Loading...
HomeMy WebLinkAboutNCC201304_NOT Closeout Documents_20211228JOHNSTON COUNTY PUBLIC UTILITY DEPARTMENT SEDIMENTATION INSPECTION REPORT 309 E. MARKET STREET, SMITHFIELD, N C 27577-TELEPHONE (919) 209-8333 Inspection Information Date: 12/8/2021 Type of Inspection ❑ Initial Inspection Construction Stage ❑ Pre -Construction Date of Inspection: 12/8/2021 ❑ Routine Site Inspection ❑ Initial Grading Inspection by: Shannon Stanley ❑ On -Site Meeting ❑ Infrastructure El Progress Inspection El Temp, Site Stabilization Others Present: Click or tap here to enter ❑X Final Inspection ElVertical tee ❑ Plat Inspection ❑X Final Site Stabilization Photos: ❑ Yes ❑X No ❑ Spot Check Inspection ❑ Complaint Inspection Weather and Site Conditions: Sunny and workable Development/Owner Information Project Name: Red Toad Solar Project Number: 19-060-P Project Location: Insert Project Location. This Report Sent To: Click or tap here to enter text. Email: adam@renewprop.com ❑ File Copy Land Owner of Record: Person Financially Responsible for Land Disturbing Activity: ❑ Same as owner Click or tap here to enter text. 6. Comments/Notes: The Johnston County Erosion Control Permit Red Toad Solar Farm (Vinson Rd) has been closed. 7. Corrective Actions: a. 8. Photos: