Loading...
HomeMy WebLinkAboutNCC201551_NOT Closeout Documents_20211215North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481 County: Washington Project: Albemarle Beach Solar -Phase A Person financially responsible: Albemarle Beach Solar, LLC - Kenny Habul, Manager Address: 192 Raceway Drive, Mooresville, NC 28117 1. Project Location: Mackeys Road Pictures: No 2. Weather and soil conditions: sunny, cool, wet 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes 5. Violations: 6. Is the site in compliance with the NPDES Permit? Yes Describe: River basin: Pasquotank Project #: WASHI-2020-003 Initial inspection: No If no, check violations below: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Jason Philbrook Title: Environmental Inspector Inspection report: Sent Report Date given/sent: December 10, 2021 9. Corrective action needed: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self - inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES 10. Comments: General Stormwater Permit for Construction Activities (NCG01) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deg.nc.gov/Forms/NCG01-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Bradley West Others present: Date of inspection: December 09, 2021 Time arriving on site: 10:30 AM Time leaving site: 12:00 PM cc: