HomeMy WebLinkAbout20121149 Ver 1_Certification of Completion_20131227Certification of Completion ` 3
D WQ Project No County
Applicant Jp HAt Z K M 24� N
Project Name
Date of Issuance of Certification or Authorization
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any
subsequent modifications, the applicant is required to return this certificate to the 401 Oversight/Express Permitting Unit,
North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699 -1650 This form may be
returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer It is not necessary to send
certificates from all of these
Applicant's Certification
I, C G WdV F, L at!l DAB I h. , hereby state that, to the best of my abilities, due care and diligence was
used in the observation `61 the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications,
and other supporting materials
Signature 7A s 4� � � �4- �--) Date !Z — // Z4t-3
Agent's Certification
1 1A URt ot4 , hereby state that, to the best of my abilities, due care and diligence was
used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications,
and other supporting mater
Signature Date
If this project was des' by a Certified Professional
1 , as a duly registered Professional (i e , Engineer,
Landscape Architect, Surveyor, etc ) in the State of North Carolina, having been authorized to observe (periodically,
weekly, full time) the construction of the project, for the Permitttee hereby state that, to the best of my abilities, due care
and diligence was used in the observation of the construction such that the construction was observed to be built within
substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and
specifications, and other supporting materials
r._ w
Signature Registration No
Date
Ut5
i
I
�n
d'NR
OUAL17 -y