January 15, 2013
Brad Shaver
69 Darlington 'Street
Wilmington, NC 28402 -1890
Ref: BRIDGEPORT SID, BEAVER CREED INVESTORS INC.
Dear Mr. Shaver,
EE 11, E #,
:N 1
Please find the attached updated PCN for the above referenced project, Several concerns
about the previous submittal and present construction have been brought to my attention.
This letter has been written in response to these concerns and request for additional
information.
The updated PCN has been revised to account for temporary impacts that are typically
present when culverts are installed. In my previous PCN I did not account for the rip rap
apron on the stream crossings. This apron is present on both stream crossings and will be
sufficient to account for any temporary impacts. The revised mitigation request form
includes this impacts as permanent, since no plan is currently in place to remove the rip
rap once the culverts are installed.
1 have also modified the PCN in reference to Impact #2, where no wetlands are present,
and it will only be a stream impact.
A clearer image of the proposed sewer lift station has been attached which shows that no
impacts are associated with its construction or design.
Presently the project is under construction by Morton Trucking. Mr. John Pierce
contracted with Mr. Morton to construct the subdivision. Two of the crossings have been
installed and the remaining crossing has been prior to the issuance of an approved fill
permit by the proper agencies. Mr. Pierce was unaware of the installation of this culvert,
until I notified him that it had been installed. Mr. Pierce would not have authorized this
activity until the proper permits were issued, but understands that it is his responsibility
as the owner to ensure that unauthorized discharges do not occur. To protect himself in
the future Mr. Pierce is currently rewriting his standard contracts to include language that
would make the contractor responsible for any wetland impacts that have not received
authorization.
At this time we have requested additional stream mitigation credits for 47 linear feet of
stream impacts and a 3:1 mitigation ratio for wetland impacts associated with the
temporal losses incurred by this unauthorized activity.
If you have any questions please feel free to contact me at 910-330-2784. Thank You.
Sincerely,
4-R. Haywood Pi-man
II
NC Licensed Soil Scientist
ot WN A'r�
0
Office Use Only:
Corps action ID no,
DWQ project no.
Form Version 1.3 Dec 10 2008
Page I of 10
PCN Form — Version 1.3 December 10, 2008 Version
Pre-Construction Notification (PCN) Form
A. Applicant Information
1.
Processing
la.
Type(s) of approval sought from the
Section 404 Permit El Section 10 Permit
Corps:
1 b.
Specify Nationwide Permit (NWP) number: 14 or General Permit (GP) number:
1c.
Has the NWP or GP number been verified by the Corps? ❑ Yes
No
Id. Type(s) of approval sought from the DWQ (check all that apply):
M 401 Water Quality Certification — Regular ❑ Non-404 Jurisdictional General Permit
❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization
1 e.
Is this notification solely for the record For the record only for DWQ 401 For the record only for Corps Permit:
because written approval is not required? Certification:
0 Yes ❑ No Z Yes
❑ No
1f.
Is payment into a mitigation bank or in-lieu fee program proposed for mitigation
Z Yes
❑ No
of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu
fee program,
1 g.
Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h
M Yes
❑ No
below.
1 h.
Is the project located within a NC DCM Area of Environmental Concern (AEC)?
❑ Yes
No
2.
Project Information
2a.
Name of project: BRIDGEPORT
2b.
County:
ONSLOW
2c.
Nearest municipality / town:
SNEADS FERRY
2d.
Subdivision name:
BRIDGEPORT
2e.
NCDOT only, T. 1, P, or state
project no:
3.
Owner Information
3a.
Name(s) on Recorded Deed:
BEAVER CREEK INVESTERS
3b.
Deed Book and Page No,
3359436
3c.
Responsible Party (for LLC if
JOHN PIERCE
applicable):
3d.
Street address:
PO BOX 1685
3e.
City, state, zip:
JACKSONVILLE, NC, 28540
3f.
