HomeMy WebLinkAbout20211850 Ver 1_002 - SP-2021-15 - Stormwater Calculations 2nd SP 8.5 x 11 BW_20211216WAKE
COUNTY
NORTH CAROLINA
FUQUAY VARINA
M-15 MIDDLE
SCHOOL
South Main Street 8t
Bowling Road
Fuquay-Varina, NC
Stormwater Management
Narrative £t Design Calculations
Site Plan #1 Submittal
July 2021
.��'-%"ti'caN''1O
� Q
SEAL
239-53—/
Prepared by:
CLH Design, pa
Stormwater Management Narrative
M15 Middle School
CLH Project No: 20-111
Proiect Description
The project proposes the construction of new middle school, track and field, softball field and associated
parking and site improvements on a 64.95 acre tract located at the intersection of South Main Street (US
HWY 401) and Bowling Road (SR 2772). This tract is mostly vacant in the mid portion of the property,
with two dwellings that front South Main Street on the western side and an abandoned Town of Fuquay
Varina wastewater treatment plant on the eastern side of the site. The middle school building and
associated program elements shall be located on the eastern portion of the property. The entire existing
wastewater treatment plans removal is a part of this project.
The eastern margin of the property is the centerline of Kenneth Creek and does lie within 100 year flood
area identified on FEMA maps 3720065600J (dated 05/02/2006), 3720066600J (dated 05/02/2006) and
3720066500K (dated 10/03/2006. The site is within the Cape Fear River basin.
There existing wetlands on the site that will be impacted by this project. All wetland impacts will be
permitted with Army Corps of Engineers and the North Carolina Department of Environmental Quality
(NCDEQ). No streams are impacted by this project. All stream buffers shown are required by the Town
of Fuquay Varina and impacts to the buffers will be regulated by the Town.
There is a varied soil surface on this site that are as follows: 5% Bibb (Hyd. Group A/D), 30% Fuquay
(Hyd. Group A), 5% Goldsboro (Hyd. Group C), 25% Griney (Hyd. Group D), 15% Nanford (Hyd.
Group C), 10% Rains (Hyd. Group A/D), 10% Urban (Hyd. Group N/A). All Group A/D soils and Urban
soils are assumed to by Hyd. Group D with the stormwater analysis.
There will be approximately 39 acres of ground disturbance with this project.
Stormwater Management Requirements
The project is located in the Town of Fuquay-Varina and must comply with the Stormwater Management
Regulations within the Land Development Ordinance. The project is considered a High Density Project
and must remove 85% TSS from runoff from the first inch of rainfall from the new impervious surfaces
and release the volume over a period of two to five days. The peak stormwater discharges from the post
development conditions must be managed to ensure they do not exceed the pre -development conditions
for the 1-yr, 2-yr, and 10-yr 24-hour Design Storm events.
Pre -Post Peak Discharge Summary
Most of the site run-off discharges to the southeast toward Kenneth Creek with the smaller portion of run-
off discharges to the west into the right-of-way of South Main Street, and Bowling Road. The site is
divided into five drainage areas for this analysis. Area A drains to the east, directly into Kenneth Creek.
Areas C and B drain to the southern properties that eventually discharge into Kenneth Creek. Area D
drains to an existing culvert that crosses under Bowling Road. Area E drains into South Main Street
right -of way. Areas D and E runoff eventually discharge into Kenneth Creek further south of the site.
Area A has an increase in post development run-off and will have two proposed stormwater wetlands to
both remove 85% TSS and reduce run-off to below or equal to pre -development rates.
Pre -Post Detention Results:
Analysis
Design
Pre -Development
Post -Development
Post -Development
Detention
Point
Event
QP. (cfs)
QPost (cfs)
Managed Q(cfs)
Provided
1-yr
13.67
30.64
11.54
A
2-yr
18.94
39.93
17.49
Two
wetlands
10- r
37.36
70.87
33.60
1-yr
0.46
0.11
B
2-yr
2.43
0.26
-
No
10- r
15.09
0.93
1-yr
3.96
3.11
C
2-yr
9.12
7.52
-
No
10- r
33.63
28.62
1-yr
6.85
6.07
D
2-yr
9.17
8.26
-
No
10- r
17.20
15.88
1-yr
1.25
1.25
E
2-yr
1.64
1.64
-
No
10- r
2.96
2.96
See attached Hydrograph Reports for additional details.
CONTENTS
Design Narrative
Maps
Quad Map
Soils Map
Pre -Development Drainage Area Map
Post -Development Drainage Areas Map
FEMA Firm Map
Supporting Calculations
Pre-Development/Post-Development Analysis
Wetland Sizing
Hydrograph Report
Storm Drainage System
10-yr Storm
Outlet Protection
QUAD MAP: FUQUAY VARINA
DATE: 1981
M15 MIDDLE SCHOOL
FUQUAY VARINA, NC
DATE JUNE, 2021
PROJECT NO 20-111
WAKE COUNTY COUNTY QUAD MAP
v
SCALE: 1" = 2000j
CLH DESIGN, P.A•
Regency Park
400 Regency Forest Drive
Suite 120
Cary, North Carolina 27518
Phone: (919) 319-6716
Fax: (919) 319-7516
--," r B �WaB = WaB
IoC2
No62 HrB? l
L y +''?
0
/ OrB
r .... OM OrB2 ,Or6 WaB ti ApB
o
ma v�.....:.
WaC 2
IoB Go drEj ADC
OrB nib
HrB - Me
.N �-
H rC
HrB
w,
1� Nob
0rB2 OrB
al HrE HfC2
NoC,
irC2 wo
rTY
j HrC2 ` p \_
'S
y.,
Wad
i >; HrC2 �� •,��. W A
Ap{;
NoB
�//ice:.: ._��'• - �i i ,
til
r
No8
/
a8
B HrB2
C
I { C�
i OrB A `.',�
yp
G HrD2
,Z•�
N
Cm
/ A
O� HICz
A 1A
o
_
—
Va
r
'
Do yr
0 o
H r E
O
o
H o
rB2 ' HrC2
c
A•
pC
10� o
NoB
A C
Q
E �.' pB� WaB Ra
/p /'��� WE
frE ` Cm - - z i Cn HrD2 W a , —
/ H rB �L _
HrB2 WgA
W 15 MIDDLE SCHOOL
UQUAY VARINA, NC
)ATE JULY, 2021
'ROJECT NO 20-111
#AKE COUNTY COUNTY SOILS MAP 101 & 11
v
SCALE: 1" = 1000'
CLH DESIGN, P.A.
Regency Park
400 Regency Forest Drive
Suite 120
Cary, North Carolina 27518
Phone: (919) 319-6716
Fax: (919) 319-7516
G !gA a x3 £ & ^€. ; =g 'ag s x�.�6as x •-. o 'b'iz =73
d
3±. -9 Y 3 ay $ % 8 B5$ ea 00 �5 �
�s $8 ro E
<x n x�n� t € @ - sx €` �z
w $XB G,: 3� x o "s` a �@a at _ II CGe z e ag ga ➢ E� E
. a y E
3 $` s IU6 °z d a a 811 :f44 INji
c$
&oa ®s'335 g �a gJi
�$@x3ax�B� $ pa$s agge v -0-r. g 0 01 rvpa mon RMUMEM
1
a mSNior-MIMMOMP "Irv,
.x §a
r _3
ir
L S
rt
�F�y / • / •-. i E s m
em t 1
- �p2ie 2� Igew„`
aEm €_
a`
� � u
{-
S
�x -
-�-� J - ➢�m$m yea
w
a
9B
az � B
iE.
EV
m
JJJJ�YY I 9 $ £ aka II
x o
i
o _ j
✓ ,� I z IIdo Qe SSaE
fififif ry e• Ego a€$Ex $€g
I du S
s s £ $ MHz
B g€mx
gags=
X m� e�
w ¢g
I
o. ¢ 9 m-r8 S5gEB g ^
Eli;
E
'IIS
�Ba€osIg aogg�E
S E3`ffi o
x 8
R§`a x� �
ISE'E'esN $Es.af�,�s^B$a`Eg=sm;
ma � m� x x �a�,�rs�`no
SV
�ioEo
_Ui
m E
s
$BWd�
E=g¢.
.mnii
„8 jag a �` o- � � �9 H � � 3 0 gaze , � ��m331
AIRS F fr� 1 Iq X 1g 3%q F d � � �. ig � $ low c
LL�EY�3' E£? py
mfi C+ • e .9 Y ; 3 aA aF=afr 8 5
gut
gax9zs€s3 3s all x� w r;�' ��S n€ �gffigs. gwa
Rs �pp yy 2 e $
8m &55W xo-
�
ON 1 ��g=fifrmg
.t
SV
Hui
sppn.
8_g€�
m E
�Ywa�
E=gg:g
IF
°
a
e U
�
ige c . ffi
gF $
fitE
6
mil
,
s _
z'
.`s=�
"£ 1 c= H €—
s$83c °:aE As _gig
•gigom'
e�mg5E^E_.'. m Flu:.
2'LLg
sz E • z3 fa"sr-a
eosui `? a H
o effis�
' e M
OP
of„6 MR!y:`$ := 1N;
a t °� E :Fe_E go� 24y YB
pg 8� Hq Sdc Es
Q� @°cF u .. • cey
vIM
Wj °�-fie; €`-�; ��i eoE ^
H1 _ mI1 =1 f 11-
E S.�E ��.
0
$Am€`gym pug
0 �s€ Emg 8' s. �a
e@s §flees as$€F
Ee5 gBr�Eef 3E ..f.$
s§i8_ Y�uluen PIPE
Fe
=so sa'se�s�
53e �'a"Y=
--e�iw- $b� —
§4 C38` § ..6$c
83o mn8Q ezggc AamY. FYI
Ego y- HPI jIK
sx2 1101 � `�g� R
°_�� aEY �w,F�Ba �08 8ggoe
F e•.� gLLYm%gLLm &�'LL BY�F
hifi
ill! HIM
a`$uou
hill :8ws€sag 11HR__f
,
n C N
NUS
a
O
�n
z
mom m
OD
y
p x
-
_
L)
c <
�`;;
toUl
D g
z
z
z
"myr zE
M,Z
�o a
�,
m y
t)
110
a
rn m
,
r -
C)C y
0
om
_
m
NUS
a
D
z
OD
<
z
OWE
-
D
czDi
g
z
z
z
"myr z
Z
�o a
CALCULATIONS
rPROJECT
4' DATE
11-12-2021 NAME PROJECT NOiddle School 20-111
LOCATION BY
Fuquay Varina, NC KAL
STORMWATER ANALYSIS ' i
Runoff
Pre -Development:
Site Area = 11.88 ac Tc = 9.2 min
Wt. CN = 53.0
Site Soils: (Hydrologic Soil Group A/D)
Wooded Area: 8.60 ac CN= 50
Impervious Area: 0.30 ac CN= 98
Lawn Area: 2.98 ac CN= 57
Weighted CN: 53
Post -Development:
Site Area = 0.48 ac Tc = 5.00 min
Wt. CN = 57.0
Site Soils: (Hydrologic Soil Group A/D)
Wooded Area: 0.00 ac CN= 50
Impervious Area: 0.00 ac CN= 98
Lawn Area: 0.48 ac CN= 57
Future Imp Area: 0.00 ac CN= 98
Weighted CN: 57.0
rPROJECT
4' DATE
11-12-2021 NAME PROJECT NOiddle School 20-111
LOCATION BY
Fuquay Varina, NC KAL
RunoffSTORMWATER ANALYSIS POINT: 'C'
Pre -Development:
Site Area = 20.31 ac Tc = 12.30 min
Wt. CN = 58.1
Site Soils: (Hydrologic Soil Group A,C & D)
Wooded Area: 8.80 ac CN= 54
Impervious Area: 0.36 ac CN= 98
Lawn Area: 11.15 ac CN= 60
Weighted CN: 58.1
Post -Development:
Site Area = 16.06 ac Tc = 9.79 min
Wt. CN = 57.3
Site Soils: (Hydrologic Soil Group A,C & D)
Wooded Area: 7.10 ac CN= 54
Impervious Area: 0.00 ac CN= 98
Lawn Area: 8.96 ac CN= 60
Future Imp Area: 0.00 ac CN= 98
Weighted CN: 57.3
rPROJECT
4' DATE
11-12-2021 NAME PROJECT NOiddle School 20-111
LOCATION BY
Fuquay Varina, NC KAL
STORMWATER ANALYSIS '1 1
Runoff Calculations
Pre -Development:
Site Area = 3.72 ac Tc = 5.00 min
Wt. CN = 77.2
Site Soils: (Hydrologic Soil Group A/D)
Wooded Area: 1.60 ac CN= 73
Impervious Area: 0.34 ac CN= 98
Lawn Area: 1.78 ac CN= 77
Weighted CN: 77.2
Post -Development:
Site Area = 3.64 ac Tc = 5.00 min
Wt. CN = Ion
Site Soils: (Hydrologic Soil Group A/D)
Wooded Area: 1.60 ac CN= 73
Impervious Area: 0.03 ac CN= 98
Lawn Area: 2.01 ac CN= 77
Future Imp Area: 0.00 ac CN= 98
Weighted CN: 75.4
rPROJECT
4' DATE
11-12-2021 NAME PROJECT NOiddle School 20-111
LOCATION BY
Fuquay Varina, NC KAL
RunoffSTORMWATER ANALYSIS POINT: 'E'
Pre -Development:
Site Area = 0.59 ac Tc = 5.00 min
Wt. CN = 80.0
Site Soils: (Hydrologic Soil Group A/D)
Wooded Area: 0.00 ac CN= 77
Impervious Area: 0.00 ac CN= 98
Lawn Area: 0.59 ac CN= 80
Weighted CN: 80.0
Post -Development:
Site Area = 0.59 ac Tc = 14.20 min
Wt. CN = Ion
Site Soils: (Hydrologic Soil Group A/D)
Wooded Area: 0.00 ac CN= 77
Impervious Area: 0.00 ac CN= 98
Lawn Area: 0.59 ac CN= 80
Future Imp Area: 0.00 ac CN= 98
Weighted CN: 80.0
rPROJECT
4' DATE
11-12-2021 NAME PROJECT NOiddle School 20-111
LOCATION BY
Fuquay Varina, NC KAL
---
Runoff Calculations
Onsite Area to SCM Al
Site Area = 8.81 ac Tc = 5.00 min
Wt. CN = 84.8
Site Soils: (Hydrologic Soil Group A/D)
Wooded Area: 0.00 ac CN= 74
Impervious Area: 3.01 ac CN= 98
Lawn Area: 5.80 ac CN= 78
Future Imp Area: 0.10 ac CN= 86
Weighted CN: 84.8
Onsite Area to SCM A2
Site Area = 22.27 ac Tc = 14.20 min
Wt. CN = 86.4
Site Soils: (Hydrologic Soil Group A/C/D)
Wooded Area: 1.70 ac CN= 73
Impervious Area: 9.63 ac CN= 98
Lawn Area: 10.74 ac CN= 78
Future Imp Area: 0.20 ac CN= 98
Weighted CN: 86.4
rPROJECT
4' DATE
11-12-2021 NAME PROJECT NOiddle School 20-111
LOCATION BY
Fuquay Varina, NC KAL
---
Runoff Calculations
Off site Area to SCM Al
Site Area = 0.27 ac Tc = 5.00 min
Wt. CN = 74.0
Site Soils: (Hydrologic Soil Group A/D)
Wooded Area: 0.27 ac CN= 74
Impervious Area: 0.00 ac CN= 98
Lawn Area: 0.00 ac CN= 78
Future Imp Area: 0.00 ac CN= 86
Weighted CN: 74.0
Area Bypassing SCMs
Site Area = 12.98 ac Tc = 74.12 min
Wt. CN = 76.2
Site Soils: (Hydrologic Soil Group A/D)
Wooded Area: 6.00 ac CN= 74
Impervious Area: 0.00 ac CN= 98
Lawn Area: 6.98 ac CN= 78
Future Imp Area: 0.00 ac CN= 86
Weighted CN: 76.2
rPROJECT
4' DATE
11-12-2021 NAME PROJECT NOiddle School 20-111
LOCATION BY
Fuquay Varina, NC KAL
---
Runoff Calculations
Off site Area to SCM A2
Site Area = 0.31 ac Tc = 5.00 min
Wt. CN = 87.7
Site Soils: (Hydrologic Soil Group A/D)
Wooded Area: 0.00 ac CN= 74
Impervious Area: 0.15 ac CN= 98
Lawn Area: 0.16 ac CN= 78
Future Imp Area: 0.00 ac CN= 86
Weighted CN: 87.7
Offsite area from Area B to Area A by Storm Bypass
Site Area = 1.78 ac Tc = 15.50 min
Wt. CN = 84.7
Site Soils: (Hydrologic Soil Group A/D)
Wooded Area: 0.00 ac CN= 74
Impervious Area: 0.60 ac CN= 98
Lawn Area: 1.18 ac CN= 78
Future Imp Area: 0.00 ac CN= 86
Weighted CN: 84.7
DATE
11-12-2021
PROJECT NAME PROJECT NO
M15 Middle School 20-111 0�
LOCATION BY
Fuauav Varina, NC KAL
Drainage Area, (DA) = 9.08 ac
Impervious Area c= 0.95 3.11 ac Includes 0.1 ac Future Imp.
Pervious Area c= 0.30 5.97 ac
Cc = 0.52
Wetland Surface Area & Volume
% Impervious = 34 %
Design Storm Rainfall 1.00 in
Runoff Coeff. (Rv = 0.05 + 0.009 (% Imperv.)) = 0.36 in/in
Required Volume (design rainfall)(Rv)(DA) = 11,808 cf (3,630 cf minimum req.)
Depth of Temporary Pool (Dplants) = 12 in (15-in max)
Approx. Ave. Surface Area for Design = 11,808 sf
Surface Area at Permanent Pool= 9,060 sf @ 0.0 in. ponding
Surface Area at 1/2 Depth= 13,720 sf @ 6.0 in. ponding
Surface Area at Temporary Pool= 14,520 sf @ 12.0 in. ponding
Temporary Ponding Volume Provided= 12,755 cf > 11,808 cf OK
Temp. Storage Depth above Dewatering Hole = 1.00 ft
Diameter of Dewatering Hole = 1.50 in
Detention (Draw -Down) Time = 4.1 days
T days=(Req. Temp. Storage Vol / (0.6 ' A * (2*g*(h))Al/2) ' 86400
(where h = one third temp. storage depth measured to centroid of orifice)
Wetland Zones Required
Forebay Surface Area (10-15%) = 1452 2178 sf
Non-Forebay Deep Pools (5-15%) = 726 2178 sf
Shallow Water Zone (35-45%) = 5082 6534 sf
Temp. Inundation Zone (30-45%) = 4356 6534 sf
Wetland Zones Provided
Forebay Surface Area =
1,750 sf
12% OK
Non-Forebay Deep Pools =
1,285 sf
9% OK
Shallow Water Zone =
5,475 sf
38% OK
Temporary Inundation Zone =
6,010 sf
41% OK
s:\1319\0001\calcs\20-111-PondSize-Wetland_Second Submittal.As printed: 11/15/2021 9:12 AM Page 1 of 2
DATE
11-12-2021
PROJECT NAME PROJECT NO
M15 Middle School 20-111
LOCATION BY
Fuauav Varina, NC KAL `
Drainage Area, (DA) = 22.58 ac
Impervious Area c= 0.95 9.98 ac Includes 0.2 ac Future Imp.
Pervious Area c= 0.30 12.60 ac
Cc = 0.59
Wetland Surface Area & Volume
% Impervious = 44 %
Design Storm Rainfall 1.00 in
Runoff Coeff. (Rv = 0.05 + 0.009 (% Imperv.)) = 0.45 in/in
Required Volume (design rainfall)(Rv)(DA) = 36,703 cf (3,630 cf minimum req.)
Depth of Temporary Pool (Dplants) = 12 in (15-in max)
Approx. Ave. Surface Area for Design = 36,703 sf
Surface Area at Permanent Pool= 29,400 sf @ 0.0 in. ponding
Surface Area at 1/2 Depth= 43,870 sf @ 6.0 in. ponding
Surface Area at Temporary Pool= 45,820 sf @ 12.0 in. ponding
Temporary Ponding Volume Provided= 40,740 cf > 36,703 cf OK
Temp. Storage Depth above Dewatering Hole = 1.00 ft
Diameter of Dewatering Hole = 3.00 in
Detention (Draw -Down) Time = 3.3 days
T days=(Req. Temp. Storage Vol / (0.6 ' A * (2*g*(h))Al/2) ' 86400
(where h = one third temp. storage depth measured to centroid of orifice)
Wetland Zones Required
Forebay Surface Area (10-15%) = 4582 6873 sf
Non-Forebay Deep Pools (5-15%) = 2291 6873 sf
Shallow Water Zone (35-45%) = 16037 20619 sf
Temp. Inundation Zone (30-45%) = 13746 20619 sf
Wetland Zones Provided
Forebay Surface Area =
5,090 sf
11 % OK
Non-Forebay Deep Pools =
3,590 sf
8% OK
Shallow Water Zone =
18,104 sf
40% OK
Temporary Inundation Zone =
19,036 sf
42% OK
s:\1319\0001\calcs\20-111-PondSize-Wetland_Second Submittal.As printed: 11/15/2021 9:12 AM Page 2 of 2
Hydrograph Summary Report HydraflowHydrographsExtension for AutodeskOCivil 3DObyAutodesk,Inc. v2021
Hyd.
No.
Hydrograph
type
(origin)
Peak
flow
(cfs)
Time
interval
(min)
Time to
Peak
(min)
Hyd.
volume
(cuft)
Inflow
hyd(s)
Maximum
elevation
(ft)
Total
strge used
(cuft)
Hydrograph
Description
1
SCS Runoff
13.67
2
758
110,060
------
------
------
Area A - Pre
2
SCS Runoff
0.456
2
726
6,402
------
------
------
Area B - Pre
3
SCS Runoff
3.959
2
724
21,023
------
------
------
Area C - Pre
4
SCS Runoff
6.852
2
718
13,703
------
------
------
Arae D - Pre
5
SCS Runoff
1.252
2
718
2,510
------
------
------
Area E - Pre
7
SCS Runoff
30.64
2
758
233,309
------
------
------
Area A - Post
8
SCS Runoff
0.107
2
720
402
------
------
------
Area B - Post
9
SCS Runoff
3.111
2
722
14,802
------
------
------
Area C - Post
10
SCS Runoff
6.073
2
718
12,168
------
------
------
Arae D - Post
11
SCS Runoff
1.252
2
718
2,510
------
------
------
Area E - Post
13
SCS Runoff
23.33
2
716
47,181
------
------
------
Onsite Area To SCM Al
14
SCS Runoff
0.415
2
718
835
------
------
------
Offsite Area to SCM Al
15
Combine
23.73
2
716
48,015
13, 14
------
------
Total Area To SCM Al
16
Reservoir
3.583
2
728
45,375
15
330.64
22,563
Route SCM Al
17
SCS Runoff
63.19
2
716
128,296
------
------
------
Onsite Area to SCM A2
18
SCS Runoff
0.928
2
716
1,893
------
------
------
Offsite Area to SCM A2
19
Combine
64.12
2
716
130,189
17, 18
------
------
Total Area to SCM A2
20
Reservoir
2.476
2
812
120,647
17
309.75
76,592
Route SCM A2
21
SCS Runoff
6.048
2
760
49,071
------
------
------
Area A Bypassing SCMs
22
SCS Runoff
3.520
2
722
9,868
------
------
------
Offsite Area Directed to Pt A
23
Combine
11.54
2
756
224,961
16, 20, 21,
------
------
Total Area A Managed
22
20-111 Pre -Post Routing.gpw
Return Period: 1 Year
Monday, 11 / 15 / 2021
Hydrograph Report
2
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Hyd. No. 1
Area A - Pre
Hydrograph type
= SCS Runoff
Storm frequency
= 1 yrs
Time interval
= 2 min
Drainage area
= 28.450 ac
Basin Slope
= 0.9 %
Tc method
= KIRPICH
Total precip.
