HomeMy WebLinkAboutSW6210503_Plansheet C-6.1 - SCM Detail_20211222PIPE OUTLE
WELL-DEFINED
1
INFLOW
STRUCTURE
CONSTRUCTION SPECIFICATIONS
PIPE OUTLET TO FLAT AREA -
GRAVEL OR FABRIC
SECTION A -A
PLAN
GRAVEL OR FABRIC
SECTION A -A
NOTES
1. LA IS THE LENGTH OF THE RIPRAP
APRON.
2. D = 1.5 TIMES THE MAXIMUM
STONE DIAMETER BUT NOT LESS
THAN 6".
3. IN A WELL-DEFINED CHANNEL EXTEND
THE APRON UP THE CHANNEL
BANKS TO AN ELEVATION OF 6"
ABOVE THE MAXIMUM TAILWATER
DEPTH OR TO THE TOP OF THE BANK,
WHICHEVER IS LESS.
4. A FILTER FABRIC OR BLANKET SHOULD BE
INSTALLED BETWEEN THE RIPRAP
AND SOIL FOUNDATION.
FILTER LAYER
GRAVEL OR FABRIC
INSPECT RIPRAP OUTLET STRUCTURES WEEKLY
AND AFTER SIGNIFICANT (} INCH OR GREATER)
RAINFALL EVENTS TO SEE IF ANY EROSION
AROUND OR BELOW THE RIPRAP HAS TAKEN
PLACE, OR IF STONES HAVE BEEN DISLODGED.
IMMEDIATELY MAKE ALL NEEDED REPAIRS TO
PREVENT FURTHER DAMAGE.
TYPICAL RIP RAP APRON
z
z
w
Y
z
a
s
w
SKIMMER
DEWATERING
OBEDDING
DEVICE
N STONE
MIN 8"
EMERGENCY
SPILLWAY
TRM INSTALLATION
-5"
OA
4.00' [1.22M]
8.00' [2.44M]
• •
2.00'[0.61 M]
0
4.00' [1.22M]
0.7
STAPLES PER SQ.
YD.
(0.8
STAPLES PER SQ.
M)
O
1.50'[0.46M]
T� 2.00' [0.61 M] 3.00' [0.91 M] • •
4.00' [1.22M] • •
•
2.00' [0.61 M] • •
• • • 4.00' [1.22M]
4.00' [1.22M] •
1.3 STAPLES PER SQ. YD. 1.7 STAPLES PER SQ. YD.
(1.5 STAPLES PER SQ. M) (2.0 STAPLES PER SQ. M)
1.50' [0.46M] 1.50' [0.46M]
J
3.00' [0.91 M] • • • 3.00' [0.91 M] • • • •
• • • 2.00' [0.61 M] • • •
• • • • • •
4.00' [1.22M] 1.00' [0.30M]
• • • • • •
2.00' [0.61 M]
3.4 STAPLES PER SQ. YD. 3.6 STAPLES PER SQ. YD.
(4.1 STAPLES PER SQ. M) (4.3 STAPLES PER SQ. M)
1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED.
NOTE: WHEN USING CELL-O-SEED DO NOT SEED PREPARED AREA. CELL-O-SEED MUST BE INSTALLED WITH PAPER SIDE DOWN.
2. BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE BLANKET IN A 6" (15 CM) DEEP X 6" (15 CM) WIDE TRENCH
WITH APPROXIMATELY 12" (30cm) OF BLANKET EXTENDED BEYOND THE UP -SLOPE PORTION OF THE TRENCH. ANCHOR THE
BLANKET WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30 CM) APART IN THE BOTTOM OF THE TRENCH.
BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12" (30 CM)
PORTION OF BLANKET BACK OVER SEED AND COMPACTED SOIL. SECURE BLANKET OVER COMPACTED SOIL WITH A ROW OF
STAPLES/STAKES SPACED APPROXIMATELY 12" (30 CM) APART ACROSS THE WIDTH OF THE BLANKET.
3. ROLL THE BLANKETS (A.) DOWN OR (B.) HORIZONTALLY ACROSS THE SLOPE. BLANKETS WILL UNROLL WITH APPROPRIATE SIDE
AGAINST THE SOIL SURFACE. ALL BLANKETS MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES
IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING THE DOT SYSTEM'" STAPLES/STAKES
SHOULD BE PLACED THROUGH EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN.