Telephone no,:
910-346-9800
3g.
Fax no.:
3h.
Email address:
Page I of 10
PCN Form — Version 1.3 December 10, 2008 Version
4.
Applicant Information (if different from owner)
4a. Applicant is:
® Agent ❑ Other, specify:
4b. Name:
HAYWOOD PITTMAN
4c.
Business name
(if applicable):
PITTMAN SOIL CONSULTING
4d.
Street address:
1003 GREGORY FORK ROAD
4e.
City, state, zip:
RICHLANDS, NC,
4f.
Telephone no.:
910- 330 -2784
4g.
Fax no.:
4h.
Email address:
PITTMANSOIL @YAHOO.COM
5.
AgentlConsultant Information (if applicable)
5a.
Name:
HAYWOOD PITTMAN
5b.
Business name
(if applicable):
PITTMAN SOIL CONSULTING
5c.
Street address:
1003 GREGORY FORK ROAD
5d.
City, state, zip:
RICHLANDS, NC,
5e. Telephone no.:
910 -330 -2784
5f.
Fax no.:
5g.
Email address:
PITTMANSOIL @YAHOO.COM
Page 2 of 10
PCN Form — Version 1.3 December 10, 2008 Version
B. Project Information and Prior Project History
1. Property Identification
1a. Property identification no. (tax PIN or parcel ID):
766 -23
Latitude: 34 31 39.57 Longitude: - 77.27
1 b. Site coordinates (in decimal degrees):
10.27
(DD.DDDDDD) (- DD.DDDDDD)
1 c. Property size:
91.87 acres
2. Surface Waters
2a. Name of nearest body of water (stream, river, etc.) to
TURKEY CREEK
proposed project:
2b. Water Quality Classification of nearest receiving water:
SA
2c. River basin:
WHITE OAK 03030001
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
RECENTLY MOWED TIMBER LAND AND OLD FARM FIELDS
3b. List the total estimated acreage of all existing wetlands on the property:
3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:
3500
3d. Explain the purpose of the proposed project:
RESIDENTIAL DEVELOPMENT
3e. Describe the overall project in detail, including the type of equipment to be used:
CONSTRUCTION OF ROAD CROSSING WITH FILL AND HEAVY EQUIPMENT
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property 1
®Yes ❑ No El Unknown
project (including all prior phases) in the past?
Comments:
4b. If the Corps made the jurisdictional determination, what type
El Preliminary IN Final
of determination was made?
4c. if yes, who delineated the jurisdictional areas?
Agency /Consultant Company: PSC
Name (if known): DAVID BAILEY
Other:
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
2009
5. Project History
5a. Have permits or certifications been requested or obtained for
❑ Yes ® No ❑ Unknown
this project (including all prior phases) in the past?
5b. If yes, explain in detail according to "help file" instructions.
6. Future Project Plans
6a. Is this a phased project?
® Yes ❑ No
6b. If yes, explain.
EASTERN PORTION OF PROPERTY WILL BE DEVEOLPED WITH NO IMPACTS
Page 3 of 10
PCN Form — Version 1.3 December 10, 2008 Version
C. Proposed Impacts Inventory
1. Impacts Summary
1a. Which sections were completed below for your project (check all that apply):
® Wetlands ® Streams - tributaries ❑ Buffers
❑ Open Waters ❑ Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a.
2b.
2c.
2d,
2e.
2f.
Wetland impact
Type of jurisdiction
number —
Type of impact
Type of wetland
Forested
(Corps - 404, 10
Area of impact
Permanent (P) or
(if known)
DWQ — non -404, other)
(acres)
Temporary T
W1 ®P ❑ T
FILL
RIPPARIAN NON
® Yes
® Corps
042
RIVERINE
❑ No
® DWQ
W2 ®P ❑ T
FILL/ CROSSING
3
RIPPARIAN
❑ Yes
® No
® Corps
® DWQ
102
W3 ❑ P ®T
E= XCAVATION
CROSSING 2
RIPPARIAN
❑ Yes
[:1 No
® Corps
® DWQ
0009
W4 ❑ P ®T
EXCAVATION
CROSSING 3
RIPPARIAN
® Yes
❑ No
® Corps
® DWQ
.007
W5 ❑ P ❑ T
® Yes
® Corps
❑ No
® DWQ
W6 ❑ P FIT
❑ Yes
❑ Corps
❑ No
❑ DWQ
2g. Total wetland impacts
.15
2h. Comments: IMPACT #2 FROM SKETCH HAS NO WETLANDS. STREAM IMPACT ONLY
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a.
3b.
3c.
3d.
3e.
3f.
3g.
Stream impact
Type of impact
Stream name
Perennial
Type of jurisdiction
Average
Impact
number -
(PER) or
(Corps - 404, 10
stream
length
Permanent (P) or
intermittent
DWQ — non -404,
width
(linear
Temporary (T)
(INT)?
other)
(feet)
feet)
S1 ®P ❑ T
CULVERT #2
UT
❑ PER
® INT
® Corps
® DWQ
4
118
S2 ® P ❑ T
CULVERT #3
UT
❑ PER
® INT
® Corps
® DWQ
4.5
94
S3 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
S4 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
S5 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
S6 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
3h. Total stream and tributary impacts
212
3i. Comments:
Page 4 of 10
PCN Form — Version 1.3 December 10, 2008 Version
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individually list all open water impacts below.
4a.
4b.
4c.
4d.
4e.
Open water
Name of waterbody
impact number --
(if applicable)
Type of impact
Waterbody type
Area of impact (acres)
Permanent (P) or
Temporary T
01 ❑P ❑T
02 ❑P ❑T
03 ❑ PEI T
04 ❑P ❑T
4E Total open water impacts
4g. Comments:
5. Pond or Lake Construction
If pond or lake construction proposed, the complete the chart below.
5a.
5b.
5c.
5d.
5e.
Wetland Impacts (acres)
Stream Impacts (feet)
Upland
Pond ID
Proposed use or purpose
(acres)
number
of pond
Flooded
Filled
Excavated
Flooded
Filled
Excavated
Flooded
P1
P2
5f. Total
5g. Comments:
5h. Is a dam high hazard permit required?
❑ Yes ❑ No If yes, permit !i] no:
5i. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts
below. If any impacts require mitigation, then you MUST fill out Section D of this form.
6a.
❑ Neuse El Tar-Pamlico ❑Other:
Project is in which protected basin?
❑ Catawba ❑ Randleman
6b.
60.
6d.
6e.
6f.
6g.
Buffer impact
number—
Reason
Buffer
Zone 1 impact
Zone 2 impact
Permanent (P) or
for
Stream name
mitigation
(square feet)
(square feet)
Temporary T
impact
required?
B1 ❑P ❑T
El Yes
❑ No
B2 ❑P ❑T
El Yes
❑ No
B3 ❑P ❑T
El Yes
❑ No
6h. Total buffer impacts
6i. Comments:
Page 5 of 10
PCN Form — Version 1.3 December 10, 2008 Version
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
ROAD PLACED IN AREA TO AVOID IMPACTS AS MUCH AS POSSIBLE. IMPACT 1 MOVED TO AVOID STREAM
CROSSING. ROAD CURVED AT CROSSING 3 TO REDUCE IMPACTS, 1:1 RATIO OF STREAM PROPOSED BECAUSE
STREAM IS AN EXCAVATED MAN MANIPULATED FEATURE. UPLANDS PRESENT ON LOTS 151 & 152 WILL BE
ACCESSED BY FOOT BRIDGE AND WILL NOT REQUIRE IMPACTS.
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
INSTALLATION OF SILT FENCE AROUND ALL WETLAND AREAS AND PLANTING A GRASS MIXTURE AND COVERING
IT WITH STRAW UPSLOPE OF THE WETLANDS TO HELP STABILIZE TO MINIMIZE EROSION.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for
impacts to Waters of the U.S. or Waters of the State?
® Yes ❑ No
2b. If yes, mitigation is required by (check all that apply):
® DWQ ® Corps
2c. If yes, which mitigation option will be used for this
project?
® Mitigation bank
El Payment to in -lieu fee program
❑ Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank: BACHELORS DELIGHT
3b. Credits Purchased (attach receipt and letter)
Type RIPPARIAN
Quantity 0.45
3c. Comments: STREAM 259 LINEAR FEET,
4. Complete if Making a Payment to In -lieu Fee Program
4a. Approval letter from in -lieu fee program is attached.
❑ Yes
4b. Stream mitigation requested:
linear feet
4c. If using stream mitigation, stream temperature:
❑ warm ❑ cool ❑cold
4d. Buffer mitigation requested (DWQ only):
square feet
4e. Riparian wetland mitigation requested:
acres
4f. Non - riparian wetland mitigation requested:
acres
4g. Coastal (tidal) wetland mitigation requested:
acres
4h. Comments:
5. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
Page 6 of 10
PCN Form — Version 1.3 December 10, 2008 Version
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires
buffer mitigation?
❑ Yes ® No
6b. if yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
Zone
6c.
Reason for impact
6d.
Total impact
(square feet)
Multiplier
6e.
Required mitigation
(square feet)
Zone 1
3 (2 for Catawba)
Zone 2
1.5
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund).
6h. Comments:
Page 7 of 10
PCN Form — Version 1.3 December 10, 2008 Version
E.
Stormwater Management and Diffuse Flow Plan (required by DWQ)
1.
Diffuse Flow Plan
1a.
Does the project include or is it adjacent to protected riparian buffers identified
❑ Yes ® No
within one of the NC Riparian Buffer Protection Rules?
1 b.
if yes, then is a diffuse flow plan included? If no, explain why.
❑ Yes ❑ No
Comments:
2.
Stormwater Management Plan
2a.
What is the overall percent imperviousness of this project?
>25 %
2b.
Does this project require a Stormwater Management Plan?
IN Yes ❑ No
2c.
If this project DOES NOT require a Stormwater Management Plan, explain why: COASTAL COUNTY
2d.
If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
PLAN WILL PREPARED BY MARK HARGROVE PE
❑ Certified Local Government
2e.
Who will be responsible for the review of the Stormwater Management Plan?
® DWQ Stormwater Program
❑ DWQ 401 Unit
3.
Certified Local Government Stormwater Review
3a.
In which local government's jurisdiction is this project?
❑ Phase II
❑ NSW
3b.
Which of the following locally - implemented stormwater management programs
❑ USMP
apply (check all that apply):
❑ Water Supply Watershed
❑ Other:
3c. Has the approved Stormwater Management Plan with proof of approval been
❑ Yes ❑ No
attached?
4.
DWQ Stormwater Program Review
® Coastal counties
❑ HQW
4a.
Which of the following state - implemented stormwater management programs apply
❑ ORW
(check all that apply):
❑ Session Law 2006 -246
❑ Other:
4b.
Has the approved Stormwater Management Plan with proof of approval been
❑ Yes ® No
attached?
5,
DWQ 401 Unit Stormwater Review
5a.
Does the Stormwater Management Plan meet the appropriate requirements?
❑ Yes ❑ No
5b.
Have all of the 401 Unit submittal requirements been met?
❑ Yes ® No
Page 8 of 10
PCN Form — Version 1.3 December 10, 2008 Version
F. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
1 a. Does the project involve an expenditure of public (federaVstatellocal) funds or the
❑ Yes ® No
use of public (federaVstate) land?
1 b. If you answered "yes' to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State
❑ Yes ❑ No
(North Carolina) Environmental Policy Act (NEPAISEPA)?
