Loading...
HomeMy WebLinkAboutNCC191194_NOT Request Not Approved_20211229 Morman, Alaina From: laserfiche@ncdenr.gov Sent: Wednesday, December 29, 2021 4:05 PM To: gduckworth@acccon.net Cc: Morman, Alaina; monica.a.stephenson.civ@mail.mil; lee.p.ward.civ@mail.mil Subject: NOT Request Not Approved This email is to notify you that your request to rescind COC No. NCC191194 for the project FB-PN 79443 Human Performance Training Center was not approved for the following reason: The final inspection report was uploaded in place of the NOT Certification Form, which is available here: https:Hdeq.nc.gov/about/divisions/energy-mineral-and-land-resources/stonnwater/stonnwater-program/npdes- construction-program. Scroll down to the "How to Terminate a Certificate of Coverage" section and the form is the second hyperlink. Additionally, Fort Bragg Directorate of Public Works is the permittee, which means Monica Stephenson or another responsible officer with Fort Bragg must sign the NOT Certification Form and electronic NOT request. Gardner Duckworth cannot sign because ACC Construction Company is not the permittee. Please submit a new NOT request once all documentation is in order. Thank you. If you have any questions, please contact Alaina Morman with the NC Stormwater Program at alaina.morman@ncdenr.gov or(919) 707-9236. This email was automatically generated by Laserfzche. Please do not respond to this email address, as responses are not monitored. i