= 3.00 in
Storm duration
= 24 hrs
Q (cfs)
14.00
12.00
10.00
01
M
4.00
ItX
Peak discharge
Time to peak
Hyd. volume
Curve number
Hydraulic length
Time of conc. (Tc)
Distribution
Shape factor
Area A - Pre
Hyd. No. 1 -- 1 Year
Monday, 11 / 15 / 2021
= 13.67 cfs
= 758 min
= 110, 060 cuft
= 76.8
= 14285 ft
= 74.12 min
= Type II
= 484
Q (cfs)
14.00
12.00
10.00
. ��
4.00
of
0.00
120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Hyd No. 1 Time (min)
3
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 2
Area B - Pre
Hydrograph type
= SCS Runoff
Peak discharge
= 0.456 cfs
Storm frequency
= 1 yrs
Time to peak
= 726 min
Time interval
= 2 min
Hyd. volume
= 6,402 cuft
Drainage area
= 11.880 ac
Curve number
= 53
Basin Slope
= 2.8 %
Hydraulic length
= 1635 ft
Tc method
= KIRPICH
Time of conc. (Tc)
= 9.21 min
Total precip.
= 3.00 in
Distribution
= Type II
Storm duration
= 24 hrs
Shape factor
= 484
Q (cfs)
0.50
0.45
0.40
0.35
0.30
0.25
0.20
0.15
0.10
Area B - Pre
Hyd. No. 2 -- 1 Year
Q (cfs)
0.50
0.45
0.40
0.35
0.30
0.25
0.20
0.15
0.10
0.05 0.05
0.00 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
— Hyd No. 2 Time (min)
Hydrograph
Report
4
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 3
Area C - Pre
Hydrograph type
= SCS Runoff
Peak discharge
= 3.959 cfs
Storm frequency
= 1 yrs
Time to peak
= 724 min
Time interval
= 2 min
Hyd. volume
= 21,023 cuft
Drainage area
= 20.310 ac
Curve number
= 58.1
Basin Slope
= 1.6 %
Hydraulic length
= 1800 ft
Tc method
= KIRPICH
Time of conc. (Tc)
= 12.30 min
Total precip.
= 3.00 in
Distribution
= Type II
Storm duration
= 24 hrs
Shape factor
= 484
Area C - Pre
Q (cfs) Hyd. No. 3 -- 1 Year Q (cfs)
4.00 4.00
3.00 3.00
2.00 2.00
1.00 1.00
0.00 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
— Hyd No. 3 Time (min)
5
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 4
Arae D - Pre
Hydrograph type
= SCS Runoff
Peak discharge
= 6.852 cfs
Storm frequency
= 1 yrs
Time to peak
= 718 min
Time interval
= 2 min
Hyd. volume
= 13,703 cuft
Drainage area
= 3.720 ac
Curve number
= 77.2
Basin Slope
= 0.0 %
Hydraulic length
= 0 ft
Tc method
= User
Time of conc. (Tc)
= 5.00 min
Total precip.
= 3.00 in
Distribution
= Type II
Storm duration
= 24 hrs
Shape factor
= 484
Q (cfs)
7.00
5.00
3.00
1.00
Arae D - Pre
Hyd. No. 4 -- 1 Year
Q (cfs)
7.00
. We
5.00
4.00
3.00
2.00
1.00
0.00 ' 1 1 1 1
' ' ' ' 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
— Hyd No. 4 Time (min)
Hydrograph Report
0
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Hyd. No. 5
Area E - Pre
Hydrograph type
= SCS Runoff
Storm frequency
= 1 yrs
Time interval
= 2 min
Drainage area
= 0.590 ac
Basin Slope
= 0.0 %
Tc method
= User
Total precip.
= 3.00 in
Storm duration
= 24 hrs
Q (cfs)
2.00
1.00
Peak discharge
Time to peak
Hyd. volume
Curve number
Hydraulic length
Time of conc. (Tc)
Distribution
Shape factor
Area E - Pre
Hyd. No. 5 -- 1 Year
120 240 360 480 600 720 840 960
Hyd No. 5
Monday, 11 / 15 / 2021
= 1.252 cfs
= 718 min
= 2,510 cuft
= 80
= 0 ft
= 5.00 min
= Type II
= 484
Q (cfs)
2.00
1.00
0.00
1080 1200 1320 1440 1560
Time (min)
Hydrograph Report
7
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Hyd. No. 7
Area A - Post
Hydrograph type
= SCS Runoff
Storm frequency
= 1 yrs
Time interval
= 2 min
Drainage area
= 44.180 ac
Basin Slope
= 0.9 %
Tc method
= KIRPICH
Total precip.
= 3.00 in
Storm duration
= 24 hrs
Q (cfs)
35.00
25.00
20.00
15.00
10.00
5.00
Peak discharge
Time to peak
Hyd. volume
Curve number
Hydraulic length
Time of conc. (Tc)
Distribution
Shape factor
Area A - Post
Hyd. No. 7 -- 1 Year
Monday, 11 / 15 / 2021
= 30.64 cfs
= 758 min
= 233,309 cuft
= 83
= 14285 ft
= 74.12 min
= Type II
= 484
Q (cfs)
35.00
30.00
25.00
20.00
15.00
10.00
5.00
0.00 '1 1 1 -..- ' ' ' ' ' ' ' -*1-1 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
— Hyd No. 7 Time (min)
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 8
Area B - Post
Hydrograph type
= SCS Runoff
Peak discharge
= 0.107 cfs
Storm frequency
= 1 yrs
Time to peak
= 720 min
Time interval
= 2 min
Hyd. volume
= 402 cuft
Drainage area
= 0.480 ac
Curve number
= 57
Basin Slope
= 0.0 %
Hydraulic length
= 0 ft
Tc method
= User
Time of conc. (Tc)
= 5.00 min
Total precip.
= 3.00 in
Distribution
= Type II
Storm duration
= 24 hrs
Shape factor
= 484
Q (cfs)
0.50
0.45
0.40
0.35
0.30
0.25
0.20
0.15
0.10
Area B - Post
Hyd. No. 8 -- 1 Year
1 1 �1 .1 �:1 .11 1 :�1 •.1 1:1 11 1 ��1 .1
Q (cfs)
0.50
0.45
0.40
0.35
0.30
0.25
0.20
0.15
0.10
Hydrograph
Report
9
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 9
Area C - Post
Hydrograph type
= SCS Runoff
Peak discharge
= 3.111 cfs
Storm frequency
= 1 yrs
Time to peak
= 722 min
Time interval
= 2 min
Hyd. volume
= 14,802 cuft
Drainage area
= 16.060 ac
Curve number
= 57.3
Basin Slope
= 2.0 %
Hydraulic length
= 1495 ft
Tc method
= KIRPICH
Time of conc. (Tc)
= 9.79 min
Total precip.
= 3.00 in
Distribution
= Type II
Storm duration
= 24 hrs
Shape factor
= 484
Area C - Post
Q (cfs) Hyd. No. 9 -- 1 Year Q (cfs)
4.00 4.00
3.00 3.00
2.00 2.00
1.00 1.00
0.00 - 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
— Hyd No. 9 Time (min)
10
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 10
Arae D - Post
Hydrograph type
= SCS Runoff
Peak discharge
= 6.073 cfs
Storm frequency
= 1 yrs
Time to peak
= 718 min
Time interval
= 2 min
Hyd. volume
= 12,168 cuft
Drainage area
= 3.640 ac
Curve number
= 75.4
Basin Slope
= 0.0 %
Hydraulic length
= 0 ft
Tc method
= User
Time of conc. (Tc)
= 5.00 min
Total precip.
= 3.00 in
Distribution
= Type II
Storm duration
= 24 hrs
Shape factor
= 484
Q (cfs)
7.00
5.00
3.00
1.00
Arae D - Post
Hyd. No. 10 -- 1 Year
Q (cfs)
7.00
. We
5.00
4.00
3.00
2.00
1.00
0.00 ' 1 1 1 1-0- ' ' ' ' 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
— Hyd No. 10 Time (min)
Hydrograph Report
11
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Hyd. No. 11
Area E - Post
Hydrograph type
= SCS Runoff
Storm frequency
= 1 yrs
Time interval
= 2 min
Drainage area
= 0.590 ac
Basin Slope
= 0.0 %
Tc method
= User
Total precip.
= 3.00 in
Storm duration
= 24 hrs
Q (cfs)
2.00
1.00
Peak discharge
Time to peak
Hyd. volume
Curve number
Hydraulic length
Time of conc. (Tc)
Distribution
Shape factor
Area E - Post
Hyd. No. 11 -- 1 Year
120 240 360 480 600 720 840 960
Hyd No. 11
Monday, 11 / 15 / 2021
= 1.252 cfs
= 718 min
= 2,510 cuft
= 80
= 0 ft
= 5.00 min
= Type II
= 484
Q (cfs)
2.00
1.00
0.00
1080 1200 1320 1440 1560
Time (min)
Hydrograph Report
12
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Hyd. No. 13
Onsite Area To SCM Al
Hydrograph type
= SCS Runoff
Storm frequency
= 1 yrs
Time interval
= 2 min
Drainage area
= 8.810 ac
Basin Slope
= 0.0 %
Tc method
= User
Total precip.
= 3.00 in
Storm duration
= 24 hrs
Q (cfs)
24.00
20.00
16.00
12.00
:1M
4.00
Peak discharge
Time to peak
Hyd. volume
Curve number
Hydraulic length
Time of conc. (Tc)
Distribution
Shape factor
Onsite Area To SCM Al
Hyd. No. 13 -- 1 Year
0.00 1---J— ' ' ' ' '
0 120 240 360 480 600 720 840
— Hyd No. 13
Monday, 11 / 15 / 2021
= 23.33 cfs
= 716 min
= 47,181 cuft
= 84.8
= Oft
= 5.00 min
= Type II
= 484
Q (cfs)
24.00
20.00
16.00
12.00
m
4.00
0.00
960 1080 1200 1320 1440
Time (min)
13
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 14
Offsite Area to SCM Al
Hydrograph type
= SCS Runoff
Peak discharge
= 0.415 cfs
Storm frequency
= 1 yrs
Time to peak
= 718 min
Time interval
= 2 min
Hyd. volume
= 835 cuft
Drainage area
= 0.270 ac
Curve number
= 74
Basin Slope
= 0.0 %
Hydraulic length
= 0 ft
Tc method
= User
Time of conc. (Tc)
= 5.00 min
Total precip.
= 3.00 in
Distribution
= Type II
Storm duration
= 24 hrs
Shape factor
= 484
Q (cfs)
0.50
0.45
0.40
0.35
0.30
0.25
0.20
0.15
0.10
Offsite Area to SCM Al
Hyd. No. 14 -- 1 Year
1 1 �1 .1 �:1 .11 1 :�1 •.1 1:1 11 1 ��1 .1
Q (cfs)
0.50
0.45
0.40
0.35
0.30
0.25
0.20
0.15
0.10
14
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 15
Total Area To SCM Al
Hydrograph type
= Combine
Peak discharge
= 23.73 cfs
Storm frequency
= 1 yrs
Time to peak
= 716 min
Time interval
= 2 min
Hyd. volume
= 48,015 cuft
Inflow hyds.
= 13, 14
Contrib. drain. area
= 9.080 ac
Q (cfs)
24.00
20.00
16.00
12.00
91011111
4.00
0.00 1 ---J—
0 120 240
— Hyd No. 15
Total Area To SCM Al
Hyd. No. 15 -- 1 Year
360 480 600
Hyd No. 13
Q (cfs)
24.00
20.00
16.00
12.00
M
4.00
0.00
720 840 960 1080 1200 1320 1440
Time (min)
Hyd No. 14
15
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 16
Route SCM Al
Hydrograph type
= Reservoir
Peak discharge
= 3.583 cfs
Storm frequency
= 1 yrs
Time to peak
= 728 min
Time interval
= 2 min
Hyd. volume
= 45,375 cuft
Inflow hyd. No.
= 15 - Total Area To SCM Al
Max. Elevation
= 330.64 ft
Reservoir name
= SCM Al
Max. Storage
= 22,563 cuft
Storage Indication method used.
Q (cfs)
24.00
20.00
16.00
12.00
91011111
4.00
0.00 ' ' 1�—
0 480
— Hyd No. 16
Route SCM Al
Hyd. No. 16 -- 1 Year
Q (cfs)
24.00
20.00
16.00
12.00
M
4.00
0.00
1440 1920 2400 2880 3360 3840 4320 4800
Time (min)
— Hyd No. 15 Total storage used = 22,563 cult
Pond Report
16
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Pond No. 1 - SCM Al
Pond Data
Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 329.00 ft
Stage / Storage Table
Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft)
0.00
329.00
9,060
0
0
0.50
329.50
13,720
5,654
5,654
1.00
330.00
14,520
7,058
12,713
2.00
331.00
16,160
15,331
28,044
3.00
332.00
17,850
16,996
45,040
4.00
333.00
19,600
18,716
63,756
5.00
334.00
21,400
20,491
84,248
6.00
335.00
23,270
22,326
106,574
7.00
336.00
25,190
24,221
130,795
Culvert / Orifice Structures
[A] [B] [C] [PrfRsr]
Rise (in)
= 24.00
1.50
15.00
0.00
Span (in)
= 24.00
1.50
15.00
0.00
No. Barrels
= 1
1
2
0
Invert El. (ft)
= 326.00
329.00
330.00
0.00
Length (ft)
= 72.00
0.50
0.50
0.00
Slope (%)
= 2.78
0.00
0.00
n/a
N-Value
= .013
.013
.013
n/a
Orifice Coeff.
= 0.60
0.60
0.60
0.60
Multi -Stage
= n/a
Yes
Yes
No
Monday, 11 / 15 / 2021
Weir Structures
[A]
[B]
[C]
[D]
Crest Len (ft)
= 16.00
Inactive
8.00
0.00
Crest El. (ft)
= 334.00
330.00
335.00
0.00
Weir Coeff.
= 3.33
3.33
2.60
3.33
Weir Type
= 1
Rect
Broad
---
Multi-Stage
= Yes
Yes
No
No
Exfil.(in/hr) = 0.000 (by Wet area)
TW Elev. (ft) = 0.00
Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s).
Stage / Storage / Discharge Table
Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total
ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs
0.00
0
329.00
0.00
0.00
0.00
---
0.00
0.00
0.00
0.05
565
329.05
21.39 is
0.00 is
0.00
---
0.00
0.00
0.00
0.10
1,131
329.10
21.39 ic
0.01 is
0.00
---
0.00
0.00
0.00
0.15
1,696
329.15
21.39 is
0.02 is
0.00
---
0.00
0.00
0.00
0.20
2,262
329.20
21.39 is
0.02 is
0.00
---
0.00
0.00
0.00
0.25
2,827
329.25
21.39 is
0.03 is
0.00
---
0.00
0.00
0.00
0.30
3,393
329.30
21.39 is
0.03 is
0.00
---
0.00
0.00
0.00
0.35
3,958
329.35
21.39 is
0.03 is
0.00
---
0.00
0.00
0.00
0.40
4,523
329.40
21.39 is
0.03 is
0.00
---
0.00
0.00
0.00
0.45
5,089
329.45
21.39 is
0.04 is
0.00
---
0.00
0.00
0.00
0.50
5,654
329.50
21.39 is
0.04 is
0.00
---
0.00
0.00
0.00
0.55
6,360
329.55
21.39 is
0.04 is
0.00
---
0.00
0.00
0.00
0.60
7,066
329.60
21.39 is
0.04 is
0.00
---
0.00
0.00
0.00
0.65
7,772
329.65
21.39 is
0.05 is
0.00
---
0.00
0.00
0.00
0.70
8,478
329.70
21.39 is
0.05 is
0.00
---
0.00
0.00
0.00
0.75
9,183
329.75
21.39 is
0.05 is
0.00
---
0.00
0.00
0.00
0.80
9,889
329.80
21.39 is
0.05 is
0.00
---
0.00
0.00
0.00
0.85
10,595
329.85
21.39 is
0.05 is
0.00
---
0.00
0.00
0.00
0.90
11,301
329.90
21.39 is
0.05 is
0.00
---
0.00
0.00
0.00
0.95
12,007
329.95
21.39 is
0.06 is
0.00
---
0.00
0.00
0.00
1.00
12,713
330.00
21.39 is
0.06 is
0.00
---
0.00
0.00
0.00
1.10
14,246
330.10
21.39 is
0.06 is
0.10 is
---
0.00
0.00
0.00
1.20
15,779
330.20
21.39 is
0.06 is
0.40 is
---
0.00
0.00
0.00
1.30
17,312
330.30
21.39 is
0.07 is
0.87 is
---
0.00
0.00
0.00
1.40
18,845
330.40
21.39 is
0.07 is
1.48 is
---
0.00
0.00
0.00
1.50
20,378
330.50
21.39 is
0.07 is
2.25 is
---
0.00
0.00
0.00
1.60
21,911
330.60
21.39 is
0.07 is
3.11 is
---
0.00
0.00
0.00
1.70
23,444
330.70
21.39 is
0.08 is
4.05 is
---
0.00
0.00
0.00
1.80
24,978
330.80
21.39 is
0.08 is
5.12 is
---
0.00
0.00
0.00
1.90
26,511
330.90
21.39 is
0.08 is
6.17 is
---
0.00
0.00
0.00
2.00
28,044
331.00
21.39 is
0.08 is
7.17 is
---
0.00
0.00
0.00
2.10
29,743
331.10
21.39 is
0.08 is
8.17 is
---
0.00
0.00
0.00
2.20
31,443
331.20
21.39 is
0.09 is
9.04 is
---
0.00
0.00
0.00
2.30
33,143
331.30
21.39 is
0.09 is
9.71 is
---
0.00
0.00
0.00
--- ---
---
0.000
--- ---
---
0.004
--- ---
---
0.011
--- ---
---
0.017
--- ---
---
0.022
--- ---
---
0.026
--- ---
---
0.029
--- ---
---
0.032
--- ---
---
0.034
--- ---
---
0.037
--- ---
---
0.039
--- ---
---
0.041
--- ---
---
0.043
--- ---
---
0.045
--- ---
---
0.047
--- ---
---
0.049
--- ---
---
0.051
--- ---
---
0.052
--- ---
---
0.054
--- ---
---
0.056
--- ---
---
0.057
--- ---
---
0.163
--- ---
---
0.461
--- ---
---
0.938
--- ---
---
1.547
--- ---
---
2.325
--- ---
---
3.180
--- ---
---
4.128
--- ---
---
5.194
--- ---
---
6.254
--- ---
---
7.251
--- ---
---
8.254
--- ---
---
9.126
--- ---
---
9.797
Continues on next
page...
17
SCM Al
Stage / Storage / Discharge Table
Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total
ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs
2.40
34,842
331.40
21.39 is
0.09 is
10.40 is
---
0.00
0.00
0.00
--- --- ---
10.49
2.50
36,542
331.50
21.39 is
0.09 is
11.05 is
---
0.00
0.00
0.00
--- --- ---
11.15
2.60
38,242
331.60
21.39 is
0.09 is
11.67 is
---
0.00
0.00
0.00
--- --- ---
11.76
2.70
39,941
331.70
21.39 is
0.10 is
12.25 is
---
0.00
0.00
0.00
--- --- ---
12.35
2.80
41,641
331.80
21.39 is
0.10 is
12.81 is
---
0.00
0.00
0.00
--- --- ---
12.91
2.90
43,340
331.90
21.39 is
0.10 is
13.34 is
---
0.00
0.00
0.00
--- --- ---
13.44
3.00
45,040
332.00
21.39 is
0.10 is
13.86 is
---
0.00
0.00
0.00
--- --- ---
13.96
3.10
46,912
332.10
21.39 is
0.10 is
14.35 is
---
0.00
0.00
0.00
--- --- ---
14.45
3.20
48,783
332.20
21.39 is
0.10 is
14.83 is
---
0.00
0.00
0.00
--- --- ---
14.93
3.30
50,655
332.30
21.39 is
0.11 is
15.29 is
---
0.00
0.00
0.00
--- --- ---
15.40
3.40
52,527
332.40
21.39 is
0.11 is
15.74 is
---
0.00
0.00
0.00
--- --- ---
15.85
3.50
54,398
332.50
21.39 is
0.11 is
16.18 is
---
0.00
0.00
0.00
--- --- ---
16.29
3.60
56,270
332.60
21.39 is
0.11 is
16.61 is
---
0.00
0.00
0.00
--- --- ---
16.72
3.70
58,142
332.70
21.39 is
0.11 is
17.02 is
---
0.00
0.00
0.00
--- --- ---
17.13
3.80
60,013
332.80
21.39 is
0.11 is
17.43 is
---
0.00
0.00
0.00
--- --- ---
17.54
3.90
61,885
332.90
21.39 is
0.12 is
17.82 is
---
0.00
0.00
0.00
--- --- ---
17.94
4.00
63,756
333.00
21.39 is
0.12 is
18.21 is
---
0.00
0.00
0.00
--- --- ---
18.33
4.10
65,806
333.10
21.39 is
0.12 is
18.59 is
---
0.00
0.00
0.00
--- --- ---
18.71
4.20
67,855
333.20
21.39 is
0.12 is
18.96 is
---
0.00
0.00
0.00
--- --- ---
19.08
4.30
69,904
333.30
21.39 is
0.12 is
19.33 is
---
0.00
0.00
0.00
--- --- ---
19.45
4.40
71,953
333.40
21.39 is
0.12 is
19.68 is
---
0.00
0.00
0.00
--- --- ---
19.81
4.50
74,002
333.50
21.39 is
0.12 is
20.04 is
---
0.00
0.00
0.00
--- --- ---
20.16
4.60
76,051
333.60
21.39 is
0.13 is
20.38 is
---
0.00
0.00
0.00
--- --- ---
20.51
4.70
78,100
333.70
21.39 is
0.13 is
20.72 is
---
0.00
0.00
0.00
--- --- ---
20.85
4.80
80,149
333.80
21.39 is
0.13 is
21.05 is
---
0.00
0.00
0.00
--- --- ---
21.18
4.90
82,199
333.90
21.51 is
0.13 is
21.38 is
---
0.00
0.00
0.00
--- --- ---
21.51
5.00
84,248
334.00
21.84 is
0.13 is
21.71 is
---
0.00
0.00
0.00
--- --- ---
21.84
5.10
86,480
334.10
23.84 is
0.13 is
22.03 is
---
1.69
0.00
0.00
--- --- ---
23.84
5.20
88,713
334.20
27.23 is
0.12 is
22.34 is
---
4.77
0.00
0.00
--- --- ---
27.23
5.30
90,946
334.30
30.29 is
0.11 is
21.43 is
---
8.76
0.00
0.00
--- --- ---
30.29
5.40
93,178
334.40
32.89 is
0.10 is
19.31 is
---
13.48
0.00
0.00
--- --- ---
32.89
5.50
95,411
334.50
35.54 is
0.08 is
16.62 is
---
18.84
0.00
0.00
--- --- ---
35.54
5.60
97,644
334.60
38.09 is
0.07 is
13.26 is
---
24.76
0.00
0.00
--- --- ---
38.09
5.70
99,876
334.70
40.22 is
0.05 is
9.37 is
---
30.81 s
0.00
0.00
--- --- ---
40.22
5.80
102,109
334.80
41.04 is
0.04 is
7.83 is
---
33.17 s
0.00
0.00
--- --- ---
41.03
5.90
104,341
334.90
41.61 is
0.03 is
6.80 is
---
34.77 s
0.00
0.00
--- --- ---
41.61
6.00
106,574
335.00
42.08 is
0.03 is
6.01 is
---
36.03 s
0.00
0.00
--- --- ---
42.08
6.10
108,996
335.10
42.49 is
0.03 is
5.38 is
---
37.08 s
0.00
0.66
--- --- ---
43.14
6.20
111,418
335.20
42.86 is
0.02 is
4.86 is
---
37.97 s
0.00
1.86
--- --- ---
44.71
6.30
113,840
335.30
43.20 is
0.02 is
4.42 is
---
38.75 s
0.00
3.42
--- --- ---
46.61
6.40
116,263
335.40
43.53 is
0.02 is
4.05 is
---
39.44 s
0.00
5.26
--- --- ---
48.78
6.50
118,685
335.50
43.84 is
0.02 is
3.74 is
---
40.07 s
0.00
7.35
--- --- ---
51.17
6.60
121,107
335.60
44.13 is
0.02 is
3.46 is
---
40.64 s
0.00
9.67
--- --- ---
53.79
6.70
123,529
335.70
44.42 is
0.02 is
3.22 is
---
41.16 s
0.00
12.18
--- --- ---
56.58
6.80
125,951
335.80
44.70 is
0.02 is
3.01 is
---
41.65 s
0.00
14.88
--- --- ---
59.56
6.90
128,373
335.90
44.98 is
0.01 is
2.82 is
---
42.13 s
0.00
17.76
--- --- ---
62.73
7.00
130,795
336.00
45.25 is
0.01 is
2.65 is
---
42.57 s
0.00
20.80
--- --- ---
66.04
End
18
Hydrograph
Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 17
Onsite Area to SCM A2
Hydrograph type
= SCS Runoff
Peak discharge
= 63.19 cfs
Storm frequency
= 1 yrs
Time to peak
= 716 min
Time interval
= 2 min
Hyd. volume
= 128,296 cuft
Drainage area
= 22.270 ac
Curve number
= 86.4
Basin Slope
= 0.0 %
Hydraulic length
= 0 ft
Tc method
= User
Time of conc. (Tc)
= 5.00 min
Total precip.
