  vi e w  of  a br i d g e  wi l l   re d u c e  th e  va l u e  of  my  pr o p e r t y — w i l l  th e r e  be  co m p e n s a t i o n  fo r  su c h  a  lo s s ?       Th e  pr o p o s e d  Mc L e a n s v i l l e  Ro a d  br i d g e  ov e r  th e  ra i l r o a d  is approximately 1,300 feet  fr o m  10 3  Bi r c h  Cr e e k  Ro a d ,  ne a r  th e  in t e r s e c t i o n  wi t h  McLeansville Road.  The  el e v a t i o n  of  Mc L e a n s v i l l e  Ro a d  wi l l  be g i n  to  ri s e  gr a d u a l l y  from near this intersection  un t i l  th e  ro a d  pa s s e s  ov e r  th e  ra i l r o a d .    Vi e w s  ar e  no t  expected to substantially  ch a n g e  at  th i s  pr o p e r t y .   NC D O T  fo l l o w s  th e  Un i f o r m  Re l o c a t i o n  as s i s t a n c e  an d  Real Property Acquisition  Po l i c i e s  Ac t  (P u b l i c  La w  91 ‐64 6 )  fo r  di r e c t  ac q u i s i t i o n  of properties, and does not  pr o v i d e  co m p e n s a t i o n  fo r  in d i r e c t  ef f e c t s .    Pr o p e r t y  values in the Project study area  ar e  a fu n c t i o n  of  a nu m b e r  of  fa c t o r s .    Wh i l e  so m e  pr o p e r t y  values may decrease  ba s e d  on  th e  lo c a t i o n  of  th e  pr o p o s e d  al i g n m e n t ,  ot h e r s  may increase based on the  ge o g r a p h i c  or i e n t a t i o n  an d  th e  pr o v i s i o n  of  im p r o v e d  access provided by the grade  se p a r a t i o n  ov e r  th e  ra i l r o a d .    Fe d e r a l  an d  St a t e  La w  prohibits NCDOT from  co m p e n s a t i n g  pr o p e r t y  ow n e r s  du e  to  ch a n g e s  in  pr o p e r t y  value because of a  pr o j e c t  in  th e  vi c i n i t y  of  th e i r  pr o p e r t y .   C‐02   1  Ra i l  cr o s s i n g  cl o s e d  at  52 7 7  Mc L e a n s v i l l e  Ro a d  le a v e s  2 ho u s e s  wi t h   li m i t e d  ac c e s s .    Is  it  po s s i b l e  to  us e  a cu l v e r t  at  th e  cl o s e d  cr o s s i n g  to   es t a b l i s h  a wa t e r  su p p l y  sy s t e m  to  th e  tw o  ho u s e s ?    Th i s  wo u l d  in v o l v e  a  dr y  pi p e  sy s t e m  to  ru n  un d e r  th e  tr a c k  th r o u g h  th e  cu l v e r t .   Th i s  ad d r e s s  is  at  a pr i v a t e  ra i l r o a d  tr a c k  cr o s s i n g  th a t  has been closed for about a  ye a r  at  th e  ol d  No r t h w e s t  Tr e e  & St o n e  pr o p e r t y ,  an d  is not a part of Project P‐5204.   In  or d e r  to  ge t  a dr y  pi p e  in s t a l l e d ,  a pe r m i t  wo u l d  be  required from NCRR.  NCDOT  wi l l  co o r d i n a t e  wi t h  th e  Mc L e a n s v i l l e  Fi r e  De p a r t m e n t  on this separate issue.  C‐03   1  Th e r e  is  a ne e d  fo r  a st o p l i g h t  at  th e  in t e r s e c t i o n  of  Mc L e a n s v i l l e  Rd  an d   Fr i e d e n  Ch u r c h  Rd  du e  to  tr a f f i c  vo l u m e s .    A st o p l i g h t  sh o u l d  be  ad d e d   to  th e  pr o j e c t .  Ba s e d  on  tr a f f i c  fo r e c a s t s  an d  op e r a t i o n s  an a l y s i s  de s c r i b e d  in Section 2.4.2 of the  EA  fo r  th e  Mc L e a n s v i l l e  Ro a d / F r i e d e n  Ch u r c h  Ro a d  in t e r s e c t i o n ,  a stop‐controlled  in t e r s e c t i o n  wi t h  ex c l u s i v e  le f t ‐tu r n  la n e s  on  al l  ap p r o a c h e s  proposed as part of the  Pr o j e c t  wi l l  pr o v i d e  ac c e p t a b l e  tr a f f i c  op e r a t i o n s  un t i l  approximately 2035.  The  in t e r s e c t i o n  wi l l  be  de s i g n e d  so  th a t  a tr a f f i c  si g n a l  co u l d  be installed when needed  wi t h o u t  ma j o r  ch a n g e s  to  th e  in t e r s e c t i o n .      Cu r r e n t  tr a f f i c  vo l u m e s  do  no t  wa r r a n t  a tr a f f i c  si g n a l .   As traffic volumes increase,  NC D O T  wi l l  re ‐ev a l u a t e  th e  ne e d  fo r  a tr a f f i c  si g n a l  at  the Frieden Church  Ro a d / M c L e a n s v i l l e  Ro a d  in t e r s e c t i o n .   C‐04   1  In t e r e s t  in  wi d t h  of  ro a d  an d  dr a i n a g e  di t c h e s  in  fr o n t  of  my  re s i d e n c e .   [5 7 1 2  Mc L e a n s v i l l e  Rd ]   Th e  pr o p e r t y  at  57 1 2  Mc L e a n s v i l l e  Ro a d  is  lo c a t e d  no r t h  of the McLeansville  Ro a d / F r i e d e n  Ch u r c h  Ro a d  in t e r s e c t i o n ,  be y o n d  th e  estimated Project limits.  The  wi d t h  of  th e  ro a d  an d  dr a i n a g e  di t c h e s  in  fr o n t  of  th i s  residence will be unchanged.      2  Sl o w i n g  do w n  tr a f f i c .    Mc L e a n s v i l l e  Rd  ch a n g e s  fr o m  45  mp h  to  35  mp h   at  my  pr o p e r t y  li n e  [5 7 1 2  Mc L e a n s v i l l e  Rd ] .    Ne i t h e r  Hi g h w a y  Pa t r o l  no r   Gu i l f o r d  Co u n t y  Sh e r r i f f ’ s  De p t .  pa t r o l  fo r  sp e e d e r s .    Sp e e d i n g  tr a f f i c   (5 5  mp h  an d  ov e r )  in c l u d e s  sc h o o l  bu s e s .   Th e  po s t e d  sp e e d  li m i t  fo r  th e  pr o p o s e d  Pr o j e c t  is  45  mph.  The currently posted  35  mp h  sp e e d  li m i t  th r o u g h  th e  ce n t e r  of  Mc L e a n s v i l l e  is not proposed to change as  pa r t  of  th e  Pr o j e c t .          No v e m b e r 2 0 1 3 M c L e a n s v i l l e R o a d G r a d e S e p a r a t i o n O v e r N C R R     Ap p e n d i x  D – Citizen Comments  Ta b l e  D‐1:   Ci t i z e n  Co m m e n t s   DO C U M E N T   NO .   CO M M E N T   NO .   CO M M E N T   RE S P O N S E   C‐05   1  Do n ’ t  cl o s e  Ca r m o n  Rd  cr o s s i n g .    No  sa f e t y  is s u e s  in  43  ye a r s .    7‐8 mi l e   dr i v e  to  ge t  ba c k  to  Kn o x  Rd  on e  wa y .    Do n ’ t  im p o s e  th i s  ex t r a  dr i v e  ti m e   on  th e  pe o p l e  of  Mc L e a n s v i l l e .   NC D O T  cu r r e n t l y  ha s  a pr o g r a m  th a t  ta r g e t s  sp e c i f i c  railroad at‐grade crossings for  cl o s u r e .    Ca r m o n  Ro a d  ha s  be e n  id e n t i f i e d  as  a cr o s s i n g  in need of closure due to the  ge o m e t r i c  de f i c i e n c i e s  an d  tr a i n / v e h i c l e  co l l i s i o n  po t e n t i a l .   Closing the Carmon  Ro a d  ra i l r o a d  cr o s s i n g  an d  gr a d e ‐se p a r a t i n g  th e  Mc L e a n s v i l l e  Road railroad crossing  wi l l  el i m i n a t e  th e  po t e n t i a l  fo r  ve h i c l e ‐tr a i n  co l l i s i o n s  and would improve vehicular  an d  tr a i n  op e r a t i o n s .    Al t h o u g h  th e  tr i p  ma y  be  lo n g e r  for some travelers, all  tr a v e l e r s  wi l l  ha v e  a re l i a b l e ,  al w a y s  op e n  cr o s s i n g  of  the railroad at McLeansville  Ro a d  wi t h  th e  gr a d e  se p a r a t i o n  Pr o j e c t  in  pl a c e .      C‐06   1  I am  co n c e r n e d  ab o u t  yo u r  pl a n s  to  cl o s e  th e  RR  cr o s s i n g  at  Mc L  Rd   du r i n g  co n s t r u c t i o n .    Tr a f f i c  wo u l d  th e n  go  we s t  on  Fr i e d e n  Ch u r c h  Rd   an d  cr o s s  th e  RR  th e r e  in  or d e r  to  ge t  ba c k  on  Mc L  Rd .    Th i s  wo u l d  be  a  lo t  of  tr a f f i c  on  a ve r y  na r r o w  rd  an d  ve r y  bu s y  wi t h  pa r e n t s  dr o p p i n g  of f   ch i l d r e n  an d  sc h o o l  bu s e s  co m i n g  an d  go i n g  in  th e  mo r n i n g  an d  th e   sa m e  pr o b l e m s  in  th e  af t e r n o o n .    It  co u l d  ca u s e  se r i o u s  pr o b l e m s  fo r  th e   em e r g e n c y  ve h i c l e s  th a t  ar e  di s p a t c h e d  fr o m  th e  fi r e  st a t i o n .    I do n ’ t   th i n k  th i s  wo u l d  be  a go o d  id e a  to  ha v e  ju s t  on e  op t i o n  to  cr o s s  th e  RR   an d  ge t  ba c k  on  Mc L  Rd .    Th e  co n g e s t i o n  an d  ac c i d e n t s  wi l l  be  te r r i b l e .    Ho w  do  yo u  pl a n  to  de a l  wi t h  th e  tr a f f i c  co m i n g  we s t  on  Fr i e d e n  Ch u r c h   Rd  fr o m  Gi b s o n v i l l e  wh i l e  yo u  wi l l  be  do i n g  wo r k  at  Fr i e d e n  Ch u r c h  Rd  to   co n n e c t  wi t h  th e  br i d g e ?   Th e r e  wi l l  be  a sh o r t  pe r i o d  wh e r e  cl o s u r e  of  th e  Mc L e a n s v i l l e  Road railroad crossing  is  ne c e s s a r y  in  or d e r  to  co n n e c t  th e  ne w  ro a d / b r i d g e  with the existing roadway.  The  le n g t h  of  ti m e  th e  Mc L e a n s v i l l e  Ro a d  ra i l r o a d  cr o s s i n g  will be closed will be kept to a  mi n i m u m .    Ba s e d  on  cu r r e n t  av a i l a b l e  in f o r m a t i o n ,  it  is estimated closure will last  ap p r o x i m a t e l y  45 ‐90  da y s .    Ev e r y  ef f o r t  wi l l  be  ma d e  to have the closure occur  du r i n g  th e  su m m e r  mo n t h s  wh e n  sc h o o l s  ar e  cl o s e d ;  therefore removing the school  bu s e s  fr o m  ha v i n g  to  us e  th e  de t o u r .    Th e  ex i s t i n g  at ‐grade railroad crossings at  Ca r m o n  Ro a d  to  th e  ea s t  an d  Fr i e d e n  Ch u r c h  Ro a d  to  the west will remain open  du r i n g  co n s t r u c t i o n  of  th e  Pr o j e c t .      Mi n o r  im p r o v e m e n t s  wi l l  be  ma d e  to  th e  se c t i o n  of  Fr i e d e n  Church Road in the  vi c i n i t y  of  it s  ra i l r o a d  cr o s s i n g  (t h e  se c t i o n  wi t h  th e  or a n g e  plastic poles down the  ce n t e r )  to  fa c i l i t a t e  it s  in c r e a s e d  us a g e  by  au t o s ,  bu s e s ,  and large trucks during the  co n s t r u c t i o n  de t o u r  pe r i o d .      C‐07   1  I li v e  at  55 3 5  Hi n e s  An d r e w s  Rd .    As  yo u  ar e  pr o b a b l y  aw a r e ,  we  ar e  no t   ha p p y  wi t h  th e  pr o p o s e d  pl a n .    We  ca n n o t  un d e r s t a n d  wh y  th i s  pr o j e c t ,   wh i c h  mo s t l y  in v o l v e s  th e  ho m e  ow n e r s  be h i n d  ou r  ho u s e ,  be c o m e s  ou r   pr o b l e m  to  so l v e .    No t  on l y  ar e  yo u  co m i n g  ac r o s s  ou r  la n d ,  yo u  wi l l  be   co m i n g  ri g h t  be s i d e  my  mo t h e r ’ s  ho u s e  wh i c h  is  to o  cl o s e  fo r  co m f o r t .      