Loading...
HomeMy WebLinkAbout20020991 Ver 1_Year 5 Monitoring Report_20140117ks CVC V\� Kings Creek Stream Restoration NCEEP Project Number: 208 Contract Number: D09082S Monitoring Year 5 2013 Final Report Submitted to North Carolina Ecosystem Enhancement Program North Carolina Department of Environment and Natural Resources November 2013 Ecosystem I'R(7li h/�M 1619 Mail Service Center Raleigh, NC 27699 RECEMD JAN 0 8 209 DG @C0w[� pp JAN 17 2014 D NR - WA ALITY 0 Monitoring Firm EQUINOX ENVIRONMENTAL CONSULTATION & DESIGN 37 Haywood Street, Suite 100 Asheville, North Carolina 28801 Phone: 828 - 253 -6856 Project Contact: Hunter Terrell Email: Hunter @equinoxenvironmental.com Kings Creek Stream Restoration 2013 Monitoring Report (MY 5) Table of Contents 10 Executive Summary / Project Abstract Page 1 20 Methodology Page 3 30 References Page 4 Appendix A Pr Figure 1 Table la Table lb Table 2 Table 3 Table 4 Appendices :)ject Vicinity Map and Background Tables Vicinity Map and Directions Project Components Component Summations Project Activity and Reporting History Project Contacts Project Attributes Appendix B Visual Assessment Data Figure 2 Integrated Current Condition Plan View Table 5 Visual Stream Morphology Stability Assessment Table 6 Vegetation Condition Assessment Appendix C Vegetation Plot Data Table 7 Vegetation Plot Criteria Attainment Vegetation Monitoring Plot Photos Table 8 CVS Vegetation Plot Metadata Table 9 Planted and Total Stem Counts (Species by Plot with Annual Means) Appendix D Stream Survey Data Cross - Sections with Annual Overlays Longitudinal Profiles with Annual Overlays Pebble Count Plots with Annual Overlays Table 10a Baseline Stream Data Summary Table l Ob Baseline Stream Data Summary (Substrate, Bed, Bank, and Hydrologic Containment Parameter Distributions) Table 11 a Monitoring Data — Dimensional Morphology Summary (Dimensional Parameters — Cross - Sections) Table l lb Monitoring Data — Stream Reach Data Summary Appendix E Hydrologic Data Table 12 Verification of Bankfull Events 1.0 EXECUTIVE SUMMARY / PROJECT ABSTRACT The goals and objectives stated to the Kings Creek Mitigation Report (NCEEP 2006) are as follows • Restore 2,119 linear feet of channel dimension, pattern, and profile to the extent possible, • Improve floodplam functionality by matching floodplam elevation with bankfull stage, thereby increasing watershed attenuation and reducing peak flows, • Establish native floodplain vegetation, which will allow treatment of diffuse storm flow and nutrient uptake while establishing part of a wildlife corridor in the watershed, • Remove invasive exotic vegetation species from the stream corridor, • Improve the natural aesthetics of the stream corridor, and • Improve the water quality in the Kings Creek watershed by reducing bank erosion, increasing nutrient storage and uptake, and increasing dissolved oxygen of the system The monitoring year five (MY5) vegetation plot data indicate that the project is meeting the final established criterion for planted stem density, which is a minimum survival of 260 planted stems per acre at the end of the year five monitoring period Average stem density for planted stems in MY5 is approximately 648 stems per acre Additionally, when planted and natural stems are combined, the average stem density is 2,536 stems per acre, which is well above the minimum established criterion Of the 48 planted stems recorded within the monitoring plots, 94% had vigor codes of good or excellent The site includes a diverse assemblage of 18 planted and volunteers species of native trees and shrubs Planted species range from 5 to 6 per plot with 10 to 13 species observed when volunteers are included Past problems with vegetation consist of areas of low stem densities adjacent to the stream reach as well as approximately 16 currently isolated patches of high threat invasive plant species that span the project area A supplemental live stake planting occurred on March 16, 2011 in those areas noted with low stem densities and eroding banks A total of four treatments of invasive plant populations occurred on February 61h, April 24`h, June 24`h, and September 30`h of 2013 Treatments targeted Bittersweet, Kudzu, Multiflora Rose, Privet, Japanese Honeysuckle, Japanese Spirea, and Bamboo A walk- through was performed to evaluate efficacy of prior treatments during the September 30`h treatment, some resiliency was observed on privet and rose, but other species were affected greatly by initial treatments Additionally, follow up treatments will be completed during 2014 growing season, prior to project closeout Stream longitudinal profiles have remained relatively stable among monitoring years The primary stream issue observed during MY5 was bank erosion resulting from thalweg migration and low woody stem densities In particular, thalweg migration has continued at station 2 +00 (83 feet) and 5 +25 (38 feet) causing further bank erosion These two areas of concern have continued to actively erode between monitoring years Including these two areas, 16% of the project area is currently actively eroding All other morphological metrics indicated performance percentages averaging between 88 and 100% Two bankfull events, one event on January 31" and one event on July 3rd, were documented during MY5 The former was documented using wrack lines as well as the crest gauge High rainfall in the area and anecdotal evidence of overbank flows confirmed the second bankfull event Kings Creek Final 1 Equinox Environmental Consultation and Design, Inc Project No 208 November 2013 Monitoring Year 5 of 5 Summary information/data related to the occurrence of items such as beaver or easement encroachment and statistics related to performance of various project and monitoring elements can be found in the tables and figures in the report appendices Narrative background and supporting information formerly found in these reports can be found in the mitigation and restoration plan documents available on EEP's website All raw data supporting tables and figures in the appendices is available from EEP upon request Kings Creek Final 2 Equinox Environmental Consultation and Design, Inc Project No 208 November 2013 Monitoring Year 5 of 5 2.0 Methodology The stream monitoring methodologies utilized to 2013 replicate those employed during previous monitoring years and are based on standard guidance and procedures documents (Rosgen 1996 and USACE 2003) Vegetation monitoring data were collected following the standard CVS -EEP Protocol for Recording Vegetation, Level 11 (Lee et al 2008) Kings Creek Final 3 Equinox Environmental Consultation and Design, Inc Project No 208 November 2013 Monitoring Year 5 of 5 3.0 References Lee, M T, R K Peet, S D Roberts, and T R Wentworth 2008 CVS -EEP Protocol for Recording Vegetation Version 4 2 The University of North Carolina at Chapel Hill, Department of Biology NCEEP (North Carolina Ecosystem Enhancement Program) 2006 Mitigation Report Kings Creek Restoration Project Raleigh Rosgen, D L 1996 Applied River Morphology Wildland Hydrology Books, Pagosa Springs, Colorado USACE (U S Army Corps of Engineers) 2003 Stream Mitigation Guidelines USACOE, USEPA, NCWRC, NCDENR -DWQ Wilmington District Kings Creek Final 4 Equinox Environmental Consultation and Design, Inc Project No 208 November 2013 Monitoring Year 5 of 5 Appendix A Project Vicinity Map and Background Tables Appendix A Project Vicinity Map and Background Tables *The anhupated mitigation units are based on the expected yields due to the lack of a full 30 -foot riparian buffer on portions of the stream - Information unavailable Table lib. Component SUMTHRUo s gable 1a. Project Components Kin s Cre,1ek / Pro'ect o. 208 Restoration Stream Non -RipaT(Ac) s Creek / ect No. 208 Riparian Wetland (Ac) Protect on c °— v u on : u ou Ac g a o. Non- Rivenne Component v w `o d a y Stationing �o _n 'e Comment or Reach ID w Enhancement Q U ii oG Q j a Enhancement II 191 Reach 1 824 R P2 990 840 1+00- 10+90 1 1 840 N/A Excavated new off -Ime bankfull channel and HQ Preservation constructed flood lam at lower elevation Reach 11 191 El 191 0 10 +90 - 12 +81 25 1 0 N/A Excavated floodplain on left bank and stabilized 00 BMP Count *Anticipated Jett bank slopes No work on right bank Reach 111 800 R P2 936 791 12 +81 - 22 +17 1 1 791 N/A Excavated new off -line bankfull channel and constructed flood lam at lower elevation *The anhupated mitigation units are based on the expected yields due to the lack of a full 30 -foot riparian buffer on portions of the stream - Information unavailable = Non - Applicable *The anticipated mitigation units are based on the expected yields due to the lack of a full 30 -foot riparian buffer on portions of the stream Kings Creek Final A -2 Equinox Environmental Consultation and Design, Inc Project No 208 November 2013 Monitoring Year 5 of 5 Table lib. Component SUMTHRUo s Kin s Cre,1ek / Pro'ect o. 208 Restoration Stream Non -RipaT(Ac) and Buffer Riparian Wetland (Ac) TBMP Level 1 Ac Ac Rrvenne Non- Rivenne Restoration 1,928 Enhancement Enhancement I Enhancement II 191 Creation Preservation HQ Preservation 0 0 Totals 2,119 0.0 0.0 00 00 BMP Count *Anticipated 1,631 0.0 0.0 00 0.0 0 SMU Totals = Non - Applicable *The anticipated mitigation units are based on the expected yields due to the lack of a full 30 -foot riparian buffer on portions of the stream Kings Creek Final A -2 Equinox Environmental Consultation and Design, Inc Project No 208 November 2013 Monitoring Year 5 of 5 Appendix A Project Vicinity Map and Background Tables Tab a 2. Proj ct ctivity and porting • � tory D ed Sinc Gr'rading ete• e apsedTime Since 1211 'ng Co IMUMMIN ete: 7 ,ears Number of a rlti ears • 5 Activity or Deliverable Data Collection Complete Completion or Delivery Restoration Plan - - Final Design - Construction Plans - Sep-04 Construction N/A 2006 Live Stakes and Bare Root Trees Planted N/A 2006 Mitigation Plan / As -bush Year 0 Momtorm - Basehne Nov- 05/Dec -05 May-06 Year 1 Monitormg 2008 2008 Year 2 Monrtorm Nov -10 Nov -10 Supplemental Live Stake Plantmg Effort Mar -11 Mar -11 Year 3 Monrtorm Nov -11 Nov -11 Beaver and Beaver Dam Removal Oct -12 Oct -12 Year 4 Monrtorm Nov -12 1 Dec -12 Year 5 Monitorm Nov -13 I Nov -13 - Information unavailable N/A - Item does not apply Kings Creek Final A -3 Equinox Environmental Consultation and Design, Inc Project No 208 November 2013 Monitoring Year 5 of 5 Appendix A Project Vicinity Map and Background Tables able 3. ;j p ect Contacts Kin s Creel;ro ect N_o_. 