HomeMy WebLinkAboutNCC205889_NOT Signed Certification_20211215Directions:
Print this form, complete, scan and upload to the electronic NOT (Rescission) form.
Then, mail the original signed form to the NC DEMLR Stormwater Program at:
Division of Energy, Mineral & Land Resources Stormwater Program
512 N. Salisbury Street, 0 Floor
1612 Mail Service Center
Raleigh, NC 27699-1612
DO NOT MAIL THIS FORM UNTIL YOUR NOT REQUEST HAS BEEN REVIEWED AND APPROVED.
THE FORM YOU MAIL MUST BE COMPLETED WITH AN ORIGINAL SIGNATURE (NOT DIGITAL) [40 CPR 122.221
General Permit Certificate of Coverage (COC) No.:
Name of Project: CVCC Stream Repair
NCC205889
Per NC General Statute 143-215.6E (i), any person who knowingly makes any false statement, representation, or
certification in any application, record, report, plan, or other document filed or required to be maintained under this
Article or a rule implementing this Article .. , shall be guilty of a Class 2 misdemeanor which may include a fine not
to exceed ten thousand dollars ($10,000).
Under penalty of law, I certify that:
I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for
the subject facility. 1 am familiar with the information contained in this request, and to the best of my knowledge
and belief, such information is true, complete, and accurate.
Legally Responsible Organizational Entity: Catawba Valley Community College
*Legally Responsible Person:
Wes Bunch
Title of Legally Responsible Person: Vice President of Finance and Operations
*Signature:
Date: I�- J - "
Print Name and Title of Signed (only if authorized individual signing differs from Legally Responsible Person):
Wes Bunch - Vice President of Finance and Operations
* IMPORTANT NOTE. This form must be signed by a responsible corporate officer that owns or operates the
construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in
accordance with Part IV, Section B, Item (6) of the NCGO10000 permit,
For more information on signatory requirements, see Part IV, Section B, Item (6) of the NCGO10000 permit.