Wh e n  we  bu i l t  ou r  ho u s e  in  19 9 0  on  Hi n e s  An d r e w s  Rd  (d e a d  en d  Rd )   we  ne v e r  im a g i n e d  we  wo u l d  be  de a l i n g  wi t h  NC D O T  wa n t i n g  to  ac q u i r e   ou r  pr o p e r t y  fo r  a ro a d .    Th i s  wi l l  to t a l l y  im p a c t  ou r  li v e s  an d  se p a r a t e   ou r  fa m i l y  la n d .    My  da u g h t e r  is  wa n t i n g  to  bu i l d  a ho u s e  on  th e  la n d   yo u  wa n t  to  co m e  ac r o s s .    Sh e  ha s  th r e e  sm a l l  ch i l d r e n  wh o  wo u l d  be   pl a y i n g  in  th e  ya r d .    We  do  no t  wa n t  to  ha v e  [t o ]  wo r r y  ab o u t  ca r s   co m i n g  ac r o s s  ou r  la n d  wh i l e  th e y  ar e  ou t s i d e .      We  be l i e v e  th e  be s t  pr o p o s a l  wo u l d  be  to  ac q u i r e  or  bu y  ou t  th e   pr o p e r t y  be h i n d  ou r  ho u s e .    Th i s  wo u l d  on l y  im p a c t  th e m  in s t e a d  of   im p a c t i n g  me ,  my  mo t h e r ,  an d  al l  th e  ot h e r  ho m e s  ow n e r s  on  Hi n e s   An d r e w s  Rd .    Th i s  sh o u l d  no t  be  ou r  pr o b l e m .      NC D O T  is  co n d u c t i n g  a se r v i c e  ro a d  st u d y  to  de t e r m i n e  if purchasing the properties  la n d l o c k e d  by  th e  cl o s u r e  of  th e  Bu l l a r d  & Bl a c k  pr i v a t e  railroad crossing is more  co s t  ef f e c t i v e  th a n  pr o v i d i n g  ne w  ro a d w a y  ac c e s s  to  them and upgrading Hines  An d r e w s  Ro a d .          No v e m b e r 2 0 1 3 M c L e a n s v i l l e R o a d G r a d e S e p a r a t i o n O v e r N C R R     Ap p e n d i x  D – Citizen Comments  Ta b l e  D‐1:   Ci t i z e n  Co m m e n t s   DO C U M E N T   NO .   CO M M E N T   NO .   CO M M E N T   RE S P O N S E   C‐08   1  I am  wr i t i n g  to  ex p r e s s  my  co n c e r n s  ab o u t  th e  pr o p o s e d  se r v i c e  ro a d  to   ac c e s s  la n d  be h i n d  my  pr o p e r t y  (5 5 2 7  Hi n e s  An d r e w s  Ro a d ) .    Ev e n   th o u g h  it  is  pr o p o s e d  to  go  on  my  da u g h t e r ’ s  pr o p e r t y  it  im p a c t s  me  th e   mo s t  be c a u s e  it  ru n s  ex t r e m e l y  cl o s e  to  my  ho u s e .    I am  co n c e r n e d   ab o u t  th e  fo l l o w i n g :   1. Th e  lo s s  of  my  pr i v a c y   2. Ne g a t i v e  im p a c t  on  we t l a n d  ar e a   3. Wa t e r  dr a i n a g e  fr o m  my  fr o n t  an d  ba c k  ya r d   4. Th e  pr o x i m i t y  of  my  pr o p a n e  ta n k  to  th e  pr o p o s e d  ro a d   5. Ho w  ma n y  ve h i c l e s  ar e  ex p e c t e d  to  us e  th i s  ro a d   6. Wi l l  th i s  op e n  up  th e  pr o p e r t y  be h i n d  me  fo r  fu t u r e  ho u s i n g  or   bu s i n e s s  de v e l o p m e n t ( ? )    If  so ,  ho w  mu c h  tr a f f i c  wo u l d  be   ex p e c t e d  on  th e  se r v i c e  ro a d .   7. I be l i e v e  th e  pr o p o s e d  ro a d  co u l d  ha v e  a ne g a t i v e  im p a c t  on  th e   va l u e  of  my  ho u s e .   I do  no t  fe e l  I sh o u l d  ha v e  to  be a r  co n c e r n s  of  in c r e a s e d  tr a f f i c ,  de c r e a s e   of  pr i v a c y  an d  po s s i b l e  lo s s  of  va l u e  in  my  ho u s e ,  th e  lo s s  of  we t l a n d   ha b i t a t  an d  th e  pl a n t s  an d  wi l d  li f e  th a t  li v e  in  th e  wo o d s  an d  we t l a n d .    Wh o  be a r s  th e  co s t  of  re s h a p i n g  an d  la n d s c a p i n g  to  pr o v i d e  pr i v a c y  an d   pr o p e r  wa t e r  dr a i n a g e  to  pr e v e n t  po s s i b l e  pr o b l e m s  wi t h  my  se p t i c  an d   we l l .    Wh o  wi l l  pa y  to  ha v e  my  pr o p o n e  ta n k  re l o c a t e d  in  a sa f e r  pl a c e   aw a y  fr o m  th e  se r v i c e  ro a d … .   …. I t  sh o u l d  no t  be  up  to  me  to  be a r  th i s  ne g a t i v e  im p a c t  on  my  li f e  an d   [i t ]  is  un r e a s o n a b l e  to  as k  th e  ta x  pa y e r s  to  ha v e  to  pa y  fo r  th i s   de v e l o p m e n t  to  ma k e  it  po s s i b l e  fo r  a fe w  to  en r i c h  th e i r  po c k e t s  un d e r   th e  gu i s e  of  sa f e t y .    I do  no t  fe e l  I sh o u l d  ha v e  to  be a r  co n c e r n s  of   in c r e a s e d  tr a f f i c ,  de c r e a s e  of  pr i v a c y  an d  po s s i b l y  lo s s  of  va l u e  in  my   ho u s e .    I wo u l d  th i n k  it  wo u l d  be  mo r e  fa i r  an d  co s t  ef f e c t i v e  an d   be n e f i c i a l  to  th e  pu b l i c  to  ta k e  th e  $5 0 0 , 0 0 0  it  wo u l d  co s t  to  bu i l d  th e   se r v i c e  ro a d  an d  us e  th e  mo n e y  to  pu r c h a s e  th e  BU L L A R D  & BL A C K   PR O P E R T Y ,  tu r n  it  in t o  a pa r k ,  sa v e  th e  we t l a n d s .   NC D O T  is  co n d u c t i n g  a se r v i c e  ro a d  st u d y  to  de t e r m i n e  if purchasing the properties  la n d l o c k e d  by  th e  cl o s u r e  of  th e  Bu l l a r d  & Bl a c k  pr i v a t e  railroad crossing is more  co s t  ef f e c t i v e  th a n  pr o v i d i n g  ne w  ro a d w a y  ac c e s s  to  them and upgrading Hines  An d r e w s  Ro a d .   If  a se r v i c e  ro a d  is  co n s t r u c t e d ,  it  wo u l d  no t  im p a c t  an y  jurisdictional wetlands and  wo u l d  be  de s i g n e d  wi t h  dr a i n a g e  me a s u r e s  in  ac c o r d a n c e  with NCDOT standards.   An y  ma j o r  fe a t u r e s  su c h  as  pr o p a n e  ta n k s ,  sh e d s ,  et c .  that would be impacted by the  pr o p o s e d  se r v i c e  ro a d  wo u l d  be  re l o c a t e d  by  NC D O T  or NCDOT would provide  co m p e n s a t i o n .               No v e m b e r 2 0 1 3 M c L e a n s v i l l e R o a d G r a d e S e p a r a t i o n O v e r N C R R     Ap p e n d i x  D – Citizen Comments  Ta b l e  D‐1:   Ci t i z e n  Co m m e n t s   DO C U M E N T   NO .   CO M M E N T   NO .   CO M M E N T   RE S P O N S E   C‐09   1  I am  an  em p l o y e e  of  th e  Ga i l  Mo s e l e y  Ag e n c y .    I st r o n g l y  fe e l  th a t  wi t h o u t  th e  pr o p e r  ac c e s s  an d  ex i t i n g  of  th e  pr o p e r t y   th e r e  is  a sa f e t y  is s u e .    I wo u l d  re s p e c t f u l l y  as k  th a t  yo u  co n s i d e r  pu r c h a s i n g  th a t  pr o p e r t y .    Th e r e  is  a fo r e c l o s e d  ho m e  di r e c t l y  be h i n d  th e  bu i l d i n g  an d  in  ou r   ec o n o m i c  ti m e s  I fe e l  it  is  un s a f e .   NC D O T  is  cu r r e n t l y  ev a l u a t i n g  wh e t h e r  or  no t  dr i v e w a y  access to the Gail Moseley  Na t i o n w i d e  In s u r a n c e  Ag e n c y  pr o p e r t y  ca n  be  pr o v i d e d  without disrupting the  pr o p e r t y ’ s  ex i s t i n g  se p t i c  sy s t e m .    Th e  fi n a l  de t e r m i n a t i o n  will be made during the  ri g h t ‐of ‐wa y  ac q u i s i t i o n  ph a s e  of  th e  Pr o j e c t .    If  th e  dr i v e w a y  access cannot be  re p l a c e d  co s t  ef f e c t i v e l y ,  th e n  NC D O T  wi l l  wo r k  wi t h  the property owner regarding  co m p e n s a t i o n  or  pu r c h a s e  in  ac c o r d a n c e  wi t h  th e  Un i f o r m  Relocation Assistance  an d  Re a l  Pr o p e r t y  Ac q u i s i t i o n  Po l i c i e s  Ac t .           C‐10   1  I am  th e  of f i c e  ma n a g e r  of  th e  Ga i l  Mo s e l e y  Ag e n c y / N a t i o n w i d e   In s u r a n c e  lo c a t e d  at  56 0 0  Mc L e a n s v i l l e  Ro a d  Mc L e a n s v i l l e ,  NC .    It  is  my   un d e r s t a n d i n g  th a t  wi t h  th e  pr o p o s e d  ch a n g e s  th a t  ar e  cu r r e n t l y  in   pl a c e ,  ou r  of f i c e  is  no t  sc h e d u l e d  to  be  pu r c h a s e d  bu t  wi l l  no  lo n g e r  be   ac c e s s i b l e  fr o m  Mc L e a n s v i l l e  Ro a d  an d  wi l l  be  at  th e  en d  of  a de a d ‐en d   st r e e t  (B e t h e l  Ch u r c h  Ro a d )  – ne x t  to  a fo r e c l o s e d  pr o p e r t y .    Be c a u s e  of   th i s ,  I fe e l  th a t  it  wi l l  be  pu t t i n g  me  an d  th e  ot h e r  em p l o y e e s  of  th i s   of f i c e  in  a ve r y  un s a f e  si t u a t i o n .    No t  on l y  wi l l  it  be  un s a f e  fo r  th e   em p l o y e e s ,  bu t  cu s t o m e r s  wo u l d  no  lo n g e r  ha v e  ac c e s s  to  ou r  pr o p e r t y   wi t h o u t  go i n g  th r o u g h  a pe r m a n e n t  de t o u r .     Ou r  bu s i n e s s ,  th a t  de p e n d s  on  wa l k ‐in  tr a f f i c ,  dr i v e ‐by  tr a f f i c  an d   vi s i b i l i t y  wi l l  no t  be  ab l e  to  su s t a i n  an d / o r  gr o w .   We  ch o s e  ou r  lo c a t i o n   ba s e d  up o n  vi s i b i l i t y  an d  th e  am o u n t  of  tr a f f i c  th a t  pa s s e s  ou r  of f i c e  on   a da i l y  ba s i s .    Ac c o r d i n g  to  th e  cu r r e n t  pl a n ,  th e  tr a f f i c  wi l l  de c r e a s e   fr o m  ap p r o x i m a t e l y  10 , 0 0 0  ca r s  pe r  da y  to  ZE R O .    Ne w  cu s t o m e r s  ar e   no t  go i n g  to  se e k  ou r  of f i c e .    Th e  bu s i n e s s  wi l l  be c o m e  st a g n a n t  an d   ev e n t u a l l y  ei t h e r  ha v e  to  la y  of f  em p l o y e e s  or  po s s i b l y  cl o s e .    It  is  un f a i r   th a t  ou r  of f i c e  ca n n o t  be  pu r c h a s e d  so  th a t  we  ca n  mo v e  to  a su i t a b l e   lo c a t i o n  th a t  ca n  al l o w  us  to  co n t i n u e  to  se r v i c e  ou r  ex i s t i n g  cu s t o m e r s   an d  gr o w  th e  bu s i n e s s  as  we  pl a n n e d  to .   We  se r v i c e  a la r g e  am o u n t  of  se n i o r  ci t i z e n s  in  th i s  ar e a  – no t  on l y  fo r   in s u r a n c e ,  bu t  fo r  fr e e  no t a r y  se r v i c e ,  co p i e s ,  fa x  se r v i c e ,  et c .    Th o s e   fo l k s  ne e d  ea s e  in  ac c e s s  of  th e  pr o p e r t y .   At  th i s  po i n t ,  we  ar e  pl e a d i n g  to  NC D O T  an d  th e  de c i s i o n  ma k e r s  to   pu r c h a s e  th i s  pr o p e r t y  so  th a t  we  ca n  co n t i n u e  to  se r v i c e  th e  wo n d e r f u l   pe o p l e  in  th i s  co m m u n i t y .   Se e  re s p o n s e  to  Co m m e n t  1 in  le t t e r  C‐09 .        C‐11   1  I am  a lo y a l  cu s t o m e r  of  Na t i o n w i d e  an d  do  my  bu s i n e s s  at  th e   Mc l e a n s v i l l e  of f i c e .    Th e  pe r s o n n e l  th e r e  is  wo n d e r f u l  wi t h  aw e s o m e ,   pr o f e s s i o n a l ,  an d  pr o m p t  cu s t o m e r  se r v i c e  sk i l l s  an d  I ST R O N G L Y   SU G G E S T  th a t  NC D O T  pu r c h a s e  th e i r  bu i l d i n g  so  th a t  th e y  ca n  mo v e  to  a  sa f e r ,  mo r e  ac c e s s i b l e  bu i l d i n g .   Se e  re s p o n s e  to  Co m m e n t  1 in  le t t e r  C‐09 .               No v e m b e r 2 0 1 3 M c L e a n s v i l l e R o a d G r a d e S e p a r a t i o n O v e r N C R R     Ap p e n d i x  D – Citizen Comments  Ta b l e  D‐1:   Ci t i z e n  Co m m e n t s   DO C U M E N T   NO .   CO M M E N T   NO .   CO M M E N T   RE S P O N S E   C‐12   1  As  yo u  ar e  aw a r e  NC D O T  is  pl a n n i n g  to  bu i l d  a br i d g e  ov e r  th e  ex i s t i n g   ra i l r o a d  cr o s s i n g  lo c a t e d  ve r y  cl o s e  to  th e  Ga i l  Mo s l e y  Ag e n c y  lo c a t e d  at   Mc L e a n s v i l l e  Rd ,  Mc L e a n s v i l l e ,  NC .  Al s o ,  I un d e r s t a n d  th a t  Be t h e l  Ch u r c h   Rd  wi l l  be c o m e  a de a d  en d  ro a d  wh i c h  is  th e  al t e r n a t i v e  ro u t e  to  th e   of f i c e .  Th i s  wi l l  st o p  al l  ac c e s s  fo r  my s e l f  an d  ot h e r s  fr o m  Mc L e a n s v i l l e   Rd .  Th i s  is  ve r y  co n c e r n i n g  fo r  me  as  a co n s u m e r .   I am  ur g i n g  yo u  an d  wh o m  el s e  is  in v o l v e d  wi t h  de c i s i o n  ma k i n g  pr o c e s s   to  ar r a n g e  to  pu r c h a s e  th e  pr o p e r t y  wh i c h  Na t i o n w i d e  is  cu r r e n t l y   es t a b l i s h e d .  It  is  ex t r e m e l y  un f a i r  to  us  as  co n s u m e r s  wh e n  we  ca n n o t   ac c e s s  th e i r  of f i c e  fo r  pa y m e n t s ,  qu e s t i o n s  an d  as s i s t a n c e  as  ne e d e d .   Wi t h o u t  th e  pu r c h a s e  of  th e  pr o p e r t y  an d  ri g h t l y  du e  fu n d s  th e  of f i c e   wi l l  cl o s e  fo r c i n g  us ,  th e  co n s u m e r s ,  to  mo v e  ou r  bu s i n e s s .  I am  ve r y   sa t i s f i e d  wi t h  th e  se r v i c e  I re c e i v e  fr o m  th i s  lo c a t i o n  an d  do  no t  wi s h  to   tr a n s f e r  my  bu s i n e s s  to  an y  ot h e r  Na t i o n w i d e  br a n c h .  If  ne c e s s a r y  I wi l l   gl a d l y  go  to  an o t h e r  lo c a t i o n  wh i c h  th e  se r v i c e  pr o v i d e r s  ar e  th e  sa m e .   Ag a i n ,  I DO  NO T  WI S H  to  be  fo r c e d  to  mo v e  to  an o t h e r  ag e n c y .  I ha v e   be e n  ex t r e m e l y  sa t i s f i e d  wi t h  th e  se r v i c e  my  fa m i l y  an d  I re c e i v e  fr o m   th e s e  ag e n t s  an d  re f u s e  to  ac c e p t  se r v i c e  fr o m  an o t h e r  ag e n t .   Se e  re s p o n s e  to  Co m m e n t  1 in  le t t e r  C‐09 .        C‐13   1  As  a lo n g ‐ti m e  cl i e n t  of  Na t i o n w i d e  In s u r a n c e  on  Mc L e a n s v i l l e  Ro a d ,  I  am  ve r y  co n c e r n e d  to  le a r n  th a t  th e  NC D O T  do e s  no t  pl a n  to  pu r c h a s e   Na t i o n w i d e ' s  bu i l d i n g  th a t  wi l l  be  cu t  of f  by  th e  pr o p o s e d  ne w  br i d g e .  I  am  su r e  th a t  yo u  ar e  we l l ‐aw a r e  of  th e  ec o n o m i c  co n d i t i o n s  in  ou r  st a t e ,   wh i c h  ha v e  ma d e  it  di f f i c u l t  en o u g h  fo r  bu s i n e s s e s  to  op e r a t e  in  re c e n t   ye a r s .  It  is  di s a p p o i n t i n g  th a t  a bu s i n e s s  wo u l d  be  fu r t h e r  ha m p e r e d  by  a  go v e r n m e n t  or g a n i z a t i o n .   I vi s i t  th i s  of f i c e  lo c a t i o n  re g u l a r l y ,  fo r  re v i e w s  of  my  in s u r a n c e  po l i c y ,  to   ch a n g e  ve h i c l e s ,  ma k e  up d a t e s ,  et c .  Al t h o u g h  I lo v e  th i s  co m p a n y  an d  it s   em p l o y e e s  en o u g h  to  re m a i n  a lo y a l  cu s t o m e r  ev e n  if  I am  un a b l e  to   ac c e s s  th e i r  lo c a t i o n ,  I al s o  re c o g n i z e  th a t  no t  ev e r y o n e  wi l l  fe e l  th e   sa m e ,  an d  I kn o w  th a t  re v i e w i n g  my  in s u r a n c e  po l i c i e s  fo r  ch a n g e s  to  be   ma d e  wi l l  be  fa r  le s s  ef f e c t i v e l y  do n e  vi a  ph o n e  or  em a i l .  I re s p e c t f u l l y   en c o u r a g e  th e  NC D O T  to  re c o n s i d e r  th i s  de c i s i o n ,  wh i c h  is  in  no  wa y  in   th e  be s t  in t e r e s t s  of  a lo c a l  sm a l l  bu s i n e s s  an d / o r  ou r  co m m u n i t y .   Se e  re s p o n s e  to  Co m m e n t  1 in  le t t e r  C‐09 .               No v e m b e r 2 0 1 3 M c L e a n s v i l l e R o a d G r a d e S e p a r a t i o n O v e r N C R R     Ap p e n d i x  D – Citizen Comments  Ta b l e  D‐1:   Ci t i z e n  Co m m e n t s   DO C U M E N T   NO .   CO M M E N T   NO .   CO M M E N T   RE S P O N S E   C‐14   1  Se e m s  th a t  yo u  al l  do  no t  ca r e  fo r  ot h e r  pe o p l e ,  yo u  al l  ne e d  to  bu y  th e   Na t i o n w i d e  bu i l d i n g  on  Mc L e a n s v i l l e  Rd ,  be c a u s e  yo u  al l  do n ’ t  se e m  to   ca r e  ab o u t  th e  im p a c t  of  ot h e r s .    If  yo u  al l  ha v e  th e  mo n e y  or  fu n d s  to   bu i l d  a br i d g e  th e n  yo u  ca n  bu y  th i s  in s u r a n c e  bu i l d i n g  so  us  pa y i n g   cu s t o m e r s  ca n  co n t i n u e  to  do  bu s i n e s s  wi t h  ou r  ag e n t s .    I ha v e  be e n   wi t h  Ga i l  Mo s e l e y  fo r  ye a r s  an d  I do n ’ t  ne e d  yo u  al l  to  co m e  in  an d  me s s   th i s  up .    If  yo u  ca n ’ t  bu y  th e  bu i l d i n g  so  we  ca n  co n t i n u e  to  go  in  an d  pa y   ou r  in s u r a n c e  th e n  le a v e  th i n g s  al o n e .    Ma y b e  yo u  al l  do n ’ t  ca r e  bu t   th i n k ,  ju s t  th i n k  ab o u t  th e  ot h e r  pe o p l e  yo u  wi l l  be  af f e c t i n g ,  cu s t o m e r s   dr i v e  ve r y  fa r  to  pa y  th e i r  bi l l  he r e  so  al l  we  ar e  as k i n g  is  to  bu y  th i s   bu i l d i n g  so  th a t  we  ca n  ha v e  a pl a c e  to  go  fo r  ou r  in s u r a n c e .    I do  no t   wa n t  to  ch a n g e  my  ag e n t s .      Se e  re s p o n s e  to  Co m m e n t  1 in  le t t e r  C‐09 .        C‐15   1  I am  wr i t i n g  yo u  in  re g a r d s  to  th e  ne c e s s a r y  pu r c h a s e  of  th e  Ga i l   Mo s e l e y  pr o p e r t y  in  Mc L e a n s v i l l e  on  th e  co r n e r  of  Mc L e a n s v i l l e  Ro a d   an d  Be t h e l  Ch u r c h  Ro a d .  My  fa m i l y  ha s  do n e  bu s i n e s s  wi t h  th i s  ag e n c y   fo r  qu i t e  a wh i l e .  I un d e r s t a n d  th a t  pr o g r e s s i o n  ha s  to  co n t i n u e  in  ou r   wo r l d  to  ma k e  th i n g s  ea s i e r  an d / o r  mo r e  co n v e n i e n t .  Bu t  I mu s t  sa y  th a t   I do n ’ t  se e  an y  co n v e n i e n c e  fo r  th i s  ag e n c y  or  th e i r  cu s t o m e r s  as  fa r  as   ac c e s s i b i l i t y .  My  un d e r s t a n d i n g  is  Be t h e l  Ch u r c h  Ro a d  wi l l  de a d  en d  an d   th e  ag e n c y ’ s  pa r k i n g  lo t  wi l l  no t  be  ac c e s s i b l e  fr o m  Mc L e a n s v i l l e  Ro a d .   So ,  th e r e f o r e ,  ho w  wi l l  cu s t o m e r  go  by  to  pa y  th e i r  bi l l  or  ta l k  to  Sa n d i  or   Tr a c y  or  ot h e r  em p l o y e e s  ab o u t  in s u r a n c e  ma t t e r s ?  I ha v e  em a i l e d  ba c k   an d  fo r t h  wi t h  Sa n d i  an d  fe e l  th a t  th e  ag e n c y ’ s  pr o p e r t y  ne e d s  to  be   pu r c h a s e d  by  th e  st a t e  so  th e y  ca n  mo v e  to  a mu c h  sa f e r  an d  mo r e   ac c e s s i b l e  lo c a t i o n .  If  th i s  do e s n ’ t  ha p p e n ,  ho w  wi l l  th e y  be  ab l e  to   co n d u c t  bu s i n e s s  on  a da i l y  ba s i s ?  Sa n d i  di d  me n t i o n  th a t  a po s s i b l e   dr i v e w a y  co u l d  be  ma d e  fr o m  Be t h e l  Ch u r c h  Ro a d  to  ge t  to  th e  bu i l d i n g ,   bu t  th a t  wo u l d  ca u s e  a lo t  of  fo l k s  to  ha v e  to  go  “a r o u n d  th e  el b o w  to   ge t  to  th e  th u m b ”  so  to  sp e a k .  Pl e a s e  do  co n s i d e r  ou r  re a s o n i n g  on  th i s   ma t t e r .  Al t h o u g h  I ag r e e  wi t h  pr o g r e s s ,  I do n ’ t  ag r e e  wi t h  th e  po s s i b i l i t y   of  ta k i n g  a co m p a n y ’ s  bu s i n e s s  aw a y .  An d  th a t  wo u l d  pr o b a b l y  ha p p e n .   Pu t  yo u r s e l f  in  th e i r  po s i t i o n .  Wh a t  wo u l d  yo u  wa n t ?   Se e  re s p o n s e  to  Co m m e n t  1 in  le t t e r  C‐09 .               No v e m b e r 2 0 1 3 M c L e a n s v i l l e R o a d G r a d e S e p a r a t i o n O v e r N C R R     Ap p e n d i x  D – Citizen Comments  Ta b l e  D‐1:   Ci t i z e n  Co m m e n t s   DO C U M E N T   NO .   CO M M E N T   NO .   CO M M E N T   RE S P O N S E   C‐16   1  My  so n  an d  I ar e  cu s t o m e r s  of  th e  Na t i o n w i d e  In s u r a n c e  co m p a n y   wh o s e  of f i c e  is  lo c a t e d  on  th e  co r n e r  of  Mc L e a n s v i l l e  Rd  an d  Be t h e l   Ch u r c h  Rd  in  Mc L e a n s v i l l e ,  NC .    We  ha v e  be e n  ad v i s e d  th a t  we  wi l l  ha v e   no  ac c e s s  to  th a t  of f i c e  wh e n  yo u  cl o s e  of f  bo t h  ro a d s .   We  ar e  pl e a d i n g  wi t h  yo u  to  pu r c h a s e  th e i r  pr o p e r t y  so  th e y  ca n  mo v e   to  an o t h e r  lo c a t i o n  th a t  wi l l  be  ac c e s s i b l e  to  us  an d  sa f e r  fo r  th e m .    We   un d e r s t a n d  th a t  th e y  ca n n o t  us e  th e  ba c k  po r t i o n  of  th a t  pr o p e r t y  to   ga i n  ac c e s s  to  Be t h e l  Ch u r c h  Rd  be c a u s e  of  th e  se p t i c  sy s t e m .    Ag a i n  we   be g  yo u  to  re c o n s i d e r  pu r c h a s i n g  th e i r  pr o p e r t y .   Se e  re s p o n s e  to  Co m m e n t  1 in  le t t e r  C‐09 .        C‐17   1  We  ar e  se n d i n g  yo u  th i s  le t t e r  in  re s p o n s e  ab o u t  my  LO C A L  Na t i o n w i d e   In s u r a n c e  Ag e n t .    It  is  to  my  un d e r s t a n d i n g  th a t  yo u  ar e  go i n g  to  bu i l d  an   ov e r p a s s  th a t  ef f e c t s  US  go i n g  in  to  pa y  ou r  ho m e o w n e r s ,  au t o m o b i l e ,   bo a t ,  an d  or  bu s i n e s s  pa y m e n t s  an d / o r  do  an y  ot h e r  bu s i n e s s  wi t h  my   ag e n t ,  Ga i l  Mo s l e y  an d  he r  as s i s t a n t s ‐‐ Sa n d i  an d  Tr a c y . …    I un d e r s t a n d   th a t  yo u  ar e  go i n g  to  cu t  of f  ac c e s s  to  he r  bu i l d i n g  vi a  Mc L e a n s v i l l e  Rd .    Th i s  me a n s  th a t  I wi l l  ha v e  to  fi n d  th e  al t e r n a t e  ro u t e  to  be  ab l e  to  en t e r   fr o m  Be t h e l  Ch u r c h  Rd .  to  wh i c h  at  th i s  ti m e  I am  no t  ex a c t l y  su r e  to   co m e  in  fr o m  an o t h e r  di r e c t i o n .    I do  no t  wi s h  to  be  dr i v i n g  th r o u g h  he r   se p t i c  dr a i n  fi e l d  li n e s  to  be  ab l e  to  go  in  an d  do  my  bu s i n e s s .    Ar e  yo u   go i n g  to  mo v e  th e s e  dr a i n  fi e l d s ,  ma k e  he r  a ne w  pa r k i n g  lo t  or  wh a t ?    I  th i n k  yo u  sh o u l d  al s o  pu r c h a s e  th e  la n d  an d  bu i l d i n g  wh e r e  Na t i o n w i d e   is  lo c a t e d  an d  pu t  a st o p  to  th i s  ma d n e s s  an d  le t  he r  bu s i n e s s  co n t i n u e   to  gr o w  in  th e  Mc L e a n s v i l l e  ar e a .    I kn o w  se v e r a l  of  he r  cu s t o m e r s  an d   we  ar e  al l  wi l l i n g  to  he l p  he r  fi g h t  fo r  th e  sa l e  an d  wi l l  do  wh a t e v e r  sh e   ne e d s .    If  th i s  we r e  my  bu s i n e s s  th e r e ,  I wo u l d n ' t  wa n t  to  be  up  un d e r   th e  ov e r p a s s .   Se e  re s p o n s e  to  Co m m e n t  1 in  le t t e r  C‐09 .        C‐18   1  Th i s  is  be i n g  se n t  to  yo u  ex p r e s s i n g  my  co n c e r n s  fo r  th e  MA J O R  wo r k   yo u  pl a n  to  do  at  th e  Ra i l r o a d  Cr o s s i n g  on  Mc L e a n s v i l l e  Ro a d .    Pe r s o n a l l y ,  I do  no t  un d e r s t a n d  wh y  th i s  ha s  to  be  do n e  at  al l .  Th e   cr o s s i n g  is  in  ex c e l l e n t  co n d i t i o n  no w  an d  is  ma i n t a i n e d  ve r y  we l l .    Th e   st i m u l u s  mo n e y  th a t  is  "t a r g e t e d "  fo r  th i s ,  sh o u l d  be  re t u r n e d  to   Wa s h i n g t o n .    Mo r e  di r e  ne e d s  to  be  ta k e n  ca r e  of  ‐   fo r  in s t a n c e ,  br i d g e s   an d  ro a d s .   Gr a d e ‐se p a r a t i n g  th e  Mc L e a n s v i l l e  Ro a d  ra i l r o a d  cr o s s i n g  and closing the Carmon  Ro a d  ra i l r o a d  cr o s s i n g  wi l l  el i m i n a t e  th e  po t e n t i a l  fo r  vehicle‐train collisions and  wo u l d  im p r o v e  ve h i c u l a r  an d  tr a i n  op e r a t i o n s .    Fu n d i n g  for the Project is anticipated  to  co m e  fr o m  th e  Am e r i c a n  Re c o v e r y  an d  Re i n v e s t m e n t  Act (ARRA) and cannot be  us e d  fo r  pr o j e c t s  th a t  ar e  no t  ra i l ‐re l a t e d .           No v e m b e r 2 0 1 3 M c L e a n s v i l l e R o a d G r a d e S e p a r a t i o n O v e r N C R R     Ap p e n d i x  D – Citizen Comments  Ta b l e  D‐1:   Ci t i z e n  Co m m e n t s   DO C U M E N T   NO .   CO M M E N T   NO .   CO M M E N T   RE S P O N S E   C‐18    (c o n t . )   2  Ho w e v e r ,  if  yo u  st i l l  pl a n  to  go  ah e a d  wi t h  th i s  pr o j e c t  th e n  wh y  is  th e   St a t e  no t  pu r c h a s i n g  th e  pr o p e r t y  th a t  is  lo c a t e d  at  th i s  cr o s s i n g  ‐   On e  of   th e  pr o p e r t i e s  is  a bu s i n e s s .    Th i s  wi l l  vi r t u a l l y  cl o s e  th i s  pe r s o n ' s   bu s i n e s s  as  no  on e  wi l l  ha v e  ac c e s s  to  he r  bu i l d i n g .    Th i s  pr o p e r t y  ne e d s   to  be  pu r c h a s e d  in  or d e r  fo r  th e  ow n e r  to  lo c a t e  to  a be t t e r  an d  sa f e r   lo c a t i o n .    Wh y  do e s  th e  go v e r n m e n t  wa n t  to  ha r m  ou r  ci t i z e n s  wh o  ha v e   do n e  no t h i n g  wr o n g  ‐   bu t  wi l l  pa y  a pr i c e  du e  to  th e  fi a s c o  in   Wa s h i n g t o n  an d  no w  in  No r t h  Ca r o l i n a .   Se e  re s p o n s e  to  Co m m e n t  1 in  le t t e r  C‐09 .          3  By  th e  wa y ,  wh a t  is  go i n g  to  ha p p e n  on  Ma i n  St r e e t  in  Gi b s o n v i l l e ?    Wi l l   th e  wh o l e  to w n  be  cl o s e d  do w n ? ? ?   An y  tr a n s p o r t a t i o n  im p r o v e m e n t s  in  Gi b s o n v i l l e  ar e  not a part of the McLeansville  Ro a d  Gr a d e  Se p a r a t i o n  Pr o j e c t .      C‐19   1  RE :  Bu i l d i n g  be l o n g i n g  to  th e  Ga i l  Mo s e l e y  In s u r a n c e   Pl e a s e  pu r c h a s e  th e i r  bu i l d i n g .    I ha v e  ha d  in s u r a n c e  wi t h  th e m  fo r  a  ve r y  lo n g  ti m e  an d  pe r i o d i c a l l y  ha v e  to  go  in  th e r e  to  do  bu s i n e s s .    I  do n ’ t  li k e  th e  id e a  of  it  be i n g  un s a f e  fo r  th e m  to  wo r k  th e r e .    Th a n k s  fo r   co n s i d e r i n g  th i s .   Se e  re s p o n s e  to  Co m m e n t  1 in  le t t e r  C‐09 .        C‐20   1  It  ha s  co m e  to  my  at t e n t i o n  th a t  a br i d g e  is  to  be  bu i l t  in  th i s  ar e a  wh i c h   wi l l  gr e a t l y  im p a c t  th e  Na t i o n w i d e  of f i c e .    Th i s  of f i c e  ha s  be e n  in   op e r a t i o n  at  th i s  si t e  si n c e  20 0 6  an d  is  a gr e a t  as s e t  to  th e  lo c a l   co m m u n i t y .    Ap p r o x i m a t e l y  12 0 0  cu s t o m e r s  us e  th i s  of f i c e  to  co n d u c t   th e i r  bu s i n e s s  an d  ha v e  co m e  to  de p e n d  on  it s  lo c a t i o n .    We  un d e r s t a n d   th a t  on c e  th e  bu i l d i n g  of  th e  br i d g e  is  do n e ,  ac c e s s i b i l i t y  fo r  th e   cu s t o m e r s  wi l l  be  gr e a t l y  af f e c t e d  in  a ne g a t i v e  wa y .    Pl e a s e  ha v e  th e   NC D O T  pu r c h a s e  th i s  lo t  so  th a t  th e y  ca n  re l o c a t e  to  a mo r e  ac c e s s i b l e   lo c a t i o n .    Th i s  wi l l  be n e f i t  so  ma n y  an d  he l p  th e  co m m u n i t y  in  so  ma n y   wa y s .    Th a n k  yo u  fo r  yo u r  ti m e  an d  co n s i d e r a t i o n  in  th i s  im p o r t a n t   ma t t e r .   Se e  re s p o n s e  to  Co m m e n t  1 in  le t t e r  C‐09 .        C‐21   1  Re :  Pr o p e r t y  Ow n e r  – Ga i l  Mo s e l e y   Ad v e r s e  im p a c t  st a t e m e n t  an d  re q u e s t  fo r  re c o n s i d e r a t i o n  of  pr o p e r t y   ta k i n g  re g a r d i n g  56 0 0  Mc L e a n s v i l l e  Ro a d   I am  wr i t i n g  on  be h a l f  of  Ga i l  Mo s e l e y ,  ow n e r  of  re a l  pr o p e r t y  lo c a t e d  at   56 0 0  Mc L e a n s v i l l e  Ro a d ,  Mc L e a n s v i l l e ,  No r t h  Ca r o l i n a .    Ms .  Mo s e l e y  ha s   op e r a t e d  he r  bu s i n e s s ,  Ga i l  Mo s e l e y  Ag e n c y ,  In c .  db a  Na t i o n w i d e   In s u r a n c e ,  at  th i s  lo c a t i o n  fo r  th e  pa s t  se v e n  ye a r s .    Al o n g  wi t h  ot h e r   ne i g h b o r i n g  pr o p e r t y  ow n e r s ,  Ms .  Mo s e l e y  wa s  ad v i s e d  of  th e  No r t h   Ca r o l i n a  De p a r t m e n t  of  Tr a n s p o r t a t i o n ’ s  (N C D O T )  pr o p o s e d  pr o j e c t  to   co n s t r u c t  a br i d g e  on  Mc L e a n s v i l l e  Ro a d  ov e r  th e  No r t h  Ca r o l i n a   Ra i l r o a d  tr a c k s ,  wh i c h  wo u l d  in c l u d e  al t e r n a t e  ro a d w a y  al i g n m e n t s  fo r   Mc L e a n s v i l l e  Ro a d  wh e r e  he r  bu s i n e s s  is  lo c a t e d .    Af t e r  le a r n i n g  of  th e   pr o p o s e d  pr o j e c t ,  Ms .  Mo s e l e y  at t e n d e d  th e  va r i o u s  NC D O T  wo r k s h o p s   Se e  re s p o n s e  to  Co m m e n t  1 in  le t t e r  C‐09 .               No v e m b e r 2 0 1 3 M c L e a n s v i l l e R o a d G r a d e S e p a r a t i o n O v e r N C R R     Ap p e n d i x  D – Citizen Comments  Ta b l e  D‐1:   Ci t i z e n  Co m m e n t s   DO C U M E N T   NO .   CO M M E N T   NO .   CO M M E N T   RE S P O N S E   on  th e  ma t t e r  an d  al s o  di s c u s s e d  th e  fa t e  of  he r  pr o p e r t y  an d  bu s i n e s s   wi t h  yo u  an d  an o t h e r  NC D O T  re p r e s e n t a t i v e  at  wh i c h  ti m e s  sh e   fo r t h r i g h t l y  vo i c e d  he r  co n c e r n  an d  po s i t i o n  ab o u t  th e  ad v e r s e   ec o n o m i c  im p a c t  to  he r  bu s i n e s s .    Fr o m  th o s e  di s c u s s i o n s  an d   in f o r m a t i o n ,  as  la t e  as  No v e m b e r  20 1 2 ,  Ms .  Mo s e l e y  be l i e v e d  th a t   NC D O T  ag r e e d  th a t  he r  bu s i n e s s  wo u l d  be  ad v e r s e l y  im p a c t e d  an d  th a t   he r  pr o p e r t y  wo u l d  be  ta k e n .    Th e r e a f t e r ,  sh e  aw a i t e d  an  of f e r  fr o m   NC D O T  to  pu r c h a s e  he r  pr o p e r t y .    La s t  mo n t h ,  yo u  ad v i s e d  Ms .  Mo s e l e y   th a t  NC D O T  ha s  ch o s e n  th e  ro a d w a y  re a l i g n m e n t  of  Mc L e a n s v i l l e  Ro a d   kn o w n  as  ‘P ‐52 0 4  Al t e r n a t i v e  A’ ,  a co p y  of  wh i c h  yo u  se n t  to  he r  an d  I  ha v e  re v i e w e d .      Fu r t h e r m o r e ,  yo u  ad v i s e d  th a t  NC D O T  wo u l d  no t  be  ta k i n g  an y  of  Ms .   Mo s e l e y ’ s  pr o p e r t y ,  as  a re s u l t  of  th e  ro a d  re a l i g n m e n t ,  be c a u s e  he r   pr o p e r t y  wa s  no t  co n s i d e r e d  im p a c t e d .    