4. THE EDGES OF PARALLEL BLANKETS MUST BE STAPLED WITH APPROXIMATELY 2" - 5" (5 CM - 12.5 CM) OVERLAP DEPENDING
ON BLANKET TYPE.
5. CONSECUTIVE BLANKETS SPLICED DOWN THE SLOPE MUST BE PLACED END OVER END (SHINGLE STYLE) WITH AN APPROXIMATE
3" (7.5 CM) OVERLAP. STAPLE THROUGH OVERLAPPED AREA, APPROXIMATELY 12" (30 CM) APART ACROSS ENTIRE
BLANKET WIDTH.
NOTE:
*IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6" (15 CM) MAY BE NECESSARY TO
PROPERLY SECURE THE BLANKETS.
MAINTENANCE:
1. INSPECT THE EROSION CONTROL BLANKET ONCE A WEEK AND AFTER EVERY RAINFALL.
2. IMMEDIATELY REPAIR AND/OR REPLACE ANY DAMAGED BLANKET.
3. IF GROUND COVER IS NOT ESTABLISHED THROUGH THE BLANKET WITHIN 2 WEEKS, THE BLANKET
SHOULD BE REMOVED AND THE AREA RESEEDED. AFTER RESEEDING, THE BLANKET SHOULD BE
REINSTALLED.
NTS NTS
2 EROSION CONTROL BLANKET INSTALLATION
PVC VENT PIPES
BAFFLES
INFLOW
STRUCTURE
BAFFLES
EMBANKMENT
1' FREEBOARD
6" MIN. INVE T ELEVATION OF
DEWATERING
EMERGENCY SPILLWAY
ZONE'
EMERGENC'
FILTER FABRIC
SPILLWAY
STONE BEDDING
SEDIMENT
STORAGE
ZONE
1. CLEAR, GRUB & STRIP TOPSOIL FROM AREAS UNDER THE EMBANKMENT TO
REMOVE TREES, VEGETATION, ROOTS AND OTHER OBJECTIONABLE MATERIAL
PLACE TEMPORARY SEDIMENT CONTROLS BELOW THE BASIN AS NEEDED.
2. ENSURE THAT FILL MATERIAL FOR THE EMBANKMENT IS FREE OF ROOTS,
WOOD VEGETATION, ORGANIC MATTER AND OTHER OBJECTIONABLE MATERIAL
PLACE THE FILL IN LIFTS NOT TO EXCEED 9INCHES AND MACHINE COMPACT IT.
OVER FILL THE EMBANKMENT 6INCHES TO ALLOW FOR SETTLEMENT.
3. SHAPE THE BASIN TO THE SPECIFIED DIMENSIONS. PREVENT THE SKIMMING
DEVICE FROM SETTLING INTO THE MUD BY EXCAVATING A SHALLOW PIT UNDER
THE SKIMMER OR PROVIDING A LOW SUPPORT UNDER THE SKIMMER OF STONE
OR TIMBER.
4. PLACE THE BARREL ON A FIRM, SMOOTH FOUNDATION OF IMPERVIOUS SOIL.
PLACE THE FILL MATERIAL AROUND THE PIPE SPILLWAY IN 4 INCH LAYERS AND
COMPACT IT UNDER AND AROUND THE PIPE TO AT LEAST THE SAME DENSITY AS
THE ADJACENT EMBANKMENT. PLACE A MINIMUM OF 2 FEET OF COMPACTED
BACKFILL OVER THE PIPE SPILLWAY BEFORE CROSSING IT WITH CONSTRUCTION
EQUIPMENT.
5. ASSEMBLE THE SKIMMER FOLLOWING THE MANUFACTURER'S INSTRUCTIONS
6. LAY THE ASSEMBLED SKIMMER ON THE BOTTOM OF THE BASIN WITH THE
FLEXIBLE JOINT AT THE INLET OF THE BARREL PIPE. ATTACHED THE FLEXIBLE
JOINT TO THE BARREL PIPE AND POSITION THE SKIMMER OVER THE EXCAVATED
PIT. ATTACH A ROPE TO THE SKIMMER AND ANCHOR IT TO THE SIDE OF THE
BASIN.
7. INSTALL THE SPILLWAY IN UNDISTURBED SOIL TO THE GREATEST EXTEND
POSSIBLE. THE SPILLWAY SHOULD BE LINED WITH LAMINATED PLASTIC OR
IMPERMEABLE GEOTEXTILE FABRIC. THE FABRIC MUST BE WIDE AND LONG
ENOUGH TO COVER THE BOTTOM AND SIDES AND EXTEND ONTO THE TOP OF
THE DAM FOR ANCHORING IN A TRENCH. THE EDGES MAY BE SECURED WITH 8
INCH STAPLES. THE FABRIC MUST BE LONG ENOUGH TO EXTEND DOWN THE
SLOPE AND EXIT ONTO STABLE GROUND. THE WIDTH OF THE FABRIC MUST BE
ONE PIECE. IF MULTIPLE SECTIONS AREA REQUIRED, THE UPPER SECTION
SHOULD OVERLAP THE LOWER SECTION SO THAT WATER CANNOT FLOW UNDER
THE FABRIC.
8. DISCHARGE WATER INTO THE BASIN TO PREVENT EROSION. USE TEMPORARY
SLOPE DRAINS OR DIVERSIONS WITH OUTLET PROTECTION TO DIVERT SEDIMENT
LADEN WATER TO THE UPPER END OF THE POOL AREA TO IMPROVE BASIN TRAP
EFFICIENCY.
9. CONSTRUCT THE STRUCTURE SO THAT THE DISTURBED AREA IS MINIMIZED.
DIVERT SURFACE WATER AWAY FROM BARE AREAS. COMPLETE THE
EMBANKMENT BEFORE THE AREA IS CLEARED.
10. INSTALL POROUS BAFFLES AS SPECIFIED.
11. AFTER ALL SEDIMENT PRODUCING AREAS HAVE BEEN STABILIZED, REMOVE
THE STRUCTURE AND ALL THE UNSTABLE SEDIMENT. SMOOTH THE AREA TO
BLEND WITH THE ADJOINING AREAS AND STABILIZE PROPERLY.
SCH 40 PVC **SKIMMER CAN BE PURCHASED FROM J.W. FAIRCLOTH & SON INC.
PIPE SKIMMER CHOSEN SHALL BE EQUAL TO THE FAIRCLOTH SKIMMER.
SKIMMER
MAINTENANCE
INSPECT SKIMMER SEDIMENT BASINS WEEKLY AND AFTER EACH PERIOD OF
SIGNIFICANT RAINFALL. REMOVE SEDIMENT AND RESTORE TRAP TO ITS ORIGINAL
DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE-HALF THE HEIGHT
OF THE FIRST BAFFLE. EXCAVATE SEDIMENT FROM THE ENTIRE BASIN. MAKE SURE
VEGETATION GROWING IN THE BOTTOM OF THE BASIN DOES NOT HOLD DOWN THE
SKIMMER. PLACE THE SEDIMENT THAT IS REMOVED IN AN AREA WITH SEDIMENT
CONTROLS.
REPAIR THE BAFFLES IF THEY ARE DAMAGED. RE -ANCHOR THE BAFFLES IF WATER
IS FLOWING UNDERNEATH OR AROUND THEM.
UNCLOGGED THE SKIMMER AS NEEDED. CHECK TO MAKE SURE ORIFICE INSIDE OF
THE SKIMMER IS NOT CLOGGED, IF SO, REMOVE THE DEBRIS. IF SKIMMER ARM OR
BARREL IS CLOGGED, REMOVE THE ORIFICE AND CLEAR THE DEBRIS.
CHECK THE FABRIC LINED SPILLWAY FOR DAMAGE AND MAKE ANY REQUIRED
REPAIRS WITH FABRIC THAT SPANS THE FULL WIDTH OF THE SPILLWAY. CHECK
THE EMBANKMENT, SPILLWAYS AND OUTLET FOR EROSION DAMAGE. MAKE ALL
NECESSARY REPAIRS IMMEDIATELY. REMOVE TRASH AND DEBRIS FROM THE
SKIMMER AND POOL AREAS.
