HomeMy WebLinkAboutNCC205182_NOT Closeout Documents_20211220North Carolina Department of Environmental Quality
Land Resources: 450 W. Hanes Mill Road, Suite 300, Winston-Salem, NC 27105
(336) 776-9800
County: Guilford Project: Piedmont Natural Gas- Line 330 River basin: Cape Fear
Person financially responsible: Piedmont Natural Gas Company, Inc. - Joseph Barbee Project #: GUILF-2021-006
Address: 4720 Piedmont Row Dr., Charlotte, NC 28210
1. Project Location: Sandy Ridge Rd., High Point
Pictures: No
2. Weather and soil conditions: 40's, Clear, Workable Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? N/A
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): Stephen Williams Title: Lead EHS Professional
Inspection report: Sent Report Date given/sent: December 10, 2021
9. Corrective action needed:
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is in compliance and released under
the SPCA. Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities (NCGO 1) must be requested by the permittee via a Notice of
Termination (NOT). The NOT is available at:
https://edoes.deq.ne.gov/Fonns/NCGOI-Termination. Please note that this correspondence
must be uploaded as part of completing the NOT process.
Reported by: Kimberly Turney Others present:
Date of inspection: December 07, 2021 Time arriving on site: 4:30 PM Time leaving site: 5:00 PM