= 3.00 in
Distribution
= Type II
Storm duration
= 24 hrs
Shape factor
= 484
Onsite Area to SCM A2
Q (cfs)
Hyd. No. 17 -- 1 Year
Q (cfs)
70.00
1 1
1 70.00
►��I��I�1c������: ������S��I��I�I
`1111111c� Z.
0.00 ' 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440
— Hyd No. 17 Time (min)
19
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 18
Offsite Area to SCM A2
Hydrograph type
= SCS Runoff
Peak discharge
= 0.928 cfs
Storm frequency
= 1 yrs
Time to peak
= 716 min
Time interval
= 2 min
Hyd. volume
= 1,893 cuft
Drainage area
= 0.310 ac
Curve number
= 87.7
Basin Slope
= 0.0 %
Hydraulic length
= 0 ft
Tc method
= User
Time of conc. (Tc)
= 5.00 min
Total precip.
= 3.00 in
Distribution
= Type II
Storm duration
= 24 hrs
Shape factor
= 484
Q (cfs)
1.00
0.90
0.80
0.70
0.60
0.50
0.40
0.30
0.20
1 1 �1 •1 �:1 •11 1 :�1 •.1 1:1 11 1 ��1
Q (cfs)
1.00
0.90
0.80
0.70
0.60
0.50
0.40
0.30
0.20
20
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 19
Total Area to SCM A2
Hydrograph type
= Combine
Peak discharge
= 64.12 cfs
Storm frequency
= 1 yrs
Time to peak
= 716 min
Time interval
= 2 min
Hyd. volume
= 130,189 cuft
Inflow hyds.
= 17, 18
Contrib. drain. area
= 22.580 ac
Total Area to SCM A2
21
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 20
Route SCM A2
Hydrograph type
= Reservoir
Peak discharge
= 2.476 cfs
Storm frequency
= 1 yrs
Time to peak
= 812 min
Time interval
= 2 min
Hyd. volume
= 120,647 cuft
Inflow hyd. No.
= 17 - Onsite Area to SCM A2
Max. Elevation
= 309.75 ft
Reservoir name
= SCM A2
Max. Storage
= 76,592 cuft
Storage Indication method used.
Q (cfs)
70.00
40.00
20.00
10.00
0.00
0 600
— Hyd No. 20
Route SCM A2
Hyd. No. 20 -- 1 Year
Q (cfs)
70.00
50.00
40.00
30.00
20.00
10.00
' 0.00
1200 1800 2400 3000 3600 4200 4800 5400 6000
Time (min)
- Hyd No. 17 Total storage used = 76,592 cult
Pond
Report
22
Hydraflow Hydrographs Extension for
Autodesk® Civil 3D® by Autodesk,
Inc. v2021
Monday, 11 / 15 / 2021
Pond No.
3 - SCM A2
Pond Data
Contours -User-defined contour areas.
Conic method used for volume calculation. Begining
Elevation = 308.00 ft
Stage / Storage
Table
Stage (ft)
Elevation (ft)
Contour area (sqft)
Incr.
Storage (cuft)
Total storage (cuft)
0.00
308.00
29,350
0
0
0.50
308.50
43,870
18,182
18,182
1.00
309.00
45,820
22,419
40,601
2.00
310.00
49,780
47,782
88,382
3.00
311.00
53,790
51,767
140,149
4.00
312.00
57,870
55,812
195,961
5.00
313.00
62,010
59,922
255,883
6.00
314.00
66,210
64,092
319,975
7.00
315.00
70,470
68,322
388,297
Culvert / Orifice Structures
Weir Structures
[A]
[B] [C] [PrfRsr]
[A] [B]
[C]
[D]
Rise (in)
= 30.00
3.00 8.00 0.00
Crest Len (ft)
= 16.00 14.00
0.00
0.00
Span (in)
= 30.00
3.00 8.00 0.00
Crest El. (ft)
= 313.00 314.00
0.00
0.00
No. Barrels
= 1
1 2 0
Weir Coeff.
= 3.33 2.60
3.33
3.33
Invert El. (ft) = 305.00
308.00 309.00 0.00
Weir Type
= 1 Broad
---
---
Length (ft)
= 168.00
0.50 0.50 0.00
Multi -Stage
= Yes No
No
No
Slope (%)
= 8.30
0.00 0.00 n/a
N-Value
= .013
.013 .013 n/a
Orifice Coeff. = 0.60
0.60 0.60 0.60
Exfil.(in/hr)
= 0.000 (by Wet area)
Multi -Stage
= n/a
Yes Yes No
TW Elev. (ft)
= 0.00
Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s).
Stage / Storage
/ Discharge
Table
Stage
Storage Elevation
Clv A Clv B
Clv C
PrfRsr
Wr A
Wr B Wr C
Wr D
Exfil User Total
ft
cuft ft
cfs cfs
cfs
cfs
cfs
cfs cfs
cfs
cfs cfs cfs
0.00
0 308.00
0.00 0.00
0.00
---
0.00
0.00 ---
---
--- --- 0.000
0.05
1,818 308.05
31.26 is 0.01 is
0.00
---
0.00
0.00 ---
---
--- --- 0.006
0.10
3,636 308.10
31.26 is 0.02 is
0.00
---
0.00
0.00 ---
---
--- --- 0.020
0.15
5,455 308.15
31.26 is 0.04 is
0.00
---
0.00
0.00 ---
---
--- --- 0.041
0.20
7,273 308.20
31.26 is 0.06 is
0.00
---
0.00
0.00 ---
---
--- --- 0.064
0.25
9,091 308.25
31.26 is 0.08 is
0.00
---
0.00
0.00 ---
---
--- --- 0.084
0.30
10,909 308.30
31.26 is 0.10 is
0.00
---
0.00
0.00 ---
---
--- --- 0.099
0.35
12,727 308.35
31.26 is 0.11 is
0.00
---
0.00
0.00 ---
---
--- --- 0.112
0.40
14,546 308.40
31.26 is 0.12 is
0.00
---
0.00
0.00 ---
---
--- --- 0.124
0.45
16,364 308.45
31.26 is 0.13 is
0.00
---
0.00
0.00 ---
---
--- --- 0.135
0.50
18,182 308.50
31.26 is 0.14 is
0.00
---
0.00
0.00 ---
---
--- --- 0.145
0.55
20,424 308.55
31.26 is 0.15 is
0.00
---
0.00
0.00 ---
---
--- --- 0.154
0.60
22,666 308.60
31.26 is 0.16 is
0.00
---
0.00
0.00 ---
---
--- --- 0.163
0.65
24,908 308.65
31.26 is 0.17 is
0.00
---
0.00
0.00 ---
---
--- --- 0.171
0.70
27,149 308.70
31.26 is 0.18 is
0.00
---
0.00
0.00 ---
---
--- --- 0.179
0.75
29,391 308.75
31.26 is 0.19 is
0.00
---
0.00
0.00 ---
---
--- --- 0.187
0.80
31,633 308.80
31.26 is 0.19 is
0.00
---
0.00
0.00 ---
---
--- --- 0.194
0.85
33,875 308.85
31.26 is 0.20 is
0.00
---
0.00
0.00 ---
---
--- --- 0.201
0.90
36,117 308.90
31.26 is 0.21 is
0.00
---
0.00
0.00 ---
---
--- --- 0.208
0.95
38,359 308.95
31.26 is 0.21 is
0.00
---
0.00
0.00 ---
---
--- --- 0.215
1.00
40,601 309.00
31.26 is 0.22 is
0.00
---
0.00
0.00 ---
---
--- --- 0.221
1.10
45,379 309.10
31.26 is 0.23 is
0.07 is
---
0.00
0.00 ---
---
--- --- 0.305
1.20
50,157 309.20
31.26 is 0.25 is
0.27 is
---
0.00
0.00 ---
---
--- --- 0.515
1.30
54,935 309.30
31.26 is 0.26 is
0.57 is
---
0.00
0.00 ---
---
--- --- 0.829
1.40
59,713 309.40
31.26 is 0.27 is
0.94 is
---
0.00
0.00 ---
---
--- --- 1.211
1.50
64,491 309.50
31.26 is 0.28 is
1.36 is
---
0.00
0.00 ---
---
--- --- 1.638
1.60
69,269 309.60
31.26 is 0.29 is
1.75 is
---
0.00
0.00 ---
---
--- --- 2.039
1.70
74,048 309.70
31.26 is 0.30 is
2.04 is
---
0.00
0.00 ---
---
--- --- 2.332
1.80
78,826 309.80
31.26 is 0.31 is
2.30 is
---
0.00
0.00 ---
---
--- --- 2.602
1.90
83,604 309.90
31.26 is 0.31 is
2.53 is
---
0.00
0.00 ---
---
--- --- 2.845
2.00
88,382 310.00
31.26 is 0.32 is
2.74 is
---
0.00
0.00 ---
---
--- --- 3.068
2.10
93,559 310.10
31.26 is 0.33 is
2.94 is
---
0.00
0.00 ---
---
--- --- 3.275
2.20
98,735 310.20
31.26 is 0.34 is
3.13 is
---
0.00
0.00 ---
---
--- --- 3.469
2.30
103,912 310.30
31.26 is 0.35 is
3.30 is
---
0.00
0.00 ---
---
--- --- 3.653
Continues on next page...
23
SCM A2
Stage / Storage / Discharge Table
Stage
Storage
Elevation
Clv A
Clv B
Clv C
PrfRsr
Wr A
Wr B
Wr C Wr D Exfil User
Total
ft
cuft
ft
cfs
cfs
cfs
cfs
cfs
cfs
cfs cfs cfs cfs
cfs
2.40
109,089
310.40
31.26 is
0.36 is
3.47 is
---
0.00
0.00
--- --- --- ---
3.828
2.50
114,266
310.50
31.26 is
0.36 is
3.63 is
---
0.00
0.00
--- --- --- ---
3.995
2.60
119,442
310.60
31.26 is
0.37 is
3.78 is
---
0.00
0.00
--- --- --- ---
4.155
2.70
124,619
310.70
31.26 is
0.38 is
3.93 is
---
0.00
0.00
--- --- --- ---
4.308
2.80
129,796
310.80
31.26 is
0.39 is
4.07 is
---
0.00
0.00
--- --- --- ---
4.457
2.90
134,972
310.90
31.26 is
0.39 is
4.21 is
---
0.00
0.00
--- --- --- ---
4.601
3.00
140,149
311.00
31.26 is
0.40 is
4.34 is
---
0.00
0.00
--- --- --- ---
4.740
3.10
145,730
311.10
31.26 is
0.41 is
4.47 is
---
0.00
0.00
--- --- --- ---
4.875
3.20
151,311
311.20
31.26 is
0.41 is
4.59 is
---
0.00
0.00
--- --- --- ---
5.007
3.30
156,893
311.30
31.26 is
0.42 is
4.71 is
---
0.00
0.00
--- --- --- ---
5.135
3.40
162,474
311.40
31.26 is
0.43 is
4.83 is
---
0.00
0.00
--- --- --- ---
5.260
3.50
168,055
311.50
31.26 is
0.43 is
4.95 is
---
0.00
0.00
--- --- --- ---
5.382
3.60
173,636
311.60
31.26 is
0.44 is
5.06 is
---
0.00
0.00
--- --- --- ---
5.501
3.70
179,217
311.70
31.26 is
0.45 is
5.17 is
---
0.00
0.00
--- --- --- ---
5.618
3.80
184,799
311.80
31.26 is
0.45 is
5.28 is
---
0.00
0.00
--- --- --- ---
5.732
3.90
190,380
311.90
31.26 is
0.46 is
5.38 is
---
0.00
0.00
--- --- --- ---
5.844
4.00
195,961
312.00
31.26 is
0.47 is
5.49 is
---
0.00
0.00
--- --- --- ---
5.954
4.10
201,953
312.10
31.26 is
0.47 is
5.59 is
---
0.00
0.00
--- --- --- ---
6.062
4.20
207,945
312.20
31.26 is
0.48 is
5.69 is
---
0.00
0.00
--- --- --- ---
6.168
4.30
213,938
312.30
31.26 is
0.48 is
5.79 is
---
0.00
0.00
--- --- --- ---
6.272
4.40
219,930
312.40
31.26 is
0.49 is
5.89 is
---
0.00
0.00
--- --- --- ---
6.374
4.50
225,922
312.50
31.26 is
0.49 is
5.98 is
---
0.00
0.00
--- --- --- ---
6.475
4.60
231,914
312.60
31.26 is
0.50 is
6.07 is
---
0.00
0.00
--- --- --- ---
6.575
4.70
237,906
312.70
31.26 is
0.51 is
6.17 is
---
0.00
0.00
--- --- --- ---
6.673
4.80
243,899
312.80
31.26 is
0.51 is
6.26 is
---
0.00
0.00
--- --- --- ---
6.769
4.90
249,891
312.90
31.26 is
0.52 is
6.35 is
---
0.00
0.00
--- --- --- ---
6.864
5.00
255,883
313.00
31.26 is
0.52 is
6.44 is
---
0.00
0.00
--- --- --- ---
6.958
5.10
262,292
313.10
31.26 is
0.53 is
6.52 is
---
1.69
0.00
--- --- --- ---
8.735
5.20
268,701
313.20
31.26 is
0.53 is
6.61 is
---
4.77
0.00
--- --- --- ---
11.91
5.30
275,111
313.30
31.26 is
0.54 is
6.69 is
---
8.75
0.00
--- --- --- ---
15.99
5.40
281,520
313.40
31.26 is
0.54 is
6.78 is
---
13.48
0.00
--- --- --- ---
20.80
5.50
287,929
313.50
31.26 is
0.55 is
6.86 is
---
18.84
0.00
--- --- --- ---
26.25
5.60
294,338
313.60
32.26 is
0.55 is
6.94 is
---
24.76
0.00
--- --- --- ---
32.26
5.70
300,748
313.70
38.74 is
0.52 is
7.02 is
---
31.20
0.00
--- --- --- ---
38.74
5.80
307,157
313.80
45.22 is
0.47 is
6.63 is
---
38.12
0.00
--- --- --- ---
45.22
5.90
313,566
313.90
51.60 is
0.40 is
5.71 is
---
45.50
0.00
--- --- --- ---
51.60
6.00
319,975
314.00
58.01 is
0.31 is
4.42 is
---
53.28
0.00
--- --- --- ---
58.01
6.10
326,807
314.10
62.45 is
0.22 is
3.13 is
---
59.10 s
1.15
--- --- --- ---
63.60
6.20
333,640
314.20
63.82 is
0.19 is
2.72 is
---
60.90 s
3.26
--- --- --- ---
67.07
6.30
340,472
314.30
64.83 is
0.17 is
2.43 is
---
62.23 s
5.98
--- --- --- ---
70.81
6.40
347,304
314.40
65.67 is
0.15 is
2.20 is
---
63.31 s
9.21
--- --- --- ---
74.87
6.50
354,136
314.50
66.39 is
0.14 is
2.01 is
---
64.24 s
12.87
--- --- --- ---
79.26
6.60
360,968
314.60
67.04 is
0.13 is
1.85 is
---
65.06 s
16.92
--- --- --- ---
83.96
6.70
367,801
314.70
67.64 is
0.12 is
1.71 is
---
65.80 s
21.32
--- --- --- ---
88.95
6.80
374,633
314.80
68.20 is
0.11 is
1.59 is
---
66.49 s
26.05
--- --- --- ---
94.23
6.90
381,465
314.90
68.72 is
0.10 is
1.48 is
---
67.12 s
31.08
--- --- --- ---
99.79
7.00
388,297
315.00
69.22 is
0.10 is
1.39 is
---
67.72 s
36.40
--- --- --- ---
105.61
... End
Hydrograph Report
24
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Hyd. No. 21
Area A Bypassing SCMs
Hydrograph type =
SCS Runoff
Storm frequency =
1 yrs
Time interval =
2 min
Drainage area =
13.100 ac
Basin Slope =
0.0 %
Tc method =
User
Total precip. =
3.00 in
Storm duration =
24 hrs
Q (cfs)
7.00
. Me
5.00
3.00
1.00
Peak discharge
Time to peak
Hyd. volume
Curve number
Hydraulic length
Time of conc. (Tc)
Distribution
Shape factor
Monday, 11 / 15 / 2021
= 6.048 cfs
= 760 min
= 49,071 cuft
= 76.2
= 0 ft
= 74.10 min
= Type II
= 484
Q (cfs)
7.00
. We
5.00
4.00
3.00
2.00
1.00
0.00 1 1 1 1 1 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
— Hyd No. 21 Time (min)
Hydrograph
Report
25
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 22
Offsite Area Directed
to Pt A
Hydrograph type
= SCS Runoff
Peak discharge
= 3.520 cfs
Storm frequency
= 1 yrs
Time to peak
= 722 min
Time interval
= 2 min
Hyd. volume
= 9,868 cuft
Drainage area
= 1.780 ac
Curve number
= 84.7
Basin Slope
= 2.8 %
Hydraulic length
= 3245 ft
Tc method
= KIRPICH
Time of conc. (Tc)
= 15.51 min
Total precip.
= 3.00 in
Distribution
= Type II
Storm duration
= 24 hrs
Shape factor
= 484
Offsite Area Directed to Pt A
Q (cfs) Hyd. No. 22 -- 1 Year Q (cfs)
4.00 4.00
3.00 3.00
2.00 2.00
1.00 1.00
0.00 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
— Hyd No. 22 Time (min)
26
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Monday, 11 / 15 / 2021
Hyd. No. 23
Total Area A Managed
Hydrograph type = Combine Peak discharge = 11.54 cfs
Storm frequency = 1 yrs Time to peak = 756 min
Time interval = 2 min Hyd. volume = 224,961 cuft
Inflow hyds. = 16, 20, 21, 22 Contrib. drain. area = 14.880 ac
Total Area A Managed
Q (cfs) Hyd. No. 23 -- 1 Year Q (cfs)
12.00 12.00
10.00 10.00
8.00 8.00
6.00 6.00
4.00 4.00
2.00 2.00
0.00 - 0.00
0 480 960 1440 1920 2400 2880 3360 3840 4320 4800 5280 5760
Hyd No. 23 Hyd No. 16 Hyd No. 20 Hyd No. 21 Time (min)
Hyd No. 22
Hydrograph Summary Report
27
Hydraflow Hydrographs Extension for Autodesk0 Civil 3DO by Autodesk, Inc. v2021
Hyd.
No.
Hydrograph
type
(origin)
Peak
flow
(cfs)
Time
interval
(min)
Time to
Peak
(min)
Hyd.
volume
(cuft)
Inflow
hyd(s)
Maximum
elevation
(ft)
Total
strge used
(cuft)
Hydrograph
Description
1
SCS Runoff
18.94
2
758
147,972
------
------
------
Area A - Pre
2
SCS Runoff
2.432
2
722
12,256
------
------
------
Area B - Pre
3
SCS Runoff
9.124
2
724
35,012
------
------
------
Area C - Pre
4
SCS Runoff
9.169
2
718
18,372
------
------
------
Arae D - Pre
5
SCS Runoff
1.637
2
718
3,301
------
------
------
Area E - Pre
7
SCS Runoff
39.93
2
758
301,115
------
------
------
Area A - Post
8
SCS Runoff
0.256
2
718
685
------
------
------
Area B - Post
9
SCS Runoff
7.525
2
720
25,101
------
------
------
Area C - Post
10
SCS Runoff
8.263
2
718
16,527
------
------
------
Arae D - Post
11
SCS Runoff
1.637
2
718
3,301
------
------
------
Area E - Post
13
SCS Runoff
29.64
2
716
60,230
------
------
------
Onsite Area To SCM Al
14
SCS Runoff
0.573
2
718
1,146
------
------
------
Offsite Area to SCM Al
15
Combine
30.19
2
716
61,376
13, 14
------
------
Total Area To SCM Al
16
Reservoir
7.280
2
724
58,711
15
331.00
28,093
Route SCM Al
17
SCS Runoff
79.35
2
716
162,233
------
------
------
Onsite Area to SCM A2
18
SCS Runoff
1.155
2
716
2,375
------
------
------
Offsite Area to SCM A2
19
Combine
80.51
2
716
164,608
17, 18
------
------
Total Area to SCM A2
20
Reservoir
3.380
2
798
154,348
17
310.15
96,357
Route SCM A2
21
SCS Runoff
8.434
2
758
66,260
------
------
------
Area A Bypassing SCMs
22
SCS Runoff
4.494
2
722
12,605
------
------
------
Offsite Area Directed to Pt A
23
Combine
17.49
2
726
291,924
16, 20, 21,
------
------
Total Area A Managed
22
20-111 Pre -Post Routing.gpw
Return Period: 2 Year
Monday, 11 / 15 / 2021
Hydrograph Report
28
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Hyd. No. 1
Area A - Pre
Hydrograph type
= SCS Runoff
Storm frequency
= 2 yrs
Time interval
= 2 min
Drainage area
= 28.450 ac
Basin Slope
= 0.9 %
Tc method
= KIRPICH
Total precip.
