Loading...
HomeMy WebLinkAboutNCC204056_NOT Closeout Documents_20211214North Carolina Department of Environmental Quality Land Resources: 450 W. Hanes Mill Road, Suite 300, Winston-Salem, NC 27105 (336) 776-9800 County: Davidson Project: Dollar General - Thomasville, NC River basin: Yadkin-PeeDee Person financially responsible: Teramore Construction, LLC - Joe Strickland Project #: DAVID-2021-008 Address: 214 Klumac Rd Suite 101, Salisbury, NC 28144 1. Project Location: Lake Road, Thomasville Pictures: Yes - Digital 2. Weather and soil conditions: sunny, workable soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): N/A Inspection report: Sent Report 9. Corrective action needed: Title: Date given/sent: December 03, 2021 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO 1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edoes.deq.ne.gov/Fonns/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Blane Houck Others present: N/A Date of inspection: November 30, 2021 Time arriving on site: 9:45 AM Time leaving site: 10:30 AM cc: