HomeMy WebLinkAboutNCC201551_NOT Closeout Documents_20211215North Carolina Department of Environmental Quality
Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481
County: Washington Project: Albemarle Beach Solar -Phase A
Person financially responsible: Albemarle Beach Solar, LLC - Kenny Habul,
Manager
Address: 192 Raceway Drive, Mooresville, NC 28117
1. Project Location: Mackeys Road
Pictures: No
2. Weather and soil conditions: sunny, cool, wet
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes
5. Violations:
6. Is the site in compliance with the NPDES Permit? Yes
Describe:
River basin: Pasquotank
Project #: WASHI-2020-003
Initial inspection: No
If no, check violations below:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): Jason Philbrook Title: Environmental Inspector
Inspection report: Sent Report Date given/sent: December 10, 2021
9. Corrective action needed:
Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -
inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES
10. Comments: General Stormwater Permit for Construction Activities (NCG01) must be requested by the permittee via a Notice of
Termination (NOT). The NOT is available at: https://edocs.deg.nc.gov/Forms/NCG01-Termination. Please note that this
correspondence must be uploaded as part of completing the NOT process.
Reported by: Bradley West Others present:
Date of inspection: December 09, 2021 Time arriving on site: 10:30 AM Time leaving site: 12:00 PM
cc: