Loading...
HomeMy WebLinkAboutSW6130703_CEI_20211215ROY`COOPER Governor ELIZABETH S. BISER Secretary BRIAN WRENN NORTH CAROLINA Director Environmental Quality December 15, 2021 Camden Glen Development, LLC Attn: Harold Kidd, Manager 6885 Cliffdale Road Fayetteville, NC 28314 Subject: Compliance Evaluation Inspection State Stormwater Management Permit SW6130703 Peartree West Subdivision (formerly Camden Glen Subdivision) Cumberland County Dear Mr. Kidd: In response to the submittal of a State Stormwater: Permit Transfer Application Form, initially received by our office on August 16, 2021, along with additional information received on December 8, 2021, a Compliance Evaluation Inspection was conducted on December 14, 2021 at the Peartree West Subdivision located off Camden Road in Cumberland County. The purpose of the inspection was to evaluate compliance with State Stormwater Management `Permit SW6130703, which was originally issued to Camden Glen Development, LLC on August 13, 2013 and subsequently` renewed on September 14, 2021. A copy of the Compliance Inspection Reportis enclosed for your review. As a result of the inspection and subsequent file review, it has been determined that the facility is compliant with the conditions of the subject permit and associated stormwater management plans. Please refer to the enclosed Compliance Inspection Report for additional comments .and observations made during the inspection. If you have any questions or this office can be of any assistance, please contact me at;(910) 433-3394 or via e-mail at mike.lawyer@ncdenr.gov. Sincerely, C Michael Lawyer, CPSWQ Environmental Program Consultant Division of Energy, Mineral and Land Resources Enclosure: Compliance Inspection Report ec: Harold Kidd, Manager — Camden Glen Development, LLC Jimmy Kizer, PE - Moorman, Kizer & Reitzel, Inc. Cynthia Smith Moorman, Kizer & Reitzel,' Inc. Radford Brown, Manager Peartree West Owners Association cc: FRO — DEMLR, State Stormwater Files u FW DpuAr�xM.at EmtlmnmeMal UuN North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Fayetteville Regional Office 1 225 Green Street, Suite 7141 Fayetteville, North Carolina 28301 910.433,3300 Compliance Inspection Report Permit: SW6130703 Effective:09/14/21 Expiration: 08/13/29 Project: Peartree West Subdivision Owner: Camden Glen Development LLC County: Cumberland Adress: Camden Rd Sr 1169 Region: Fayetteville City/State/Zip:,Fayetteville NC 28366 Contact Person: Harold J Kidd Title: Phone: Directions to Project: Head southwest on camden rd from the intersection of rockfish rd and camden rd approx 2.9 mi and the project is on the rt. Type of Project: State Stormwater - HD - Detention Pond Drain Areas: 1 - (Stewarts Creek) (03-06-15) ( C) 2 - (Stewarts Creek) (03-06-15) ( C) 3 - (Stewarts Creek) (03-06-15) ( C) On -Site Representative(s): Related Permits: Inspection Date: 12/14/2021 Entry Time 03:44PM Primary Inspector: Mike Lawyer r Secondary Inspector(s); Reason for Inspection: Routine Permit Inspection Type: State Stormwater Facility Status: E Compliant ❑ Not Compliant Question Areas: State Stormwater (See attachment summary) Exit Time: 04:20PM Phone: 910-433-3394 Inspection Type: Compliance Evaluation page 1 permit: SW6130703 Owner - Project: Camden Glen Development LLC Inspection Date: 12/14/2021 Inspection Type Compliance Evaluation Reason for Visit: Routine Inspection Summary: Inspection conducted in response to submittal of permit transfer application initially received on August 16, 2021. Original permit expired on August 13, 2021 and had to be renewed prior to transfer. Permit renewal application was received on August 18, 2021 and permit was renewed on September 14, 2021 with expiration date of August 13, 2029. Additional information regarding correct orifice diameters and drawdown rates for the three wet ponds was requested from Moorman, Kizer & Reitzel (MK&R) on August 24, 2021 (via phone call) and again on September 24, 2021 (via email). Revised as -built drawings with corrected orifice diameters were received via email from MK&R on December 8, 2021. At the time of inspection, the associated built -upon area (BUA) and the permitted stormwater control measures (three wet ponds) appeared to be constructed/maintained per the original permit and certified as -built drawings received from MK&R on December 8, 2021. Silt fencing that remains installed around the ponds, specifically at the flow path of the outlets and/or emergency spillways, should be removed so it does not block concentrated flow. Inspection report will be sent to the current permittee (Camden Glen Development, LLC/Harold Kidd) with a copy sent to the proposed permittee (Peartree West Owners Association/Radford Brown). Permit will be transferred to the proposed permittee under separate letter. page 2 Permit: SW6130703 Owner - Project: Camden Glen Development LLC Inspection Date: 12/14/2021 Inspection Type Compliance Evaluation Reason for Visit: Routine File Review Yes No NA NE Is the permit active? ■ ❑ ❑ ❑ Signed copy of the Engineer's certification is in the file? Signed copy of the Operation & Maintenance Agreement is in the file? Copy of the recorded deed restrictions is in the file? Comment: Built Upon Area Is the site BUA constructed as per the permit and approval plans? Is the drainage area as per the permit and approved plans? Is the BUA (as permitted) graded such that the runoff drains to the system? Comment: SW Measures Are the SW measures constructed as per the approved plans? Are the inlets located per the approved plans? Are the outlet structures located per the approved plans? Comment: Operation and Maintenance Are the SW measures being maintained and operated as per the permit requirements? ❑❑❑ ■ ■ ■ ■ ❑❑❑ Yes No NA NE ■ ❑❑❑ ■ ❑❑❑ Yes No NA NE ❑❑❑ ❑❑❑ Yes No NA NE ■ ❑❑❑ Are the SW BMP inspection and maintenance records complete and available for review or ■ ❑ ❑ ❑ provided to DWQ upon request? Comment: Other Permit Conditions Yes No NA NE Is the site compliant with other conditions of the permit? ■ ❑ ❑ ❑ Comment: page 3