Loading...
HomeMy WebLinkAbout20210955 Ver 1_ePCN Application_20211221DWR Division of Water Resources Initial Review Pre -Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) June 1, 2021 Ver 4.1 Has this project met the requirements for acceptance in to the review process?* Yes No Is this project a public transportation project?* Yes No Change only if needed. BIMS # Assigned* Version#* 20210935 1 Is a payment required for this project?* No payment required Fee received Fee needed - send electronic notification Select Project Reviewer* Garcy Ward:eads\gpward Information for Initial Review la. Name of project: Pitt County Bridge No. 38 on US 13 (Memorial Drive) over Tar River la. Who is the Primary Contact?* Deanna Riffey Reviewing Office* Washington Regional Office - (252) 946-6481 1 b. Primary Contact Email: * lc. Primary Contact Phone: * driffey@ncdot.gov (919)707-6151 Date Submitted 12/21/2021 Nearest Body of Water Tar River Basin Tar -Pamlico Water Classification C; NSW Site Coordinates Latitude: 35.618175 A. Processing Information Longitude: -77.390172 County (or Counties) where the project is located: Pitt Is this a NCDMS Project Yes No Is this project a public transportation project? * Yes No Is this a NCDOT Project?* Yes No (NCDOT only) T.I.P. or state project number: B-4786 WBS # (?) 38222.1.FR2 Pre -Filing Meeting Information Is this a courtesy copy notification?* Yes No ID# 20210935 Pre -fling Meeting or Request Date 5/13/2021 Attach documentation of Pre -Filing Meeting Request here: Click the upload button or drag and drop files here to attach document File type must be PDF la. Type(s) of approval sought from the Corps: Section 404 Permit (wetlands, streams and waters, Clean Water Act) Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) Has this PCN previously been submitted?* Yes No 1 b. What type(s) of permit(s) do you wish to seek authorization? Nationwide Permit (NWP) Regional General Permit (RGP) Standard (IP) lc. Has the NWP or GP number been verified by the Corps? Yes No Regional General Permit (RGP) Number: RGP Numbers (for multiple RGPS): ld. Type(s) of approval sought from the DWR: 401 Water Quality Certification - Regular Non-404 Jurisdictional General Permit Individual 401 Water Quality Certification Version 1 201902350 - Work associated with bridge construction, widening, replacement, and interchanges le. Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: If. Is this an after -the -fact permit application?* Yes No lg. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No lg. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No 1 h. Is the project located in any of NC's twenty coastal counties? Yes No 1j. Is the project located in a designated trout watershed? Yes No B. Applicant Information Id. Who is applying for the permit? Owner Applicant (other than owner) le. Is there an Agent/Consultant for this project?* Yes No 401 Water Quality Certification - Express Riparian Buffer Authorization Yes No Yes No 2. Owner Information 2a. Name(s) on recorded deed: Multiple properties 2b. Deed book and page no.: 2c. Contact Person: 2d. Address Street Address 1000 Birch Ridge Road Address Line 2 City Raleigh Postal / Zip Code 27610 2e. Telephone Number: (919)707-6123 2g. Email Address: * pharris@ncdot.gov C. Project Information and Prior Project History State / Province / Region NC Country USA 2f. Fax Number: 1. Project Information 1 b. Subdivision name: (if appropriate) 1c. Nearest municipality / town: Greenville 2. Project Identification 2a. Property Identification Number: 2b. Property size: 2c. Project Address Street Address Address Line 2 City Postal / Zip Code 3. Surface Waters 3a. Name of the nearest body of water to proposed project: * Tar River 3b. Water Resources Classification of nearest receiving water: * C; NSW 3c. What river basin(s) is your project located in?* Tar -Pamlico 3d. Please provide the 12-digit HUC in which the project is located. 03020103 4. Project Description and History State / Province / Region Country 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: * The project vicinity is developed primarily for residential purposes, while land use in the vicinity consists of residential and retail development and land cleared and maintained for air traffic at the Pitt -Greenville Airport (clearway). 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past? * Yes No Unknown 4f. List the total estimated acreage of all existing wetlands on the property: 0.19 4g. List the total estimated linear feet of all existing streams on the property: 250 4h. Explain the purpose of the proposed project:* Bridge No. 38 (US 13 eastbound) is sixty -two -year -old bridge with a deteriorating concrete structure that can no longer be addressed by maintenance activities. The purpose of the project is to replace the structure on its existing alignment. 41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used: * The existing 541 foot long, 33.5 foot wide, 12-span structure will be replaced on the existing alignment. The new bridge will be an 8-span, 550 foot long and and a 41 foot wide. A temporary work bridge will be needed for bridge construction. Standard roadbuilding equipment will be used. There are no impacts expected from utilities. 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* Yes No Comments: 5b. If the Corps made a jurisdictional determination, what type of determination was made? * Preliminary Approved Not Verified Unknown N/A Corps AID Number: 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: Sandy Smith and Scott Davis Axiom Unknown 5d. List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR Tom Steffens informed Axiom by phone in July 2015 that he and Garcy Ward had visited the project site and verified the wetland delineation. No written JD documentation was provided. 6. Future Project Plans 6a. Is this a phased project?* Yes No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? D. Proposed Impacts Inventory 1. Impacts Summary la. Where are the impacts associated with your project? (check all that apply): Wetlands Open Waters 2. Wetland Impacts Streams -tributaries Pond Construction Buffers 2a. Site #* (?) 2a1 Reason (?) 2b. Impact type* (?) 2c. Type of W.* 2d. W. name* 2e. Forested* 2f. Type of Jurisdicition* (?) 2g. Impact area* 1 Access road T Bottomland Hardwood Forest WD Yes Both 0.100 (acres) 2 Access road T Riverine Swamp Forest WB & WC Yes Both 0.010 (acres) 2g. Total Temporary Wetland Impact 0.110 2g. Total Wetland Impact 0.110 2g. Total Permanent Wetland Impact 0.000 21. Comments: A temporary work bridge (conceptual footprint shown on sheet 4) is proposed for removal of the existing bridge and construction of the proposed bridge. The impacts shown due to temporary fill in wetlands are for the anticipated temporary fill to build access roads on each side of the river from ends of temporary work bridge out along embankments and then up 20' high embankments. 4. Open Water Impacts 4a. Site # 4a1. Impact Reason 4b. Impact type 4c. Name of waterbody 4d. Activity type 4e. Waterbodytype 4f. Impact area 1 Bridge bents P Tar River Fill Other 0.01 1 Bridge bents T Tar River Fill Other 0.01 4g. Total temporary open water Impacts: 0.01 4g. Total open water impacts: 0.02 4h. Comments: 6. Buffer Impacts (for DWR) 6a. Project is in which protect basin(s)? Check all that apply. Neuse Catawba Goose Creek Other 4g. Total permanent open water impacts: 0.01 Tar -Pamlico Randleman Jordan Lake 6b. Impact Type 6c. Per or Temp 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact 6g. Zone 2 impact Roadway/bridge P Tar River No 6,279 3,317 6h. Total buffer impacts: Total Temporary impacts: Total Permanent impacts: Total combined buffer impacts: 6i. Comments: Zone 1 0.00 Zone 1 6,279.00 Zone 2 0.00 Zone 2 3,317.00 Zone 1 Zone 2 6,279.00 3,317.00 E. Impact Justification and Mitigation 1. Avoidance and Minimization la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: The bridge will be replaced along its existing alignment, and traffic detoured onto the southbound bridge. 2.5:1 is the steepest allowable traditional grass lined fill slope for this project. Rock Plating is being used in this area to allow for a steeper than 2.5:1 slope as this is necessary to avoid filling in a portion of the greenway. It was estimated that a 2.5:1 is achievable at 23+75 so that is where rock plating will begin, 1.5:1 is needed at 25+00. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Design Standards in Sensitive Watersheds will be adhered to. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? Yes No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: All wetland impacts are temporary, and buffer impacts are allowable. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan la. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes No What type of SCM are you providing? Level Spreader Vegetated Conveyance (lower SHWT) Wetland Swale (higher SHWT) Other SCM that removes minimum 30% nitrogen Proposed project will not create concentrated stormwater flow through the buffer 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? * Yes No Comments: G. Supplementary Information 1. Environmental Documentation la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? * Yes No 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)?* Yes No lc. If you answered "yes" to the above, has the document review been finalized by the State Clearing House?* Yes No Comments: * Type II Categorical Exclusions do not require submission to the Clearing House. 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)?* Yes No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* Yes No 3b. If you answered "no," provide a short narrative description. Due to the existing bridge being replaced, this project will neither influence nearby land uses nor stimulate growth. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* Yes No N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* Yes No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* Yes No 5c. If yes, indicate the USFWS Field Office you have contacted. Raleigh 5d. Is another Federal agency involved?* Yes What Federal Agency is involved? NMFS 5e. Is this a DOT project located within Division's 1-8? Yes No No Unknown 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USFWS IPaC, coordination with USFWS and NMFS. The NLEB PBO will be utilized as will the PCO/PBO for the Tar River spinymussel, yellow lance, Carolina madtom, Atlantic pigtoe, green floater, and Neuse River waterdog. Concurrence was received from the NMFS for the Atlantic sturgeon. Guidelines for Avoiding Impacts to the West Indian Manatee will be adhered to. Other species received biological conclusions of No Effect due to no habitat or no observation of species during surveys. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* Yes No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat? * Coordination with NMFS during NRTR research, Essential Fish Mapper checked in 2021. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* Yes No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* Programmatic CE documentation 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain?* Yes No 8b. If yes, explain how project meets FEMA requirements: Hydraulics Unit coordination with FEMA 8c. What source(s) did you use to make the floodplain determination?* FEMA mapping Miscellaneous Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred. Click the upload button or drag and drop files here to attach document B-4786 General Pitt December 21 2021.pdf 6.25MB File must be PDF or KMZ Comments Signature By checking the box and signing below, I certify that: • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief'; and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true, accurate, and complete information on this form; I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND I intend to electronically sign and submit the PCN form. Full Name: Mack Christopher Rivenbark, III Signature Date 12/21/2021