1c. If you answered "yes' to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
❑Yes El No
letter.)
Comments:
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards,
® Yes ❑ No
or Riparian Buffer Rules (15A NCAC 28 ,0200)?
2b. Is this an after - the -fact permit application?
® Yes ❑ No
2c. If you answered "yes" to one or both of the above questions, provide an explanation of the vielation(s): Installation of 2
crossings and disturbance of crossing prior to approval of request
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in
Yes ® No
additional development, which could impact nearby downstream water quality?
3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered "no," provide a short narrative description.
4. Sewage Disposal (DWQ Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
PLURIS
Page 9 of 10
PCN Form — Version 1.3 December 10, 2008 Version
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or
❑ Yes ® No
habitat?
5b. Have you checked with the USFWS concerning Endangered Species Act
® Yes ❑ No
impacts?
® Raleigh
5c. if yes, indicate the USFWS Field Office you have contacted.
❑ Asheville
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
usfw web site Natural HERITAGE
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat?
❑ Yes ® No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
SOUTH ATLANTIC HABITAT AND ECOSYSTEM IMS
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation
❑ Yes ® No
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
STATE HISTORIC PRESERVATION OFFICE WEB -SITE
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA - designated 100 -year floodplain?
❑ Yes ® No
8b. If yes, explain how project meets FEMA requirements:
8c. What source(s) did you use to make the floodplain determination? NC FLOODPLAIN MAPPING PROGRAM WEBSITE
HAYWOOD PITTMAN
1 -6 -13
Applicant/Agent's Printed Name
Date
Applicant/Agent's Signature
(Agent's signature is valid only if an authorization letter from the applicant
is Provided .
Page 10 of 10
PCN Form —Version 1.3 December 10, 2008 Version
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur In or near an area with federally protected species or Yes No
habitat?
5b. Have you chocked with the USFWS concerning Endangered Species Act 0 Yes ❑ No
Impacts?
Z Raleigh
6c, If yes, Indicate the USFWS Field Office you have contacted.
❑ Asheville
5d. What data sources did you use to determine whether your site would Impact Endangered Species or Designated Critical
Habitat?
usfvv web site Natural HERITAGE
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an areazdesignated as essential fish habitat?
El Yes No
6b. What data sources did you use to determine whether your site would Impact Essential Fish Habitat?
SOUTH ATLANTIC HABITAT AND ECOSYSTEM IMS
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation Yes No
status (e.g,, National Historic Trust designation or properties significant In
North Carolina history and archaeology)?
7b. What data sources did you use to determine whether your site would Impact historic or archeological resources?
STATE HISTORIC PRESERVATION OFFICE WEB-SITE
8. Flood Zone Designation (Corps Requirement)
89. Will this project occur in a FEMA-designated 100 -year floodplain? El Yes No
Bb, If yes, explain how project meets FEMA requirements:
Be. What source(s) did you use to make the floodplain determination? NC FLOODPLAIN MAPPING PROGRAM WEBSITE
HAYWOOD PITTMAN 1-6-13
lf�lll
Applicant/Agent's Printed Name ' Applicant/Agent's Signature Date
(Agent's signature Is valid only if an authorization letter from the applicant
is provicled. ,
Page 10 of 10
PCN Form —Version 1.3 December 10, 2008 Version
GRAPHIC SCALE
4W o 2w 4W eoo
I inch a 4W it,
•
WETLAN
D
IMPACT #3
_ r
r .i °•
WETLAND
s,' ',��• •!•
IMPACT #1
•
.•
• • • w • • - `.r• • •
•
•
• r r
•
�
a
•
s • 4 •
p
a
1
t
•
lip
• •
•
1 • ' ♦ • •
! % • ! • •
i * 1
• s • •
• r s , •
•
r w •
• • •
• r
r s ,•
•
•
• • r s •
•
• s • r
s s r •
a
• •
•
r
s
• r
•
! • • • •
• • •
• • • s •
•
•
a
1
of II.. cY•-it .,.I,,- N f► II
II i� « B 6'i 11 _
LV—C- S
WETLAND
IMPACT #1 — 1,843 SF 0 L F'
-0
IMPACT #2 — 5F I l i i.F
IMPACT 2
IMPACT #3 -- 4,7_B5__SF_ 9,l1 -F
- --
TOTAL a �, C SF 5.1 d� LF
TOTAL = 0, { 9 AC
FOOL DERGN -AIM' it.RIXA_SED FOR CONSTRUCTION - FOR PEitMYIT NG ONLY
BRIDC�OIq'!' SOBDl1�IDN
YOZAL 187L ND nFAL79
Dow aw
srxc
rlownc Ma
D
WMAN / BWACTS
PM
3" Camma
1Ui�A
�,��.