= 3.51 in
Storm duration
= 24 hrs
Q (cfs)
21.00
18.00
15.00
12.00
3.00
Peak discharge
Time to peak
Hyd. volume
Curve number
Hydraulic length
Time of conc. (Tc)
Distribution
Shape factor
Area A - Pre
Hyd. No. 1 -- 2 Year
Monday, 11 / 15 / 2021
= 18.94 cfs
= 758 min
= 147,972 cuft
= 76.8
= 14285 ft
= 74.12 min
= Type II
= 484
Q (cfs)
21.00
18.00
15.00
12.00
M
3.00
0.00 ' 1 1 1 1 11 ' ' ' ' ' ' ' '-%-`-1 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
— Hyd No. 1 Time (min)
Hydrograph
Report
29
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 2
Area B - Pre
Hydrograph type
= SCS Runoff
Peak discharge
= 2.432 cfs
Storm frequency
= 2 yrs
Time to peak
= 722 min
Time interval
= 2 min
Hyd. volume
= 12,256 cuft
Drainage area
= 11.880 ac
Curve number
= 53
Basin Slope
= 2.8 %
Hydraulic length
= 1635 ft
Tc method
= KIRPICH
Time of conc. (Tc)
= 9.21 min
Total precip.
= 3.51 in
Distribution
= Type II
Storm duration
= 24 hrs
Shape factor
= 484
Area B - Pre
Q (cfs) Hyd. No. 2 -- 2 Year Q (cfs)
3.00 3.00
2.00 2.00
1.00 1.00
0.00 - 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
— Hyd No. 2 Time (min)
Hydrograph Report
30
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Hyd. No. 3
Area C - Pre
Hydrograph type
= SCS Runoff
Storm frequency
= 2 yrs
Time interval
= 2 min
Drainage area
= 20.310 ac
Basin Slope
= 1.6 %
Tc method
= KIRPICH
Total precip.
= 3.51 in
Storm duration
= 24 hrs
Q (cfs)
10.00
Were
. UX
4.00
r w
Peak discharge
Time to peak
Hyd. volume
Curve number
Hydraulic length
Time of conc. (Tc)
Distribution
Shape factor
Area C - Pre
Hyd. No. 3 -- 2 Year
Monday, 11 / 15 / 2021
= 9.124 cfs
= 724 min
= 35,012 cuft
= 58.1
= 1800 ft
= 12.30 min
= Type II
= 484
Q (cfs)
10.00
N. We
4.00
r w
0.00
120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Hyd No. 3 Time (min)
Hydrograph Report
31
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Hyd. No. 4
Arae D - Pre
Hydrograph type
= SCS Runoff
Storm frequency
= 2 yrs
Time interval
= 2 min
Drainage area
= 3.720 ac
Basin Slope
= 0.0 %
Tc method
= User
Total precip.
= 3.51 in
Storm duration
= 24 hrs
Q (cfs)
10.00
Were
. OX
4.00
r w
Peak discharge
Time to peak
Hyd. volume
Curve number
Hydraulic length
Time of conc. (Tc)
Distribution
Shape factor
Arae D - Pre
Hyd. No. 4 -- 2 Year
Monday, 11 / 15 / 2021
= 9.169 cfs
= 718 min
= 18,372 cuft
= 77.2
= 0 ft
= 5.00 min
= Type II
= 484
Q (cfs)
10.00
N. We
4.00
r w
0.00
120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Hyd No. 4 Time (min)
Hydrograph Report
32
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Hyd. No. 5
Area E - Pre
Hydrograph type
= SCS Runoff
Storm frequency
= 2 yrs
Time interval
= 2 min
Drainage area
= 0.590 ac
Basin Slope
= 0.0 %
Tc method
= User
Total precip.
= 3.51 in
Storm duration
= 24 hrs
Q (cfs)
2.00
1.00
Peak discharge
Time to peak
Hyd. volume
Curve number
Hydraulic length
Time of conc. (Tc)
Distribution
Shape factor
Area E - Pre
Hyd. No. 5 -- 2 Year
120 240 360 480 600 720 840 960
Hyd No. 5
Monday, 11 / 15 / 2021
= 1.637 cfs
= 718 min
= 3,301 cuft
= 80
= 0 ft
= 5.00 min
= Type II
= 484
Q (cfs)
2.00
1.00
0.00
1080 1200 1320 1440 1560
Time (min)
Hydrograph
Report
33
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 7
Area A - Post
Hydrograph type
= SCS Runoff
Peak discharge
= 39.93 cfs
Storm frequency
= 2 yrs
Time to peak
= 758 min
Time interval
= 2 min
Hyd. volume
= 301,115 cuft
Drainage area
= 44.180 ac
Curve number
= 83
Basin Slope
= 0.9 %
Hydraulic length
= 14285 ft
Tc method
= KIRPICH
Time of conc. (Tc)
= 74.12 min
Total precip.
= 3.51 in
Distribution
= Type II
Storm duration
= 24 hrs
Shape factor
= 484
Area A - Post
Q (cfs) Hyd. No. 7 -- 2 Year Q (cfs)
40.00 40.00
30.00 30.00
20.00 20.00
10.00 10.00
0.00 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
— Hyd No. 7 Time (min)
34
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 8
Area B - Post
Hydrograph type
= SCS Runoff
Peak discharge
= 0.256 cfs
Storm frequency
= 2 yrs
Time to peak
= 718 min
Time interval
= 2 min
Hyd. volume
= 685 cuft
Drainage area
= 0.480 ac
Curve number
= 57
Basin Slope
= 0.0 %
Hydraulic length
= 0 ft
Tc method
= User
Time of conc. (Tc)
= 5.00 min
Total precip.
= 3.51 in
Distribution
= Type II
Storm duration
= 24 hrs
Shape factor
= 484
Q (cfs)
0.50
0.45
0.40
0.35
0.30
0.25
0.20
0.15
0.10
Area B - Post
Hyd. No. 8 -- 2 Year
1 1 �1 .1 �:1 .11 1 :�1 •.1 1:1 11 1 ��1 .1
Q (cfs)
0.50
0.45
0.40
0.35
0.30
0.25
0.20
0.15
0.10
Hydrograph Report
35
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Hyd. No. 9
Area C - Post
Hydrograph type
= SCS Runoff
Storm frequency
= 2 yrs
Time interval
= 2 min
Drainage area
= 16.060 ac
Basin Slope
= 2.0 %
Tc method
= KIRPICH
Total precip.
= 3.51 in
Storm duration
= 24 hrs
Q (cfs)
8.00
M
4.00
I'm
0.00
0 120 240
— Hyd No. 9
Peak discharge
Time to peak
Hyd. volume
Curve number
Hydraulic length
Time of conc. (Tc)
Distribution
Shape factor
Area C - Post
Hyd. No. 9 -- 2 Year
360 480 600 720 840
Monday, 11 / 15 / 2021
= 7.525 cfs
= 720 min
= 25,101 cuft
= 57.3
= 1495 ft
= 9.79 min
= Type II
= 484
Q (cfs)
8.00
. ��
4.00
I'm
0.00
960 1080 1200 1320 1440 1560
Time (min)
Hydrograph Report
36
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Hyd. No. 10
Arae D - Post
Hydrograph type
= SCS Runoff
Storm frequency
= 2 yrs
Time interval
= 2 min
Drainage area
= 3.640 ac
Basin Slope
= 0.0 %
Tc method
= User
Total precip.
= 3.51 in
Storm duration
= 24 hrs
Q (cfs)
10.00
Were
. OX
4.00
r w
Peak discharge
Time to peak
Hyd. volume
Curve number
Hydraulic length
Time of conc. (Tc)
Distribution
Shape factor
Arae D - Post
Hyd. No. 10 -- 2 Year
Monday, 11 / 15 / 2021
= 8.263 cfs
= 718 min
= 16,527 cuft
= 75.4
= 0 ft
= 5.00 min
= Type II
= 484
Q (cfs)
10.00
N. We
4.00
r w
0.00
120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Hyd No. 10 Time (min)
Hydrograph Report
37
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Hyd. No. 11
Area E - Post
Hydrograph type
= SCS Runoff
Storm frequency
= 2 yrs
Time interval
= 2 min
Drainage area
= 0.590 ac
Basin Slope
= 0.0 %
Tc method
= User
Total precip.
= 3.51 in
Storm duration
= 24 hrs
Q (cfs)
2.00
1.00
Peak discharge
Time to peak
Hyd. volume
Curve number
Hydraulic length
Time of conc. (Tc)
Distribution
Shape factor
Area E - Post
Hyd. No. 11 -- 2 Year
120 240 360 480 600 720 840 960
Hyd No. 11
Monday, 11 / 15 / 2021
= 1.637 cfs
= 718 min
= 3,301 cuft
= 80
= 0 ft
= 5.00 min
= Type II
= 484
Q (cfs)
2.00
1.00
0.00
1080 1200 1320 1440 1560
Time (min)
Hydrograph
Report
38
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Hyd. No. 13
Onsite Area To SCM Al
Hydrograph type = SCS Runoff
Storm frequency = 2 yrs
Time interval = 2 min
Drainage area = 8.810 ac
Basin Slope = 0.0 %
Tc method = User
Total precip. = 3.51 in
Storm duration = 24 hrs
Peak discharge
Time to peak
Hyd. volume
Curve number
Hydraulic length
Time of conc. (Tc)
Distribution
Shape factor
Monday, 11 / 15 / 2021
= 29.64 cfs
= 716 min
= 60,230 cuft
= 84.8
= 0 ft
= 5.00 min
= Type II
= 484
Q (cfs)
30.00
Onsite Area To SCM Al
Hyd. No. 13 -- 2 Year
Q (cfs)
30.00
25.00
25.00
20.00
20.00
15.00
15.00
10.00
10.00
5.00
5.00
0.00
0 120
— Hyd No.
240 360 480 600 720 840 960 1080
13
0.00
1200 1320 1440
Time (min)
39
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 14
Offsite Area to SCM Al
Hydrograph type
= SCS Runoff
Peak discharge
= 0.573 cfs
Storm frequency
= 2 yrs
Time to peak
= 718 min
Time interval
= 2 min
Hyd. volume
= 1,146 cuft
Drainage area
= 0.270 ac
Curve number
= 74
Basin Slope
= 0.0 %
Hydraulic length
= 0 ft
Tc method
= User
Time of conc. (Tc)
= 5.00 min
Total precip.
= 3.51 in
Distribution
= Type II
Storm duration
= 24 hrs
Shape factor
= 484
Q (cfs)
1.00
0.90
0.80
0.70
0.60
0.50
0.40
0.30
0.20
Offsite Area to SCM Al
Hyd. No. 14 -- 2 Year
1 1 1 .1 :1 .11 1 1 •.1 1PON
Q (cfs)
1.00
0.90
0.80
0.70
0.60
0.50
0.40
0.30
0.20
40
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 15
Total Area To SCM Al
Hydrograph type
= Combine
Peak discharge
= 30.19 cfs
Storm frequency
= 2 yrs
Time to peak
= 716 min
Time interval
= 2 min
Hyd. volume
= 61,376 cuft
Inflow hyds.
= 13, 14
Contrib. drain. area
= 9.080 ac
Total Area To SCM Al
Hydrograph
Report
41
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 16
Route SCM Al
Hydrograph type
= Reservoir
Peak discharge
= 7.280 cfs
Storm frequency
= 2 yrs
Time to peak
= 724 min
Time interval
= 2 min
Hyd. volume
= 58,711 cuft
Inflow hyd. No.
= 15 - Total Area To SCM Al
Max. Elevation
= 331.00 ft
Reservoir name
= SCM Al
Max. Storage
= 28,093 cuft
Storage Indication method used
Route SCM Al
1 1 �1 •1 �:1 •11 1 :�1 •.1 1:1 11 1 ��1 •1 .:1 :11
42
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 17
Onsite Area to SCM A2
Hydrograph type
= SCS Runoff
Peak discharge
= 79.35 cfs
Storm frequency
= 2 yrs
Time to peak
= 716 min
Time interval
= 2 min
Hyd. volume
= 162,233 cuft
Drainage area
= 22.270 ac
Curve number
= 86.4
Basin Slope
= 0.0 %
Hydraulic length
= 0 ft
Tc method
= User
Time of conc. (Tc)
= 5.00 min
Total precip.
= 3.51 in
Distribution
= Type II
Storm duration
= 24 hrs
Shape factor
= 484
Q (cfs)
80.00
70.00
40.00
20.00
10.00
Q (cfs)
80.00
70.00
50.00
40.00
30.00
20.00
10.00
0.00 1 1 10.00
0 120 240 360 480 600 720 840 960 1080 1200 1320
— Hyd No. 17 Time (min)
Hydrograph Report
43
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Hyd. No. 18
Offsite Area to SCM A2
Hydrograph type
= SCS Runoff
Storm frequency
= 2 yrs
Time interval
= 2 min
Drainage area
= 0.310 ac
Basin Slope
= 0.0 %
Tc method
= User
Total precip.
= 3.51 in
Storm duration
= 24 hrs
Q (cfs)
2.00
1.00
Peak discharge
Time to peak
Hyd. volume
Curve number
Hydraulic length
Time of conc. (Tc)
Distribution
Shape factor
Offsite Area to SCM A2
Hyd. No. 18 -- 2 Year
Monday, 11 / 15 / 2021
= 1.155 cfs
= 716 min
= 2,375 cuft
= 87.7
= 0 ft
= 5.00 min
= Type II
= 484
120 240 360 480 600 720 840 960 1080 1200
Hyd No. 18
Q (cfs)
2.00
1.00
0.00
1320
Time (min)
44
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 19
Total Area to SCM A2
Hydrograph type
= Combine
Peak discharge
= 80.51 cfs
Storm frequency
= 2 yrs
Time to peak
= 716 min
Time interval
= 2 min
Hyd. volume
= 164,608 cuft
Inflow hyds.
= 17, 18
Contrib. drain. area
= 22.580 ac
Q (cfs)
90.00
80.00
70.00
60.00
50.00
40.00
30.00
20.00
1 1 1 .1 :1 .11 1 1 •.1 1:1 11 1
Q (cfs)
90.00
80.00
70.00
60.00
50.00
40.00
30.00
20.00
45
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 20
Route SCM A2
Hydrograph type
= Reservoir
Peak discharge
= 3.380 cfs
Storm frequency
= 2 yrs
Time to peak
= 798 min
Time interval
= 2 min
Hyd. volume
= 154,348 cuft
Inflow hyd. No.
= 17 - Onsite Area to SCM A2
Max. Elevation
= 310.15 ft
Reservoir name
= SCM A2
Max. Storage
= 96,357 cuft
Storage Indication method used.
Route SCM A2
1
1 1 1 -■--------- 1 1 1
1 1 1 -■-------- 1 1 1
1 1 1 -■--------- 1 1 1
1 1 1 -■-------- 1 1 1
1 11 -■-------- 1 11
1 •11 11 :11 �11 111 •11 � 11 �:11 �11 •111
Hydrograph Report
46
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Hyd. No. 21
Area A Bypassing SCMs
Hydrograph type =
SCS Runoff
Storm frequency =
2 yrs
Time interval =
2 min
Drainage area =
13.100 ac
Basin Slope =
0.0 %
Tc method =
User
Total precip. =
3.51 in
Storm duration =
24 hrs
Q (cfs)
10.00
Were
. OX
4.00
r w
Peak discharge
Time to peak
Hyd. volume
Curve number
Hydraulic length
Time of conc. (Tc)
Distribution
Shape factor
Area A Bypassing SCMs
Hyd. No. 21 -- 2 Year
Monday, 11 / 15 / 2021
= 8.434 cfs
= 758 min
= 66,260 cuft
= 76.2
= 0 ft
= 74.10 min
= Type II
= 484
Q (cfs)
10.00
N. We
4.00
r w
0.00
120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Hyd No. 21 Time (min)
Hydrograph Report
47
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Hyd. No. 22
Offsite Area Directed to Pt A
Hydrograph type =
SCS Runoff
Storm frequency =
2 yrs
Time interval =
2 min
Drainage area =
1.780 ac
Basin Slope =
2.8 %
Tc method =
KIRPICH
Total precip. =
3.51 in
Storm duration =
24 hrs
Q (cfs)
5.00
4.00
3.00
1.00
Peak discharge
Time to peak
Hyd. volume
Curve number
Hydraulic length
Time of conc. (Tc)
Distribution
Shape factor
Offsite Area Directed to Pt A
Hyd. No. 22 -- 2 Year
Monday, 11 / 15 / 2021
= 4.494 cfs
= 722 min
= 12,605 cuft
= 84.7
= 3245 ft
= 15.51 min
= Type II
= 484
Q (cfs)
5.00
4.00
3.00
2.00
1.00
0.00 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
— Hyd No. 22 Time (min)
48
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 23
Total Area A Managed
Hydrograph type
= Combine
Peak discharge
= 17.49 cfs
Storm frequency
= 2 yrs
Time to peak
= 726 min
Time interval
= 2 min
Hyd. volume
= 291,924 cuft
Inflow hyds.
= 16, 20, 21, 22
Contrib. drain. area
= 14.880 ac
Total Area A Managed
Q (cfs) Hyd. No. 23 -- 2 Year Q (cfs)
18.00 18.00
15.00 15.00
12.00 12.00
9.00 9.00
6.00 6.00
3.00 3.00
0.00 M 0.00
0 480 960 1440 1920 2400 2880 3360 3840 4320 4800
Hyd No. 23 Hyd No. 16 Hyd No. 20 Hyd No. 21 Time (min)
Hyd No. 22
Hydrograph Summary Report
49
Hydraflow Hydrographs Extension for Autodesk0 Civil 3DO by Autodesk, Inc. v2021
Hyd.
No.
Hydrograph
type
(origin)
Peak
flow
(cfs)
Time
interval
(min)
Time to
Peak
(min)
Hyd.
volume
(cuft)
Inflow
hyd(s)
Maximum
elevation
(ft)
Total
strge used
(cuft)
Hydrograph
Description
1
SCS Runoff
37.36
2
758
281,898
------
------
------
Area A - Pre
2
SCS Runoff
15.09
2
720
39,732
------
------
------
Area B - Pre
3
SCS Runoff
33.63
2
722
94,859
------
------
------
Area C - Pre
4
SCS Runoff
17.20
2
716
34,815
------
------
------
Arae D - Pre
5
SCS Runoff
2.964
2
716
6,037
------
------
------
Area E - Pre
7
SCS Runoff
70.87
2
758
530,942
------
------
------
Area A - Post
8
SCS Runoff
0.925
2
718
1,919
------
------
------
Area B - Post
9
SCS Runoff
28.62
2
720
69,624
------
------
------
Area C - Post
10
SCS Runoff
15.88
2
716
32,085
------
------
------
Arae D - Post
11
SCS Runoff
2.964
2
716
6,037
------
------
------
Area E - Post
13
SCS Runoff
50.12
2
716
103,992
------
------
------
Onsite Area To SCM Al
14
SCS Runoff
1.123
2
716
2,268
------
------
------
Offsite Area to SCM Al
15
Combine
51.24
2
716
106,260
13, 14
------
------
Total Area To SCM Al
16
Reservoir
14.53
2
724
103,542
15
332.12
47,226
Route SCM Al
17
SCS Runoff
131.36
2
716
275,026
------
------
------
Onsite Area to SCM A2
18
SCS Runoff
1.879
2
716
3,968
------
------
------
Offsite Area to SCM A2
19
Combine
133.24
2
716
278,994
17, 18
------
------
Total Area to SCM A2
20
Reservoir
5.405
2
796
266,207
17
311.52
169,160
Route SCM A2
21
SCS Runoff
16.84
2
758
127,245
------
------
------
Area A Bypassing SCMs
22
SCS Runoff
7.676
2
722
21,789
------
------
------
Offsite Area Directed to Pt A
23
Combine
33.60
2
726
518,783
16, 20, 21,
------
------
Total Area A Managed
22
20-111 Pre -Post Routing.gpw
Return Period: 10 Year
Monday, 11 / 15 / 2021
Hydrograph
Report
50
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 1
Area A - Pre
Hydrograph type
= SCS Runoff
Peak discharge
= 37.36 cfs
Storm frequency
= 10 yrs
Time to peak
= 758 min
Time interval
= 2 min
Hyd. volume
= 281,898 cuft
Drainage area
= 28.450 ac
Curve number
= 76.8
Basin Slope
= 0.9 %
Hydraulic length
= 14285 ft
Tc method
= KIRPICH
Time of conc. (Tc)
= 74.12 min
Total precip.
= 5.13 in
Distribution
= Type II
Storm duration
= 24 hrs
Shape factor
= 484
Area A - Pre
Q (cfs) Hyd. No. 1 -- 10 Year Q (cfs)
40.00 40.00
30.00 30.00
20.00 20.00
10.00 10.00
0.00 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
— Hyd No. 1 Time (min)
Hydrograph Report
51
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Hyd. No. 2
Area B - Pre
Hydrograph type
= SCS Runoff
Storm frequency
= 10 yrs
Time interval
= 2 min
Drainage area
= 11.880 ac
Basin Slope
= 2.8 %
Tc method
= KIRPICH
Total precip.
= 5.13 in
Storm duration
= 24 hrs
Q (cfs)
18.00
15.00
12.00
M
M
3.00
Peak discharge
Time to peak
Hyd. volume
Curve number
Hydraulic length
Time of conc. (Tc)
Distribution
Shape factor
Area B - Pre
Hyd. No. 2 -- 10 Year
Monday, 11 / 15 / 2021
= 15.09 cfs
= 720 min
= 39,732 cuft
= 53
= 1635 ft
= 9.21 min
= Type II
= 484
Q (cfs)
18.00
15.00
12.00
M
. ��
3.00
0.00
120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Hyd No. 2 Time (min)
52
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 3
Area C - Pre
Hydrograph type
= SCS Runoff
Peak discharge
= 33.63 cfs
Storm frequency
= 10 yrs
Time to peak
= 722 min
Time interval
= 2 min
Hyd. volume
= 94,859 cuft
Drainage area
= 20.310 ac
Curve number
= 58.1
Basin Slope
= 1.6 %
Hydraulic length
= 1800 ft
Tc method
= KIRPICH
Time of conc. (Tc)
= 12.30 min
Total precip.
