HomeMy WebLinkAbout20211850 Ver 1_USACE Confirmation Email_20211216Ashley Steele Bentz
From: Phillips, George L CIV USARMY CESAW (USA) <George.L.Phillips@usace.army.mil>
Sent: Monday, February 1, 2021 1:12 PM
To: Ashley Steele Bentz; Walter Cole
Subject: WCPSS M-15E-49 Site / 1291 Bowling Road / Fuquay-Varina / Wake County /
SAW-2020-01295
Attachments: Figure 4 - Feature Exhibit.pdf
This message originated outside of S&ME. Please report this as phishing if it implies it is from an S&ME employee.
Ashley,
Based on my site visit on 08/27/2020 the Corps concurs with the delineation within the red outlined "Proposed Site"
depicted on "Figure 4 — Feature Exhibit" attached. It may take 90-120 days for the issuance of a written jurisdictional
determination. The delineation may be used for planning and permitting purposes, should a permit be required the JD
can be issued and the time of permit verification. AID for the project is SAW-2020-01295. I have attached the
delineation for reference.
Please let me know if you have any questions or concerns.
Lyle Phillips
Regulatory Specialist
US Army Corps of Engineers
CE-SAW-RG-R
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Phone: (919) 554-4884, Ext. 25.
Fax: (919) 562-0421
Email: George.L.PhiIlips@usace.army.mil
We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is
located at: http://corpsmapu.usace.army.mil/cm apex/f?p=136:4:0. Thank you for taking the time to visit this site and
complete the survey.