Loading...
HomeMy WebLinkAbout20191577 Ver 1_Y1Q3_Monitoring_20211221DocuSign Envelope ID: 51119150-0242-4FFA-A64E-B67A2EB213A0 CLearWaLer An EnviroScience Companyp C1earWater Environmental Consultants, Inc. www.cwenv.com December 21, 2021 Mr. Andrew Moore Division of Water Resources Asheville Regional Office 2090 U.S. 70 Highway Swannanoa, NC 28778-8211 RE: Project Ranger (SAW-2019-01867) (DWR Project No.20191577) Year 1 Quarter 3 Documentation Buncombe County, North Carolina Dear Mr. Moore, The attached Year 1 Quarter 3 Documentation is submitted on behalf of Lee Thomason and Biltmore Farms, L.L.C. in compliance with condition 8 of the DWR 401 Permit WQC004226 issued June 1, 2020. Project Ranger is also authorized under Section 404 and Section 10 in a permit issued by USACE on July 10, 2020 for the construction of a bridge over the French Broad River. The site is located at 1600 Brevard Road, in Asheville, NC (Figure 1). A qualitative assessment of the banks upstream and downstream of the bridge location was performed by ClearWater Environmental Consultants, Inc. on December 7, 2021. Please do not hesitate to contact me at 828-698-9800 if you have any questions or comments. Sincerely, DocuSigned by: AE92310EDC6E42D... Britten Yant, P.W.S. Biologist EQ DocuSigned by: . U�t Q,a& OA79F7DC85EE4F7_. R. Clement Riddle, P.W.S. Senior Scientist 145 7`h Avenue West, Suite B Hendersonville, NC 28792 828-698-9800 Tel DocuSign Envelope ID: 51119150-0242-4FFA-A64E-B67A2EB213A0 Biltmore Farms Project Ranger Year 1 Quarter 3 — Photographic Documentation — 12/07/2021 Project Ranger is authorized to begin construction of a bridge over the French Broad River in a Section 404 and Section 10 issued by USACE on July 10, 2020, and the Division of Water Resources Water Quality Certification Issued June 1, 2020. The site is located at 1600 Brevard Road, in Asheville, NC (Figure 1). The Year 1 Quarter 3 qualitative assessment of the banks upstream and downstream of the bridge location was performed by ClearWater Environmental Consultants, Inc. on December 7, 2021, in compliance with condition 8 of the DWR 401 Permit WQC004226 issued June 1, 2020. This qualitative monitoring will be repeated quarterly following construction of the bridge, for one year, or two bankfull events (whichever is longer), and then annually for three years. Clearing for the bridge began in early February 2021. The assessment included collecting eighteen (18) georeferenced photographs of both banks of the French Broad River and noting any existing visible areas of bank erosion (Figures 1 - 2). The upstream extent of the study reach began at Bent Creek River Park, approximately 600 LF upstream from the proposed bridge location, while the downstream extent ended at an overhead electric (OHE) powerline crossing, approximately 1200 LF downstream from the proposed bridge location. The photo points were georeferenced with Trimble sub -meter GPS device and collected both on foot and by canoe. Three areas of active erosion or bare vertical banks were identified during the baseline survey conducted on December 21, 2020 and were observed again during the December 7, 2021 survey. One area of sediment aggradation was identified during the June 10, 2021 survey. This area of sediment aggradation was observed again during the Year 1 Quarter 3 monitoring. Area 1 includes portions of bank erosion at Bent Creek Park on the left bank of the French Broad River. This is visible in Photo Point 1. The erosion in Area 1 is likely due to the lack of a forested buffer and heavy use of the banks by the general public to access the creek. No change was observed. Area 2 includes a vertical bare bank on the right bank of the French Broad River visible in Photo Point 14. This bare bank is immediately downstream from a log debris jam, approximately 350 feet downstream from the bridge location. No change was observed. Area 3 includes vertical bare banks which are actively slumping and eroding, located on the right bank of the French Broad River. The Area 3 erosion is visible from Photo Point 8 and Photo Point 16. This portion of bank lacks a forested buffer and is located in a maintained OHE right-of-way (ROW). The location of the photo points and three areas of existing bank erosion are indicated on the attached Overview Map (Figure 2). Area 4 includes a newly formed area of sediment aggradation along the right bank of the French Broad River. This area is forming along the right bank of the river, approximately 75 feet downstream from the rip -rap causeway near the bridge construction site (Figure 2). The sediment aggradation is visible in Photo Point 18. The aggradation affect may be caused by an eddy current downstream of the temporary bridge causeway. The upland work area at this location was surveyed and no instance of silt fencing failure or sediment escape into the river was observed. Page 1 of 11 DocuSign Envelope ID: 51119150-0242-4FFA-A64E-B67A2EB213A0 ��UO�IIUCSOLSu �� °� Il Photo Point 1 Facing Left Bank to Bent Creek River Park — No change observed. x _ Photo Point 2 Facing Left Bank to Bent Creek Confluence - No change observed. Page 2 of 11 DocuSign Envelope ID: 51119150-0242-4FFA-A64E-B67A2EB213A0 Page 3 of 11 DocuSign Envelope ID: 51119150-0242-4FFA-A64E-B67A2EB213A0 Photo Point 6 Facing Left Bank - No change observed. Page 4 of 11 DocuSign Envelope ID: 51119150-0242-4FFA-A64E-B67A2EB213A0 IMMUM M:20 Photo Point 7 Facing Left Bank - No change observed. Photo Point 7 Facing Downstream Left Bank - No change observed. Page 5 of 11 DocuSign Envelope ID: 51119150-0242-4FFA-A64E-B67A2EB213A0 Page 6 of 11 DocuSign Envelope ID: 51119150-0242-4FFA-A64E-B67A2EB213A0 Photo Point 10 Bank - No observed. Photo Point 11 Facing Left Bank from Rock Outcrop — Causeway installed. Page 7 of 11 DocuSign Envelope ID: 51119150-0242-4FFA-A64E-B67A2EB213A0 Photo Point 12 Facing Right Bank — Causeway and piers installed. 1 4 Page 8 of 11 DocuSign Envelope ID: 51119150-0242-4FFA-A64E-B67A2EB213A0 f #3. 8 +I .' 3 {iii I- '. °. d �-�' t4l) 9 i I S WORM II � ll ° FacingPhoto Point 14 Rightchange MW e i4 v yr ���' < <�!•� A ze' F ����iS Vertical Bare Bank on Right Bank near Photo Point 14 - No change observed. Page 9 of 11 DocuSign Envelope ID: 51119150-0242-4FFA-A64E-B67A2EB213A0 WORM TPoC a.. Photo Point 15 Facing Right Bank - No change observed. Photo Point 16 Facing Right Bank - No change observed. Page 10 of 11 DocuSign Envelope ID: 51119150-0242-4FFA-A64E-B67A2EB213A0 t.. I. t . Photo Point 17 Facing Downstream at Bent Creek Confluence - No change observed. v �• s Photo Point 18 Right Bank, Facing Downstream. North of Bridge Construction. Sediment aggradation immediately downstream of causeway. Page 11 of 11 DocuSign Envelope ID: 51119150-0242-4FFA-A64E-B67A2EB213A0 Project Ranger W Montford Hills d Haw Creek ` 63 Asheville m Crowne Plaza % % y Tennis & Golf N, T \ Leicester o' Resort m 4h\ JI tiWy z ;Hilliard AveCD Pv t� e °n R Deaver View (\ Beverly Hills West Asheville Kenilworth �\ Sulphur Springs \ ps in Sf` \ Malvern Hills Carrier Park °key ooQ <0 Oakle P 6 iLU A 4� QQ� � �/dRidge o r \ a m Shiloh 'c ° 0 N a 4 � and a 0/1Riv z \ u Q O er fl ea Biltmore Forest Biltmolo r��vai �c°O�\ Country Club Venable CID T a a Valley Springs Project Area Creek o Q a i 9e, w Ak eL W3r w � Busbee a a �O' o o°•�, R K owhatan C/ o c N reation Area h H c — ♦� �On9 Shoats RC/ 191 Q Bridge Location Lake Julian 0 0.5 1 2 Miles Drawn by: BWY Date; 12.20.2021 CEC Project#303 West Haven OLearWater Year 1 Quarter 3 Buncombe County, AnEnviroScienceCompanyL North Carolina Streambank Assessment 145 7th Avenue West, Suite B Figure 1 Hendersonville, NC 28792 DocuSign Envelope ID: 51119150-0242-4FFA-A64E-B67A2EB213A0 Project Ranger Proposed Bridge \\ Location 1 Area 1: Bent Creek Park, sparse buffer, vertical banks Bridge Construction Area Photo Point Existing Stream Bank Erosion Buncombe County, North Carolina 94 V �-- Area 3: Missing 'P$ buffer, active PRs7 bank erosion In OHE ROW PP16 " PJL PP15 • �._ F' Area 2: Vertical, unvegetated bank downstream ..� i from debris ' Jam w PP 1,hP.P'l, Area 4: Sediment aggradation, right bank, downstream of construction OLearWater An EnviroScience CompanyLQ 145 7th Avenue West, Suite B Hendersonville, NC 28792 0 250 500 Feet Year 1 Quarter 3 Streambank Assessment Figure 2