= 5.13 in
Distribution
= Type II
Storm duration
= 24 hrs
Shape factor
= 484
Q (cfs)
35.00
25.00
20.00
15.00
10.00
5.00
Area C - Pre
Hyd. No. 3 -- 10 Year
Q (cfs)
35.00
30.00
25.00
20.00
15.00
10.00
5.00
0.00 ' 1 1 1 1' ' ' ' ' ' ' " ' 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
— Hyd No. 3 Time (min)
Hydrograph
Report
53
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Hyd. No. 4
Arae D - Pre
Hydrograph type = SCS Runoff Peak discharge
Storm frequency = 10 yrs Time to peak
Time interval = 2 min Hyd. volume
Drainage area = 3.720 ac Curve number
Basin Slope = 0.0 % Hydraulic length
Tc method = User Time of conc. (Tc)
Total precip. = 5.13 in Distribution
Storm duration = 24 hrs Shape factor
Monday, 11 / 15 / 2021
= 17.20 cfs
= 716 min
= 34,815 cuft
= 77.2
= 0 ft
= 5.00 min
= Type II
= 484
Q (cfs)
Arae D - Pre
Hyd. No. 4 -- 10 Year
Q (cfs)
18.00
18.00
15.00
15.00
12.00
12.00
9.00
9.00
6.00
6.00
3.00
0.00
0 120
Hyd No.
240 360 480 600 720 840 960 1080
4
3.00
0.00
1200 1320 1440
Time (min)
Hydrograph
Report
54
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 5
Area E - Pre
Hydrograph type
= SCS Runoff
Peak discharge
= 2.964 cfs
Storm frequency
= 10 yrs
Time to peak
= 716 min
Time interval
= 2 min
Hyd. volume
= 6,037 cuft
Drainage area
= 0.590 ac
Curve number
= 80
Basin Slope
= 0.0 %
Hydraulic length
= 0 ft
Tc method
= User
Time of conc. (Tc)
= 5.00 min
Total precip.
= 5.13 in
Distribution
= Type II
Storm duration
= 24 hrs
Shape factor
= 484
Area E - Pre
Q (cfs) Hyd. No. 5 -- 10 Year Q (cfs)
3.00 3.00
2.00 2.00
1.00 1.00
0.00 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440
Hyd No. 5 Time (min)
Hydrograph Report
55
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Hyd. No. 7
Area A - Post
Hydrograph type
= SCS Runoff
Storm frequency
= 10 yrs
Time interval
= 2 min
Drainage area
= 44.180 ac
Basin Slope
= 0.9 %
Tc method
= KIRPICH
Total precip.
= 5.13 in
Storm duration
= 24 hrs
Q (cfs)
80.00
70.00
40.00
20.00
10.00
Peak discharge
Time to peak
Hyd. volume
Curve number
Hydraulic length
Time of conc. (Tc)
Distribution
Shape factor
Area A - Post
Hyd. No. 7 -- 10 Year
Monday, 11 / 15 / 2021
= 70.87 cfs
= 758 min
= 530,942 cuft
= 83
= 14285 ft
= 74.12 min
= Type II
= 484
Q (cfs)
80.00
70.00
50.00
40.00
30.00
20.00
10.00
0.00 '1 1 1 ' ' ' ' ' ' ' 1'1 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
— Hyd No. 7 Time (min)
56
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 8
Area B - Post
Hydrograph type
= SCS Runoff
Peak discharge
= 0.925 cfs
Storm frequency
= 10 yrs
Time to peak
= 718 min
Time interval
= 2 min
Hyd. volume
= 1,919 cuft
Drainage area
= 0.480 ac
Curve number
= 57
Basin Slope
= 0.0 %
Hydraulic length
= 0 ft
Tc method
= User
Time of conc. (Tc)
= 5.00 min
Total precip.
= 5.13 in
Distribution
= Type II
Storm duration
= 24 hrs
Shape factor
= 484
Q (cfs)
1.00
0.90
0.80
0.70
0.60
0.50
0.40
0.30
0.20
Area B - Post
Hyd. No. 8 -- 10 Year
Q (cfs)
1.00
0.90
0.80
0.70
0.60
0.50
0.40
0.30
0.20
0.10 0.10
0.00 == 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
57
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 9
Area C - Post
Hydrograph type
= SCS Runoff
Peak discharge
= 28.62 cfs
Storm frequency
= 10 yrs
Time to peak
= 720 min
Time interval
= 2 min
Hyd. volume
= 69,624 cuft
Drainage area
= 16.060 ac
Curve number
= 57.3
Basin Slope
= 2.0 %
Hydraulic length
= 1495 ft
Tc method
= KIRPICH
Time of conc. (Tc)
= 9.79 min
Total precip.
= 5.13 in
Distribution
= Type II
Storm duration
= 24 hrs
Shape factor
= 484
Q (cfs)
30.00
25.00
20.00
15.00
10.00
5.00
Area C - Post
Hyd. No. 9 -- 10 Year
Q (cfs)
30.00
25.00
20.00
15.00
10.00
5.00
0.00 1 1 1 1 1 . i i i i i i rk i 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
— Hyd No. 9 Time (min)
Hydrograph
Report
58
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Hyd. No. 10
Arae D - Post
Hydrograph type = SCS Runoff
Storm frequency = 10 yrs
Time interval = 2 min
Drainage area = 3.640 ac
Basin Slope = 0.0 %
Tc method = User
Total precip. = 5.13 in
Storm duration = 24 hrs
Peak discharge
Time to peak
Hyd. volume
Curve number
Hydraulic length
Time of conc. (Tc)
Distribution
Shape factor
Monday, 11 / 15 / 2021
= 15.88 cfs
= 716 min
= 32,085 cuft
= 75.4
= 0 ft
= 5.00 min
= Type II
= 484
Q (cfs)
18.00
Arae D - Post
Hyd. No. 10 -- 10 Year
Q (cfs)
18.00
15.00
15.00
12.00
12.00
9.00
9.00
6.00
6.00
3.00
0.00
0 120 240 360 480 600 720 840
Hyd No. 10
960 1080 1200
3.00
- 0.00
1320 1440 1560
Time (min)
Hydrograph
Report
59
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 11
Area E - Post
Hydrograph type
= SCS Runoff
Peak discharge
= 2.964 cfs
Storm frequency
= 10 yrs
Time to peak
= 716 min
Time interval
= 2 min
Hyd. volume
= 6,037 cuft
Drainage area
= 0.590 ac
Curve number
= 80
Basin Slope
= 0.0 %
Hydraulic length
= 0 ft
Tc method
= User
Time of conc. (Tc)
= 5.00 min
Total precip.
= 5.13 in
Distribution
= Type II
Storm duration
= 24 hrs
Shape factor
= 484
Area E - Post
Q (cfs) Hyd. No. 11 -- 10 Year Q (cfs)
3.00 3.00
2.00 2.00
1.00 1.00
0.00 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440
Hyd No. 11 Time (min)
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 13
Onsite Area To SCM Al
Hydrograph type
= SCS Runoff
Peak discharge
= 50.12 cfs
Storm frequency
= 10 yrs
Time to peak
= 716 min
Time interval
= 2 min
Hyd. volume
= 103,992 cuft
Drainage area
= 8.810 ac
Curve number
= 84.8
Basin Slope
= 0.0 %
Hydraulic length
= 0 ft
Tc method
= User
Time of conc. (Tc)
= 5.00 min
Total precip.
= 5.13 in
Distribution
= Type II
Storm duration
= 24 hrs
Shape factor
= 484
Q (cfs)
60.00
40.00
20.00
10.00
Onsite Area To SCM Al
Hyd. No. 13 -- 10 Year
Q (cfs)
60.00
50.00
40.00
30.00
20.00
10.00
0.00 ' 1 1 1 1
' ' 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320
— Hyd No. 13 Time (min)
Hydrograph Report
61
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Hyd. No. 14
Offsite Area to SCM Al
Hydrograph type
= SCS Runoff
Storm frequency
= 10 yrs
Time interval
= 2 min
Drainage area
= 0.270 ac
Basin Slope
= 0.0 %
Tc method
= User
Total precip.
= 5.13 in
Storm duration
= 24 hrs
Q (cfs)
2.00
1.00
Peak discharge
Time to peak
Hyd. volume
Curve number
Hydraulic length
Time of conc. (Tc)
Distribution
Shape factor
Offsite Area to SCM Al
Hyd. No. 14 -- 10 Year
120 240 360 480 600 720 840 960
Hyd No. 14
Monday, 11 / 15 / 2021
= 1.123 cfs
= 716 min
= 2,268 cuft
= 74
= 0 ft
= 5.00 min
= Type II
= 484
Q (cfs)
2.00
1.00
0.00
1080 1200 1320 1440 1560
Time (min)
62
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 15
Total Area To SCM Al
Hydrograph type
= Combine
Peak discharge
= 51.24 cfs
Storm frequency
= 10 yrs
Time to peak
= 716 min
Time interval
= 2 min
Hyd. volume
= 106,260 cuft
Inflow hyds.
= 13, 14
Contrib. drain. area
= 9.080 ac
Total Area To SCM Al
Q (cfs) Hyd. No. 15 -- 10 Year Q (cfs)
60.00 60.00
50.00 50.00
40.00 40.00
30.00 30.00
20.00 20.00
10.00 10.00
0.00 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320
Time (min)
— Hyd No. 15 Hyd No. 13 Hyd No. 14
Hydrograph
Report
63
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 16
Route SCM Al
Hydrograph type
= Reservoir
Peak discharge
= 14.53 cfs
Storm frequency
= 10 yrs
Time to peak
= 724 min
Time interval
= 2 min
Hyd. volume
= 103,542 cuft
Inflow hyd. No.
= 15 - Total Area To SCM Al
Max. Elevation
= 332.12 ft
Reservoir name
= SCM Al
Max. Storage
= 47,226 cuft
Storage Indication method used
Q (cfs)
60.00
40.00
20.00
10.00
Route SCM Al
Hyd. No. 16 -- 10 Year
Q (cfs)
60.00
50.00
40.00
30.00
20.00
10.00
0.00 ' 1 1 1-W ' ' " -I 10.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 1680
Time (min)
— Hyd No. 16 Hyd No. 15 Total storage used = 47,226 cult
64
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 17
Onsite Area to SCM A2
Hydrograph type
= SCS Runoff
Peak discharge
= 131.36 cfs
Storm frequency
= 10 yrs
Time to peak
= 716 min
Time interval
= 2 min
Hyd. volume
= 275,026 cuft
Drainage area
= 22.270 ac
Curve number
= 86.4
Basin Slope
= 0.0 %
Hydraulic length
= 0 ft
Tc method
= User
Time of conc. (Tc)
= 5.00 min
Total precip.
= 5.13 in
Distribution
= Type II
Storm duration
= 24 hrs
Shape factor
= 484
Q (cfs)
140.00
120.00
100.00
40.00
20.00
Onsite Area to SCM A2
Hyd. No. 17 -- 10 Year
Q (cfs)
140.00
120.00
100.00
40.00
20.00
0.00 ' ' ' ' 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320
— Hyd No. 17 Time (min)
Hydrograph Report
65
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Hyd. No. 18
Offsite Area to SCM A2
Hydrograph type
= SCS Runoff
Storm frequency
= 10 yrs
Time interval
= 2 min
Drainage area
= 0.310 ac
Basin Slope
= 0.0 %
Tc method
= User
Total precip.
= 5.13 in
Storm duration
= 24 hrs
Q (cfs)
2.00
1.00
Peak discharge
Time to peak
Hyd. volume
Curve number
Hydraulic length
Time of conc. (Tc)
Distribution
Shape factor
Offsite Area to SCM A2
Hyd. No. 18 -- 10 Year
Monday, 11 / 15 / 2021
= 1.879 cfs
= 716 min
= 3,968 cuft
= 87.7
= 0 ft
= 5.00 min
= Type II
= 484
Q (cfs)
2.00
1.00
0.00 ' 1 1
' ' 0.00
0 120 240 360 480 600 720 840 960 1080 1200
Hyd No. 18 Time (min)
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 19
Total Area to SCM A2
Hydrograph type
= Combine
Peak discharge
= 133.24 cfs
Storm frequency
= 10 yrs
Time to peak
= 716 min
Time interval
= 2 min
Hyd. volume
= 278,994 cuft
Inflow hyds.
= 17, 18
Contrib. drain. area
= 22.580 ac
Q (cfs)
140.00
120.00
100.00
40.00
20.00
Total Area to SCM A2
Hyd. No. 19 -- 10 Year
Q (cfs)
140.00
120.00
100.00
40.00
20.00
0.00 ' 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320
Time (min)
— Hyd No. 19 Hyd No. 17 Hyd No. 18
67
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 20
Route SCM A2
Hydrograph type
= Reservoir
Peak discharge
= 5.405 cfs
Storm frequency
= 10 yrs
Time to peak
= 796 min
Time interval
= 2 min
Hyd. volume
= 266,207 cuft
Inflow hyd. No.
= 17 - Onsite Area to SCM A2
Max. Elevation
= 311.52 ft
Reservoir name
= SCM A2
Max. Storage
= 169,160 cuft
Storage Indication method used.
Q (cfs)
140.00
120.00
100.00
40.00
20.00
0.00
0 600
— Hyd No. 20
Route SCM A2
Hyd. No. 20 -- 10 Year
Q (cfs)
140.00
120.00
100.00
E:i1l<H=
40.00
20.00
0.00
1200 1800 2400 3000 3600 4200 4800 5400 6000
Time (min)
Hyd No. 17 Total storage used = 169,160 cult
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 21
Area A Bypassing SCMs
Hydrograph type =
SCS Runoff
Peak discharge
= 16.84 cfs
Storm frequency =
10 yrs
Time to peak
= 758 min
Time interval =
2 min
Hyd. volume
= 127,245 cuft
Drainage area =
13.100 ac
Curve number
= 76.2
Basin Slope =
0.0 %
Hydraulic length
= 0 ft
Tc method =
User
Time of conc. (Tc)
= 74.10 min
Total precip. =
5.13 in
Distribution
= Type II
Storm duration =
24 hrs
Shape factor
= 484
Q (cfs)
18.00
15.00
12.00
•M
.M
3.00
Area A Bypassing SCMs
Hyd. No. 21 -- 10 Year
Q (cfs)
18.00
15.00
12.00
m
m
3.00
0.00 1 1 1 1 1' ' ' ' ' ' ' 1-1 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Hyd No. 21 Time (min)
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Hyd. No. 22
Offsite Area Directed to Pt A
Hydrograph type =
SCS Runoff
Storm frequency =
10 yrs
Time interval =
2 min
Drainage area =
1.780 ac
Basin Slope =
2.8 %
Tc method =
KIRPICH
Total precip. =
5.13 in
Storm duration =
24 hrs
Q (cfs)
8.00
.M
4.00
rM
0.00
0 120 240
— Hyd No. 22
Peak discharge
Time to peak
Hyd. volume
Curve number
Hydraulic length
Time of conc. (Tc)
Distribution
Shape factor
Offsite Area Directed to Pt A
Hyd. No. 22 -- 10 Year
360 480 600 720 840
Monday, 11 / 15 / 2021
= 7.676 cfs
= 722 min
= 21,789 cuft
= 84.7
= 3245 ft
= 15.51 min
= Type II
= 484
Q (cfs)
8.00
m
4.00
2.00
' ' 0.00
960 1080 1200 1320 1440 1560
Time (min)
70
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 23
Total Area A Managed
Hydrograph type
= Combine
Peak discharge
= 33.60 cfs
Storm frequency
= 10 yrs
Time to peak
= 726 min
Time interval
= 2 min
Hyd. volume
= 518,783 cuft
Inflow hyds.
= 16, 20, 21, 22
Contrib. drain. area
= 14.880 ac
Total Area A Managed
In
see
Hydrograph Summary Report
71
Hydraflow Hydrographs Extension for Autodesk0 Civil 3DO by Autodesk, Inc. v2021
Hyd.
No.
Hydrograph
type
(origin)
Peak
flow
(cfs)
Time
interval
(min)
Time to
Peak
(min)
Hyd.
volume
(cuft)
Inflow
hyd(s)
Maximum
elevation
(ft)
Total
strge used
(cuft)
Hydrograph
Description
1
SCS Runoff
58.86
2
758
440,941
------
------
------
Area A - Pre
2
SCS Runoff
34.16
2
720
80,726
------
------
------
Area B - Pre
3
SCS Runoff
67.06
2
722
178,233
------
------
------
Area C - Pre
4
SCS Runoff
26.49
2
716
54,293
------
------
------
Arae D - Pre
5
SCS Runoff
4.456
2
716
9,222
------
------
------
Area E - Pre
7
SCS Runoff
105.46
2
756
794,174
------
------
------
Area A - Post
8
SCS Runoff
1.826
2
718
3,660
------
------
------
Area B - Post
9
SCS Runoff
57.22
2
720
132,256
------
------
------
Area C - Post
10
SCS Runoff
24.88
2
716
50,731
------
------
------
Arae D - Post
11
SCS Runoff
4.456
2
716
9,222
------
------
------
Area E - Post
13
SCS Runoff
72.50
2
716
153,656
------
------
------
Onsite Area To SCM Al
14
SCS Runoff
1.784
2
716
3,626
------
------
------
Offsite Area to SCM Al
15
Combine
74.28
2
716
157,283
13, 14
------
------
Total Area To SCM Al
16
Reservoir
19.17
2
724
154,539
15
333.23
68,369
Route SCM Al
17
SCS Runoff
187.81
2
716
402,065
------
------
------
Onsite Area to SCM A2
18
SCS Runoff
2.663
2
716
5,752
------
------
------
Offsite Area to SCM A2
19
Combine
190.47
2
716
407,817
17, 18
------
------
Total Area to SCM A2
20
Reservoir
6.946
2
806
392,056
17
312.99
255,124
Route SCM A2
21
SCS Runoff
26.69
2
758
199,950
------
------
------
Area A Bypassing SCMs
22
SCS Runoff
11.17
2
722
32,216
------
------
------
Offsite Area Directed to Pt A
23
Combine
49.99
2
754
778,762
16, 20, 21,
------
------
Total Area A Managed
22
20-111 Pre -Post Routing.gpw
Return Period: 50 Year
Monday, 11 / 15 / 2021
Hydrograph Report
72
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Hyd. No. 1
Area A - Pre
Hydrograph type
= SCS Runoff
Storm frequency
= 50 yrs
Time interval
= 2 min
Drainage area
= 28.450 ac
Basin Slope
= 0.9 %
Tc method
= KIRPICH
Total precip.
= 6.89 in
Storm duration
= 24 hrs
Q (cfs)
60.00
40.00
20.00
10.00
Peak discharge
Time to peak
Hyd. volume
Curve number
Hydraulic length
Time of conc. (Tc)
Distribution
Shape factor
Area A - Pre
Hyd. No. 1 -- 50 Year
Monday, 11 / 15 / 2021
= 58.86 cfs
= 758 min
= 440,941 cuft
= 76.8
= 14285 ft
= 74.12 min
= Type II
= 484
Q (cfs)
60.00
50.00
40.00
30.00
20.00
10.00
0.00 '1 1 1— ' ' ' ' ' ' ' �— i 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
— Hyd No. 1 Time (min)
73
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 2
Area B - Pre
Hydrograph type
= SCS Runoff
Peak discharge
= 34.16 cfs
Storm frequency
= 50 yrs
Time to peak
= 720 min
Time interval
= 2 min
Hyd. volume
= 80,726 cuft
Drainage area
= 11.880 ac
Curve number
= 53
Basin Slope
= 2.8 %
Hydraulic length
= 1635 ft
Tc method
= KIRPICH
Time of conc. (Tc)
= 9.21 min
Total precip.
= 6.89 in
Distribution
= Type II
Storm duration
= 24 hrs
Shape factor
= 484
Q (cfs)
35.00
25.00
20.00
15.00
10.00
5.00
Area B - Pre
Hyd. No. 2 -- 50 Year
Q (cfs)
35.00
30.00
25.00
20.00
15.00
10.00
5.00
0.00 '1 1 1 1 ' ' ' ' ' ' ' A i 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
— Hyd No. 2 Time (min)
Hydrograph Report
74
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Hyd. No. 3
Area C - Pre
Hydrograph type
= SCS Runoff
Storm frequency
= 50 yrs
Time interval
= 2 min
Drainage area
= 20.310 ac
Basin Slope
= 1.6 %
Tc method
= KIRPICH
Total precip.
= 6.89 in
Storm duration
= 24 hrs
Q (cfs)
70.00
40.00
20.00
10.00
Peak discharge
Time to peak
Hyd. volume
Curve number
Hydraulic length
Time of conc. (Tc)
Distribution
Shape factor
Area C - Pre
Hyd. No. 3 -- 50 Year
Monday, 11 / 15 / 2021
= 67.06 cfs
= 722 min
= 178,233 cuft
= 58.1
= 1800 ft
= 12.30 min
= Type II
= 484
Q (cfs)
70.00
50.00
40.00
30.00
20.00
10.00
0.00 '1 1 1 1 -.O� ' ' ' ' ' ' _� 1 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
— Hyd No. 3 Time (min)
75
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 4
Arae D - Pre
Hydrograph type
= SCS Runoff
Peak discharge
= 26.49 cfs
Storm frequency
= 50 yrs
Time to peak
= 716 min
Time interval
= 2 min
Hyd. volume
= 54,293 cuft
Drainage area
= 3.720 ac
Curve number
= 77.2
Basin Slope
= 0.0 %
Hydraulic length
= 0 ft
Tc method
= User
Time of conc. (Tc)
= 5.00 min
Total precip.
= 6.89 in
Distribution
= Type II
Storm duration
= 24 hrs
Shape factor
= 484
Q (cfs)
28.00
24.00
20.00
16.00
12.00
Arae D - Pre
Hyd. No. 4 -- 50 Year
Q (cfs)
28.00
24.00
20.00
16.00
12.00
4.00
0.00 ' —' ' ' ' 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320
— Hyd No. 4 Time (min)
76
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 5
Area E - Pre
Hydrograph type
= SCS Runoff
Peak discharge
= 4.456 cfs
Storm frequency
= 50 yrs
Time to peak
= 716 min
Time interval
= 2 min
Hyd. volume
= 9,222 cuft
Drainage area
= 0.590 ac
Curve number
= 80
Basin Slope
= 0.0 %
Hydraulic length
= 0 ft
Tc method
= User
Time of conc. (Tc)
= 5.00 min
Total precip.
= 6.89 in
Distribution
= Type II
Storm duration
= 24 hrs
Shape factor
= 484
Q (cfs)
5.00
4.00
3.00
1.00
0.00
0 120 240
— Hyd No. 5
Area E - Pre
Hyd. No. 5 -- 50 Year
360 480 600 720 840
Q (cfs)
5.00
4.00
3.00
2.00
1.00
0.00
960 1080 1200 1320
Time (min)
Hydrograph Report
77
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Hyd. No. 7
Area A - Post
Hydrograph type
= SCS Runoff
Storm frequency
= 50 yrs
Time interval
= 2 min
Drainage area
= 44.180 ac
Basin Slope
= 0.9 %
Tc method
= KIRPICH
Total precip.