2_0_8 Designer Buck Engineering / Michael Baker Corp 797 Haywood Road, Suite 201 Asheville, North Carolina 28806 Primary Project Design POC Andrew Bick (828) 350 -1408 Construction Contractor l -J, inc 220 Stoneridge Drive, Suite 405 Columbia, SC 29210 Construction Contractor POC Richard Goodwin (803 ) 929-1181 Survey Contractor Joel Johnson land Surveying Survey Contractor POC Joel Johnson (828) 586 -6488 Planting Contractor Unknown Planting Contractor POC Unknown Seeding Contractor Unknown Planting Contractor POC Unknown Seed M ix Sources Unknown Nursery Stock Suppliers Unknown Momtonng Performers (YO) - 2006 Buck Engineering/ Michael Baker Corp 797 Haywood Road, Suite 201 Asheville, North Carolina 28806 Stream Monitoring POC Unknown Vegetation Monitoring POC Unknown Momtonng Performers (Yl) - 2008 North Carolina Wildlife Resources Commission 171 Southern Cross Road Weaverville, North Carolina 28787 Stream Monitoring POC Jeff Ferguson (828)231 -3517 Vegetation M onitoring POC JeffFer son (828) 231 -3517 Monitoring Performers (Y2) - 2010 Equinox Environmental Consultation & Design, inc 37 Haywood Street, Suite 100 Asheville, North Carolina 28801 Stream Monitoring POC Steve Melton (828) 253 -6856 Vegetation Monitoring POC Sarah Marcmko (828 ) 253 -6856 Monitoring Performers (Y3) - 2011 Equinox Environmental Consultation & Design, Inc 37 Haywood Street Suite 100 Asheville, North Carolina 28801 Stream M omtonn POC Win Taylor (828) 253 -6856 Vegetation Monitoring POC Kevin Mitchell (828) 253 -6856 Monitonng Performers (Y4) - 2012 Equinox Environmental Consultation & Design, inc 37 Haywood Street, Suite 100 Asheville, North Carolina 28801 Stream Monitoring POC Kevin Mitchell (828) 253 -6856 Vegetation M onitoring POC Kevin Mitchell (828) 253 -6856 Momtonng Performers (Y5) - 2013 Equinox Environmental Consultation & Design, Inc 37 Haywood Street, Suite 100 Asheville, North Carolina 28801 Stream Monitoring POC Hunter Terrell (828 ) 253 -6856 Vegetation M onitoring POC lHunter Terrel](828) 253 -6856 EEEE� Unknown - information was unknown at time of report submittal Kings Creek Final A -4 Equinox Environmental Consultation and Design, Inc Project No 208 November 2013 Monitoring Year 5 of 5 Appendix A Project Vicinity Map and Background Tables Table 4. Projec W" b Project County Transylvania Physiographic Region Blue Ridge Ecoregion Broad Basms Project River Basm French Broad USGS HUC for Project 14 di 06010105010050 NCDW Sub -Basin for Project 04 -03 -01 Withm Extent of EEP Watershed Plan No WRC Class Warm, Cool, Cold Cool % of Project Easement Fenced or Demarcated 1000/0 Beaver Activity Observed Durmg Design Phase Unknown Restoration Component Attributes Kings Creek Drama e Area (sq rr 4 2 Stream Order Second Restored Length feet 2,119 Perennial or Intermittent Perennial Watershed Type Urban Watershed LULC Distribution - Watershed Impervious Cover - NCDW AU / Index Number 6 -30 NCDWQ Classification C / Tr 303d Listed No Upstream of 303d Listed Segment No Reasons for 303d Listmg or Stressor N/A Total Acreage of Easement 6 11 Total Vegetated Acreage within Easement 566 Total Planted Acreage as Part of Restoration 556 Ros en Classification of Pre- Existm - Ros en Classification of As -Built C4 VaUey Type - VaHey Slope - VaHey Side Sloe Range - VaHey Toe Sloe Range - Cowardm Classification N/A Trout Waters Designation Yes Species of Concern, Endangered, Etc - Dorrmant Soil Series and Characteristics Series Depth - Cla /o - K T. - - Information unavailable N/A - Item does not apply Kings Creek Final A -5 Equinox Environmental Consultation and Design, Inc Project No 208 November 2013 Monitoring Year 5 of 5 Appendix B Visual Assessment Data i' Hui i c. ill LU9I iiiUu ' U i 1U 111 L.I /IIU 1l1V11 1 lull v IU VV L1 ill Prepared for Project: Kings Creek Notes: 1) Base Map Data Provided by NCEEP Prepared by Year 5 Monitoring 2) 2010 Aerial Photo �,.. Transylvania County, North Carolina Sheet 1 of 1 EQUINOX Ecosystem Date ENVIROY M o:: Y14M Project Number PROGRAM November 2013 NCEEP # 208 Appendix B Visual Assessment Data Table 5. Visual Stream Morphology Stability Assessment Kings Creek / Project No. 208 Assessed LenErth 2,119 feet Number Footage Adfusted % Number Total Number of Amount of % Stable, with wrth for Major Channel Channel Stable, Category Sub- Category Metric PerforPerforming Number in Unstable Unstable Performing Stabilizing Stabilizing Stabilizing As -built Segments Footage as Intended Woody Woody Woody as ]mended Vegetation Vegetation Vegetation 1 Bed I Aggradation Bar formation /growth sufficient to significantly deflect 1 Vertical Stabihh flow lateral) (not to include omt bars) 1 74 96% 2 Dewadation Evidence of downcuttmg 0 0 100% (Riffle and Run Units) 2 Riffle Condition I Texture /Substrate - Riffle maintains coarser substrate 13 13 100% I Depth Sufficient (Max Pool Depth Mean Bankfull Depth 7 1 6) 12 12 100% 3 Meander Pool Condition 2 Lemith appropriate(> 30 %ofcenterlmedistancebctweenfail of upstream riffle and head of downstream nRle 1) 12 100% I Thalweg centering at upstream of meander bend (Run) 7 12 58% 4 Thalweg Position 91% 2 Thalwegcentermg at downstream of meander bend (Glide) 10 11 2 Bank 1 Scoured /Eroding Bank lacking vegetative cover resulting simply from poor growth and/or 11 611 86% II 284 92% scour and erosion Banks undercut /overhangmgto the extent that mass wasting appears likely 2 Undercut Does NOT mclude undercuts that are modest appear sustainable and are 1 18 100% 1 18 100% providing habitat 3 Mass Wasting Bank slump mgcahmgorcollapse 2 49 99% 0 49 100% Totals 14 678 84% 12 1 351 92% 3 Engineered I Overall Integrity Structures physically intact with no dislodged boulders or logs 14 16 88% Structures 2 Grade Control Grade control structures exhibiting maintenance of grade across the sill 21 24 88% 2a Piping Structures lacking any substantial flow underneath sills or aims 24 24 100% 3 Bank Protection Bank erosion within the structures extent of influence does NOT exceed 29 30 97% 15% Pool foamingstructuresmaintaining -Max