Loading...
HomeMy WebLinkAboutGW1-2021-08099_Well Construction - GW1_20211105 WELL CONS=UenON RECORD is form can be used for siriEle or multiple wells Th For imemal Use ONLY: I.Well Contractor-Inform tion: Chris IGng 14.a azI;RR ZMES: . _FROM i TO DESCVJprtoN Weli connector Nary �� B. i� fL 3415 R R NC Well Connecter Certification Number J&OUTER;CASMG i i-jii ihffk'pIt L1NER if FRoli TO I DLaMEM THtCt1VFSS tdATERIA[, Green River Well&Pump R fL ;a C°mpao"Nmme 16INNERCASING_ORTUBING: _ - LOB i FROM TO DL1M£tER MUCK-NM MATER[AL 2.Well Construction Permit#: _ i fL R s M. 21 PVC all applicable-u pe wits(ace comity 3Yate,variance:bg-ma etc) 1 R R is 3.Well.Use(cheek-well use): Water Supply Welk FROM I To I D[AmE ER I sL rslzr I nt[ctSS M ATE Tt1AL ❑Agricultural ❑MunicipaMblic B' & 1O ❑Geothermal(HeatmgCooiing Supply) Mesidenhal water Supply(single) R R m ❑IndustialiCommemial ❑Residential Water Supply(shared) a8'CROUT ,- iROa! TO. MATERIAL FAtPLACEM4NfME[RODdcAMOu r Mitigation Non-Water Supply Well: O R 20 D' 3alvefie wk&POW ❑Monitoring IL IL Injection Well: & R ❑Aquifer Recharge ❑GroundwaterRemediation iiMSANDJGRAVXLMACHcd " >; ❑Aquifer Storage and Recovery ❑Salmtty Barrier FROM R To MATERML EMP1AM EMM METHOD R ❑Aquifer Test ❑Stmin atmDraimge ❑Experimental Technology ❑Subsidence Control R R 20 DRII iaNG LOG..(attch adossT 'H' - ❑Geothermal(Closed Loop) ❑Tracer FROM TO DFSI RWMN(+Nir numm .soivswx ` ermsmr.eii:) ❑Geothermal(Fleatjng/Cooling Rd=) ❑08ter(a Phdn under521 Remarks) D R 4.Date Welts)Completed i 2 Well IINJ 10 R �L' R V A Sa.Weft Location: o R IL r- �i-Ji4Lk Lao R .VL MMTE Facilih! Facdia•IDA(ifaliplirable) t! R R & Ptnsic/al�Address,City:and Zip 1 i Jd ;21- ISMARKS NOV - 202 Co�y Parcel -NOV (m) 5b.Latitude and Longitude in degrees/minutes/seconds or decimal degrees: (ifwell field,one Iattlong is sufficient) 22.Certirea#on: , +s ofCertifnxlWellCantractor pore 6.Is(are)the well(s)- ®Permanent or ❑Temporary L?v.rrgriM Mora+,i hemk certifi thai the weA(s)ass(were)constructed m accord2we with 15A NCAC 02C.0100 or 15A MAC 02C.0200 WeII Construction Srmafor&and that a 7.Is this a repair to an existing we& ❑Yes or 8No c'oM ofthir record has been provided to due urR owner ifthis is a repair,fill ow known cull rnnunrction irfarnwrim and eWhria the nature ofthe repair wider=`21 rewarks section or on ere back ofthisform. 23-Site diagram or additional well details: You may use the back of this page to provide additional well site details or well &Number of wells constructed: construction details. You may also attach additional pages if necessary. For nwhiple h0ixtion or non-crater surpptt weIIs OAZP with the mrae aonstradFai ym,can submit one form. SUBMITTAL INSTUCI'IONS 9.Total well depth below land surface: () (fL) 24a. For AB Weir Submit this form within 30 days of completion of well Far mahiple wells list all depths if&ffe ent(amnrle-3@200'avid 2@100) construction to the following: It Static water level below top of casing: 3 (D-) Division of Water Resources,Information Processing Unit, If inter leml is abmv casing,use"-" 1617 Mad Service Center,Raleigh,NC 27699-1617 11.Borehole diameter. 6 6a.) 241L For Injection Wells ONLY: In addition to sending the form to the address in .Well construction method. Rotary Rota Ma atmve,also submit a copy of this form Within 30 days of completion of welli. (1e.now,tummy,cable,direct push.etc.) construction to the following: Division of Water Resources,Underground Injection Control Program, FOR WATER SUPPLY\VELI S ONLY. 1636 fsUff Service Center,Ralejgli,NC 27699-1636 13a.Yield(gpm) 11 Method of test: Air 24a For Water Supply&Injection Wells: Also submit one copy of this farm!within 30 days of completion of 13b Disinfection type I'lTM Amount vuell construction to the county health'department of the county where constructed. Form 0W-1 North Corolnm Depmiment of fsrtirone ent and Natural Resources-Division of Water Resources Rmised August 2013