= 6.89 in
Storm duration
= 24 hrs
Q (cfs)
120.00
100.00
40.00
20.00
Peak discharge
Time to peak
Hyd. volume
Curve number
Hydraulic length
Time of conc. (Tc)
Distribution
Shape factor
Area A - Post
Hyd. No. 7 -- 50 Year
Monday, 11 / 15 / 2021
= 105.46 cfs
= 756 min
= 794,174 cuft
= 83
= 14285 ft
= 74.12 min
= Type II
= 484
Q (cfs)
120.00
100.00
40.00
20.00
0.00 1 I i i i i i i i -"*--1 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
— Hyd No. 7 Time (min)
Hydrograph Report
78
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Hyd. No. 8
Area B - Post
Hydrograph type
= SCS Runoff
Storm frequency
= 50 yrs
Time interval
= 2 min
Drainage area
= 0.480 ac
Basin Slope
= 0.0 %
Tc method
= User
Total precip.
= 6.89 in
Storm duration
= 24 hrs
Q (cfs)
2.00
1.00
Peak discharge
Time to peak
Hyd. volume
Curve number
Hydraulic length
Time of conc. (Tc)
Distribution
Shape factor
Area B - Post
Hyd. No. 8 -- 50 Year
120 240 360 480 600 720 840 960
Hyd No. 8
Monday, 11 / 15 / 2021
= 1.826 cfs
= 718 min
= 3,660 cuft
= 57
= 0 ft
= 5.00 min
= Type II
= 484
Q (cfs)
2.00
1.00
0.00
1080 1200 1320 1440 1560
Time (min)
Hydrograph Report
79
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Hyd. No. 9
Area C - Post
Hydrograph type
= SCS Runoff
Storm frequency
= 50 yrs
Time interval
= 2 min
Drainage area
= 16.060 ac
Basin Slope
= 2.0 %
Tc method
= KIRPICH
Total precip.
= 6.89 in
Storm duration
= 24 hrs
Q (cfs)
60.00
40.00
20.00
10.00
Peak discharge
Time to peak
Hyd. volume
Curve number
Hydraulic length
Time of conc. (Tc)
Distribution
Shape factor
Area C - Post
Hyd. No. 9 -- 50 Year
Monday, 11 / 15 / 2021
= 57.22 cfs
= 720 min
= 132,256 cuft
= 57.3
= 1495 ft
= 9.79 min
= Type II
= 484
Q (cfs)
60.00
50.00
40.00
30.00
20.00
10.00
0.00 ' 1 1 1 1
' ' ' 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
— Hyd No. 9 Time (min)
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 10
Arae D - Post
Hydrograph type
= SCS Runoff
Peak discharge
= 24.88 cfs
Storm frequency
= 50 yrs
Time to peak
= 716 min
Time interval
= 2 min
Hyd. volume
= 50,731 cuft
Drainage area
= 3.640 ac
Curve number
= 75.4
Basin Slope
= 0.0 %
Hydraulic length
= 0 ft
Tc method
= User
Time of conc. (Tc)
= 5.00 min
Total precip.
= 6.89 in
Distribution
= Type II
Storm duration
= 24 hrs
Shape factor
= 484
Q (cfs)
28.00
24.00
20.00
16.00
12.00
Arae D - Post
Hyd. No. 10 -- 50 Year
0.00 1 ---J— '
0 120 240 360 480 600 720 840
— Hyd No. 10
Q (cfs)
28.00
24.00
20.00
16.00
12.00
4.00
0.00
960 1080 1200 1320 1440
Time (min)
81
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 11
Area E - Post
Hydrograph type
= SCS Runoff
Peak discharge
= 4.456 cfs
Storm frequency
= 50 yrs
Time to peak
= 716 min
Time interval
= 2 min
Hyd. volume
= 9,222 cuft
Drainage area
= 0.590 ac
Curve number
= 80
Basin Slope
= 0.0 %
Hydraulic length
= 0 ft
Tc method
= User
Time of conc. (Tc)
= 5.00 min
Total precip.
= 6.89 in
Distribution
= Type II
Storm duration
= 24 hrs
Shape factor
= 484
Q (cfs)
5.00
4.00
3.00
R 11
1.00
0.00
0 120 240
— Hyd No. 11
Area E - Post
Hyd. No. 11 -- 50 Year
360 480 600 720 840
Q (cfs)
5.00
4.00
3.00
2.00
1.00
0.00
960 1080 1200 1320
Time (min)
82
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 13
Onsite Area To SCM Al
Hydrograph type
= SCS Runoff
Peak discharge
= 72.50 cfs
Storm frequency
= 50 yrs
Time to peak
= 716 min
Time interval
= 2 min
Hyd. volume
= 153,656 cuft
Drainage area
= 8.810 ac
Curve number
= 84.8
Basin Slope
= 0.0 %
Hydraulic length
= 0 ft
Tc method
= User
Time of conc. (Tc)
= 5.00 min
Total precip.
= 6.89 in
Distribution
= Type II
Storm duration
= 24 hrs
Shape factor
= 484
Q (cfs)
80.00
70.00
40.00
20.00
10.00
Onsite Area To SCM Al
Hyd. No. 13 -- 50 Year
Q (cfs)
80.00
70.00
50.00
40.00
30.00
20.00
10.00
0.00 ' ' 0.00
0 120 240 360 480 600 720 840 960 1080 1200
— Hyd No. 13 Time (min)
Hydrograph Report
83
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Hyd. No. 14
Offsite Area to SCM Al
Hydrograph type
= SCS Runoff
Storm frequency
= 50 yrs
Time interval
= 2 min
Drainage area
= 0.270 ac
Basin Slope
= 0.0 %
Tc method
= User
Total precip.
= 6.89 in
Storm duration
= 24 hrs
Q (cfs)
2.00
1.00
120 240
Hyd No. 14
Peak discharge
Time to peak
Hyd. volume
Curve number
Hydraulic length
Time of conc. (Tc)
Distribution
Shape factor
Offsite Area to SCM Al
Hyd. No. 14 -- 50 Year
Monday, 11 / 15 / 2021
= 1.784 cfs
= 716 min
= 3,626 cuft
= 74
= 0 ft
= 5.00 min
= Type II
= 484
360 480 600 720 840 960 1080 1200 1320
Q (cfs)
2.00
1.00
--1 0.00
1440
Time (min)
84
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 15
Total Area To SCM Al
Hydrograph type
= Combine
Peak discharge
= 74.28 cfs
Storm frequency
= 50 yrs
Time to peak
= 716 min
Time interval
= 2 min
Hyd. volume
= 157,283 cuft
Inflow hyds.
= 13, 14
Contrib. drain. area
= 9.080 ac
Total Area To SCM Al
85
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 16
Route SCM Al
Hydrograph type
= Reservoir
Peak discharge
= 19.17 cfs
Storm frequency
= 50 yrs
Time to peak
= 724 min
Time interval
= 2 min
Hyd. volume
= 154,539 cuft
Inflow hyd. No.
= 15 - Total Area To SCM Al
Max. Elevation
= 333.23 ft
Reservoir name
= SCM Al
Max. Storage
= 68,369 cuft
Storage Indication method used.
Route SCM Al
Hydrograph
Report
86
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Hyd. No. 17
Onsite Area to SCM A2
Hydrograph type = SCS Runoff Peak discharge
Storm frequency = 50 yrs Time to peak
Time interval = 2 min Hyd. volume
Drainage area = 22.270 ac Curve number
Basin Slope = 0.0 % Hydraulic length
Tc method = User Time of conc. (Tc)
Total precip. = 6.89 in Distribution
Storm duration = 24 hrs Shape factor
Monday, 11 / 15 / 2021
= 187.81 cfs
= 716 min
= 402,065 cuft
= 86.4
= 0 ft
= 5.00 min
= Type II
= 484
Q (cfs)
210.00
Onsite Area to SCM A2
Hyd. No. 17 -- 50 Year
Q (cfs)
210.00
180.00
180.00
150.00
150.00
120.00
120.00
90.00
90.00
60.00
60.00
30.00
30.00
0.00
0 120
— Hyd No.
0.00
240 360 480 600 720 840 960 1080 1200
17 Time (min)
87
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 18
Offsite Area to SCM A2
Hydrograph type
= SCS Runoff
Peak discharge
= 2.663 cfs
Storm frequency
= 50 yrs
Time to peak
= 716 min
Time interval
= 2 min
Hyd. volume
= 5,752 cuft
Drainage area
= 0.310 ac
Curve number
= 87.7
Basin Slope
= 0.0 %
Hydraulic length
= 0 ft
Tc method
= User
Time of conc. (Tc)
= 5.00 min
Total precip.
= 6.89 in
Distribution
= Type II
Storm duration
= 24 hrs
Shape factor
= 484
Q (cfs)
3.00
rM
1.00
e
120 240
Hyd No. 18
Offsite Area to SCM A2
Hyd. No. 18 -- 50 Year
360 480 600 720 840 960
Q (cfs)
3.00
2.00
1.00
0.00
1080 1200
Time (min)
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 19
Total Area to SCM A2
Hydrograph type
= Combine
Peak discharge
= 190.47 cfs
Storm frequency
= 50 yrs
Time to peak
= 716 min
Time interval
= 2 min
Hyd. volume
= 407,817 cuft
Inflow hyds.
= 17, 18
Contrib. drain. area
= 22.580 ac
Total Area to SCM A2
Q (cfs) Hyd. No. 19 -- 50 Year Q (cfs)
210.00 210.00
180.00 180.00
150.00 150.00
120.00 120.00
90.00 90.00
60.00 60.00
30.00 30.00
0.00 0.00
0 120 240 360 480 600 720 840 960 1080 1200
Time (min)
— Hyd No. 19 — Hyd No. 17 Hyd No. 18
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 20
Route SCM A2
Hydrograph type
= Reservoir
Peak discharge
= 6.946 cfs
Storm frequency
= 50 yrs
Time to peak
= 806 min
Time interval
= 2 min
Hyd. volume
= 392,056 cuft
Inflow hyd. No.
= 17 - Onsite Area to SCM A2
Max. Elevation
= 312.99 ft
Reservoir name
= SCM A2
Max. Storage
= 255,124 cuft
Storage Indication method used.
Q (cfs)
210.00
180.00
150.00
120.00
0.00
0 600
— Hyd No. 20
Route SCM A2
Hyd. No. 20 -- 50 Year
Q (cfs)
210.00
180.00
150.00
120.00
30.00
0.00
1200 1800 2400 3000 3600 4200 4800 5400 6000
Time (min)
Hyd No. 17 Total storage used = 255,124 cult
Hydrograph Report
9
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Hyd. No. 21
Area A Bypassing SCMs
Hydrograph type =
SCS Runoff
Storm frequency =
50 yrs
Time interval =
2 min
Drainage area =
13.100 ac
Basin Slope =
0.0 %
Tc method =
User
Total precip. =
6.89 in
Storm duration =
24 hrs
Q (cfs)
28.00
24.00
20.00
16.00
12.00
Peak discharge
Time to peak
Hyd. volume
Curve number
Hydraulic length
Time of conc. (Tc)
Distribution
Shape factor
Area A Bypassing SCMs
Hyd. No. 21 -- 50 Year
Monday, 11 / 15 / 2021
= 26.69 cfs
= 758 min
= 199,950 cuft
= 76.2
= 0 ft
= 74.10 min
= Type II
= 484
Q (cfs)
28.00
24.00
20.00
16.00
12.00
4.00
0.00 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
— Hyd No. 21 Time (min)
Hydrograph Report
91
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Hyd. No. 22
Offsite Area Directed to Pt A
Hydrograph type =
SCS Runoff
Storm frequency =
50 yrs
Time interval =
2 min
Drainage area =
1.780 ac
Basin Slope =
2.8 %
Tc method =
KIRPICH
Total precip. =
6.89 in
Storm duration =
24 hrs
Q (cfs)
12.00
10.00
:1M
.M
4.00
rM
Peak discharge
Time to peak
Hyd. volume
Curve number
Hydraulic length
Time of conc. (Tc)
Distribution
Shape factor
Offsite Area Directed to Pt A
Hyd. No. 22 -- 50 Year
Monday, 11 / 15 / 2021
= 11.17 cfs
= 722 min
= 32,216 cuft
= 84.7
= 3245 ft
= 15.51 min
= Type II
= 484
Q (cfs)
12.00
10.00
m
m
4.00
2.00
I I _ - I I I I I - 0.00
120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Hyd No. 22 Time (min)
92
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 23
Total Area A Managed
Hydrograph type
= Combine
Peak discharge
= 49.99 cfs
Storm frequency
= 50 yrs
Time to peak
= 754 min
Time interval
= 2 min
Hyd. volume
= 778,762 cuft
Inflow hyds.
= 16, 20, 21, 22
Contrib. drain. area
= 14.880 ac
Total Area A Managed
Q (cfs) Hyd. No. 23 -- 50 Year Q (cfs)
50.00 50.00
40.00 40.00
30.00 30.00
.Al
20.00 20.00
10.00 10.00
0.00 0.00
0 240 480 720 960 1200 1440 1680 1920 2160
— Hyd No. 23 Hyd No. 16 Hyd No. 20 Hyd No. 21 Time (min)
Hyd No. 22
Hydrograph Summary Report
93
Hydraflow Hydrographs Extension for Autodesk0 Civil 3DO by Autodesk, Inc. v2021
Hyd.
No.
Hydrograph
type
(origin)
Peak
flow
(cfs)
Time
interval
(min)
Time to
Peak
(min)
Hyd.
volume
(cuft)
Inflow
hyd(s)
Maximum
elevation
(ft)
Total
strge used
(cuft)
Hydrograph
Description
1
SCS Runoff
68.87
2
758
515,969
------
------
------
Area A - Pre
2
SCS Runoff
43.90
2
720
102,103
------
------
------
Area B - Pre
3
SCS Runoff
83.73
2
722
220,491
------
------
------
Area C - Pre
4
SCS Runoff
30.78
2
716
63,471
------
------
------
Arae D - Pre
5
SCS Runoff
5.137
2
716
10,712
------
------
------
Area E - Pre
7
SCS Runoff
121.32
2
756
916,399
------
------
------
Area A - Post
8
SCS Runoff
2.274
2
718
4,547
------
------
------
Area B - Post
9
SCS Runoff
71.48
2
720
164,133
------
------
------
Area C - Post
10
SCS Runoff
29.05
2
716
59,563
------
------
------
Arae D - Post
11
SCS Runoff
5.137
2
716
10,712
------
------
------
Area E - Post
13
SCS Runoff
82.63
2
716
176,627
------
------
------
Onsite Area To SCM Al
14
SCS Runoff
2.092
2
716
4,272
------
------
------
Offsite Area to SCM Al
15
Combine
84.72
2
716
180,899
13, 14
------
------
Total Area To SCM Al
16
Reservoir
20.76
2
724
178,146
15
333.68
77,597
Route SCM Al
17
SCS Runoff
213.32
2
716
460,635
------
------
------
Onsite Area to SCM A2
18
SCS Runoff
3.016
2
716
6,573
------
------
------
Offsite Area to SCM A2
19
Combine
216.34
2
716
467,207
17, 18
------
------
Total Area to SCM A2
20
Reservoir
16.03
2
750
450,420
17
313.30
275,175
Route SCM A2
21
SCS Runoff
31.28
2
758
234,307
------
------
------
Area A Bypassing SCMs
22
SCS Runoff
12.75
2
722
37,040
------
------
------
Offsite Area Directed to Pt A
23
Combine
65.54
2
754
899,913
16, 20, 21,
------
------
Total Area A Managed
22
20-111 Pre -Post Routing.gpw
Return Period: 100 Year
Monday, 11 / 15 / 2021
Hydrograph Report
94
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Hyd. No. 1
Area A - Pre
Hydrograph type
= SCS Runoff
Storm frequency
= 100 yrs
Time interval
= 2 min
Drainage area
= 28.450 ac
Basin Slope
= 0.9 %
Tc method
= KIRPICH
Total precip.
= 7.69 in
Storm duration
= 24 hrs
Q (cfs)
70.00
40.00
20.00
10.00
Peak discharge
Time to peak
Hyd. volume
Curve number
Hydraulic length
Time of conc. (Tc)
Distribution
Shape factor
Area A - Pre
Hyd. No. 1 -- 100 Year
Monday, 11 / 15 / 2021
= 68.87 cfs
= 758 min
= 515,969 cuft
= 76.8
= 14285 ft
= 74.12 min
= Type II
= 484
Q (cfs)
70.00
50.00
40.00
30.00
20.00
10.00
0.00 ' ' ' ' ' ' ' ' "'*--1 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
— Hyd No. 1 Time (min)
Hydrograph Report
95
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Hyd. No. 2
Area B - Pre
Hydrograph type
= SCS Runoff
Storm frequency
= 100 yrs
Time interval
= 2 min
Drainage area
= 11.880 ac
Basin Slope
= 2.8 %
Tc method
= KIRPICH
Total precip.
= 7.69 in
Storm duration
= 24 hrs
Q (cfs)
50.00
40.00
20.00
10.00
Peak discharge
Time to peak
Hyd. volume
Curve number
Hydraulic length
Time of conc. (Tc)
Distribution
Shape factor
Area B - Pre
Hyd. No. 2 -- 100 Year
Monday, 11 / 15 / 2021
= 43.90 cfs
= 720 min
= 102,103 cuft
= 53
= 1635 ft
= 9.21 min
= Type II
= 484
Q (cfs)
50.00
40.00
30.00
20.00
10.00
0.00 1 1 1 1� ' ' ' ' 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
— Hyd No. 2 Time (min)
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 3
Area C - Pre
Hydrograph type
= SCS Runoff
Peak discharge
= 83.73 cfs
Storm frequency
= 100 yrs
Time to peak
= 722 min
Time interval
= 2 min
Hyd. volume
= 220,491 cuft
Drainage area
= 20.310 ac
Curve number
= 58.1
Basin Slope
= 1.6 %
Hydraulic length
= 1800 ft
Tc method
= KIRPICH
Time of conc. (Tc)
= 12.30 min
Total precip.
= 7.69 in
Distribution
= Type II
Storm duration
= 24 hrs
Shape factor
= 484
Q (cfs)
90.00
80.00
70.00
60.00
50.00
40.00
30.00
20.00
Area C - Pre
Hyd. No. 3 -- 100 Year
1 1 �1 •1 �:1 •11 1 :�1 •.1 1:1 11 1 ��1 •1
Q (cfs)
90.00
80.00
70.00
60.00
50.00
40.00
30.00
20.00
97
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 4
Arae D - Pre
Hydrograph type
= SCS Runoff
Peak discharge
= 30.78 cfs
Storm frequency
= 100 yrs
Time to peak
= 716 min
Time interval
= 2 min
Hyd. volume
= 63,471 cuft
Drainage area
= 3.720 ac
Curve number
= 77.2
Basin Slope
= 0.0 %
Hydraulic length
= 0 ft
Tc method
= User
Time of conc. (Tc)
= 5.00 min
Total precip.
= 7.69 in
Distribution
= Type II
Storm duration
= 24 hrs
Shape factor
= 484
Q (cfs)
35.00
c 1 It It
25.00
20.00
15.00
10.00
5.00
Q (cfs)
35.00
30.00
25.00
20.00
15.00
10.00
5.00
0.00 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320
— Hyd No. 4 Time (min)
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 5
Area E - Pre
Hydrograph type
= SCS Runoff
Peak discharge
= 5.137 cfs
Storm frequency
= 100 yrs
Time to peak
= 716 min
Time interval
= 2 min
Hyd. volume
= 10,712 cuft
Drainage area
= 0.590 ac
Curve number
= 80
Basin Slope
= 0.0 %
Hydraulic length
= 0 ft
Tc method
= User
Time of conc. (Tc)
= 5.00 min
Total precip.
= 7.69 in
Distribution
= Type II
Storm duration
= 24 hrs
Shape factor
= 484
Q (cfs)
6.00
5.00
4.00
3.00
rM
1.00
Area E - Pre
Hyd. No. 5 -- 100 Year
Q (cfs)
6.00
5.00
4.00
3.00
2.00
1.00
0.00 ' ' ' 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320
— Hyd No. 5 Time (min)
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Hyd. No. 7
Area A - Post
Hydrograph type
= SCS Runoff
Storm frequency
= 100 yrs
Time interval
= 2 min
Drainage area
= 44.180 ac
Basin Slope
= 0.9 %
Tc method
= KIRPICH
Total precip.
= 7.69 in
Storm duration
= 24 hrs
Q (cfs)
140.00
120.00
100.00
40.00
20.00
Peak discharge
Time to peak
Hyd. volume
Curve number
Hydraulic length
Time of conc. (Tc)
Distribution
Shape factor
Area A - Post
Hyd. No. 7 -- 100 Year
Monday, 11 / 15 / 2021
= 121.32 cfs
= 756 min
= 916,399 cuft
= 83
= 14285 ft
= 74.12 min
= Type II
= 484
Q (cfs)
140.00
120.00
100.00
40.00
20.00
0.00 ' ' ' ' ' ' ' ' ' -"�--1 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
— Hyd No. 7 Time (min)
Hydrograph
Report
100
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 8
Area B - Post
Hydrograph type
= SCS Runoff
Peak discharge
= 2.274 cfs
Storm frequency
= 100 yrs
Time to peak
= 718 min
Time interval
= 2 min
Hyd. volume
= 4,547 cuft
Drainage area
= 0.480 ac
Curve number
= 57
Basin Slope
= 0.0 %
Hydraulic length
= 0 ft
Tc method
= User
Time of conc. (Tc)
= 5.00 min
Total precip.
= 7.69 in
Distribution
= Type II
Storm duration
= 24 hrs
Shape factor
= 484
Area B - Post
Q (cfs) Hyd. No. 8 -- 100 Year Q (cfs)
3.00 3.00
2.00 2.00
1.00 1.00
0.00 - 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
— Hyd No. 8 Time (min)
Hydrograph Report
101
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Hyd. No. 9
Area C - Post
Hydrograph type
= SCS Runoff
Storm frequency
= 100 yrs
Time interval
= 2 min
Drainage area
= 16.060 ac
Basin Slope
= 2.0 %
Tc method
= KIRPICH
Total precip.
= 7.69 in
Storm duration
= 24 hrs
Q (cfs)
80.00
70.00
40.00
20.00
10.00
Peak discharge
Time to peak
Hyd. volume
Curve number
Hydraulic length
Time of conc. (Tc)
Distribution
Shape factor
Area C - Post
Hyd. No. 9 -- 100 Year
Monday, 11 / 15 / 2021
= 71.48 cfs
= 720 min
= 164,133 cuft
= 57.3
= 1495 ft
= 9.79 min
= Type II
= 484
Q (cfs)
80.00
70.00
50.00
40.00
30.00
20.00
10.00
0.00 ' 1 1 11� ' ' ' ' 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
— Hyd No. 9 Time (min)
102
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 10
Arae D - Post
Hydrograph type
= SCS Runoff
Peak discharge
= 29.05 cfs
Storm frequency
= 100 yrs
Time to peak
= 716 min
Time interval
= 2 min
Hyd. volume
= 59,563 cuft
Drainage area
= 3.640 ac
Curve number
= 75.4
Basin Slope
= 0.0 %
Hydraulic length
= 0 ft
Tc method
= User
Time of conc. (Tc)
= 5.00 min
Total precip.