Pool Depth McanBankfull 4 Habitat Depth Ratio x 1 6 Rootwads/logs providing some cover at base -flow 12 12 1 Kings Creek Final Project No 208 Monitoring Year 5 of 5 B -2 Equinox Environmental Consultation and Design, Inc November 2013 Appendix B Visual Assessment Data i Table 6. Vegetation Condition Assessment � gs C re e !OJ 1ct P No. 208 Acrea a 5_S_6 Number of Combined % of Vegetation Category Definitions CCPV Depiction Polygons Acreage Planted Acreage 1 Bare Areas Very limited cover of both woody and herbaceous material N/A 0 000 0% 2 Low Stem Density Areas Woody stem densities clearly below target levels based on M Y3, Stipple 7 005 1% 4, or 5 stem count criteria Black Dots White Background Tptals 7 005 1% 3 Areas of Poor Growth Rates or Vigor Areas with woody stems of a size class that are obviously small N/A 0 000 0% given the momtonn year Cumalative Totals 7 005 1 % Easement Acre age 6.11 % of Vegetation Category Definitions CCPV Depiction Number of Combined Easement Polygons Acreage Acreage 4 Invasive Areas of Concern Areas or points (if too small to render as polygons at map scale) Cross Hatch _ 0 000 4 0% m (Red - Dense/Yellow - Present 5 Easement Encroachment Areas Areas or points (if too small to render as polygons at map scale) N/A 0 000 0% Kings Creek Final Project No 208 Monitoring Year 5 of 5 B -3 Equinox Environmental Consultation and Design, Inc November 2013 Appendix C Vegetation Plot Data Appendix C Kings Creek Final Project No 208 Monitoring Year 5 of 5 Vegetation Plot Data Table MY Vegetation Plot Criteria Attainmen s Creek / P,ro'ect No 208 Vegetation Vegetation Plot Survival Tract Mean ID Threshold Met? I Yes 100% 2 Yes 3 Yes C -1 Equinox Environmental Consultation and Design, Inc November 2013 Appendix C Vegetation Plot Data Vegetation Monitoring Plot 1 Monitoring Year 5 — June 3, 2013 Kings Creek Final Project No. 208 Monitoring Year 5 of 5 Vegetation Monitoring Plot 2 Monitoring Year 5 — June 3, 2013 C -2 Equinox Environmental Consultation and Design, Inc. November 2013 Appendix C Vegetation Plot Data Kings Creek Final Project No. 208 Monitoring Year 5 of 5 Vegetation Monitoring Plot 3 Monitoring Year 5 — June 3, 2013 C -3 Equinox Environmental Consultation and Design, Inc. November 2013 Appendix C Vegetation Plot Data Ta61e 8. C1fS Vegetation Plot Metadata Tangs Creek /Project No. 208 Report Prepared By Owen Carson Date Prepared 7/15/2013 10 49 Database Name E wnox- 2013 -A -Km sCreek -MY5 mdb Database Location Z \ES \NRI &M \EEP Monitorin \Kin s Creek \KC -MY5- 2013 \Data \Ve Computer Name SENIORSCIEMIST File Size 148234496 DESCRIP.jTiIONTO -ORK HS TS IN THIS DOCUMENIT Metadata Description of database file, the report worksheets, and a summary of project(s) and project data Proj, Planted Each project is listed with its PLANTED stems per acre, for each year This excludes live stakes Proj, Total Stems Each project is listed with its TOTAL stems per acre, for each year This includes live stakes, all planted stems, and all natural /volunteer stems Plots List of plots surveyed with location and summary data (live stems, dead stems, missing, etc Vigor Frequency distribution of v or classes for stems for all plots Vigor b Spp Frequency distribution of v or classes listed by species Damage List of most frequent damage classes with number of occurrences and percent of total stems impacted by each Damage by Spp Dama a values tallied by type for each species Damage by Plot Damage values tallied by type for each plot Planted Stems by Plot and Spp A matrix of the count of PLANTED living stems of each species for each lot, dead and missing stems are excluded ALL Stems by Plot and spp A matrix of the count of total living stems of each species (planted and natural volunteers combined) for each plot, dead and missing stems are excluded PR EIN QUMM Project Code 208 project Name Kings Creek Description On the campus of Brevard College River Basin French Broad Length(ft) Stream -to -Ede Width ft Area sq m Required Plots calculated Sam led Plots 13 Kings Creek Final Project No 208 Monitoring Year 5 of 5 C -4 Equinox Environmental Consultation and Design, Inc November 2013 Appendix C Vegetation Assessment Data 'Fable 9. Planted and 7btal Stem Counts (Species by Plot with Annual Means) Kings Creek / Project No. 208 Current Plot Data (MY5 2013) Annual Means Scientific Name Common Name Species Type E208 -01 -0001 E208 -01 -0002 E208 -01 -0003 MY5(2013) MY4(2012) MY3(2011) MY2(2010) PnoLS P -all T PnoLS P -all T PnoLS P -all T PnoLS P -all T PnoLS P -all IT PnoLS P -all IT PnoLS P -all IT Acer maple Tree 3 Acer rubrum red maple Tree 48 113 Acer rubrum var. rubrum red maple Tree 16 10 49 75 113 Acersaccharinum silver maple Tree 2 2 Alnusserrulata hazel alder Shrub 6 6 6 1 1 1 1 1 4 8 8 11 8 8 16 8 8 13 10 10 1 Aronia arbutifolia Red Chokeberry Shrub 1 2 2 3 2 2 4 21 2 2 2 2 3 2 2 2 Betula nigra river birch Tree 2 2 2 3 3 3 3 3 3 81 8 8 8 8 8 7 7 7 8 8 Cornus amomum silky dogwood Shrub 3 3 9 8 3 3 3 20 3 3 21 3 3 8 3 3 5 Corylus americana American hazelnut Shrub 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Fraxinus pennsylvanica green ash Tree 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Hamamelis virginiana var American witchhazel Tree 4 4 4 2 2 2 1 1 1 7 7 7 7 7 7 7 7 7 5 5 5 Juglans nigra black walnut Tree 2 2 2 Liquidambarstyraciflua sweetgum Tree 1 1 7 1 2 Liriodendron tulipifera tuliptree Tree 13 Liriodendron tulipifera vz Tulip -tree, Yellow Pc Tree 2 1 6 9 6 12 Nyssa sylvatica blackgum Tree 2 2 3 2 2 3 2 2 2 2 2 2 2 2 2 Pinus strobus eastern white pine Tree 1 1 2 1 Platanus occidentalis var. Sycamore, Plane-trei Tree 6 6 it 3 3 3 7 7 9 16 16 23 12 12 28 16 16 27 15 15 39 Prunus serotina black cherry Tree 2 Prunus serotina var, serol black cherry Tree 2 2 1 Quercus phellos 1willow oak Tree 1 Salix nigra Iblackwillow Tree 3 3 4 3 Sambucuscanadensis lCommon Elderberry Shrub 12 2 14 1 2 1 1 1 1 size (ares1 size (ACRES0.02 Stem counr93O.8 Species coun StemsperACR930.8 23 61 10 10 4 15 15 85 48 48 188 44 45 151 47 48 2 47 48 2 1 1 3 3 3 3 0.02 0.02 0.07 0.07 0.07 0.07 6 1 5 5 1 6 6' 12 9 9 1 9 10 1 9 10 15 9 10 1 246 404.71404 7 1700 607 607 3440 647.5 647.5 2536 593.5 607 203J 634 647.51 2752 634 647.5 281 Exceeds requirements by 10% Kings Creek Final C-5 Equinox Environmental Consultation and Design, Inc. Project No. 208 November 2013 Monitoring Year 5 of 5 Appendix D Stream Survey Data Appendix D 2115 2114 2113 2112 2111 2110 :. 2109 u � 2108 0 cya 2107 W 2106 2105 2104 2103 2102 2101 2100 11+{10 0 +10 0 +20 0 +30 0 +40 0 +50 0+60 0 +70 0 +80 0 +90 Station (feet) �- MYO 5/2006 MY2 6/22/2010 MY3 2/17/2011 MY4 2/8/2012 —•--- MY5 3/27/2013 Stream Survey Data Kings Creek/ Project No. 208 Cross - Section 1 - Riffle Station 6 +84 1 +00 Kings Creek Final D- I Equinox Environmental Consultation and Design, Inc. Project No. 208 November 2013 Monitoring Year 5 of 5 Appendix D Stream Survey Data Cross - Section 1 — Riffle Left Bank Descending Monitoring Year 5 — March 27, 2013 Cross - Section 1 — Riffle Right Bank Descending Monitoring Year 5 — March 27, 2013 Kings Creek Final D -2 Equinox Environmental Consultation and Design, Inc. Project No. 208 November 2013 Monitoring Year 5 of 5 Appendix D Stream Survey Data Cross - Section 1 — Riffle Downstream Monitoring Year 5 — March 27, 2013 Cross- Section 1 — Riffle Upstream Monitoring Year 5 — March 27, 2013 Kings Creek Final D -3 Equinox Environmental Consultation and Design, Inc. Project No. 208 November 2013 Monitoring Year 5 of 5 Appendix D 2115 2114 2113 2112 2111 2110 2109 w 1.108 0 a 2107 W 2106 2105 2104 2103 2102 2101 2100 0 Stream Survey Data Kings Creek / Project No. 208 Cross - Section 2 - Pool Station 7 +85 +00 0 +10 0 +20 0 +30 0 +40 0 +50 0+60 0 +70 0 +80 0+90 1+00 1 +10 1 +20 1 +30 Station (feet) • MYO 5/2006 MY2 6/22/2010 MY3 2/17/2011 MY4 2/8/2012 ' MY5 3/27/2013 — — — * Bkf Kings Creek Final D -4 Equinox Environmental Consultation and Design, Inc. Project No. 208 November 2013 Monitoring Year 5 of 5 Appendix D Stream Survey Data Cross - Section 2 — Pool Left Bank Descending Monitoring Year 5 — March 27, 2013 Cross - Section 2 — Pool Right Bank Descending Monitoring Year 5 — March 27, 2013 Kings Creek Final D -5 Equinox Environmental Consultation and Design, Inc. Project No. 208 November 2013 Monitoring Year 5 of 5 Appendix D Stream Survey Data Cross - Section 2 — Pool Downstream Monitoring Year 5 — March 27, 2013 Cross - Section 2 — Pool Upstream Monitoring Year 5 — March 27, 2013 Kings Creek Final D -6 Equinox Environmental Consultation and Design, Inc. Project No. 208 November 2013 Monitoring Year 5 of 5 Appendix D 2110 2109 2108 2107 2106 a 2105 w C 0 2104 W 2103 2102 2101 2100 2099 2098 0+00 0 +10 0 +20 0 +30 0 +40 0+50 0 +60 0 +70 0+80 Station (feet) MYO 5/2006 MY2 6/24/2010 Ml'3 2/18/2011 MY4 2/8/2012 ` MY5 3/28/2013 - -- Bkf Stream Survey Data Kings Creek / Project No. 208 Cross - Section 3 - Riffle Station 15 +13 0 +90 Kings Creek Final 0-7 Equinox Environmental Consultation and Design, Inc. Project No. 208 November 2013 Monitoring Year 5 of 5 Appendix D Stream Survey Data Cross - Section 3 — Riffle Left Bank Descending Monitoring Year 5 — March 28, 2013 Cross - Section 3 — Riffle Right Bank Descending Monitoring Year 5 — March 28, 2013 Kings Creek Final D -8 Equinox Environmental Consultation and Design, Inc. Project No. 208 November 2013 Monitoring Year 5 of 5 Appendix D Stream Survey Data Cross - Section 3 — Riffle Downstream Monitoring Year 5 — March 28, 2013 Cross - Section 3 — Riffle Upstream Monitoring Year 5 — March 28, 2013 Kings Creek Final D -9 Equinox Environmental Consultation and Design, Inc. Project No. 208 November 2013 Monitoring Year 5 of 5 Appendix D 2110 2109 2108 2107 2106 a 2105 w c 2104 W 2103 2102 2101 2100 2099 2098 0+00 Stream Survey Data Kings Creek/ Project No. 208 Cross - Section 4 - Pool Station 16 +17 0 +10 0 +20 0 +30 0 +40 0 +50 0 +60 0 +70 0 +80 0 +90 Station (feet) • Y1Y0 5/2006 MY2 6/24/2010 MY3 2/18/2011 MY4 2/8/2012 iN9Y5 3/28/2013 — — — Bkf Kings Creek Final D -10 Equinox Environmental Consultation and Design, Inc. Project No. 208 November 2013 Monitoring Year 5 of 5 Appendix D Stream Survey Data Cross - Section 4 — Pool Left Bank Descending Monitoring Year 5 — March 28, 2013 Kings Creek Final Project No. 208 Monitoring Year 5 of 5 Cross - Section 4 — Pool Right Bank Descending Monitoring Year 5 — March 28, 2013 D -11 Equinox Environmental Consultation and Design, Inc. November 2013 Appendix D Stream Survey Data Cross- Section 4 — Pool Downstream Monitoring Year 5 — March 28, 2013 Cross - Section 4 — Pool Upstream Monitoring Year 5 — March 28, 2013 Kings Creek Final D -12 Equinox Environmental Consultation and Design, Inc. Project No. 208 November 2013 Monitoring Year 5 of 5 Appendix D 2120 2118 2116 2114 2112 2110 2108 w 2106 c 0 2104 w 2102 2100 2098 2096 2094 2092 2090 0 Stream Survey Data Kings Creek Longitudinal Profile Stationing 1 +14 - 22 +28 8 9 to !j l2 I� 'bo 'bo �o �o Station (feet) "I'halweg MYO ___r — Thalweg NIY'I Thal"g MY2 Thalweg MY'3 1halweg NIY4 Thalweg NIN 5 • Bkf YY'S o Structures Kings Creek Final D -13 Equinox Environmental Consultation and Design, Inc. Project No. 208 November 2013 Monitoring Year 5 of 5 Appendix D ds Stream Survey Data 5 C @l3 Monrtormg Year 5 Description Material Size (mm) Total # Item % Cum % Silt /Clay sdt/clay 0 062 0% 0% Sand very fine sand 0 125 0% 0% fine sand 025 0% 0% median sand 050 6 6% 6% coarse sand 100 6 6% 12% very coarse sand 200 4 4% 16% Gravel very fine gravel 40 00/0 16% fine gravel 57 2 2% 18% fine gravel 80 1 1% 19% medium gravel 113 1 1% 20% medium gravel 160 5 5% 25% coarse gravel 223 11 11% 36% coarse gravel 32 13 13% 49% very coarse gravel 45 22 22% 70% very coarse gravel 64 15 15% 85% Cobble small cobble 90 9 9% 94% medium cobble 128 6 6% 1000/0 large cobble 180 0% 100% very large cobble 256 0% 1000/. Boulder small boulder 362 0% 1000/0 small boulder 512 0% 1000/0 medium boulder 1024 0% 1000/0 large boulder 2048 0% 1000/0 very large boulder 4096 0% 1000/0 Bedrock bedrock >4096 0% 1000/0 TOTALS 1 101 100% 100% IN a D50 33 D84 62 D95 95 Kings Creek Final Project No 208 Monitoring Year 5 of 5 r D -14 Equinox Environmental Consultation and Design, Inc November 2013 Appendix D Stream Survey Data Kings Creek Pebble Count - Percent Cumulative Cross Section 1 - Riffle a • • • • • F —+ 100 90% — 80% — e ro r 70% F -- u e -- 60% i e u 50 -- d a — 40% > 30% E 0 20% — �— 10% O C N M N O O O 0% ry C1 Particle Size (mm) MY2 6/16/2010 MY3 211712011 MY4 6/26/2012 MY5 3/28/2013 Kings Creek Pebble Count - Percent Individual Cross Section 1 - Riffle 25% 20% 15% ;v e c v 10% � u a 5% 0% t N Q 7 O M Vo V O O 'm O O ^O N V 9 V m Particle Size (mm) o MY2 6/16/2010 13 MY3 1/17/2011 13 MY4 6/26/2012 ■ MY5 3/28/2013 Kings Creek Final Project No. 208 Monitoring Year 5 of 5 D -15 Equinox Environmental Consultation and Design, Inc. November 2013 Appendix D Stream Survey Data I C e Momtormg Year 5 Description Material Size (mm) Total # Item % Cum % Silt /Clay sdUclay 0 062 0% 0% Sand very fine sand 0 125 2 2% 2% fine sand 025 9 9% 11% medium sand 050 5 5% 16% coarse sand 100 10 10% 26% very coarse sand 200 5 5% 31% very fine gravel 40 0% 31% fore gravel 57 4 4% 35% Gravel fine gravel 80 3 3% 38% medium gravel 113 6 6% 44% medium gravel 160 7 7% 50% coarse gravel 223 11 11% 61% coarse gravel 32 12 12% 73% very coarse gravel 45 9 9% 82% very coarse gravel 64 7 7% 89% Cobble small cobble 90 11 11% 100% medium cobble 128 0% 100% large cobble 180 0% 100% very large cobble 256 0% 1000/0 Boulder small boulder 362 01/1. 100% small boulder 512 0% 100° /a medium boulder 1024 0% 100% large boulder 2048 0% 1000/0 very large boulder 4096 0% 1000/0 Bedrock bedrock >4096 0% 100% FTOTALS1 1 101 1 100% 100% a D50 16 D84 49 D95 77 Kings Creek Final D -16 Equinox Environmental Consultation and Design, Inc Project No 208 November 2013 Monitoring Year 5 of 5 Appendix D Stream Survey Data Kings Creek Pebble Count - Percent Cumulative Cross Section 2 - Pool 100% 90 80 ¢, t F' 70% r 60% L% e 5 i 40% i 30 U 20% 10% ` 0% d CC Particle Size (mm) MY2 6/16/2010 MY3 2/17/2011 MY4 7/12/2012 MY5 3/28/2013 Kings Creek Pebble Count - Percent Individual Cross Section 2 - Pool 25% 20 is 0 :2 15% 9 O d to % 96 5% 0% V1 �O N 7 OD N R 0O Y T V d m Particle Size (mm) ®MY2 6116/2010 13MY3 2/17/2011 �MY4 7/12/2012 OMY5 3/28/2013 Kings Creek Final Project No. 208 Monitoring Year 5 of 5 D -17 Equinox Environmental Consultation and Design, Inc. November 2013 Appendix D Stream Survey Data Kings Creek Final D -18 Equinox Environmental Consultation and Design, Inc Project No 208 November 2013 Monitoring Year 5 of 5 ' D50 Monitormg Year 5 Description Material Size (mm) Total # Item % Cum % Silt /Clay sildclay 0 062 0% 0% Sand very fine sand 0 125 0% 0% fine sand 025 0% 0% medium sand 050 1 1% 1% coarse sand 100 4 4% 5% very coarse sand 200 8 7% 12% Gravel very fine gravel 40 0% 12% fine gravel 57 1 1% 13% fine gravel 80 0% 13% medium gravel 113 1 1% 14% medium gravel 160 0% 14% coarse gravel 223 3 3% 17% coarse gravel 32 19 17% 34% very coarse gravel 45 15 14% 48% very coarse gravel 64 20 18% 66% Cobble small cobble 90 8 7% 73% medium cobble 128 20 18% 92% large cobble 180 7 6% 98% very large cobble 256 2 2% 1000/0 Boulder small boulder 362 0% 1000/0 small boulder 512 0% 1000/0 medium boulder 1024 0% 100% large boulder 2048 0% 100% very large boulder 4096 0% 1000/0 Bedrock bedrock >4096 0% 100% TOTALS 1 1 109 100% 100% Kings Creek Final D -18 Equinox Environmental Consultation and Design, Inc Project No 208 November 2013 Monitoring Year 5 of 5 ' D50 47 D84 110 D95 150 Kings Creek Final D -18 Equinox Environmental Consultation and Design, Inc Project No 208 November 2013 Monitoring Year 5 of 5 Appendix D Stream Survey Data Kings Creek Final Project No. 208 Monitoring Year 5 of 5 D -19 Equinox Environmental Consultation and Design, Inc. November 2013 Kings Creek Pebble Count - Percent Cumulative Cross Section 3 - Riffle 100% 90% — 80% e ea L F. 70% 40 d e Lz 60% v — 50% 6 u a — 40% > .W 30% E — e U 20% — 10% 0% m Particle Size (mm) MV2 6116/2010 MY3 2/18/2011 ' MY4 7/12/2012 MY5 3/28/2013 Kings Creek Pebble Count - Percent Individual Cross Section 3 - Riffle 25% 20% is 15% e e 10% Y a 5% 0% N V � �(, � �O N Q p — N •f .0 X - .L N N �, "I � OC O D N N - - N -f �. T 00 1A b r N M VI Q b N !