9 TEMPORARY SEDIMENT BASIN
SCH 40 PVC **SKIMMER CAN BE PURCHASED FROM J.W. FAIRCLOTH & SON INC.
PIPE SKIMMER CHOSEN SHALL BE EQUAL TO THE FAIRCLOTH SKIMMER.
MAINTENANCE
INSPECT SKIMMER SEDIMENT BASINS AT LEAST WEEKLY AN AFTER EACH SIGNIFICANT (0.5 INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. REMOVE
SEDIMENT AND RESTORE BASIN TO ITS ORIGINAL DIMENSIONS WHEN SEDIMENT ACCUMULATES TO 1/2 HEIGHT OF THE 1ST BAFFLE. PULL THE SKIMMER TO ONE SIDE
SUCH THAT THE SEDIMENT UNDERNEATH IT CAN BE EXCAVATED. EXCAVATE THE SEDIMENT FROM THE ENTIRE BASIN. MAKE SURE THE VEGETATION GROWING IN THE
BOTTOM OF THE BASIN DOES NOT HOLD DOWN THE SKIMMER.
a�I_lI:i17I�:1_lyy��yl��7lalla��l:PGIH���:a�_l�[y7Nli�7I�:1_lyy��yl�'�'!_���:�6yyS•P�7I�[elIP.I�]�:a�Iy:�P.t�]:�L'T•lIP.Ili17I���
IF THE SKIMMER IS CLOGGED WITH TRASH AND THERE IS WATER IN THE BASIN, USUALLY JERKING THE ROPE WILL MAKE THE SKIMMER BOB UP AND DOWN AND
DISLODGE THE DEBRIS AND RESTORE FLOW. IF THIS DOES NOT WORK, PULL THE SKIMMER OVER TO THE SIDE OF THE BASIN AND REMOVED THE DEBRIS. CHECK
THE ORIFICE INSIDE THE SKIMMER TO SEE IF IT IS CLOGGED; IF SO, REMOVE THE DEBRIS.
IF THE SKIMMER ARM OR BARREL PIPE IS CLOGGED, THE ORIFICE CAN BE REMOVED AND THE OBSTRUCTION CLEARED WITH A PLUMBER'S SNAKE OR BY FLUSHING
WITH WATER. BE SURE AND REPLACE THE ORIFICE BEFORE REPOSITIONING THE SKIMMER.
CHECK THE FABRIC LINED SPILLWAY FOR DAMAGE AND MAKE ANY REQUIRED REPAIRS WITH FABRIC THAT SPANS THE FULL WIDTH OF THE SPILLWAY. CHECK
EMBANKMENT, SPILLWAYS, AND OUTLET FOR EROSION DAMAGE AND INSPECT THE EMBANKMENT FOR PIPING AND SETTLEMENT. MAKE ALL NECESSARY REPAIRS.
6 FAIRCLOTH SKIMMER
L = THE DISTANCE SUCH THAT POINTS
A AND B ARE OF EQUAL ELEVATION
CENTER OF THE DAM IS
TO BE 9" LOWER THAN
THE EDGES (MIN)
1.5'
TO FORM A WEIR A MIN.
9" MIN.
TO AVOID UNDERMINING THE DAM DURING CLEANOUT.
3. CLEAN OR REPLACE THE STONE WHEN IT SHOWS SIGNS OF
CLOGGING OR OTHERWISE DOES NOT PERFORM CORRECTLY
4. WEIR SECTION MUST BE 9" LOWER THAN ABUTMENTS
5. DOWNSTREAM APRON LENGTH SHOULD BE 3 TIMES THE
HEIGHT OF THE WEIR.
10 CHECK DAM WITH WEIR
NTS
3 STAPLE PATTERN FOR 8' ROLLS
NTS
E
3/4"x3/4" ALUM
NOTES
LIFTING LUG
1.THE MAXIMUM SPACING BETWEEN BARS SHALL
NOT EXCEED 5.5 INCHES.
2. INSTALL AN ACCESS DOOR IN THE RACK FOR
MAINTENANCE INSIDE THE STRUCTURE.
:1
BELOW WATER SURFACE
COMMON NAME SIZE SPACING
a� 71W
oN
GE OF NORMAL P00
�1L� �1tr
UPLANDS (ABOVE WATER SURFACE)
SHALLOW WATER PLANTS
SHALLOW LAND PLANTS
COMMON NAME
BOTANICAL NAME
COMMON NAME
BOTANICAL NAME
WATERPOD
HYDROLEA QUADRIVALVIS
JOE PYE WEED
EUPATORIUM FISTULOSUM
PICKERELWEED
PONTEDERIA CORDATA
*
RED CHOKEBERRY
ARONIA ARBUTIFOLIA
LIZARD TAIL
SAURURUS CERNUUS
CARDINAL FLOWER
LOBELIA CARDINALIS
BULLTONGUE
SAGITTARIA LANCIFOLIA
SILKY DOGWOOD
CORNUS AMOMUM
WATERPOD
4 IN CONTAINER
24" O.C. MAXIMUM
PICKERELWEED
4 IN CONTAINER
24" O.C. MAXIMUM
LIZARD TAIL
4 IN CONTAINER
24" O.C. MAXIMUM
BULLTONGUE
4 IN CONTAINER
24" O.C. MAXIMUM
BLUE FLAG IRIS
4 IN CONTAINER
24" O.C. MAXIMUM
JOE PYE WEED
4 IN CONTAINER
18" O.C. MAXIMUM
RED CHOKEBERRY
1 GAL CONTAINER
48" O.C. MAXIMUM
CARDINAL FLOWER
1 GAL CONTAINER
48" O.C. MAXIMUM
SILKY DOGWOOD
1 GAL CONTAINER
48" O.C. MAXIMUM
SWAMP MILKWEED
4 IN CONTAINER
18" O.C. MAXIMUM
* BLUE FLAG IRIS IRIS VIRGINICA * SWAMP MILKWEED ASCLEPIAS INCARNATA PLANT SUPPLIERS
NOTES * ALTERNATE PLANTS CAROLINA GREENERY, WEST END, NC 910-947-3150
MELLOW MARSH FARM, PITTSBORO, NC 919-742-1200
1. PLANT SPACINGS SHALL BE A MAXIMUM OF 18 INCHES ON CENTER. PLANT DELIGHTS NURSERY, RALEIGH, NC 919-772-4794
2. PLANTS CAN AND SHOULD BE MIXED MATCHED DURING THE PLANTING PROCESS. CILL IDE NATIVE PLANT NURSERY, RALEIGH, NC 877-479-2673
SHALLOW LAND PLANTS AND SHALLOW WATER PLANTS CANNOT BE MIXED TOGETHER.
3. SOIL SAMPLE SHOULD BE TAKEN PRIOR TO SAMPLING AND FERTLIZE AT RECOMMENDATION
FROM SOILS ANALYSIS. **VEGETATED SHELF AND SLOPES ABOVE THE PERMANENT POOL ELEVATION SHALL HAVE A MINIMUM
4. ALL SLOPES AND AREAS ADJACENT TO THE WET POND SHALL BE SEEDED WITH BERMUDA OF 6" TOPSOIL. SUBGRADE SHALL BE ADJUSTED TO ACCOUNT FOR ADDITION OF TOPSOIL IN THESE
GRASS FOR A PERMANENT GROUNDCOVER. AREAS SUCH THAT THE ELEVATIONS SHOWN ABOVE ARE TO THE FINISHED GRADE OF THE TOPSOIL.
5. ALL INSTALLATIONS SHALL BE FROM A QUALIFIED PROFESSIONAL.
5 VEGETATED SHELF PBANTING DETAIL
7
RASH RACK
RISER
6" PVC STUBBED
INTO BOX
6" PVC SCREW
TYPE PLUG
-6* PVC TEE
TEMPORARY POOL
12"
6" PVC CAP WITH
2.4" DRILLED HOLE
SECTION A -A TYPICAL ORIFICE OUTLET CONFIGURATIONOU��CONFIGU�TION
NOTES
1. OUTSIDE RISER DIMENSIONS: L=4% W=3"
A (FT) B (FT) C (IN) D (FT) # HOLES E (FT) F (FT) INSIDE RISER DIMENSIONS: L=3', W=2"
2. POUR 1.0' THICK BASE FOR ANTI -FLOTATION
210.00 205.50 2.4 205.50 1 207.32 1 1.5 TO THE RISER.
NTS
STORM BASIN RISER WITH ORIFICE DETAIL
CURB AND GUTTER TO BE POURED
IN 10' SECTIONS WITH EXPANSION
JOINTS EVERY 50' P
(90' IF MACHINE PLACED)
11 38" p
=� (END OF CURVE)
N
3000" PSI
CONCRETE
i 11 7/8"
(LOW POINT IN CURVE) 2tjR 3Sl�
FE n.
46' 2' 1 1 ' R/W
3.0%
0 •
NTS NTS
11 SYM. CUL-DE-SAC WITH CONCRETE CURB 12
TOP OF POND
SEE PLAN FOR
RIP RAP
THICKNESS
CLASS B STONE
SEE PLAN FOR
THICKNESS SEE PLAN FOR THE
INVERT OF THE SPILLWAY
WHICH IS THE ELEVATION
FILTER FABRIC WHERE THE FABRIC
SEE PLAN FOR MEETS THE STONE
SPILLWAY WIDTH
SPILLWAY CROSS SECTION
1. INSTALL THE EMERGENCY SPILLWAY IN UNDISTURBED SOIL. THE ACHIEVEMENT
OF PLANNED ELEVATIONS, GRADE, DESIGN WIDTH, AND ENTRANCE AND EXIT
CHANNEL SLOPES ARE CRITICAL TO THE SUCCESSFUL OPERATION OF THE
EMERGENCY SPILLWAY.
2. ALTERNATIVE MATERIALS MAY BE USED OTHER THAN THE SPECIFIED STONE IF
APPROVED BY THE DESIGN ENGINEER.
3. MAX SIDE SLOPES ARE 3:1
EMERGENCY SPILLWAY
NTS
NTS
NTS
NATURAL GROUND
MAX. SLOPE (TYP)
f
IN. 2.5 2.5
I' 1 F
NATURAL GROUND- z
25
00
COMPACTED SOIL
*** WHEN A GRAVEL DIVERSION BERM IS REQUIRED, THE HEIGH
SHALL BE REDUCED TO 12 INCHES AND THE TOP WIDTH TO 6",
ALL OTHER REQUIREMENTS SHALL REMAIN THE SAME.
TEMPORARY DIVERSION KEY NOTES:
1. CLEAR THE ARE UNDER THE BERM AND STRIP THE ROOTS/OTHER ORGANICS.
2. COMPACT THE SIDE SLOPES, PREFERABLY WITH A TRACKED VEHICLE TO SLOW RUNOFF VELOCITIES.
3. VEGITATE THE RIDGE OF THE BERM IMMEDIATELY AFTER CONSTRUCTION UNLESS THE BERM WILL REMAIN IN PLACE
FOR LESS THAN 30 DAYS.
MAINTENANCE:
INSPECT TEMPORARY DIVERSIONS ONCE A WEEK AND AFTER EVERY RAINFALL. IMMEDIATELY REMOVE
SEDIMENT FROM THE FLOW AREA AND REPAIR THE DIVERSION RIDGE. CAREFULLY CHECK OUTLETS
AND MAKE TIMELY REPAIRS AS NEEDED.
TEMPORARY DIVERSION BERM
NTS
IIII ■
IIII
■
D Is i-IL e
solutions
Civft engineering I land surveying
409 Chicago Drive, Suite 112, Fayetteville, NC 28306
office 1 910-426-6777 fax 1 910-426-5777 license number I C-2354
wwwAD site solutions.com
PROJECT NAME
TOWNSEND
ESTATES
SUBDIVISION
EROSION
CONTROL & SITE
DETAILS
CLIENT
J&K GENERAL
CONTRACTORS
645 Laurinburg Highway
Raeford, North Carolina 28376
Phone: (910) 638-6102
PROJECT INFORMATION
DESIGNED BY:
SEAN/CHRIS
DRAWN BY:
SEAN/CHRIS
CHECKED BY:
SCOTT
PROJECT NUMBER:
1651
DRAWING SCALE
NOT TO SCALE
_..7!/00//////A7MQ111NI41 IIIIIIIIIIIIII
DATE RELEASED
OCTOBER 5, 2021
IIIIIIIIIIIIII
SHEET NUMBER
C-6m
1