Ms .  Mo s e l e y  st r o n g l y  di s a g r e e s   wi t h  th e  NC D O T ’ s  de c i s i o n  no t  to  ta k e  he r  pr o p e r t y  an d  no t  to  ma k e  an   of f e r  to  pu r c h a s e  sa m e .    Th e  re a l i g n m e n t  of  Mc L e a n s v i l l e  Ro a d  wi l l  ha v e   an  ad v e r s e  im p a c t  on  Ms .  Mo s e l e y ’ s  bu s i n e s s  an d  sh e  wi l l  su f f e r   su b s t a n t i a l  bu s i n e s s  ec o n o m i c  lo s s  in  wa y s  wh i c h  in c l u d e ,  bu t  ar e  no t   li m i t e d ,  to  th e  fo l l o w i n g :     2  1.  Th e r e  wi l l  be  no  tr a f f i c  pa s s i n g  by  Ms .  Mo s e l e y ’ s  bu s i n e s s .    Ac c o r d i n g   to  ‘P ‐52 0 4  Al t e r n a t i v e  A’ ,  af t e r  th e  re a l i g n m e n t  of  Mc L e a n s v i l l e  Ro a d ,   Ms .  Mo s e l e y ’ s  bu s i n e s s  wi l l  be  lo c a t e d  at  th e  en d  of  a de a d  en d  st r e e t .    It  is  he r  un d e r s t a n d i n g  th a t  th e  po r t i o n  of  Mc L e a n s v i l l e  Ro a d  wh i c h   cu r r e n t l y  ru n s  in  fr o n t  of  he r  bu s i n e s s  wi l l  be  co m p l e t e l y  cl o s e d  to   tr a f f i c .    Th e  on l y  pe r s o n s  tr a v e l i n g  do w n  Be t h e l  Ch u r c h  Ro a d ,  wh i c h  ru n s   ad j a c e n t  to  th e  we s t e r n  si d e  an d  ba c k  of  he r  bu i l d i n g ,  wi l l  be  th e  ve r y   fe w  pr o p e r t y  ow n e r s  an d / o r  re s i d e n t s  re m a i n i n g  on  th e  ro a d .   Ac c o r d i n g  to  th e  ‘2 0 1 2  Al t e r n a t i v e  1 – No  Bu i l d  av e r a g e  an n u a l  da i l y   tr a f f i c  di a g r a m ’ ,  ap p r o x i m a t e l y  9, 8 0 0  ve h i c l e s  tr a v e l  th e  po r t i o n  of   Mc L e a n s v i l l e  Ro a d  th a t  wi l l  be  cl o s e d  an d  re a l i g n e d ;  an d  ap p r o x i m a t e l y   2, 0 0 0  ve h i c l e s  tr a v e l  Be t h e l  Ch u r c h  Ro a d  to  an d  fr o m  Mc L e a n s v i l l e  Ro a d   to  th a t  sa m e  po r t i o n .    Af t e r  th e  pr o p o s e d  re a l i g n m e n t ,  NO N E  of  th e s e   ve h i c l e s  wi l l  pa s s  Ms .  Mo s e l e y ’ s  bu s i n e s s  an y  lo n g e r  on  th e  Mc L e a n s v i l l e   Ro a d  si d e  an d  th e  ve h i c l e  co u n t  wi l l  be  dr a s t i c a l l y  re d u c e d  to  pr a c t i c a l l y   no n e  on  th e  Be t h e l  Ch u r c h  Ro a d  si d e .    Ms .  Mo s e l e y  de r i v e s  th e  va s t   ma j o r i t y  of  he r  cl i e n t s  fr o m  ‘w a l k ‐in s ’  wh o  se e  he r  of f i c e  wh i l e  tr a v e l i n g   on  Mc L e a n s v i l l e  Ro a d .    Af t e r  th e  re a l i g n m e n t ,  Ms .  Mo s e l e y ’ s  bu s i n e s s   wi l l  no t  be  vi s i b l e  fr o m  Mc L e a n s v i l l e  Ro a d  an d  th e  af o r e s a i d  ‘w a l k ‐in ’   bu s i n e s s  wi l l  be  lo s t .    In d e e d ,  th e  bu s i n e s s  wi l l  no t  be  vi s i b l e  fr o m  an y   ro a d  an d  th e  ON L Y  wa y  a pe r s o n  ca n  ge t  to  he r  of f i c e  is  if  th a t  pe r s o n   Se e  re s p o n s e  to  Co m m e n t  1 in  le t t e r  C‐09 .               No v e m b e r 2 0 1 3 M c L e a n s v i l l e R o a d G r a d e S e p a r a t i o n O v e r N C R R     Ap p e n d i x  D – Citizen Comments  Ta b l e  D‐1:   Ci t i z e n  Co m m e n t s   DO C U M E N T   NO .   CO M M E N T   NO .   CO M M E N T   RE S P O N S E   al r e a d y  pl a n n e d  to  tr a v e l  Be t h e l  Ch u r c h  Ro a d .    Ms .  Mo s e l e y ’ s  bu s i n e s s  is   th e  ON L Y  BU S I N E S S  in  he r  im m e d i a t e  ar e a  an d  fo r  mi l e s  in  ea c h   di r e c t i o n .    He r  bu s i n e s s  si m p l y  wi l l  no t  su r v i v e  fi n a n c i a l l y  af t e r  th e   re a l i g n m e n t  if  it  is  si m p l y  le f t  th e r e  is o l a t e d  at  th e  en d  of  a cl o s e d  de a d ‐ en d  ro a d  wi t h  no  tr a f f i c  pa s s i n g  by .   C‐21    (c o n t . )   3  2.  If  Mc L e a n s v i l l e  Ro a d  is  cl o s e d  an d  su b s e q u e n t l y  re a l i g n e d ,  as   pr o p o s e d ,  th e r e  wi l l  be  no  ac c e s s  to  Ms .  Mo s e l e y ’ s  bu s i n e s s ’  pa r k i n g  lo t   or  en t r a n c e .    Th e  en t r a n c e  an d  pa r k i n g  lo t  fo r  Ms .  Mo s e l e y ’ s  bu s i n e s s   ar e  of f  Mc L e a n s v i l l e  Ro a d .    Th e r e  is  no  en t r a n c e  to  th e  bu s i n e s s  fr o m   Be t h e l  Ch u r c h  Ro a d ,  wh i c h  wi l l  be  th e  on l y  wa y  to  ge t  to  th e  of f i c e  af t e r   th e  re a l i g n m e n t .    Fu r t h e r m o r e ,  Ms .  Mo s e l e y  CA N N O T  mo v e  or  cr e a t e  an   en t r a n c e  or  pa r k i n g  lo t  fo r  he r  pr o p e r t y  fr o m  Be t h e l  Ch u r c h  Ro a d   be c a u s e  th e  of f i c e  bu i l d i n g ’ s  se p t i c  sy s t e m  is  lo c a t e d  di r e c t l y  to  th e  re a r   of  th e  bu i l d i n g  on  th e  Be t h e l  Ch u r c h  Ro a d  si d e .    Pl e a s e  se e  th e  en c l o s e d   co u r t e s y  co p y  of  th e  re l e v a n t  po r t i o n s  of  Ms .  Mo s e l e y ’ s  pr o p e r t y  su r v e y .   Se e  re s p o n s e  to  Co m m e n t  1 in  le t t e r  C‐09 .          4  3.  Al l  pr o p e r t i e s  im m e d i a t e l y  su r r o u n d i n g  Ms .  Mo s e l e y ’ s  pr o p e r t y  ar e   be i n g  ta k e n  (p u r c h a s e d )  by  NC D O T  or  ar e  un o c c u p i e d .    It  is  Ms .   Mo s e l e y ’ s  un d e r s t a n d i n g  th a t  th e  pr o p e r t y  (l o t  or  tr a c t )  to  th e  ri g h t  of   he r  bu s i n e s s  is  be i n g  ta k e n  (p u r c h a s e d )  by  NC D O T ;  an d  th a t  th e  pr o p e r t y   ac r o s s  th e  st r e e t  (M c L e a n s v i l l e  Ro a d )  fr o m  he r  bu s i n e s s  is  be i n g  ta k e n   (p u r c h a s e d )  by  NC D O T .    Th e  pr o p e r t y  ac r o s s  th e  st r e e t  fr o m  th e   bu s i n e s s  on  th e  Be t h e l  Ch u r c h  Ro a d  si d e  is  un i m p r o v e d  la n d ;  an d  th e   pr o p e r t y  di r e c t l y  be h i n d  Ms .  Mo s e l e y ’ s  tr a c t  is  an  un o c c u p i e d   fo r e c l o s u r e  pr o p e r t y .    Ms .  Mo s e l e y ’ s  bu s i n e s s  wi l l  be  is o l a t e d  an d   re m o t e  wh i c h  wi l l  ir r e p a r a b l y  re d u c e  he r  ab i l i t y  to  at t r a c t  ne w   cu s t o m e r s  an d  to  se r v i c e  he r  ex i s t i n g  cu s t o m e r s .    Th e s e  im p a i r m e n t s  wi l l   re s u l t  in  si g n i f i c a n t  lo s s  of  bu s i n e s s  an d  bu s i n e s s  in c o m e .   Se e  re s p o n s e  to  Co m m e n t  1 in  le t t e r  C‐09 .          5  Ba s e d  up o n  th e  fo r e g o i n g  ev i d e n c e  of  si g n i f i c a n t  ad v e r s e  im p a c t  to  Ms .   Mo s e l e y  bu s i n e s s  an d  bu s i n e s s  in c o m e  as  a re s u l t  of  th e  re a l i g n m e n t  of   Mc L e a n s v i l l e  Ro a d ,  Ms .  Mo s e l e y  he r e b y  re q u e s t s  th a t  th e  NC D O T   re c o n s i d e r  it s  de c i s i o n  to  ta k e  he r  pr o p e r t y ,  as  it  ha s  al l  su r r o u n d i n g   pr o p e r t i e s ,  an d  ma k e  a re a s o n a b l e  of f e r  to  Ms .  Mo s e l e y ,  in  ac c o r d a n c e   wi t h  No r t h  Ca r o l i n a  la w ,  to  pu r c h a s e  sa m e .    Yo u r  co n s i d e r a t i o n  is  gr e a t l y   ap p r e c i a t e d  an d  Ms .  Mo s e l e y  lo o k s  fo r w a r d  to  he a r i n g  fr o m  yo u  so o n .   Se e  re s p o n s e  to  Co m m e n t  1 in  le t t e r  C‐09 .        C‐22   1  It  is  ve r y  im p o r t a n t  th a t  th e  po n d  re m a i n s  us a b l e  fo r  pr i v a t e  re c r e a t i o n   an d  as  an  ir r i g a t i o n  so u r c e  fo r  fo o d  pr o d u c t i o n  an d  la n d s c a p i n g .   A te m p o r a r y  ea s e m e n t  ar o u n d  th e  po n d  is  pr o p o s e d  during construction.  The  fu n c t i o n s  an d  us e  of  th e  po n d  lo c a t e d  ju s t  no r t h  of  th e  McLeansville Road/Birch  Cr e e k  Ro a d  in t e r s e c t i o n  wi l l  no t  be  pe r m a n e n t l y  af f e c t e d  by the proposed Project.      2  Wh e n  wi l l  th e  fi n a l  de c i s i o n  be  ma d e  as  to  wh i c h  al t e r n a t i v e  is  se l e c t e d ?   Th i s  Fi n d i n g  of  No  Si g n i f i c a n t  Im p a c t  (F O N S I )  do c u m e n t s  the selection of  Al t e r n a t i v e  A as  th e  Se l e c t e d  Al t e r n a t i v e .          No v e m b e r 2 0 1 3 M c L e a n s v i l l e R o a d G r a d e S e p a r a t i o n O v e r N C R R     Ap p e n d i x  D – Citizen Comments  Ta b l e  D‐1:   Ci t i z e n  Co m m e n t s   DO C U M E N T   NO .   CO M M E N T   NO .   CO M M E N T   RE S P O N S E   C‐22   (c o n t . )   3  Wh e n  wi l l  th e  ne w  pr o p e r t y  li n e  fo r  ou r  pr o p e r t y  be  de t e r m i n e d  an d   co m m u n i c a t e d  to  us ?   Th e  ri g h t ‐of ‐wa y  ac q u i s i t i o n  ph a s e  fo r  th e  Pr o j e c t  wi l l  be initiated after Fall 2013.   La n d  su r v e y s  ar e  sc h e d u l e d  to  be  co n d u c t e d  by  th e  en d  of 2013.  Once surveys are  co m p l e t e d ,  ri g h t ‐of ‐wa y  ag e n t s  fr o m  NC D O T  wi l l  be g i n  scheduling meetings with  af f e c t e d  pr o p e r t y  ow n e r s  be g i n n i n g  in  Fe b r u a r y  20 1 4 .   On c e  ri g h t  of  wa y  ac q u i s i t i o n  be g i n s ,  th e  du r a t i o n  is  dependent upon a number of  fa c t o r s ,  in c l u d i n g :  to t a l  nu m b e r  of  pa r c e l s  re q u i r e d  fo r  the Project, appraisals, and  ne g o t i a t i o n s  wi t h  in d i v i d u a l  pr o p e r t y  ow n e r s .    Fi n a l  ri g h t ‐of‐way plans have not  be e n  co m p l e t e d .    Th e  ma p p i n g  sh o w n  at  th e  Pu b l i c  He a r i n g  is preliminary mapping,  wh i c h  me a n s  th a t  it  is  no t  ex a c t .    As  mo r e  de t a i l e d  ma p p i n g  is developed during final  de s i g n ,  NC D O T  wi l l  be  ab l e  to  ad v i s e  pr o p e r t y  ow n e r s  on the total amount of  pr o p e r t y  ne e d e d  fo r  ac q u i s i t i o n .     4  Wh e n  wi l l  th e  pu r c h a s e  of  pr o p e r t y  be  ne g o t i a t e d ?   Se e  re s p o n s e  to  Co m m e n t  3 in  th i s  le t t e r .     5  Wh e n  wi l l  th e  pu r c h a s e  of  pr o p e r t y  be  co m p l e t e d ?   Al l  ri g h t ‐of ‐wa y  ac q u i s i t i o n  is  ta r g e t e d  to  be  co m p l e t e d  by September 2014, but this  is  su b j e c t  to  ch a n g e .  Se e  re s p o n s e  to  Co m m e n t  3 in  th i s  letter.    6  It  ap p e a r s  th a t  th e  pr e f e r r e d  al t e r n a t i v e  wi l l  re s u l t  in  th e  lo s s  of   ap p r o x i m a t e l y  on e  th i r d  of  an  ac r e  at  54 1 9  Mc L e a n s v i l l e  Ro a d .    Pl e a s e   co n f i r m .   Ba s e d  on  th e  pr e l i m i n a r y  de s i g n ,  th e  Pr e f e r r e d  Al t e r n a t i v e  will require  ap p r o x i m a t e l y  0. 2 7  ac r e s  fr o m  th e  pr o p e r t y  at  54 1 9  McLeansville Road.  This impact  ar e a  ma y  ch a n g e  as  th e  Pr o j e c t  pr o g r e s s e s  th r o u g h  fi n a l  design.  Cu r r e n t l y  th e  ma p p i n g  is  sh o w i n g  la n d  ar o u n d  th e  po n d  to be used as temporary  ea s e m e n t .    NC D O T  do e s  no t  an t i c i p a t e  pe r m a n e n t l y  acquiring any part of the pond.    7  It  is  no t  cl e a r  if  an y  of  th e  po n d  wi l l  be  pa r t  of  th e  ac q u i s i t i o n  fo r  th e   pr e f e r r e d  al t e r n a t i v e .    Pl e a s e  pr o v i d e  mo r e  de t a i l s .   Th e  NC D O T  wi l l  no t  ne e d  to  pu r c h a s e  th e  po n d .      Cu r r e n t l y  th e  ma p p i n g  is  sh o w i n g  la n d  ar o u n d  th e  po n d  to be used as temporary  ea s e m e n t .    NC D O T  do e s  no t  an t i c i p a t e  pe r m a n e n t l y  acquiring any part of the pond.    8  Wi l l  DO T  en s u r e  th a t  th e  po n d  da m  is  in t a c t  an d  ta k e  ne c e s s a r y   co n s t r u c t i o n  to  re p a i r  an y  da m a g e ?   A sm a l l  ar e a  of  th i s  po n d ,  ap p r o x i m a t e l y  0. 0 2  ac r e ,  ma y  be permanently impacted by  th e  Pr e f e r r e d  Al t e r n a t i v e .    A te m p o r a r y  ea s e m e n t  ar o u n d  the pond is proposed  du r i n g  co n s t r u c t i o n .    Th e  fi l l  sl o p e  fo r  th e  ne w  Mc L e a n s v i l l e  Road encroaches slightly  on  th e  bo t t o m  of  th e  fi l l  sl o p e  fo r  th e  po n d ’ s  da m .    Im p a c t s  during construction may  in c l u d e  te m p o r a r i l y  dr a i n i n g  th e  po n d .    NC D O T  wi l l  co o r d i n a t e  with the property  ow n e r  du r i n g  th e  ri g h t  of  wa y  an d  co n s t r u c t i o n  ph a s e s  regarding impacts to the  po n d  an d  to  en s u r e  th e  po n d ’ s  da m  is  ou t s i d e  of  th e  McLeansville Road right of way.          No v e m b e r 2 0 1 3 M c L e a n s v i l l e R o a d G r a d e S e p a r a t i o n O v e r N C R R     Ap p e n d i x  D – Citizen Comments  Ta b l e  D‐1:   Ci t i z e n  Co m m e n t s   DO C U M E N T   NO .   CO M M E N T   NO .   CO M M E N T   RE S P O N S E   C‐22   (c o n t . )   9  On  ot h e r  ro a d  pr o j e c t s  an d  ra i l r o a d  pr o j e c t s ,  th e  NC  or  US  go v e r n m e n t   ha v e  in s t a l l e d  fe n c i n g  al o n g  hi g h w a y s .    On  ou r  pr o p e r t y ,  th e  ra i l r o a d   in s t a l l e d  fe n c i n g  on  th e  si d e  of  pa s t u r e  ne x t  to  th e  tr a c k  as  pa r t  of  an   up g r a d e  pr o j e c t  se v e r a l  ye a r s  ag o .    Wi l l  DO T  in s t a l l  pe r m a n e n t  fe n c i n g  in   th e  pa s t u r e  al o n g  ou r  pr o p e r t y ?    Th i s  is  ou r  pr e f e r r e d  op t i o n .    Wh i l e   th e r e  ar e  cu r r e n t l y  no  fa r m  an i m a l s  in  th e  pa s t u r e ,  we  ha v e  ha d   in q u i r i e s  ab o u t  in d i v i d u a l s  wa n t e d  to  bo a r d  ho r s e s  in  th e  pa s t u r e .    We   al s o  fe e l  st r o n g l y  th a t  fe n c i n g  is  ne e d e d  du e  to  th e  po n d .    It  ap p e a r s   fr o m  dr a w i n g s  th a t  th e  ro a d  wi l l  ab u t  th e  po n d  di r e c t l y .   Th e  ex i s t i n g  fe n c i n g  on  th e  pr o p e r t y  al o n g  Mc L e a n s v i l l e  Road will be replaced.      10   In  th e  sp i l l w a y  ar e a  of  th e  po n d  th a t  wi l l  be  ac q u i r e d  in  th e  pr e f e r r e d   al t e r n a t i v e ,  th e  la n d  is  ve r y  lo w  an d  we t .    Wi l l  DO T  be  fi l l i n g  in  th i s  ar e a ?    If  so ,  ho w  wi l l  DO T  pr e v e n t  ru n ‐of f  in t o  th e  po n d  an d  su r r o u n d i n g  la n d   of  ou r  pr o p e r t y ?   Ap p r o p r i a t e  dr a i n a g e  st r u c t u r e s ,  su c h  as  bu t  no t  li m i t e d  to culverts and ditches, will  be  in c l u d e d  as  pa r t  of  th e  Pr o j e c t  de s i g n  in  ac c o r d a n c e  with NCDOT standards.      11   Pe c a n  tr e e s  ar e  ab u n d a n t  on  th e  pr o p e r t y  an d  [m y  pa r e n t s ]  so l d  pe c a n s   in  Gu i l f o r d  Co u n t y …      In  th e  pr e f e r r e d  al t e r n a t i v e ,  it  ap p e a r s  th a t  pe c a n  tr e e s  wi l l  ne e d  to  be   re m o v e d  fr o m  th e  pa s t u r e .    Wi l l  DO T  re l o c a t e  th e  tr e e s  to  ot h e r  pa r t s  of   th e  pr o p e r t y  or  co m p e n s a t e  fo r  lo s s  of  re v e n u e  fr o m  sa l e  of  pe c a n s ?    My   br o t h e r  an d  I pr e f e r  th a t  th e  tr e e s  be  re l o c a t e d  by  a tr e e  sp e c i a l i s t .   Th e  NC D O T  Ri g h t  of  Wa y  Ag e n t  wi l l  wo r k  wi t h  ea c h  im p a c t e d  property owner along  th e  Pr o j e c t  re g a r d i n g  co m p e n s a t i o n  fo r  la n d  ac q u i r e d  by the Project.  The existing  re s o u r c e s  an d  fe a t u r e s  on  pr o p e r t i e s  ar e  ta k e n  in t o  co n s i d e r a t i o n .       12   Th e  po n d  is  us e d  an d  ha s  be e n  us e d  fo r  pr i v a t e  re c r e a t i o n ,  as  a so u r c e  of   wa t e r  fo r  an i m a l s ,  as  a so u r c e  of  ir r i g a t i o n  fo r  fo o d s  (p e c a n  tr e e s ,   gr a p e s ,  bl u e b e r r y  bu s h e s ,  an d  ve g e t a b l e  ga r d e n ) ,  as  a so u r c e  of   ir r i g a t i o n  fo r  fo d d e r  fo r  co w s ,  an d  as  a so u r c e  of  ir r i g a t i o n  fo r   la n d s c a p i n g .    We  ha v e  co n c e r n s  ab o u t  th e  ef f e c t s  of  co n s t r u c t i o n  on  th e   wa t e r  qu a l i t y  in  th e  po n d  an d  aq u a t i c  sp e c i e s  in  th e  po n d .    We  al s o  ha v e   co n c e r n s  ab o u t  th e  ef f e c t s  af t e r  co n s t r u c t i o n  of  ru n ‐of f  fr o m  th e  ro a d   an d  DO T  pr a c t i c e s  of  us i n g  he r b i c i d e s  an d  pe s t i c i d e s  on  sh o u l d e r s  of   ro a d s  in  NC .   As  di s c u s s e d  in  Se c t i o n  4. 4 . 2  of  th e  EA ,  an  er o s i o n  an d  sedimentation control plan  wi l l  be  de v e l o p e d  pr i o r  to  co n s t r u c t i o n .    Th e  pl a n  wi l l  be prepared in accordance  wi t h  th e  NC  De p a r t m e n t  of  En v i r o n m e n t  an d  Na t u r a l  Resources Division of Land  Re s o u r c e ’ s  pu b l i c a t i o n  Er o s i o n  an d  Se d i m e n t  Co n t r o l  Planning and Design (revised  Ma y  20 1 3 ) ( N C  Di v i s i o n  of  La n d  Re s o u r c e s  We b  si t e :    ht t p : / / p o r t a l . n c d e n r . o r g / w e b / l r / e r o s i o n ) an d  th e  NC D O T ’ s  Best Management  Pr a c t i c e s  fo r  th e  Pr o t e c t i o n  of  Su r f a c e  Wa t e r s .   NC D W Q ’ s  most recent version of the  St o r m w a t e r  Be s t  Ma n a g e m e n t  Pr a c t i c e s  Ma n u a l  (N C D W Q  Web site:   ht t p : / / p o r t a l . n c d e n r . o r g / w e b / w q / e s / s u / b m p ‐ma n u a l ) also will be applied.    13   We  wo u l d  li k e  fo r  wa t e r  te s t i n g  to  be  co n d u c t e d  pr i o r  to  la n d   ac q u i s i t i o n ,  du r i n g  co n s t r u c t i o n  on  a ro u t i n e  ba s i s ,  an d  af t e r   co n s t r u c t i o n  to  in s u r e  th a t  th e  wa t e r  qu a l i t y  of  th e  po n d  is  no t  af f e c t e d   by  th e  pr o j e c t .    Sp e c i f i c a l l y ,  me a s u r e m e n t  of  pH ,  di s s o l v e d  ox y g e n  an d   tu r b i d i t y  ar e  ne e d e d .    In  ad d i t i o n ,  pr i o r  to  co n s t r u c t i o n ,  we  wo u l d  li k e  to   re q u e s t  th a t  a li s t  of  aq u a t i c  sp e c i e s  be  co m p i l e d .    If  fi s h  ki l l s  oc c u r   du r i n g  co n s t r u c t i o n ,  we  wo u l d  li k e  DO T  to  re s t o c k  th e  po n d  wi t h  fi s h .   Se e  re s p o n s e  to  Co m m e n t  12  in  th i s  le t t e r  (c ‐22 ) .             No v e m b e r 2 0 1 3 M c L e a n s v i l l e R o a d G r a d e S e p a r a t i o n O v e r N C R R     Ap p e n d i x  D – Citizen Comments  Ta b l e  D‐1:   Ci t i z e n  Co m m e n t s   DO C U M E N T   NO .   CO M M E N T   NO .   CO M M E N T   RE S P O N S E   C‐22   (c o n t . )   14   Du r i n g  an d  af t e r  co n s t r u c t i o n ,  we  wo u l d  li k e  DO T  to  gu a r a n t e e  th a t   pe s t i c i d e s  an d  he r b i c i d e s  wi l l  no t  be  us e d  du e  to  ru n ‐of f  in t o  th e  po n d   an d  pa s t u r e  an d  on t o  th e  ga r d e n  pl o t  th a t  ab u t s  pr o p o s e d  ro a d w a y .    Ot h e r  en v i r o n m e n t a l ‐fr i e n d l y  al t e r n a t i v e s  ex i s t  th a t  ca n  be  us e d  by  DO T   ra t h e r  th a n  th e  us e  of  he r b i c i d e s  an d  pe s t i c i d e s  th a t  de s t r o y  wa t e r   qu a l i t y  an d  bi o l o g i c a l  di v e r s i t y .   Se e  re s p o n s e  to  Co m m e n t  12  in  th i s  le t t e r  (c ‐22 ) .    He r b i c i d e s  or pesticides will not be  us e d  du r i n g  th e  co n s t r u c t i o n  of  th e  Pr o j e c t .          15   Du r i n g  co n s t r u c t i o n ,  we  as k  th a t  th e  ch e a p  pl a s t i c  fe n c e s  fo r  er o s i o n   co n t r o l  no t  be  us e d  du e  to  lo c a t i o n  of  th e  po n d ,  pa s t u r e  an d  ga r d e n  pl o t   an d  th a t  mo r e  st r i n g e n t  al t e r n a t i v e s  be  se l e c t e d  th a t  wi l l  co n t a i n   er o s i o n  an d  se d i m e n t a t i o n .    Du e  to  th e  de p t h  of  th e  po n d ,  ru n ‐of f  an d   se d i m e n t a t i o n  wi l l  li k e l y  ha v e  an  ef f e c t  on  wa t e r  qu a l i t y  an d  aq u a t i c   sp e c i e s .   Se e  re s p o n s e  to  Co m m e n t  12  in  th i s  le t t e r  (c ‐22 ) .  NC D O T  will utilize erosion control  de v i c e s  th a t  ar e  co n s i s t e n t  wi t h  de p a r t m e n t a l  Be s t  Management Practices for the  co n t r o l  of  st o r m w a t e r .        16   Wi l l  th e  in t e r s e c t i o n  of  Bi r c h  Cr e e k  Ro a d  an d  Mc L e a n s v i l l e  Ro a d  be   re a l i g n e d ?    Cu r r e n t l y  th e  Bi r c h  Cr e e k  Ro a d  in t e r s e c t s  Mc L e a n s v i l l e  Ro a d   at  an  an g l e .    It  is  di f f i c u l t  to  tu r n  le f t  an d  to  se e  on c o m i n g  tr a f f i c  at  th i s   in t e r s e c t i o n .    Se v e r a l  ve h i c l e s  ha v e  ru n  th e  st o p  si g n  an d  en d e d  up  in   ou r  pa s t u r e .    If  po s s i b l e ,  it  wo u l d  im p r o v e  sa f e t y  to  re a l i g n  th i s   in t e r s e c t i o n  du r i n g  th i s  pr o j e c t .   Th e  in t e r s e c t i o n  of  Mc L e a n s v i l l e  Ro a d  an d  Bi r c h  Cr e e k  Road will be realigned as part  of  th e  Pr o j e c t  to  im p r o v e  si g h t  di s t a n c e s  fo r  tr a f f i c  en t e r i n g  McLeansville Road via  no r t h b o u n d  Bi r c h  Cr e e k  Ro a d .     17   Th e  as s e s s m e n t  st a t e s  th a t  no  im p a c t  wi l l  oc c u r  on  pu b l i c  he a l t h .    Fu r t h e r  an a l y s i s  of  th i s  st a t e m e n t  is  ne e d e d  in  th e  as s e s s m e n t .    Wa s  a  st u d y  co n d u c t e d  to  de t e r m i n e  th e  nu m b e r  of  ch i l d r e n  at t e n d i n g   Mc L e a n s v i l l e  Sc h o o l  th a t  ha v e  as t h m a  as  pa r t  of  th e  as s e s s m e n t ?    Co n s t r u c t i o n  ac t i v i t i e s  an d  in c r e a s e d  ve h i c u l a r  an d  ra i l r o a d  tr a f f i c  af t e r   co n s t r u c t i o n  wi l l  in c r e a s e  ai r  em i s s i o n s  of  oz o n e ,  2. 5  mi c r o n  pa r t i c u l a t e   ma t t e r  an d  di e s e l  pa r t i c u l a t e  ma t t e r .    In c r e a s e d  oz o n e  an d  pa r t i c u l a t e   ma t t e r  af f e c t  as t h m a  an d  ot h e r  re s p i r a t o r y  il l n e s s e s  su c h  as  CO P D .    Di e s e l  pa r t i c u l a t e  ma t t e r  is  co n s i d e r e d  to  be  a hi g h l y  to x i c  po l l u t a n t  wi t h   ca n c e r  an d  no n ‐ca n c e r  ef f e c t s .    Du r i n g  co n s t r u c t i o n ,  ch i l d r e n  wi t h   as t h m a  sh o u l d  no t  be  on  th e  pl a y g r o u n d  if  th e  wi n d  ro s e  is  to w a r d  th e   sc h o o l .   Th e  EA  ad e q u a t e l y  di s c u s s e s  pu b l i c  he a l t h  co n c e r n s  directly related to the  co n s t r u c t i o n  of  th e  Pr o j e c t .    As  di s c u s s e d  in  Se c t i o n s  3.2.2 and 4.2.2 of the EA, the  pr o p o s e d  Pr o j e c t  ar e a  is  in  Gu i l f o r d  Co u n t y ,  wh i c h  ha s  been determined by EPA to  be  cu r r e n t l y  me e t i n g  Na t i o n a l  Am b i e n t  Ai r  Qu a l i t y  St a n d a r d s ,  which have been set  fo r  oz o n e ,  ca r b o n  mo n o x i d e ,  su l f u r  di o x i d e ,  ni t r o g e n  dioxide, particulate matter, and  le a d .    Th e  Pr o j e c t  is  no t  a re g i o n a l l y  si g n i f i c a n t  pr o j e c t  and would not significantly  co n t r i b u t e  to  an  ex c e e d a n c e  of  th e  ai r  qu a l i t y  st a n d a r d s .   As noted in the EA, the  EP A  ad o p t e d  in  Ma r c h  20 0 8  a 3‐pa r t  pr o g r a m  to  dr a m a t i c a l l y  reduce emissions from  di e s e l  lo c o m o t i v e s  of  al l  ty p e s .    Th e  ru l e  wi l l  cu t  pa r t i c u l a t e  matter emissions from  th e s e  en g i n e s  by  as  mu c h  as  90  pe r c e n t  an d  ni t r o g e n  oxides emissions by as much as  80  pe r c e n t  wh e n  fu l l y  im p l e m e n t e d .      Du r i n g  co n s t r u c t i o n ,  th e  co n s t r u c t i o n  co n t r a c t o r  wi l l  be responsible for controlling  du s t  at  th e  Pr o j e c t  si t e  an d  at  ar e a s  af f e c t e d  by  th e  co n s t r u c t i o n ,  including haul  ac c e s s  ro a d s ,  di s p o s a l  si t e s ,  bo r r o w e d  ma t e r i a l  so u r c e s ,  and production sites  (S e c t i o n  4. 6  of  th e  EA ) .             No v e m b e r 2 0 1 3 M c L e a n s v i l l e R o a d G r a d e S e p a r a t i o n O v e r N C R R     Ap p e n d i x  D – Citizen Comments  Ta b l e  D‐1:   Ci t i z e n  Co m m e n t s   DO C U M E N T   NO .   CO M M E N T   NO .   CO M M E N T   RE S P O N S E   C‐22   (c o n t . )   18   Re c r e a t i o n  op p o r t u n i t i e s  ar e  li s t e d  as  ha v i n g  no  im p a c t  in  th e   as s e s s m e n t .    Wh i l e  th e r e  ar e  no  pr i v a t e  re c r e a t i o n a l  fa c i l i t i e s  th a t   op e r a t e  fo r  pr o f i t ,  th e  po n d  lo c a t e d  at  54 1 9  Mc L e a n s v i l l e  Ro a d  is  us e d   by  fr i e n d s  an d  fa m i l y  fo r  fi s h i n g  an d  fo r  wi l d l i f e  ob s e r v a t i o n .    A nu m b e r   of  bi r d s  vi s i t  th e  po n d  an d  th e  pr o p e r t y .    Ot h e r  wi l d l i f e  in c l u d e s  fr o g s ,   tu r t l e s ,  aq u a t i c  or g a n i s m s ,  an d  sm a l l  ma m m a l s .    Th e  as s e s s m e n t  sh o u l d   be  re v i s e d  to  in c l u d e  ac k n o w l e d g e m e n t  of  pr i v a t e  re c r e a t i o n  on   pr o p e r t i e s .   Se e  re s p o n s e  to  Co m m e n t  8 in  th i s  le t t e r  (c ‐22 ) .    Im p a c t s  to  pr i v a t e  pr o p e r t i e s  ar e  ad d r e s s e d  in  th e  di s c u s s i o n s  of relocations and  ac q u i s i t i o n s  in c l u d e d  in  Se c t i o n s  4. 1 . 2  an d  4. 1 . 3  in  th e  EA.    It  is  ac k n o w l e d g e d  th a t  th e  po n d  at  54 1 9  Mc L e a n s v i l l e  Road is used for recreational  pu r p o s e s .    NC D O T  wi l l  no t  be  ac q u i r i n g  th e  po n d ,  bu t  rather a temporary easement  wi l l  be  pu r c h a s e d  fo r  th e  pu r p o s e  of  co n s t r u c t i n g  th e  Project.      19   Th e  as s e s s m e n t  st a t e s  no  im p a c t  wi l l  oc c u r  on  no i s e  an d  vi b r a t i o n .    Wi t h   in c r e a s e d  tr a i n  tr a f f i c ,  th e  pe r i o d  of  ti m e  th a t  vi b r a t i o n  oc c u r s  wi l l   in c r e a s e  in  th e  fu t u r e .    Th e  ap p e n d i c e s  al s o  no t e  th a t  vi b r a t i o n  le v e l s   wi l l  in c r e a s e .    Th i s  st a t e m e n t  ne e d s  re v i s i o n  to  re f l e c t  no t  on l y  le v e l  of   vi b r a t i o n ,  bu t  to  al s o  in c l u d e  an a l y s i s  of  in c r e a s i n g  am o u n t  ti m e  du r i n g   th e  da y  th a t  vi b r a t i o n  wi l l  oc c u r .   Th e  no i s e  an d  vi b r a t i o n  an a l y s e s  fo r  th e  Bu i l d  Al t e r n a t i v e s  were performed in  ac c o r d a n c e  wi t h  ap p l i c a b l e  re g u l a t i o n s  an d  gu i d a n c e .   The study did not identify any  no i s e  or  vi b r a t i o n  im p a c t s  th a t  ar e  pr o j e c t e d  to  ex c e e d  FRA criteria.        20   Th e  as s e s s m e n t  as s i g n s  no  im p a c t  to  ai r  qu a l i t y .    Th i s  st a t e m e n t  ne e d s   mo r e  an a l y s i s .    Ac c o r d i n g  to  NC  DE N R  we b s i t e ,  Gu i l f o r d  Co u n t y  is  in   at t a i n m e n t  fo r  8 hr  oz o n e  st a n d a r d  an d  Pa r t i c u l a t e  Ma t t e r  2. 5  st a n d a r d .    Ho w e v e r ,  th e  as s e s s m e n t  do e s  no t  ad d r e s s  ef f e c t s  of  in c r e a s i n g  ra i l r o a d   an d  ve h i c u l a r  tr a f f i c  on  th e s e  le v e l s .    Fr o m  20 0 9  – 20 1 1 ,  th e  la t e s t   av a i l a b l e  as s e s s m e n t  ye a r s ,  th e  fe d e r a l  8 hr  oz o n e  st a n d a r d  is  0. 0 7 6   pa r t s  pe r  mi l l i o n  (p p m ) .    Th e  Gu i l f o r d  Co u n t y  av e r a g e  is  0. 0 7 4  pp m ,   ba r e l y  un d e r  th e  st a n d a r d .    In  20 1 1  Gu i l f o r d  Co u n t y  ha d  4 ex c e e d a n c e s   of  th e  st a n d a r d  an d  th e  de t e r m i n a t i o n  of  wh e t h e r  Gu i l f o r d  Co u n t y  is  in   at t a i n m e n t .    Th e  oz o n e  NA A Q S  is  cu r r e n t l y  un d e r  re v i s i o n  an d  th e   st a n d a r d  ma y  be  ti g h t e n e d  in  th e  fu t u r e .    In  20 1 1 ,  DE N R  de f i n e d   Gu i l f o r d  Co u n t y  as  a ma i n t e n a n c e  ar e a  fo r  pa r t i c u l a t e  ma t t e r  2. 5 .    Ai r   Qu a l i t y  mo d e l i n g  is  ne e d e d  to  as s i g n  a no  im p a c t  de s i g n a t i o n  to  th i s   pr o j e c t .    Pr o j e c t e d  in c r e a s e  in  mo b i l e  so u r c e  em i s s i o n s  du e  to  in c r e a s e d   ra i l  an d  ve h i c u l a r  tr a f f i c  is  ne e d e d  to  de t e r m i n e  if  th e  pr o j e c t  wi l l  ha v e   no  im p a c t  on  ai r  qu a l i t y .    At  a mi n i m u m ,  am b i e n t  ai r  qu a l i t y  mo n i t o r s   sh o u l d  be  pl a c e d  at  Mc L e a n s v i l l e  Sc h o o l  to  me a s u r e  oz o n e  an d   pa r t i c u l a t e  ma t t e r  2. 5 .   Se e  re s p o n s e  to  Co m m e n t  17  in  th i s  le t t e r  (c ‐22 ) .   Th e  pr o p o s e d  Pr o j e c t  wi l l  no t  ad d  ca p a c i t y  to  th e  ex i s t i n g  road network.  The  pr o p o s e d  Pr o j e c t  wi l l  re d u c e  ve h i c l e  id l i n g  by  el i m i n a t i n g  the need for vehicles to  wa i t  fo r  tr a i n s  to  pa s s  th r o u g h  th e  cr o s s i n g s  or  wa i t i n g  for trains parking in the  si d i n g .             No v e m b e r 2 0 1 3 M c L e a n s v i l l e R o a d G r a d e S e p a r a t i o n O v e r N C R R     Ap p e n d i x  D – Citizen Comments  Ta b l e  D‐1:   Ci t i z e n  Co m m e n t s   DO C U M E N T   NO .   CO M M E N T   NO .   CO M M E N T   RE S P O N S E   C‐22   (c o n t . )   21   Th e  im p a c t  on  co m m u n i t i e s  is  de s c r i b e d  in  th e  as s e s s m e n t  as  mi n o r .    Th e  as s e s s m e n t  sh o u l d  ac k n o w l e d g e  th a t  th e  pr o j e c t  wi l l  li k e l y  ha v e  a  si g n i f i c a n t  im p a c t  on  th e  co m m u n i t y .    Tr a f f i c  ha s  in c r e a s e d  ov e r  th e  la s t   20  ye a r s  du e  to  no n ‐Mc L e a n s v i l l e  re s i d e n t s  us i n g  Mc L e a n s v i l l e  an d  Bi r c h   Cr e e k  Ro a d s  as  a co r r i d o r  fr o m  US  40  (R o c k  Cr e e k  Ex i t )  to  US  70  to   US  29 .    Ve h i c l e s  co n s t a n t l y  sp e e d  on  th e s e  ro a d  an d  sp e e d  li m i t s  ar e  no t   st r i c t l y  en f o r c e d .    Tr a f f i c  is  pr e s e n t  24 / 7 .    La r g e  tr u c k s  us e  th i s  co r r i d o r   an d  co n t r i b u t e  to  de g r a d a t i o n  of  th e  ro a d s .    Bi r c h  Cr e e k  Ro a d  wa s  no t   bu i l t  fo r  th e  tr a f f i c  th a t  it  no w  ca r r i e s  an d  co n t i n u e s  to  ha v e   ma i n t e n a n c e  pr o b l e m s  su c h  as  po t h o l e s .    Th e  us e  of  th e s e  ro a d s  as  a  tr a n s p o r t a t i o n  co r r i d o r  ha s  de s t r o y e d  th e  ru r a l  am b i e n c e  of  th e   co m m u n i t y .    Th i s  pr o j e c t  is  li k e l y  to  in c r e a s e  pr i v a t e  an d  co m m e r c i a l   ve h i c l e  tr a f f i c .    I be l i e v e  th e  pr o j e c t i o n s  of  tr a f f i c  co u n t s  ar e   un d e r e s t i m a t e d  in  th e  as s e s s m e n t .    Th e r e  ar e  so l u t i o n s ,  su c h  as  th e   fo l l o w i n g .   a. Co m p l e t e  by p a s s  fr o m  hi g h w a y  40  to  hi g h w a y  29  th a t   cu r r e n t l y  st o p s  at  hi g h w a y  70 .   b. Pr o h i b i t  tr u c k s  of  ce r t a i n  we i g h t s  fr o m  us i n g  Bi r c h  Cr e e k  an d   Mc L e a n s v i l l e  Ro a d s   c. Du e  to  po p u l a t i o n  de n s i t y ,  ma k e  sp e e d  li m i t  35  th e  wh o l e   ro u t e  fr o m  Bi r c h  Cr e e k  an d  Mc L e a n s v i l l e  Ro a d  to  hi g h w a y  29   d. St r i c t l y  en f o r c e  sp e e d i n g  24 / 7  (a l s o  a sa f e t y  is s u e )   e. Pr o v i d e  pu b l i c  tr a n s p o r t a t i o n  al t e r n a t i v e s  in c l u d i n g  bu s e s ,   va n s  si m i l a r  to  Tr i a n g l e  Tr a n s i t  Au t h o r i t y  (T T A ) ,  et c .   f. Pr o v i d e  in c e n t i v e s  fo r  us i n g  pu b l i c  tr a n s p o r t a t i o n  su c h  as   tr a n s i t  su b s i d i e s   g. Ex p l o r e  us e  of  li g h t  ra i l  or  co m m u t e r  tr a i n s  to  co m m u t e  fr o m   Mc L e a n s v i l l e  to  Gr e e n s b o r o  an d  Bu r l i n g t o n .    Pl a t f o r m  ca n  be   bu i l t  in  lo c a t i o n  of  or i g i n a l  pl a t f o r m .    Pr o v i d e  pa r k i n g  fo r   co m m u t e r s .   Gu i l f o r d  Co u n t y  an d  th e  Mc L e a n s v i l l e  ar e a  ha v e  gr o w n  since 2000.  Guilford County  is  pr o j e c t e d  to  co n t i n u e  to  gr o w  ap p r o x i m a t e l y  31  pe r c e n t  from 2010 to 2030 and  th e  Mc L e a n s v i l l e  ar e a  li k e l y  wi l l  se e  so m e  of  th i s  gr o w t h .   Growth in population  ge n e r a l l y  me a n s  gr o w t h  in  tr a f f i c  vo l u m e s .    Tr a f f i c  fo r e c a s t s  for 2035 were prepared  in  ac c o r d a n c e  wi t h  NC D O T  st a n d a r d s  an d  pr e d i c t  in c r e a s e s  in traffic volumes with or  wi t h o u t  th e  pr o p o s e d  Pr o j e c t ,  as  de s c r i b e d  in  Se c t i o n  1.9.1 of the EA.  The Project  wi l l  ma k e  tr a v e l  th r o u g h  th e  ar e a  sa f e r  an d  mo r e  ef f i c i e n t  by providing a grade  se p a r a t i o n  ov e r  th e  ra i l r o a d  th a t  wi l l  al w a y s  be  op e n  to traffic.    Th e  sp e e d  li m i t  fo r  th e  Pr o j e c t  is  pr o p o s e d  to  be  45  miles per hour (mph), consistent  wi t h  th e  cu r r e n t  sp e e d  li m i t  so u t h  of  th e  Pr o j e c t  on  McLeansville Road.  The State  Hi g h w a y  Pa t r o l  an d  lo c a l  sh e r i f f  an d  po l i c e  de p a r t m e n t s  have the responsibility for  en f o r c i n g  sp e e d  li m i t s .      Cu r r e n t l y  th e r e  is  no  lo c a l  ra i l  tr a n s i t  se r v i c e  or  da i l y  bus service offered in the  Pr o j e c t  ar e a .    Pu b l i c  tr a n s p o r t a t i o n  is  no t  pa r t  of  th e  Project’s purpose or proposed  ac t i o n .    Ho w e v e r ,  pu b l i c  tr a n s p o r t a t i o n  is  in c l u d e d  as  an element of the Greensboro  ar e a ’ s  co m p r e h e n s i v e  lo n g ‐ra n g e  tr a n s p o r t a t i o n  pl a n ,  prepared by the Greensboro  Ur b a n  Ar e a  Me t r o p o l i t a n  Pl a n n i n g  Or g a n i z a t i o n  (M P O ) .   The MPO identifies and  pr i o r i t i z e s  ro a d w a y ,  pu b l i c  tr a n s p o r t a t i o n ,  pe d e s t r i a n ,  and bicycle projects for  im p l e m e n t a t i o n .    Th e  LR T P  do e s  no t  in c l u d e  re c o m m e n d a t i o n s  to extend public  tr a n s i t  se r v i c e s  to  th e  Pr o j e c t  ar e a  in  th e  fu t u r e  th r o u g h  2035.             No v e m b e r 2 0 1 3 M c L e a n s v i l l e R o a d G r a d e S e p a r a t i o n O v e r N C R R     Ap p e n d i x  D – Citizen Comments  Ta b l e  D‐1:   Ci t i z e n  Co m m e n t s   DO C U M E N T   NO .   CO M M E N T   NO .   CO M M E N T   RE S P O N S E   C‐22   (c o n t . )   22   Th e  as s e s s m e n t  st a t e s  th a t  no  hi s t o r i c a l  st r u c t u r e s  ar e  pr e s e n t .    Wh i l e   th e r e  ar e  no  st r u c t u r e s  de s i g n a t e d  as  a St a t e  Hi s t o r i c a l  Si t e ,  th e r e  ar e   ho m e s  th a t  ar e  of  hi s t o r i c a l  si g n i f i c a n c e .    Th e  as s e s s m e n t  sh o u l d   ac k n o w l e d g e  th a t  si t e s  of  hi s t o r i c a l  si g n i f i c a n c e  to  th e  Mc L e a n s v i l l e   co m m u n i t y  ex i s t  in  th e  pr o j e c t  ar e a .    Fr o m  it s  be g i n n i n g ,  ed u c a t i o n  wa s   im p o r t a n t  to  th e  ci t i z e n s  of  Mc L e a n s v i l l e .    Mc L e a n s v i l l e  Ac a d e m y  wa s   co n s t r u c t e d  in  th e  18 0 0 s  on  th e  pr e s e n t  da y  si t e  of  th e  sh o p p i n g  ce n t e r .    In  th e  la t e  18 0 0 s  an d  ea r l y  19 0 0 s ,  Je f f e r s o n  Ac a d e m y  pr o v i d e d   ed u c a t i o n  fo r  Gu i l f o r d  Co u n t y  an d  Gr e e n s b o r o  st u d e n t s  fr o m   el e m e n t a r y  th r o u g h  2 yr  co l l e g e .    Je f f e r s o n  Ac a d e m y  ha d  bo a r d i n g  an d   da y  st u d e n t s .    Lo c a l  ch i l d r e n  we r e  al l o w e d  to  at t e n d  th e  Ac a d e m y  fo r   fr e e  du r i n g  5 mo n t h s  of  th e  ye a r  (n o n ‐fa r m i n g  pe r i o d s  of  ti m e ) .    Bo a r d i n g  an d  ch i l d r e n  pa y i n g  tu i t i o n  at t e n d e d  th e  Ac a d e m y  fo r  lo n g e r   pe r i o d s  of  ti m e  du r i n g  th e  ye a r .    Bo a r d i n g  st u d e n t s  wo u l d  tr a v e l  by  tr a i n   an d  st o p  at  a pl a t f o r m  on  wh a t  to d a y  is  th e  54 1 9  Mc L e a n s v i l l e  Ro a d   pr o p e r t y ,  cr o s s  a fi e l d  an d  wa l k  to  th e  ca m p u s  lo c a t e d  at  th e   in t e r s e c t i o n  of  Bi r c h  Cr e e k  an d  Mc L e a n s v i l l e  Ro a d s .    Se v e r a l  of  th e   or i g i n a l  Je f f e r s o n  Ac a d e m y  st r u c t u r e s  st i l l  st a n d  to d a y  an d  ar e  in  th e   ar e a  im p a c t e d  by  th e  pr o j e c t .    Re f e r e n c e :  So c k w e l l ,  “L i f e ,  Lo r e  an d   Le g e n d  of  Mc L e a n s v i l l e ”   Th e  Na t i o n a l  Hi s t o r i c  Pr e s e r v a t i o n  Ac t  of  19 6 6  an d  Ge n e r a l  Statue 121‐12(a)  re q u i r e s  th e  co n s i d e r a t i o n  of  ef f e c t s  fo r  si t e s  on  or  el i g i b l e  for listing on the National  Re g i s t e r  of  Hi s t o r i c  Pl a c e s .    Th e  NC  De p a r t m e n t  of  Cu l t u r a l  Resources State Historic  Pr e s e r v a t i o n  Of f i c e r  re v i e w e d  th i s  Pr o j e c t  an d  de t e r m i n e d  no historic resources  (i n c l u d i n g  ar c h a e o l o g i c a l  re s o u r c e )  on  or  el i g i b l e  fo r  li s t i n g  on the National Register  of  Hi s t o r i c  Pl a c e s  wi l l  be  af f e c t e d  by  th e  Pr o j e c t .    Wr i t t e n  verification was received  fr o m  th e  HP O  by  le t t e r  da t e d  Ma y  31 ,  20 1 2 ,  wh i c h  is  included in Appendix D of the  EA .      Th e  pr o p e r t y  fo r  Je f f e r s o n  Ac a d e m y  th e  co m m e n t e r  is  likely referring to is in the  so u t h e a s t  qu a d r a n t  of  th e  in t e r s e c t i o n  at  10 7  Bi r c h  Cr e e k  Road.  Guilford County tax  pa r c e l  da t a  in d i c a t e  th e  ye a r  bu i l t  is  18 8 8 .    Ba s e d  on  the preliminary design for the  Pr e f e r r e d  Al t e r n a t i v e ,  a sm a l l  ar e a  ne a r  th e  dr i v e w a y  of this parcel would be needed  fo r  ri g h t  of  wa y .    No n e  of  th e  st r u c t u r e s  on  th i s  pa r c e l  would be affected.  Likewise,  fo r  th e  ot h e r  tw o  pr o p e r t i e s  in  th i s  qu a d r a n t ,  10 1  an d  103 Birch Creek Road, only a  sm a l l  am o u n t  of  ri g h t  of  wa y  is  ne e d e d  fr o m  th e  po r t i o n  of the property adjacent to  ex i s t i n g  Mc L e a n s v i l l e  Ro a d  an d  no  st r u c t u r e s  wo u l d  be affected.