► O O �D Y O� V O O d 6i Particle Size (mm) MY2 6/16/2010 OMY3 2/18/2011 OMY4 7112/2102 ■MY5 3/28/2013 Kings Creek Final Project No. 208 Monitoring Year 5 of 5 D -19 Equinox Environmental Consultation and Design, Inc. November 2013 Appendix D Stream Survey Data 0 o. 208 13 Monrtormg Year 5 Description Material Size (mm) Total # Item % Cum % Silt /Clay sdUclay 0 062 0% 0% Sand very fine sand 0 125 0% 0% fine sand 025 9 9% 9% medium sand 050 9 9% 18% coarse sand 100 8 8% 26% very coarse sand 200 9 9% 35% Gravel very fine gravel 40 0% 35% fine gravel 57 1 1% 36% fine gravel 80 2 2% 38% medium gravel 113 4 4% 42% medium gravel 160 18 18% 59% coarse gravel 223 18 18% 77% coarse gravel 32 17 17% 94% very coarse gravel 45 6 6% 100% very coarse gravel 64 0% 100% Cobble small cobble 90 0% 100% medium cobble 128 0% 100% large cobble 180 0% 100% very large cobble 256 0% 100% Boulder small boulder 362 0% 100% small boulder 512 0% 100% medium boulder 1024 0% 100% large boulder 2048 0% 100% very large boulder 4096 0% 100% Bedrock bedrock >4096 0% 100% TOTALS1 101 100% 1000/0 Kings Creek Final D -20 Equinox Environmental Consultation and Design, Inc Project No 208 November 2013 Monitoring Year 5 of 5 D50 13 D84 26 D95 34 Kings Creek Final D -20 Equinox Environmental Consultation and Design, Inc Project No 208 November 2013 Monitoring Year 5 of 5 Appendix D Stream Survey Data Kings Creek Pebble Count - Percent Cumulative Cross Section 4 - Pool 100% 90% 80% C W L 70 d C 60 50 u CL 40% > — 30 U -- 20% -- 10% 0% m Particle Size (mm) MY2 6/16/2010 MY3 2/18/2011 MY4 7/12/2012 t MY5 3/28/2013 Kings Creek Pebble Count - Percent Individual Cross Section 4 - Pool 25% 20% 1� W 15% 10°% 5% 0% _ 00 �L rl N V, R O 00 O b 00 N N N Q 00 _ 0 N R �O a O, V v m Particle Size (mm) ■MY2 6/16/2010 13MY3 2/18/2011 ■MY4 7/12/2012 ■MYS 3/28/2013 Kings Creek Final Project No. 208 Monitoring Year 5 of 5 D -21 Equinox Environmental Consultation and Design, Inc. November 2013 Appendix D Stream Survey Data M Y'"r _ _ _ ^I [E'er" e e S ti `� f,Table�l0a Baslin Stream Data ummary r rte.,' s,ICi s Creek /�P,ro ect�No. 208 - t i 't�� '� Parameter Gaugi Regional Cure Pre - Existing Condition Reference Reach(es) Data Design Monitoring Baseline Dl mensiag&I3_ubstrate-Rlffle s LL UL Eq Min Mean Med Max SD n Min Mean Med Max SD' n Min Med Max Min Mean x SD n Bankfull Width (ft) 242 255 7 N/A 2 Floodprone Width (f) � l >150 >150 0 N/A 2 Bankfull Mean Depth (ft) 2 1 22 [653 2 N/A 2 Bankfull Max Depth (ft) 3 0 3 1 1 N/A 2 Bankfull Cross - Sectional Area (ft') 519 552 5 N/A 2 Width/Depth Ratio l� 113 118 2 N/A 2 Entrenchment Ratio ® ®� _ - - _ - - - - - - >3 60 73 65 70 N/A 2 Bank Height Ratio - _ _ _ 10 10 1 1 U 1 1 0 N/A 2 Profile Riffle Length (ft) ®_ 293 460 444 682 132 10 Riffle Slope (ft /ft - - - - - - - - - - - - - - 0281 0026 00069 00059 00153 0 0039 10 Pool Length (ft) S - - - - - - _ - - - - - - 52 4 586 698 156 11 Pool Max Depth (ft)�� ®_ - 14 22 23 34 05 11 Pool Spacing (ft) - - - - - - - - - 985 150 6 143 2 220 9 409 8 Pattern Channel Beltwidth (ft) _ _ 610 1108 107 5 173 0 35 2 12 Radius of Curvature (ft) _ _ _ 620 56 0 139 0 26 7 11 Rc Bankfull Width ft /ft) _ _ Meander Wavelen li ft L23'101 276 8 240 0 414 0 77 6 5 Meander Width Ratio _ _ - - - - - - - - - 4 2 4 2 4 4 N/A 2 ?ra nspori Painmgtere Reach Shear Stress (competency) (lb /ft) � O Max part size (mm ) mobilized at bankfall Stream Power trans ort ca acit W /m) � - - Additlona�Reech Parameters Rosgen Classification - C4 Bankfull Velocity (fps) - - - - Bankfull Discharge (cfs) - - - - Valley Length (ft) ® 1 694 Channel Thahveg Length (ft) 1,815 2 135 Sinuosity (ft) ® 1 07 128 Water Surface Slope (Channel) (ft /ft) - ® 00049 Bankfull Slope (ft /ft) ® 00044 Bankfull Floodplain Area (acres) % of Reach with Eroding Banks Channel Stability or Habitat Metnc Biological or Other - mtomation unavailable N/A Information does not apply Kings Creek Final D -22 Equinox Environmental Consultation and Design, Inc Project No 208 November 2013 Monitoring Year 5 of 5 Appendix D Stream Survey Data TSble 106 Basel a Stream Data Summary (Substrate, Bed, Bank, ead Hydrologic Coutammeat Parameter DishiboLoas) Km s Creek / P,ro ct N-o 20S - Reaches wirwit II Parameter Pre- Dasting Condition Reference Reach(es) Data Design Nbnitonng Baseline Rt% /Ru% /P% /G% /S% - __ __ - -- 33% 10% 41% 16% 0% SC% /SA % /G % /C % /B % /Be% d16 /d35 /d50 /d84 /d95 /diP /dt`P mm Entrenchment Class <15 /15 199/2 49/50 99/>10 ■ ■ e ■ ■ ■ ■ ■ ■ ■ ■ - - - Class <12/12 149/15nc199/>20 ■S■ ®■■■■■■■■N No Zrci— nuns =romi u = "one,a =—p = Sdt -Clay / SA = Sand / G = Gmvel / C =Cobble/ B = Boulder/ Bc = Bedrock d? =max pave /di' =max sub pave Infomat ton unavailable Kings Creek Final Project No 208 Monitoring Year 5 of 5 D -23 Equinox Environmental Consultation and Design, Inc November 2013 Appendix D Stream Survey Data KBIM a. ' o ' o ' MEMO ' o ho o , nmmaty s Cross - Section 1 Riffle Cross - Section 2 Pool Dimension Base MYI MY2 MY3 MY4 MY5 Base MYl MY2 MY3 MY4 MY5 Record elevation (datum) used - 2108 9 2108 9 2108 9 2108 9 - - 21081 21081 21081 2108 1 Bankfull Width (ft) 267 268 268 275 272 31 I 303 298 296 276 Flood prone Width (ft) >150 >150 >150 >150 >I50 >150 >150 >150 >150 >150 Bankfull Mean Depth (ft) 22 22 21 20 20 25 l9 19 19 20 Bankfull Max Depth (ft) 31 33 33 33 34 47 37 35 34 33 Bankfull Cross - Sectional Area (ft`) 585 580 573 56 1 552 766 585 556 550 54 1 Bankfull Width/Depth Ratio 122 124 125 13 5 134 127 157 160 15 9 141 Bankfull Entrenchment Ratio >3 7 >5 6 >5 6 >5 4 >5 5 >3 9 >4 9 >5 0 >5 1 >5 4 Bankfull Bank Height Ratio 10 1 0 10 10 10 10 1 1 1 1 1 1 1 1 Cross - Sectional Area Between End Pms (ft`) - 596 584 566 56 1 - 61 6 574 57 1 559 d50 (mm) 24 13 17 33 16 17 29 1 16 