= 7.69 in
Distribution
= Type II
Storm duration
= 24 hrs
Shape factor
= 484
Q (cfs)
30.00
25.00
20.00
15.00
10.00
5.00
Arae D - Post
Hyd. No. 10 -- 100 Year
Q (cfs)
30.00
25.00
20.00
15.00
10.00
5.00
0.00 ' —'— ' ' ' 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320
— Hyd No. 10 Time (min)
103
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 11
Area E - Post
Hydrograph type
= SCS Runoff
Peak discharge
= 5.137 cfs
Storm frequency
= 100 yrs
Time to peak
= 716 min
Time interval
= 2 min
Hyd. volume
= 10,712 cuft
Drainage area
= 0.590 ac
Curve number
= 80
Basin Slope
= 0.0 %
Hydraulic length
= 0 ft
Tc method
= User
Time of conc. (Tc)
= 5.00 min
Total precip.
= 7.69 in
Distribution
= Type II
Storm duration
= 24 hrs
Shape factor
= 484
Q (cfs)
6.00
5.00
4.00
3.00
rM
1.00
Area E - Post
Hyd. No. 11 -- 100 Year
Q (cfs)
6.00
5.00
4.00
3.00
2.00
1.00
0.00 ' ' ' 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320
— Hyd No. 11 Time (min)
104
Hydrograph
Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 13
Onsite Area To SCM Al
Hydrograph type
= SCS Runoff
Peak discharge
= 82.63 cfs
Storm frequency
= 100 yrs
Time to peak
= 716 min
Time interval
= 2 min
Hyd. volume
= 176,627 cuft
Drainage area
= 8.810 ac
Curve number
= 84.8
Basin Slope
= 0.0 %
Hydraulic length
= 0 ft
Tc method
= User
Time of conc. (Tc)
= 5.00 min
Total precip.
= 7.69 in
Distribution
= Type II
Storm duration
= 24 hrs
Shape factor
= 484
Onsite Area To SCM Al
Q (cfs)
Hyd. No. 13 -- 100
Year
Q (cfs)
90.00
1
1 1 1
1 1 90.00
;ilxlil C�W:1111I11
F10W1Ti�i[lloill
:'llilll C�miellIsl
![OW@=.======.=====[Il1lll
K 0X110>C====== milloIll
`DlOM������ � ����imtellIsl
0.00 ' 0.00
0 120 240 360 480 600 720 840 960 1080 1200
— Hyd No. 13 Time (min)
Hydrograph Report
105
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Hyd. No. 14
Offsite Area to SCM Al
Hydrograph type
= SCS Runoff
Storm frequency
= 100 yrs
Time interval
= 2 min
Drainage area
= 0.270 ac
Basin Slope
= 0.0 %
Tc method
= User
Total precip.
= 7.69 in
Storm duration
= 24 hrs
Q (cfs)
3.00
r M
1.00
e
120 240
Hyd No. 14
Peak discharge
Time to peak
Hyd. volume
Curve number
Hydraulic length
Time of conc. (Tc)
Distribution
Shape factor
Offsite Area to SCM Al
Hyd. No. 14 -- 100 Year
Monday, 11 / 15 / 2021
= 2.092 cfs
= 716 min
= 4,272 cuft
= 74
= 0 ft
= 5.00 min
= Type II
= 484
360 480 600 720 840 960 1080 1200
Q (cfs)
3.00
2.00
1.00
0.00
1320
Time (min)
106
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 15
Total Area To SCM Al
Hydrograph type
= Combine
Peak discharge
= 84.72 cfs
Storm frequency
= 100 yrs
Time to peak
= 716 min
Time interval
= 2 min
Hyd. volume
= 180,899 cuft
Inflow hyds.
= 13, 14
Contrib. drain. area
= 9.080 ac
Total Area To SCM Al
107
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 16
Route SCM Al
Hydrograph type
= Reservoir
Peak discharge
= 20.76 cfs
Storm frequency
= 100 yrs
Time to peak
= 724 min
Time interval
= 2 min
Hyd. volume
= 178,146 cuft
Inflow hyd. No.
= 15 - Total Area To SCM Al
Max. Elevation
= 333.68 ft
Reservoir name
= SCM Al
Max. Storage
= 77,597 cuft
Storage Indication method used.
Q (cfs)
90.00
80.00
70.00
60.00
50.00
40.00
30.00
20.00
Route SCM Al
Hyd. No. 16 -- 100 Year
Q (cfs)
90.00
80.00
70.00
60.00
50.00
40.00
30.00
20.00
see
1 1 �1 .1 �:1 .11 1 :�1 •.1 1:1 11 1 ��1 .1
108
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 17
Onsite Area to SCM A2
Hydrograph type
= SCS Runoff
Peak discharge
= 213.32 cfs
Storm frequency
= 100 yrs
Time to peak
= 716 min
Time interval
= 2 min
Hyd. volume
= 460,635 cuft
Drainage area
= 22.270 ac
Curve number
= 86.4
Basin Slope
= 0.0 %
Hydraulic length
= 0 ft
Tc method
= User
Time of conc. (Tc)
= 5.00 min
Total precip.
= 7.69 in
Distribution
= Type II
Storm duration
= 24 hrs
Shape factor
= 484
Q (cfs)
240.00
210.00
180.00
150.00
120.00
Onsite Area to SCM A2
Hyd. No. 17 -- 100 Year
Q (cfs)
240.00
210.00
180.00
150.00
120.00
30.00
0.00 ' 1 1
' ' ' 0.00
0 120 240 360 480 600 720 840 960 1080 1200
— Hyd No. 17 Time (min)
Hydrograph
Report
109
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Hyd. No. 18
Offsite Area to SCM A2
Hydrograph type = SCS Runoff Peak discharge
Storm frequency = 100 yrs Time to peak
Time interval = 2 min Hyd. volume
Drainage area = 0.310 ac Curve number
Basin Slope = 0.0 % Hydraulic length
Tc method = User Time of conc. (Tc)
Total precip. = 7.69 in Distribution
Storm duration = 24 hrs Shape factor
Monday, 11 / 15 / 2021
= 3.016 cfs
= 716 min
= 6,573 cuft
= 87.7
= 0 ft
= 5.00 min
= Type II
= 484
Q (cfs)
4.00
Offsite Area to SCM A2
Hyd. No. 18 -- 100 Year
Q (cfs)
4.00
3.00
3.00
2.00
2.00
1.00
1.00
0.00
0 120
— Hyd No.
0.00
240 360 480 600 720 840 960 1080 1200
18 Time (min)
110
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 19
Total Area to SCM A2
Hydrograph type
= Combine
Peak discharge
= 216.34 cfs
Storm frequency
= 100 yrs
Time to peak
= 716 min
Time interval
= 2 min
Hyd. volume
= 467,207 cuft
Inflow hyds.
= 17, 18
Contrib. drain. area
= 22.580 ac
Total Area to SCM A2
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 20
Route SCM A2
Hydrograph type
= Reservoir
Peak discharge
= 16.03 cfs
Storm frequency
= 100 yrs
Time to peak
= 750 min
Time interval
= 2 min
Hyd. volume
= 450,420 cuft
Inflow hyd. No.
= 17 - Onsite Area to SCM A2
Max. Elevation
= 313.30 ft
Reservoir name
= SCM A2
Max. Storage
= 275,175 cuft
Storage Indication method used.
Q (cfs)
Route SCM A2
Hyd. No. 20 -- 100 Year Q (cfs)
0 480
— Hyd No. 20
960 1440 1920 2400 2880 3360 3840 4320
Time (min)
Hyd No. 17 Total storage used = 275,175 cult
Hydrograph Report
112
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Hyd. No. 21
Area A Bypassing SCMs
Hydrograph type =
SCS Runoff
Storm frequency =
100 yrs
Time interval =
2 min
Drainage area =
13.100 ac
Basin Slope =
0.0 %
Tc method =
User
Total precip. =
7.69 in
Storm duration =
24 hrs
Q (cfs)
35.00
c 1 It It
25.00
20.00
15.00
10.00
5.00
Peak discharge
Time to peak
Hyd. volume
Curve number
Hydraulic length
Time of conc. (Tc)
Distribution
Shape factor
Monday, 11 / 15 / 2021
= 31.28 cfs
= 758 min
= 234,307 cuft
= 76.2
= 0 ft
= 74.10 min
= Type II
= 484
Q (cfs)
35.00
30.00
25.00
20.00
15.00
10.00
5.00
0.00 110.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
— Hyd No. 21 Time (min)
113
Hydrograph
Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 /
15 / 2021
Hyd. No. 22
Offsite Area Directed to Pt A
Hydrograph type
= SCS Runoff
Peak discharge
= 12.75 cfs
Storm frequency
= 100 yrs
Time to peak
= 722 min
Time interval
= 2 min
Hyd. volume
= 37,040 cuft
Drainage area
= 1.780 ac
Curve number
= 84.7
Basin Slope
= 2.8 %
Hydraulic length
= 3245 ft
Tc method
= KIRPICH
Time of conc. (Tc)
= 15.51 min
Total precip.
= 7.69 in
Distribution
= Type II
Storm duration
= 24 hrs
Shape factor
= 484
Offsite Area Directed to Pt A
Q (cfs)
Hyd. No. 22 -- 100 Year
Q (cfs)
14.00
14.00
12.00
12.00
10.00
10.00
8.00
8.00
6.00
6.00
4.00
4.00
2.00
2.00
0.00
- 0.00
0 120 240 360 480 600 720 840 960 1080 1200
1320 1440 1560
Hyd No. 22
Time (min)
114
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Monday, 11 / 15 / 2021
Hyd. No. 23
Total Area A Managed
Hydrograph type
= Combine
Peak discharge
= 65.54 cfs
Storm frequency
= 100 yrs
Time to peak
= 754 min
Time interval
= 2 min
Hyd. volume
= 899,913 cuft
Inflow hyds.
= 16, 20, 21, 22
Contrib. drain. area
= 14.880 ac
Total Area A Managed
Culvert Report
Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Friday, Jul 23 2021
CULVERT
Invert Elev Dn (ft)
= 356.90
Calculations
Pipe Length (ft)
= 106.00
Qmin (cfs)
= 0.00
Slope (%)
= 0.66
Qmax (cfs)
= 7.24
Invert Elev Up (ft)
= 357.60
Tailwater Elev (ft)
= Normal
Rise (in)
= 24.0
Shape
= Circular
Highlighted
Span (in)
= 24.0
Qtotal (cfs)
= 7.24
No. Barrels
= 1
Qpipe (cfs)
= 7.24
n-Value
= 0.012
Qovertop (cfs)
= 0.00
Culvert Type
= Circular Concrete
Veloc Dn (ft/s)
= 5.78
Culvert Entrance
= Groove end projecting (C)
Veloc Up (ft/s)
= 4.89
Coeff. K,M,c,Y,k
= 0.0045, 2, 0.0317, 0.69, 0.2
HGL Dn (ft)
= 357.74
HGL Up (ft)
= 358.55
Embankment
Hw Elev (ft)
= 358.94
Top Elevation (ft)
= 365.50
Hw/D (ft)
= 0.67
Top Width (ft)
= 30.00
Flow Regime
= Inlet Control
Crest Width (ft)
= 0.00
El-(ft)
366.00
364.00
362.00
360.00
358.00
356.00
354.00
0
CULVERT
1c 20 30 40 50 60 70 80
• Circular Culvert HGL Embank
H. Depth jt)
8.40
6.40
4.40
2.40
0.40
-1.60
-3.60
90 100 110 120 130 140 150
Reach (R)
tC
a
4rs�
LOcn
O
LOLo
o
C)
00
Otn
LOoO
O
O
o
O
o
t
to Cl
(Drn
(D
Cl
C, n
r Cl)
(O 0) rn
CDr
C,cn
u�
4)
0) CDr
N
Cl)
cY �T
U) U?
(D (D O
O
t�
IT
CD
O
> ...
N Cl)M
M M
Cl)
co
Co M
Cl) M
M M M
M
Cl)
"�t
rt
M
= y:
co M
co
co M
M
M
co Cl)
Cl) Co
Co Cl) M
Cl)
Cl)
Cl)
co
Co
N
O
N
�
N
a
C-) C)
U
Utz
C)U
UU
UU
C-) C)
U
C)t)
U
U
J
�
r
.0
cU
O U7
M r
d'
N
- U)
N r
�t
N
d'
(V
d' t0
N r
O U0
r r
O U7 (O
r r r
t0
r
U)
r
U)
r
U>
r
LO
r
N O
N •v
LO
C.
LO
O
O
C.
t.f)
LO
t0
O
O
O
O
C.
O
O
O
O
O
O
O
d'
1^-
V
M
O
(9
d'
U7
O
O
O
r
d-
C)
O
C)
O
N
(='
O)
O
N
M
M
It
(D
h
(9
M
7
O
N
0)
O)
(D
O
't
4) �,,,�
N
M
M
M
co
Cl)
M
Cl)
Cl)
V
U)
It
d'
M
M
V
Cl)
Cl)
co
O
Cl)
co
Cl)
Cl)
Cl)
M
Cl)
Cl)
M
Cl)
Cl)
Cl)
M
M
co
Cl)
Cl)
co
Cl)
co
N
N
a
�
U
Q
i
d
U
U
U
U
U
U
U
U
U
U
U
U
U
U
{.)
U
U
U
U
U
J
m
O
(n
rs
E
Z
O
O
O
O
(O
t0
U7
U7
U7
U0
0
th
0U)
) U
Nco Cl) N N N N r r r r r r r r r r r r r
N �
N •v
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
a r
rl
�Y
rl
�7
'It
v
It
IT
It
IT
IT
IT
It
v
v
'S$
L
V
O
Cl
O
O
O
Cl
O
O
O
O
O
O
O
Cl
O
O
O
O
O
O
�
O
O
O
O
®
O
O
O
O
O
O
®
®
O
O
O
®
O
O
O
.�.t
�
U)
J
d
=
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
m
N
tU
N
N
tU
tU
N
N
fU
N
N
tU
tU
tU
N
N
fU
fU
N
N
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
N
tom-
C?
(O
0)
tom-
(D
tI-
to
O
U)
O
M
O
7
U]
U)
t0
CO
(0
C,
Cl
0)
CO
LO
C,
co
CD
Cl)
O
co
f`-
'IT
C,
CD
O
(D
CD
co
W
ct
co
Cl)
M
M
co
Cl)
It
It
Nt
(f)
LO
rt
It
It
It
It
It
Nt
M
Co
co
co
Cl)
co
co
Cl)
co
co
Cl)
M
M
M
M
co
co
Cl)
M
M
M
o
O
o
0
0
0
0
0
0
0
o
O
+'�
(> o)
m
c
m
c
m
c
m
c
m
c
m
c
m
c
m
c
m
c
m
c
m
c
m A
Q
O
4
L!
L!
Q
@
N
N
L!
L!
O
@
@
@
N
I—
E
O
m
E
O
E
O
E
O
E
O
E
O
m
is
is
E
O
E
O
E
O
is
m
m
m
E
O
is
E
O
(DU`
U
U
U
U
ci
U
U
U
U
U
0
E
�
N
�
Q
V
L
O
O
M
�
(0
O
O
O
O
r
N
M
U)
N
cod'
t0
t9
r-
co
6)
N
N
N
N
Q
Q
<
Q
Q
Q
Q
Q
d
Q
Q
Q
Q
Q
<
Q
¢
Q
Q
Q
03
lL
U
N
t;N
O
O
O
O
O
O
cort
(0
O
P-
(o
tb
r
--
--
—
P
r
d
(A Z
c
r_
C:
C:
r_
r_
r_
r_
C:
C:
c
r_
0
0
0
0
0
0
0
0
a
0
0
0
m
m
cc
cc
cc
ca
m
m
m
ca
r_ CL
-0
4)
a)
a)
4)
-0
-0
-0
a)
a)
a)
a)
-0
a)
-0
E
E
E
E
E
E
—
—
—
E
E
E
—
—
—
—
E
E
0
(D
0
0
0
C)
0
0
0
U
0
U
2
(D
2
(D
2
(D
o
C)
o
U
o
C)
2
(D
2
(D
2
(D
2
(D
o
0
(D
0
C)
cli
G Cc,4
0
LU
m
't
tn
co
11
co
r
Or
ce)
0
C14
im -j Z
to
w
—
m
to
0
0
C:,
N
'o
�r
0
h
m
0
h
rC?
O
(q
rO
7
(P
CD
Un
Ln
M
h
W
Ln
CD
_j
r_
N m m q Lo Lo I'- w r-- 'T 'T CD cq CD (D (D (n cf
m
co
ce)
m
co
m
m
m
co
m
m
m
ce)
m
co
co
co
m
m
4
m
U.)
V)
-t
m
V
Co
"t
m
rr
Cl)
't
co
m
m
co
(1)
A
m
0
Cl)
0)
CO
0)
C?
c
c
c
c
CD
c
C)
C)
c
c
c
r_
r_
c
c
C)
c
c
c
c
ON
Ln
CO
M
U)
(o
a
M
C:>
CV
Ln
1
M
r-
M
N
r".
Imo-
r
C*?
CP
O)
llz-
1p
(q
U?
V
Ln
cM
r-:
O
Lq
(qVe
�6
CL
M
M
dt
Ln
to
1-
0
1--
dr
-,t
0
N
0
0
0
0
't
(D
Cl)
Cl)
M
co
M
Cl)
m
m
Cl)
m
Cl)
<e)
M
m
co
m
m
CY)
Cl)
Ir
Cl)
V)
m
M
Cl)
It
Cl)
-Z
M
V
M
M
M
m
M
CY)
Cl)
0
co
N
w
m
L2
Lo
m
m
<D
0
N
w
"T
(0
(0
to
co
NV:
U?
Cl?
(9
.
O)
Ln
(9
Iq
ll�
":
G)
M
77
7
C?
E
CD
N
Cl)
Cl)
Lo
Lo
r-
r-
Iq
I-
CD
m
(D
P-
(D
Lo
m
:3
OF
Ce)
m
M
M
m
m
m
m
m
m
M
m
m
m
m
m
co
m
M
m
Ce)
m
"t
M
Cl)
m
't
m
Cl)
m
't
m
co
m
co
m
Ce)
m
Ce)
m
z
N
1-
0
U)
't
qT
"T
M
CO
F-
-t
-t
C)
M
Cl)
0)
0)
Cl)
co
IT
CD
(D
CD
0)
OD
co
I'll
co-
co
m
0)
0)
'r
(D
(D
0
0)
0)
C)
a)
C�
a
N
a
0)
(o
Lo
(l-
Lo
0)
N
M
r-
Lo
ci
P
r
r
r
pj
r_:
C6
6
r
r-.
6
N
C-i
U)
CD
U')
C=)
C)
C)
41)
Lo
Ln
C>
C>
(D
ct�'
(D
C)
C)
C>
C,
CR
"t
r-�
V
M
mlp
VU?
CA
CR
9
(cy�i
Cn
M
a
C\!
9
>
m
N
Cl)
0
�Y)
m
�;
Cl)
N
m
co
M
m
co
M
m
co
�t
V)
m
(D
m
m
r,
m
Cl)
(D
Cl)
Cl)
cl)
'r
Cl)
-,t
V)
co
C)
VMco
Cl)
Cl)
Cl)
0)
m
m
(0 (D
m
(D
(o
Cl)
't
Cl)
Cl)
F
uj —
C,
L.nU)
C)
C)
aLo
Lo
C)
0
C)
C)
a
V)
(D
L0
C�
Lq
(q
C?
fl
r(P
q
rC>
M
Cl)
C,
W,
M
CO
Lo
Iq
M
> -j F
m
N
m
0)
C%j
co
m
m
cli
co
m
Cl)
co
m
Cl)
co
Lo
Cl)
co
(D
co
co
CD
Cl)
m
r-
Cl)
m
"T
"�r
co
(o
Cl)
m
CD
I�r
C')
co
co
C')
0)
Cl)
co
(D
Cl)
co
V)
Cl)
m
M
co
�;
m
uj —
co
co
N
I-
co
U-)
C%j
(o Nr
co
Lo
m
0)
C)
Cl)
(D
m
co
co
m
co
co
0)
a
(D
N
cm
-T
ly�
Lo
m
co
Lnm
r-
CO
00
(.0
(o
r
r
co
U')
co
Lo
m
6
F
NU')
co
0
V)
(D
Cl)
�
CD
fl-
fl-
(D
w
t--
co
0
M6
U-5
0
(o
(o
(D
1--
r
N
r
C',
0
(D
�
�
-t
,I-
co
co
Lo
Lo
tn
Ln
Lo
U')
U')
U')
U')
Lo
V)
N
NC14
—
—
—
—
—
—
—
—
—
—
—
—
—
(D
CR
Lq
�
Cl
<D
M
0)
0
N
a)
0)
(o
C)
rl-
'IT
4
C6
C�
M
Mq
c!
(9
19
(9
t-:
0 �o
NN
CV—
—
—
—
fl-
M
M
N
CD
C>
CO
'41'
CD
Lo
(D
N
0
u
(D
E
(D
0
rr,
0
c
L,2
�i
N
co
U')
CO
fl-
co
0)
NNCl)
cu
0-
a-
IL
LL
b
a
C'4
Co
'It
U)
co
il-
M
0>
0
n
z
D
—
C\j
m
(D
r-
m
0)
N
CL 0)
>,.r- o
Cl)
LO
Co Z
0
0
0
0
-t
Lo
0
1--
<0
—
I
CL
0
C)
0
C)
0
(O
O
C)
C)
0
C)
0
C)
0
O
(O
O
C)
0
C)
4) a
6
0
C5
6
6
0
0
6
6
6
0
6
6
6
C5
0
0
6
6
0
(Y)
U)
C)
co
OS
U)
Cl
Cl)
(DLO
CD
C�
"T
Cl)
V)
U)
00
CO
LO
�T
P-:
C)
C*4
LO
P-
.
r-
(9
Mrl-
M
CA
M—
—
N
—
N
fl-
fl-
q
LO
r
0
'IT
'IT
C>
CO
r
to
a
a_-
0
LO
0)
En
O
1-
M
0
(D
!�
00
N
M
M0U)
O
O
r
r
C?
N
6'7
a
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
(1)
LO
C)
00
ce)
LO
9
V�
q
(D
P-
9
�2
LO
t--
"t
0)
1'-
M(Y>
(D
(D
LO
ll' C> cli LO . cli. rl- . (q " (9 Fl-: rl-: 'DR LO ci LO "
rLF
r-
CQ
LO
0)
0)
(D
fl-
t-
—
LO
LO
C14
—
V)
00
(1)
0
0
M
LO
Lo
0)
0
00
0)
0
00
(0
(0
0)
(D
(14
(D
N
M7
VS
"
'7
'7
"
'7
9
'7
'7
9
"
7
ca
F
(D
C>
C>
CD
C)
(D
C>
<D
<D
C)
C>
C,
C)
C)
CDI
CDI
CD,
C)
C)
CD,
2
0
C,
01
a
�2
�2
'c::>'
�2
�2
�2
�2
�2
c2
�2
�2
�2
�2
c2
�2
�2
0
CD
0
CD
co
O
0
I?
C)
C?
0
O
a
0
a
(D.
C,
C?
0
O
a
O
a
O
0
I?
C)
I?
0
O
a
O
a
I?
C,
I?
C,
I?
