HomeMy WebLinkAboutNCG020997_Site Plans_20211229 (2)0
oM
H �
Hr z
xcnoo
Mo n n
m z1xD
= o D n m
mzD
x woo
z +.a -o
• GIoH
(�nD>
� H
z
z ,
a
0 rn
H Z
'm_'z-ix➢
=�zym
x000
zHor.m
� H
Cn H
0
z ,
C1
em
mz
r ro-
n W
O =
CAD
I z
C D
A z
� o
M p
o�
z�
mZ
Z 0
m
D 5
z
n
m
TOP AND BOTTOM STRAND -
SHALL BE 10 GAUGE MIN.
WIRE
NOTES
_ 81 MAX. WITH WIRE
(6 MAX, WITHOUT WIRE
MIDDLE AND VERTICAL WIRES
SHALL BE 121/2 GAUGE MIN.
FILTRATION GEOTEXTILE-
USE WIRE A MINIMUM OF 32"
IN WIDTH AND WITH A MINIMUM
OF 6 LINE WIRES WITH 12" STAY
SPACING.
USE FILTRATION GEOTEXTILE
A MINIMUM OF 36" IN WIDTH AND
FASTEN ADEQUATELY TO THE WIRE
AS DIRECTED.
PROVIDE 5'-0" STEEL POST OF
THE SELF -FASTENER ANGLE STEEL
TYPE.
FOR MECHANICAL SLICING METHOD
INSTALLATION, GEOTEXTILE SHALL
BE A MAXIMUM OF 18" ABOVE GROUND
SURFACE.
B IN. MIN. DEPTH
24" MAX,
(18" MIN.)
FILTRATION GEOTEXTILE
COMPACTED FILL--",,
STEEL POST
EXTENSION OF GEOTEXTILE AND
WIRE INTO TRENCH
N TE
1. PROVIDE TURNING RADIUS SUFFICIENT TO ACCOMMODATE LARGE
TRUCKS.
2. LOCATE ENTRANCES TO PROVIDE FOR UTILIZATION
BY ALL CONSTRUCTION VEHICLES.
3. MUSI BE MAINTAINED IN A CONDITION WHICH WILL PREVENT
TRACKING OR DIRECT FLOW OF MUD ONTO STREETS.
PERIODIC TOPDRESSING WITH STONE WILL BE NECESSARY.
4. ANY MATERIAL TRACKED ONTO THE ROADWAY MUST BE
CLEANED UP IMMEDIATELY,
5. LOCATE GRAVEL CONSTRUCTION ENTRANCE AT ALL POINTS OF
INGRESS AND EGRESS UNTIL SITE IS STABILIZED. PROVIDE
FREQUENT CHECKS OF THE DEVICE AND TIMELY MAINTENANCE.
6. NUMIIER AND LOCATION OF CONSTRUCTION ENTRANCES TO
BE f1ETERMINED BY THE ENGINEER.
7. USE CLASS 'A' STONE OR OTHER COARSE AGGREGATE APPROVED
By THE ENGINEER.
8, INSTALL CONSTRUCTION ENTRANCES IN A WAY TO PREVENT VEHICLES
FROM BYPASSING CONSTRUCTION ENTRANCE LEAVING PROJECT SITE.
NOTE: rLACE FILTRATION GEOTEXTILE BENEATH STONE
Mining ,area cross-section
(:sot to scale)
Z
oC
�Q
Q
H 0(=}U
V__Io04 z
o o�[ o x
wQ ZLL
Q UX<O0M
�xa zw
rql-ryOJ
O000r
z ,jam
~H
a❑
, o
o W
u_ V
z Z
H W
�LL
O ~
J
H
cc N
z fr
rn
OC
x O
U)C
" G
J W
CD
t'
z
o�
�Q
Q
H�Cx7U
O U) O x z
z LL
QU�O,o'i
ooU)X
zIn
H
w❑
W
Q
cc
0 Q
o pC
u_ �
z La
o O
M
z
z cc
Nz
0
co U
� J
z W
d
C
0
lrlFww VRom C VM?
O&M
6 I§, MRx
NEu1NT
Construction Detail for 801X60' Basin
blotto: Scale
Plan View
zTi enaview 6EbrmBmr STowf-
6o' Cross Section
• •,•'Rol firi�Iyi.b1•i1iiI11,.0ii Ii �r�i�,y�• .0
aft
min
30' Cross Section
aft
min
?a.. 2•7 6 ft
Filter fabric
Reclamation Plan: The entire Mining Area will be left as a pond. All slopes will be
graded to a 3:1 slope or flatter. All disturbed areas above static water level will be
seeded according to approved Revegetation Plan. The haul roads will remain in use as
farm access roads.
CATEGORY
CURRENT AFFECTED
ACREAGE
PROPOSED CHANGE TO
AFFECTED ACREAGE
TOTAL AFFECTED
ACREAGE
Tailings/Sediment Ponds
Stockpiles
Waste piles
Processing Areas/Haul Roads
0.70
0.70
Mine Excavations
6.00
6.00
Other (Please explain)
Total Affected Acreage
6.70
6,70
Total Permitted Acreage
8.40
8.40
MINE PLAN AND DETAILS
CARTERET FARM MINE
CARTERET FARM LLC
CARTERET COUNTY
1'=100' DECEMBER 2, 2021
PAGE 2 OF 2
PREPARED BY CAROLINA GEOLOGICAL SERVICES, INC