pw m0 � pq�
ANNOM et:
WM
AV �a
WHAMIUM w sow
zj� Mir P—Im
6 mm
LWIS
28
26
24 .
22
20
18
161
I
14`
CENTERLINE ROAD
ELEV 24.57 28
i
! 26
f.
�. FIL .
- 24
I HIEADIAL
1
HE DW,�LL
F 60 LF 8" 1 CP� EXISTING
D .. _ 9 - -1 J. .. -- - -.... GROUND
T (2d9b Ft -I-Ed)
`1207, FILIl� -
?IPR�1P
END OF
.. _ . WE AND
�. ...__ INV OU1C 8.6J I. .. IMPACT
f 11 16
L..... _ .. IN� IN._... 1 .80i -
? 1114
0 +00 0 +50 1 +00
SECTION A -A
WETLAND IMPACT 1
GRAPHIC SCALE
40 0 20 40 80
1 inch = 40 ft.
FINAL DESIGN - NOT RELEASED FOR CONSTRUCTION - FOR PERiN11TTING ONLY
1 DRAW, BY: SCME, nww W.
BRIDGEPORT SUBDIVISION #` SION
WETAND IMPACTS Mm 1"-40' 2
PORT CITY CONSULTING ENGINEWS, PLW APPROVED Br. Dare: JOB Ila
6216 STONMRIDGE ROAD
JA J NCB E8461 WILMGTON. NC 28409 MNH 5120113
•
1
� r
• �� •
kfBR PUMP •
c.�
STATION
f
ETLANDS LIN ,
dp
B2- 2-a0,--
ee6 4��� � '`� t�`•1 t mss. \�j��•
1w
n
r'
CENTERLINE ROAD
28 ELEV 26.57 28
26 - 1 l 26
I
(4 HE owALL
24 24
HEA WAI L .... .... I
8$ F I CP
BEGINNING OF 22 (20 ?FI LED j 22 END OF
WETLAND J �_ WETLAND
IMPACT c - a- o - IMPACT
I
20 20
I r !
GROUND
IPR P
E
18 ._..... .. 18
1 INV OUT '10.1
16 16
i
i I
I ..._ 1 t
14 14
0 +00 0 +50 1 +00
SECTION B —B
WETLAND IMPACT 2
GRAPHIC SCALE
40 0 20 40 80
1 inch = 40 ft.
FINAL DESIGN - NOT RELEASED FOR CONSTRUCTION - FOR PERIMITUNG ONLY
DRAW BY. SCALE riGUFIE No.
BRIDGEPORT SUBDM IMPACT SION ;E'
WETAND IMPACTS MNH 1' =40' 4
PORT CITY CONSULTING ENGMEERS PLLC APPR044D er. DATE: JOID ND: DRERsnm 8216 STONEBMGE ROAD
dAClisO lO NC %WJ WILakINGTON, NC 28409 MNH 6120113
2 D
s$
24
22
20
BEGINNING OF 18
WETLAND
IMPACT
12 RIPRAP
10 ! 1
CENTERLINE ROAD
ELEV 20.69 24
- _
I 22
FILL
20
I _
I I EAD AL
18
VAL
D. 50%
SCALE:
MIM
1-40'
APPROVED BY:
DAIS,
]INN
1]/8/13
FILL
i
I-
16
ILL
�I
14
l..
EXISTIN[
... _....._.
.�. _...
!
_...
!
GROUND
I V IN
�.
4.3
12
I i
T
- -1
.00 I
V
,0
0 +00 0 +50 1 +00
SECTION C -C
WETLAND IMPACT 3
GRAPHIC SCALE
40 0 20 40 80
1 inch = 40 ft.
END OF
WETLAND
IMPACT
FINAL DESIGN -NOT RELEASED FOR CONSTRUCTION -FOR PER�411TT1NG ONLY
BRIDGEPORT SUBDIVISION IMPACT 13
WETAND IMPACTS PORT CITY CONSULTING ENGINEERS, PLW
��{N 6218 SWNEBRWGE ROAD
CKSOHVIILiS
JA NCDL% 61 WH"GTDN, NC 28409
DRAM BY:
SCALE:
MIM
1-40'
APPROVED BY:
DAIS,
]INN
1]/8/13
FRAME NO.
6
JOB NO;
BACHELORS DELIGHT MITIGATION CREDIT REQUEST FORM
(July 2012)
Print this form, fill in requested information, sign and date, and either
mail to: Bachelors Delight Mitigation Bank or email to. cpreziosi@lrngroua.net
c/o Land Management Group, Inc.
3805 Wrightsville Avenue, Suite 16
Wilmington, NC 28403
d N.srleman4a .— na.ranlahia frer ninrifirn #inn nr rrnnQaC tim -nfinn man of nrnirlf:t arRa iR n4miprindl.
CONTACT INFORMATION
APPLICANT'S AGENT (optional)
APPLICANT
1. Business or Individual Name
BEAVER CREEK INVESTORS INC
HAYWOOD PITTMAN
2. Street Address or P O Box
3. City, State, Zip
PO BOX 1685
JACKSONVILLE, NC 28541
1003 GREGORY FORK ROAD
RICHLANDS, NC 28574
4. Contact person
BETTY BULLOCK
HAYWOOD PITTMAN
8. Telephone Number
910 -346 -9800
910 -330 -2784
6. Fax Number
7. E -Mail Address (optional) PITTMANSOIL@YAHOO.COM
PROJECT INFORMATION
B. Project Name
BRIDGEPORT
S. Project Location (nearest town, city)
"ATTACH MAP SHOWING IMPACT LOCATION"
SNEADS FERRY
10. Lat -Long Coordinates (optional)
11. Project County
12. River Basin
ONSLOW
WHITE OAK
13. Cataloging Unit (8- digit) (See Note 1)
03030001
IMPACT INFORMATION
Total Impact (ac.) (e.g., 0.13)
Amount of Credits
Requested (ac.)
14. Riparian Wetland
0.15
0.45
16. Non- Riparian Wetland
16. Coastal Marsh
17. Stream Impact: Warm only
(ft.) (e.g. 1,234)
212
259
18. Regulatory Agency Staff Contacts
Indicate last names, it known
USACB: DAVID BAILEY
DWQ: JOANNE STEENHUIS
19. Other Regulatory ID Information
Lea USAGE= Action ID, if known
SAW -2009 -01655
IMPORTANT
Check (4) below if this request is a:
X revision to a current acceptance, or
re- submission of an expired acceptance
Signal; f Applicant or Agent:
Date: _ jr
Nate 1: For help In determining the Cataloging Unit, go to EPA's "Surf Your Watershed" web page:
http.11cfaub.ena.govlsudllo� tet(ndgx cfm
Note 2: Please contact Christian PrezIosi (LMG, Inc.) with questions at (910) 452 -0001 or rcx� eziosl tmsrroup.not