HomeMy WebLinkAboutWQ0020493_FUP_20211229
SENT VIA ELECTRONIC MAIL ONLY: NO HARD COPY WILL BE MAILED
December 29, 2021
David Evans
Email: devans@partonlumber.com
Parton Lumber Company Inc
SUBJECT: Follow-up Compliance Inspection Report
Parton Lumber – Rutherfordton CLRS
Non-discharge Permit No. WQ0020493
Rutherford County
Dear Permittee:
The North Carolina Division of Water Resources conducted an inspection of the Parton Lumber –
Rutherfordton CLRS on 12/08/2021. This inspection was conducted to verify that the facility is
operating in compliance with the conditions and limitations specified in Non-discharge Permit No.
WQ0020493. The findings and comments noted during this inspection are provided in the enclosed
copy of the inspection report entitled "Compliance Inspection Report".
There were no significant issues or findings noted during the inspection and therefore, a response to this
inspection report is not required.
If you should have any questions, please do not hesitate to contact me at 828-296-4686 or via email at
mikal.willmer@ncdenr.gov.
Sincerely,
Mikal Willmer, Environmental Specialist II
Water Quality Regional Operations Section
Asheville Regional Office
Division of Water Resources, NCDEQ
ATTACHMENTS: Inspection Report
Ec: LF
Compliance Inspection Report
Permit:WQ0020493 Effective:06/01/21 Expiration:12/31/26 Owner :Parton Lumber Company Inc
SOC:
Contact Person:
Region:
County:
Directions to Facility:
Rutherford
Asheville
David Evans
Effective:Expiration:Facility:Parton Lumber – Rutherfordton CLRS
251 Parton Rd
Rutherfordton NC 28139
Title:Phone:828-287-4257
From Rutherfordton, take Hwy 64 east to Parton Lumber on right just before crossing the Second Broad River.
Secondary ORC(s):
Phone:Certification:Primary ORC:
System Classifications:
On-Site Representative(s):
Related Permits:
Secondary Inspector(s):
Primary Inspector:
Inspection Date:Exit Time:Entry Time:
Phone:
12/08/2021 09:10AM 09:50AM
Mikal Willmer 828-296-4686
Facility Status:
Permit Inspection Type:
Reason for Inspection:Inspection Type:
Not CompliantCompliant
Follow-up
Closed-Loop Recycle
Compliance Evaluation
Question Areas:
Miscellaneous Questions Record Keeping
(See attachment summary)
Page 1 of 4
Inspection Date:
Permit:
Inspection Type :
Owner - Facility:
Reason for Visit:
WQ0020493
12/08/2021 Compliance Evaluation
Parton Lumber Company Inc
Follow-up
Inspection Summary:
Mikal Willmer, with the Asheville Regional Office (ARO), conducted a follow-up inspection of Parton Lumber's closed-loop
recycle system on December 8, 2021. This inspection was conducted due to the non-compliant inspection in 2020. David
Evans, Parton Lumber, was present and assisted in the inspection.
Parton Lumber is now submitting results to the ARO annually. Weekly freeboard records were available for review at the time
of the inspection. As a reminder, a minimum of seven feet of freeboard is required to be maintained in the pond. If the pond
waste level exceeds the required freeboard, the permittee is required to notify the ARO within 24 hours.
ARO sample results upstream and downstream of the pond will be reported to the permittee as soon as they are available.
Page 2 of 4
Inspection Date:
Permit:
Inspection Type :
Owner - Facility:
Reason for Visit:
WQ0020493
12/08/2021 Compliance Evaluation
Parton Lumber Company Inc
Follow-up
Type Yes No NA NE
Infiltration System
Lagoon Spray, LR
Reuse (Quality)
Activated Sludge Spray, LR
Single Family Spray, LR
Activated Sludge Spray, HR
Activated Sludge Drip, LR
Single Family Drip
Recycle/Reuse
Record Keeping Yes No NA NE
Is a copy of current permit available?
Are monitoring reports present: NDMR?
NDAR?
Are flow rates less than of permitted flow?
Are flow rates less than of permitted flow?
Are application rates adhered to?
Is GW monitoring being conducted, if required (GW-59s submitted)?
Are all samples analyzed for all required parameters?
Are there any 2L GW quality violations?
Is GW-59A certification form completed for facility?
Is effluent sampled for same parameters as GW?
Do effluent concentrations exceed GW standards?
Are annual soil reports available?
# Are PAN records required?
# Did last soil report indicate a need for lime?
If so, has it been applied?
Are operational logs present?
Are lab sheets available for review?
Do lab sheets support data reported on NDMR?
Do lab sheets support data reported on GW-59s?
Are Operational and Maintenance records present?
Were Operational and Maintenance records complete?
Has permittee been free of public complaints in last 12 months?
Is a copy of the SOC readily available?
Page 3 of 4
Inspection Date:
Permit:
Inspection Type :
Owner - Facility:
Reason for Visit:
WQ0020493
12/08/2021 Compliance Evaluation
Parton Lumber Company Inc
Follow-up
No treatment units bypassed since last inspection?
Facility submits annual sampling results to ARO. See summary for details.Comment:
Page 4 of 4