Cross - Section 3 Riffle Cross - Section 4 Pool D mk on Base MYl MY2 MY3 MY4 MY5 Base MYI MY2 MY3 MY4 MY5 Record elevation (datum) used - 2104 7 2104 7 2104 7 2104 7 - - 21041 21041 21041 2104 1 Bankfull Width (ft) 242 25 7 256 25 8 279 283 25 8 259 241 22 8 Floodprone Width (ft) >150 >150 >150 >150 >150 >150 >150 >150 >150 >150 Bankfull Mean Depth (ft) 21 21 20 21 18 20 25 26 27 29 Bankfull MaxDepth (ft) 30 32 31 31 31 31 44 45 45 42 Bankfull Cross - Sectional Area (ft -) 51 9 53 1 520 530 51 1 55 5 63 1 674 659 653 Bankfull Width/Depth Ratio 11 3 124 126 125 15 3 144 105 99 88 79 Bankfull Entrenchment Ratio >3 6 >5 8 >5 9 >5 8 >5 4 >3 2 >5 8 >5 8 >6 2 >66 Bankfull Bank Height Ratio 10 10 1 0 10 1 0 10 10 10 1 0 1 0 Cross - Sectional Area Between End Pins (ft`) - 602 593 594 56 1 - 661 693 676 665 d50 (mm) 33 24 12 47 - 13 2 2 13 - Information unavailable Kings Creek Final D -24 Equinox Environmental Consultation and Design, Inc Project No 208 November 2013 Monitoring Year 5 of 5 Appendix D Stream Survey Data mormation unavmiame N/A Information does not apply Ri = Riffle/R­ Run / P -Pool /G = Gltde / S = Step SC = Sib Clay / SA - Sand / G = Gravel / C - Cobble / B = Bouldm / Be = Bedrock Pmenta®s based on riffle and pool pebble counts Kings Creek Final Project No 208 Monitoring Year 5 of 5 D -25 Equinox Environmental Consultation and Design, Inc November 2013 Tab 1 1b Monkoriog eta - beam Reuh llYffi S®maly KID Greek Sro cbNo. 08- each HI MY 1 MY -2 1 MY -3 Parameter MY -4 MY -5 Baseilne DIt>xaV ®B<T8a6ctnte - RrID7 Bankfull Width 1 Ift-91 bteae 1Wd] t8D7 WOE 1WRI IMeI a1 II M—A ISDN Witt♦ M11 257 We" 263 5W41 263 268 N/A 2 256 JUI 262 �lYoul 1 262 illfec 268 iSD1 N/A rn1♦ 2 /Min7 258 IMea -1n 267 kHr'dl fM1ta -1 267 275 /9Dl N/A inl♦ 2 Mira 272 IMe'wl 276 IMa'dl 276 '1 279 /eD7 N/A to7 2 242 255 255 267 N/A 2 Flood ronc Width (it) 1150 1150 >150 >150 N/A 2 >150 >150 >150 1150 N/A 2 >150 1150 >150 1150 N/A 2 1150 1150 1150 >150 N/A 2 >150 >150 >150 >150 N/A 2 Bankfull Mean Depth 1 2 1 2 2 22 2 2 N/A 2 2 1 2 2 2 2 2 2 1 N/A 2 20 2 1 N/A 2 20 2 1 2 1 2 1 N/A 2 1 8 19 1 9 20 N/A 2 Bankfull McXDepth I 30 31 31 31 N/A 2 32 33 33 33 N/A 2 31 N/A 2 31 32 32 33 N/A 31 33 33 34 N/A 2 Bankfull Cross Sectional Aria (R 51 9 55 2 55 2 5R 5 N/A 2 53 1 55 6 55 6 SR 0 N/A 2 52 0 N/A 2 53 0 54 6 54 6 56 1 N/A 2 51 1 53 2 53 2 55 2 N/A 2 Width/D th Ratio 113 118 118 122 N/A 2 124 124 124 124 N/A 125 j32 g8>5 N/A 2 125 130 130 135 N/A 2 134 144 144 153 N/A Lntrcnchmcnt Ratio >3 6 >3 7 >3 7 >3 7 N/A 2 >5 6 >3 7 >5 7 >5 8 N/A 2 >5 6 N/A 2 >5 4 >5 6 >3 6 >5 8 N/A 2 >5 4 >5 5 >5 5 >5 5 N/A 2 Bank Hci t Ratio 1 0 1 0 1 0 1 0 N/A 2 1 0 t 0 1 0 1 0 N/A 2 1 0 N/A 2 1 0 10 10 10 1 N/A 2 1 0 1 1 0 10 10 N/A 2 PTIBa Riffle lain h ffl) 293 460 1 444 682 132 10 95 347 333 588 166 10 108 257 256 630 155 10 119 334 305 609 156 9 135 352 312 582 143 9 130 348 362 590 128 9 Riflle Slo e(0 /R 0003 0007 0006 0015 0004 10 0005 0013 0010 0027 0008 10 0003 0017 0020 0025 0009 10 0004 0013 0012 0029 0007 9 0004 0013 0012 0027 0008 9 0002 0015 0013 0034 0010 9 Pool Lcn h(11) 281 524 586 698 156 11 129 357 322 879 189 22 144 414 381 998 217 22 147 383 339 1007 214 21 151 382 374 967 21 I 21 148 403 385 978 224 23 Pool M-Depth (1 31 39 39 47 N/A 2 37 41 41 44 N/A 2 35 40 40 45 N/A 2 40 51 50 72 O8 21 39 48 47 64 06 22 Pools acm (R 985 1506 1432 2209 409 8 229 946 1012 1705 409 21 320 798 711 2141 414 21 305 886 933 1833 383 19 382 897 848 1615 354 19 311 869 834 1728 357 21 l3ttam Channel Belt Width (B) 1 610 1 1108 1 1075 1 17301 35 2 1 12 S S Radius of Curvature ffl)I 41 0 1 620 1 560 1 1390 1 267 11 Re Bankfull Width (il /B Meander Wavelen h (R) 1 231 0 1 2768 1 2400 1 4140 1 776 5 Meander Width RallO 40 42 42 44 N/A 2 mil♦ ���� Addi8an`_td�Rea�hn,m RosWn Classficauon C4 C4 C4 C4 C4 Channel Thatweg Length (R) 2 119 2 189 2 135 2 138 2 101 2092 Smuostl (B ) 125 129 129 128 126 125 Water Surlacc Slope (Channel) (R /R) 00049 00050 00048 00048 00048 00049 Bankfull Slope (ft/ft) 00044 00051 00052 00049 0 0048 00051 Ri% /Ru % /P % /G % /S%• 33% 10% 41% 1 16% 1 0% 22% 1 II% 1 51% 1 16% 1 0% 16% 6% 1 57% 21% 0% i7% 9% 45% 28% 0% 17% 12% 44% 26% 0% 16% 14% 47% 23% 0% SC % /SA " % /G % /CBo /B% /Be %����� ������ 0% 17% 71% I3% 0% 0% 0% 27 °/ 68% 5% 0% 0% 5% 26% 59% 10% 0% 0% 0% 23% 62% IS% 0% 0% d16/d35/d50/dR4/d95 mm N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A % of Reach with 'c'ui Banks 0% 11 % 15% 15% 15% 16% Channel Stabibt y or Habitat M etne N/A N/A N/A N/A N/A N/A Biolo cal or Otha N/A N/A N/A N/A N/A N/A mormation unavmiame N/A Information does not apply Ri = Riffle/R­ Run / P -Pool /G = Gltde / S = Step SC = Sib Clay / SA - Sand / G = Gravel / C - Cobble / B = Bouldm / Be = Bedrock Pmenta®s based on riffle and pool pebble counts Kings Creek Final Project No 208 Monitoring Year 5 of 5 D -25 Equinox Environmental Consultation and Design, Inc November 2013 Appendix E Hydrologic Data Appendix E Hydrologic Data Date of Data Date of Collection Occurrence Method Photo # (if available) 6/15/2010 Unknown Crest gauge & wrack lines 11/9/2010 Unknown Crest gauge & wrack Ines 1/20/2011 Unknown Crest gauge & wrack lines 10/2612011 9/6/2011 Crest gauge & wrack Ines 1/18/2012 11/29/2011 Crest gauge & wrack tines 10/15/2012 9/19/2012 Crest gauge & wrack Ines 3/28/2013 1/31/2013 Crest gauge & wrack Ines 7/25/2013 07/03/13 Precipitation data & anecdotal evidence Kings Creek Final Protect No 208 Monitoring Year 5 of 5 I-v, E -1 Equinox Environmental Consultation and Design, Inc November 2013