0
O
a
O
0
I?
C)
ID
OC)OC)O(Doaaoc)oc)O(D(Doa0c)
F
04
N
N
N
N
N
N
N
N
04
N
N
N
N
N
NC*4
CIA
CIA
N(D
4
x
C?
O
O
Z
0
(D
C>
Q
0
C.
C>
Q
Q
0
C,
C>
Q
0
C.
C.
C.
Q
0
(D
0
0
C>
C>
C)
0
C)
0
a
a
0
C>
C>
C)
0
C)
C)
0
a
0
C>
F
LO
C?
U-)
U-)
LO
1?
LO
LO
LO
LO
1?
LO
1?
LO
1?
V)
LO
(?
V)
C?
V)
V)
LO
LO
1?
LO
C?
U-)
9
9
9
9
9
9
9
9
9
9
0 tilt
C)
CD,
CD
CD
CD
CD
CD
CD
CD
CD
CD,
CD
CD
C)
C>
C>
C>
C)
C)
CD,
70
0
(D
0
(D
0
C>
C>
CD
CD
0
(D
0
(D
0
C>
C>
C>
CD
0
(D
0
c
�
0
LO
(D
LO
a
Cj
a
C14
0
C14
C)
cli
0
cli
C)
0
(n
Cl)
(n
m
0
cq
a
N
0
V)
a
cli
0
0.
1.0
0)
a.
a.
lc:>>
N
N
M
C)
0
O
IOU
00)
wl9
UO)
cq:)
C9
9
9
C)
<D
ID
(D
(D
O
C>
C)
C)
C)
<D
ID
(D
CD
O
O
C>
(D
CD
<D
E2
0
C>
0
C,
0
C)
0
a
a
0
C)
0
C,
0
C)
C)
C)
C)
0
C)
>-
C
Lq
9
U)
LO
LO
U?
U?
I?
0
9
U)
U)
UO
9
9
9
9
U?
9
U)
0
F
r
N
—
—
—
—
—
N
N
N
—
—
—
N
(N
(N
cli
—
N
—
C7
cc F
O
O
6
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
4.) rr
C�
C�
I?
I?
C�
C�
C�
I?
C?
C�
C�
I?
I?
C?
C�
C�
I?
m
CO
co
Co
a
0
co
a
a
0
00
a
a
0
00
a
0
(D
E
CD
(D
(D
(D
(0
(0
(0
C)
C)
0
(0
(0
(0
0
C)
C)
C)
<0
0
<0
N
Jam'
cli
C,
04
04
04
04
C4
Q
Q
0
04
N
cli
0
(D
(D
0
N
0
CA
0
(D
0
a
0
C)
0
a
a
0
a
0
a
0
a
C)
0
C)
0
(D
4
4
C;
C;
O
a CL
E
-c6
E
E
E
E
E
E
E
E
T
T
2
2
0
0
0
0
0
0
0
0
0
0
0
6
0
(D
(D
(D
0
0
0
(D
0
(D
(D
0
(D
C)
+
E
06
0
0
0
0
co
0
0
N
a
04
0)
U)
It
0
(S')
U)
0
a
0
a
C>
0)
m
r-
r-
m
0
co
Cc>
0)
C14
C�
CV
6
N
(0
co
0)
0)
U')
W
'14'
0)
N
d'
d'
It
0
0
0
M
OD
M
N
C?
Lq
1p
h
O
N
M
1p
7
Lq
LO
C14
0
LO
0
(0
0)
(0
It
0
0
0
0
0
O
0
0
0
0
0
II
(D
C14.
Nr
r
(O
W
-14'
CV
M
co
rl-
O
0)
O
0
O
C)
O
0
O
co
N
(O
O
C)
0
(D
Ul)
co
'T
0
cli
co
C4
04
co
Ul)
co
C)
co
LO
NT
m
C>
N
00
tom-
II9
O
--;,:
cq
9
M
-:
7
CV
V
"
q
cy
0
co
cli
co
O
M—
cli
0
0
N
LO
0
cli
(D
ocr
co
z
(D
CO
C)
Cl)
NT
m
Q0
rl-
co
(M
C>iNiyy
M
z
C
0
It
<
LO
<
P�
<
co
0)
LL
Chi
U
O
LU
(D
o
r- 0
N
0
�t
0
co
r-
M
0
Nn
z
D z
I I
IL
M
W`t�
yO�
T
Q
Q
4
V/
T
x
j
L
Cl)
E
L
0
-W
cn
0
/-/�
�V
YTS
i
O
�
ro
V
V
a
N
Lo
V
a
°
h
LO
W
M
M
�
rR
M
M
N
w
3
�
N
O
_
CV
C)
N
N
�
t0
N
M
d
N
O
V
N
M
M
�
—
M
O
M
O
�C
G
h
h
�
N
N
M
r
a0
N
N
O
�
N
O
M
N
O
N
O
N
O
M
m
N
d
N
N
E
N
m
tL
�
U
N
O
d
R
a
4rs�
00to
O
0(n
LOO
0
0
00
0
00
O
O
O
00
(n
00
00
t
7 O M
to
7,7
r N
M
O
00 M
O
O O
r-
O
0
r r`
r
r r
O O
47
(A (T O
r-
00 CD
0) CD
O
N
N N
Cl)
(V (V
O
N
rP
LO CO
r1'
LO CO
(0(D
y
0 O
N CO
N CO
CO
Cl)
CO CO
M
rt et
(O
(O
(O
(0 (0
rt et
Nt It
= y:
co Cl) M
M
M co
co Cl)
co
co
co Cl)
Cl)
co co
Cl)
M
M
M co
M
M Cl)
Cl) co
N
O
N
N
a
UUU
U
UU
UU
U
U
UU
U
UU
U
U
U
UU
U
UU
UU
J
�
r
.0
cU
N d' (O
rt (V r
N
yT
N (O
rt r
(0 co
CO r
(O
M
(0
co
(A t0
CO r
0
M
d' 0
N M
I�t
N
Nt
N
(O
r
(O t0
r r
O
Cl)
0 t0
M r
O (O
M r
C
O
O
0
t0
C.
O
O
O
C.
O
O
O
O
O
0
UO
O
0
C1
M
O
d'
r
CA
(O
V
N
(O
LO
O
U0
r
V
O
O
CA
00
h
r-
00
O
O
N
M
O
N
C7
(O
O
(O
M
It
(O
N
N
Cl)
M
M
co
V
(O
(O
(O
(0
(0
(O
N
_
Cl)
M
Cl)
Cl)
Cl)
M
Cl)
Cl)
Cl)
Cl)
Cl)
Cl)
Cl)
M
Cl)
Cl)
Cl)
Cl)
(0
N
�+
�
U
Q
i
d
U
U
U
U
U
U
{.)
U
J
m
O
t!)
rs
E
Z
N
N
N
N
C0
(0
(0
(4
0
IT
(O
(O
t0
O
O
O
Cl) M M co co N N N r r r CO Cl) co
N �
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
0
a -
rr
�r
rr
rr
�r
rr
rr
�r
It
IT
IT
IT
IT
IT
�r
v
'S$
L
V
O
O
O
O
Cl
O
O
O
Cl
O
O
O
O
O
O
O
O
0
�
O
O
O
O
O
O
O
®
O
O
O
®
®
O
O
O
®
O
.�.t
�
Sl?
J
d
=
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
N
97
N
N
tU
N
N
tU
tU
N
N
tU
tU
N
N
N
tU
N
O
0
(O
O
O
O
O
O
0
(O
(O
O
(O
(O
O
O
O
0
r-
O
r-
Cl?
N
OS
O
(O
(V
r-
O
O
O
0
O
O
r-
O
N
N
r--:
It
r-
O
CO
d'
O
O
0
O
'IT
O
I?N
0
W
M
rt
ct
rt
ct
cP
M
(O
(O
co
(0
M
r-
r-
co
C0
co
M
M
M
Co
co
co
co
co
co
M
Cl)
M
M
Cl)
M
M
M
Cl)
O
O
O
O
O
O
O
O
O
O
O
O
O
++
t6
S9
<6
<6
m
m
<6
t6
m
m
<6
t6
r_ T
E
O
E
O
m
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
0
E
O
m
m
is
is
�
E
�
N
�
m
V
m
Cl)
m
It
m
m
(.0
m
r-
m
(0
m
0)
m
m
m
m
m
m
m
N
m
co
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
(a
w
U
N
U
O
N—
M—
't
0
(0
cloy
O
M
v'
(O
to
r.
M
(M.
r
.
1-
d
(A Z
N
d
tS3
a
OLo
00
O
O O
O
O
O
O O
O
U>
O
00
V)Lo
t
N t--
N N
r
O O
r
O)
M
Izr �
(0
r
N
N (V
(D t4
N
O OJ
Cl)
rt rf
M
N
(D (D
h
co
O
M OJ
O O
"� ...
ct rt
(() to
LO
LO tt)
(D
LO
(()
M M
Cl)
M
Cl)
Co Cl)
co Cl)M
M co
M
Cl)
co
M co
co
CoM
Cl) co
Co M
N
O
N
N
G
UU
U
U)U
{�
t
U
{�
U
UU
U
U
U
UU
Utz
J
�
r
.0
cU
LO
O to
O
u) LO
LO
u)
LO
co LO
O
LO
LO
d- LO
LO
CV r
r r
r
r r
r
r
r
r r
r
r
r
N r
N r
N �
to c,-..
O
C.
O
O
O
O
O
O
O
C.
C.
N
O
O
C.
tO
O
h
O
tO
t
O
D)
O
O
N
W
M
O
N
(D
I--m
M
h
N
UO
M
r
N
(D
O
P^
M
(V
(D
d'
h
(A
Ih
C,
D)
(D
O
4
(D
b'
0)
4)
> �„
'ITt0
Lf)
LO
(D
(D
LO
LO
tD
t0
t0
Un
t()
M
Cl)
M
M
V
N
_ �i-
M
(`')
co
Cl)
M
M
Cl)
Cl)
Cl)(`')
(`')
M
Cl)
M
(`')
M
Cl)
Cl)
M
M
(D
N
a
�
U
Q
i
c
(D
U
t}
C)
C)
C)
C)
C)
C)
v
t}
C)
c)
U
C)
C)
c)
U
C)
C)
{
J
m
O
t!)
rs
E
Z
O
O
M
LO
LO
u)
u)
tO
U)
U)
LO
LO
O
O
c4
0tO
co r r r r r r r r r r r r r r r r N
N N
N �
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
.a .-.
rr
�r
rr
rr
rr
�r
rr
rr
�r
�r
�r
rr
rr
rr
�r
rr
rr
rr
�r
rr
'S$
L
V
O
Cl
O
O
O
O
O
O
O
Cl
Cl
O
O
O
Cl
O
O
O
O
O
�
O
O
O
O
®
O
O
O
®
O
O
O
O
®
O
O
O
®
O
O
.�.t
�
Sl?
J
d
=
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
m
N
cU
N
N
97
97
N
N
cU
cU
cU
N
N
97
cU
N
N
97
97
N
O
O
O
O
to
LO
O
O
O
O
O
O
O
tO
O
O
O
O
LO
O
N
tt)
O
V:
O
O
O
O
O
co
O
O
N
tO
th
O
O
O
O
O
O
7
O
h
M
h
(V
(D
N
tt)
co
to
V'
LO
O
O
co
W
tO
(D
co
CD
(D
h
(D
CD
LO
(D
(D
(D
(D
It
It
It
It
It
M
N
co
M
M
Cl)
co
M
M
Cl)
Cl)
co
co
co
co
co
M
co
co
M
M
co
O
O
O
O
O
0
O
0
o
v m
c
c
c
c
c
c
c
c
c
r_ T
@
4}
4}
N
4}
4}
N
N
N
N
m
oo
`
oof
bb
o
000`o
b
`b
(D
(D
(D
0
E
�
N
�
m
V
N
�
M
O
tq
O
N
N
N
N
N
Cp
m
Ul)
N
co
N
I-N
N
m
N
m
C)O
(D
CO
M
m
m
coM
co
co
(O
co
m
h
M
I -
CO
0�
t0
t0
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
lL
U
N
U
O
O
N
co
d-
LO
(D
h-
(D
m
O
N
Cl)
It
LO
(D
h
co
O
r
N
N
N
N
N
N
N
N
N
N
M
Cl)
Cl)
Cl)
co
Cl)
CO
CO
M
d
(A Z
R
a
LO cn
o 0
0
(n LO
o U)
a
o o
N
o
r-
o
0
t
(D(D
If)
N
(0(0
r Cl)
r
77
t`
OR
tp
ll�
(9
N
0 0
C0
IT IT
MO
CO
0 C)
CDN
IT
LO
N N
N N
N
N N
N N
Cl)
M co
co
N
(V
(V
Na
y:
Co co
co m
M
Cl) co
Co co
co
f7 Ci
co
M
Cl)
Cl)
co
N
O
N
N
a
UU
UU
t)
t)U
UU
U
UU
U
U
t)
U
U
J
�
r
.0
cU
to
its
0
LO
r to
I�t
LO LO
th U)
(n
to U)
(n
LO
LO
LO
LO
CV r
N r
N
r r
r r
r
r r
r
r
r
r
r
N �
Ul)
C.
O
U)
O
O
O
(N
O
tf)
N
O
O
O
O
r-
O
C.
C.
U)
O
CM
O
C0
V
It
d7
t0
0)
ih
co
0)
t0
O
O
r
OR
h
0
(9
Cl?N
N
"t
d'
U7
CM
0(O
b'
N
N
N
N
(V
fM
M
M
C7
M
M
M
(`')
h7
N
N
N
N
N
N
N
Cl)
co
Cl)
Cl)
Cl)
Cl)
Cl)
Cl)
M
C7
Cl)
f7
co
C7
Cl)
Cl)
Cl)
Cl)
Cl)
(7
(p
N
a
�
U
Q
i
d
U
U
U
U
U
U
C)
U
U
U
C)
U
U
U
U
U
U
U
C)
C)
J
m
O
(/i
rs
E
Z
LO
LO
LO
LO
th
LO
LO
LO
th
LO
U)
LO
LO
U')
U')
U')
N N N N r r r r r r r r r r r r r r r r
N �
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
a -
rr
�r
rr
rr
rr
rr
rr
rr
o
�r
rr
rr
rr
�r
IT
rr
rr
�r
�r
rr
'S$
L
V
O
Cl
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
Cl
O
ai
o
0
0
0
®
O
o
o
O
o
0
0
®
o
0
0
0
®
o
0
.t.t
to
J
d
=
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
�
N
tU
N
N
97
N
N
N
97
97
N
N
97
97
N
N
N
tU
tU
N
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
N ...
O
00
O
tb
C?O
co
CO
0)
O)
N
tl-
N
h
co
M
()
tb
m
t--
(0
V)
U]
(D
N
C,r
(DCO
I,,-
U)
CO
o
co
C,t
O
UZ
co
CL W
N
N
N
N
'mot
cr
cP
cP
M
M
M
C')
'1t
Y
Cl)
N
N
N
N
N
Co
co
M
Cl)
co
co
co
Co
co
m
co
co
(1)
m
Cl)
M
M
m
cm
co
0
O
O
O
o
O
o
o
00)
c
c
c
c
c
c
c
r_ T
@
4)
4)
N
N
4)
4)
m
m
o
0
0
0
p
o
fb
o
o
T
T
m
m
is
is
m
C7
(?
(D
U
C7
U
U
(D
(D
(D
(D
(?
{?
(7
0
E
�
N
�
m
7
m
It
Nr
O
m
co
7
Q
O
+�-
N
com
Co
co
O
�
�
m
CD
m
Nr
m
C4
m
CO
O
u-,
U)
u)
N
to
M
v)
d'
O
to
U)
I—
m
m
m
m
W
m
m
CO
CO
CO
CO
m
m
RL
U
N
U
O)
O
N
m
d-
tt)
(0
h
N
O
O
N
CO
�t
U)
(D
h
CO
O
.F O
Cl)
IT
rt
rt
rt
rt
It
rt
v
'It
rt
to
u)
U')
to
U')
LO
u)
LO
LO
O_
UA Z
it
t
4)
CD
Q
cli
0
C>
C,
cl?
"
So
't
C14
co
cli
N
cli
cli
co
Cl)
Cl)
Cl)
to
(D
C)
0
C)
U
CL
15
to
-0
E
z
.Li
CD
C>
C>
CD
0
C)
0
C)
(D
(D
CL
m
(n
L2
c:)
c:)
r= >
, .
0)
V:
co
V:
co
"q
co
m
m
0
�o
.0
76
76
a Q
E
E
0
0
0
10
0
E
co
LO
r-_
LO
co
LO
rn
0
co
co
co
LO
co
ca
m
co
U)
}
Qy
ii
t;
LO
�o
CD
cq
0
.(D
9
n
to z
c
r_
C:
r_
r_
r_
c
c
r_
r_
C:
C:
r_
C:
r_
0
0
0
0
0
0
0
0
0
0
a
0
0
0
0
to
cc
cc
cc
m
m
ca
ca
m
to
cc
to
cc
r_ CL
4)
4
4
a)
Sl
a)
a)
a)
2
-0
-0
E
E
E
E
E
E
E
E
E
E
E
E
—
—
—
.2
.2
.2
p
.2
p
(D
0
C)
0
0
(D
0
0
0
0
0
0
0
0
0
0
0
0
0
C)
0
C)
0
C)
0
0
2
(D
2
(D
2
(D
2
(D
2
0
2
(D
(D
(D
0
C)
0
LU
co
C�
(D
r
C:l
co
C14
cr
im -j Z
c,4
m
tn
11
co
0)
N
cli
04
C)
N
m
0
LO
O
I--
C*4
O
(o
"r
U)
N
m
r--
CO
"r
0
N
Lo
V
C)
r
R
N
fl:
fl:
C?
U)
U)
P
P
O
C\!
'DR
C?
(
_j
Ue r_
CD Cj U-) co m r-- Cj 'T Lo (D 0) m 0) cq m 'T Lo Lo (o c) 00
�-'!
m
C\l
co
co
m
co
m
co
m
co
m
co
co
co
m
-1
CY)
V)
co
V)
Cl)
tn
co
(D
m
<0
Cl)
(0
Cl)
�r
Cl)
Ln
m
Ln
m
U�,
Cl)
U5
m
tn
m
LO
m
<0
m
(D
m
0 0)
(D
0
co
t--
0)
U')
Cl)
CO
Cl)
't
Cl)
(D
(0
to
-U2
I-
N
N
IT
C,
C',
10
C,
-U2
-U2
't
N
-�T
IT
1p
CO
OR
C?
(9
Cl?
"
T
T
c
a
r-
r-
c
CV
6
C6
c
c
6
r-
c
c
C)
C)
C)
C)
C:)
(D
c
c
C:>
c)
co
u
C:>
0)
m
(0
It
CO
co
I�r
NNr
CO
CY)
0)
m
"
LO
to
I?
r-
N
I-
r-:
.
r-
CO
'7
7
'()
C:'
(M
U)
CA
C'J
M
R
CO
"T
C:'
0
7
0 CL
0
0
N
*-
<0
CO
q
N
V-
U)
(D
0)
(D
CO
0
N
m
dt
LO
(D
cl)
CO
(D
co
CIJ
(I
Cl)
(n
M
(n
m
Cl)
m
co
Cl)
V)
Cl)
V)
It
C")
V)
co
V)
co
LO
V)
(0
V)
C.0
m
CD
Cl)
I-T
V)
LO
(n
LO
(n
LO
co
LO
Cl)
LO
<0
LO
co
C.0
Cl)
(D
Cl)
0
C)
N
m
Cj
C)
C)
r-
cli
'T
C.0
(.0
01
LO
�!
�2
N.
(D
'IT
a
cq
I?
rl-
LO
U.
C?
fl-:
O�
Lo
(S
23
O�
U?
.
9
"
OR
M
(9
E
M
N
CD
CD
�;
m
U.)
CO
0)
r--
N
'T
r--
m
N
m
Cr
Lo
Lo
0
m
:3
CD 0^
C,
m
M
N
m
Cl)
m
m
Ce)
m
Cl)
(')
Cl)
m
ce)
m
et
m
LO
m
to
co
LO
m
(0
m
(0
m
It
(')
It
m
LO
m
LO
m
V)
m
tn
m
Ln
m
to
m
(0
m
z
r-
C14
r-
—
M
CO
r-
r-
0
qT
CO
CO
N
0)
CO
M
M
0)
qT
CV
O
LO
c:�
cO
CO
<D
0)
LO
cO
LO
'T
CO
V
cD
Lf)
c:�
�2
C�
Cl)
0
LO
(o
C)
C�
co
C,
0
0
C)
0
co
M
co
m
ci
.
N
r_:
.
.
C>
CD
C=)
U')
C,
(D
C)
C,
C>
C�
C)
C=)
C)
41)
CD
CD
C)
C>
C)
C=)
<D
C)
CL
(3�
M
0�
OR
(Q
V
CO
U)
U)
O
U)
O
a,
CO
q
9
M
CO
Ol
C-9
>
CO
C)
co
rl-
cn
rl-
C,4
Cl)
m0
C,4
Cl)
m
co
0
m
co
N
M
Cl)
Cl)
MLO
m
co
co
N
LO
co
CO
LO
co
LO
(0
Cl)
0)
C.0
co
(D
(D
co
M
T
(Y)
�t
V,
m
V)
V,
m
0
�T
co
�)
co
NN
V)
co
CO
V)
Cl)
(D
Cl)
r"
(D
co
_j
uj
O
O
O
O
L2
C)
C)
0
a
C�
C�
CD
0
C)
C)
C)
L2
(R
C�
C�
C)
0
CL
CO
a
00
(D
C,
fl-
(0
C>
rl-
tl-
(D
C,
N
Cli
P
o
r
E
00
m
CD
CV
C'4
co
CV
CD
"
'T
'o
U-)
CV
'T
V)
(D
G>
�;
m
co
2
> -j
C,
co
CD
co
m
N
m
N
C')
co
C')
Cl)
co
Cl)
co
Cl)
co
Nr
m
LO
m
tn
co
Ln
m
<0
m
(0
m
M
It
m
It
co
Nt
m
It
co
co
U)
m
Ln
co
(D
C')
Lu
C�
0)
N
cq
P�
co
0)
CO
<0
a)
IT
1.0
Cl)
'IT
Lr)
co
LO
0')
C\l
1-
(1)
CO
tq
m
(D
co
cli
C?
r--
co
IT
Cl)
C>
IT
cli
m
Cl)
0)
U,
OlCD
m
co
(D
(D
C)
0)
(D
co
L6
r:
—
cq
r-
M
'7
o
c.
C�
Cj
7
U)
0
0
r:
co
C)
V:
00
;t
0
t-
(0
CO(D
U)
Lo
'o
Co.
C.0
C
M
m
to
LO
C',
(1)
CO
m
N
r--
Zo
C\l
(D
C:l
CN
't
cli
0
O
N
N
cli
cli
(0
(0
(0
(0
(D
Ln
LO
LO
(D
0
0
CD
co
co
U)
U)
0
co
co
<Q
cq
cq
cq
—
—
—
CO
CO
CO
(1)
C-4
—
—
—
—
w
4) (D
>
0
m
co
m
0)
w
C)
N
(0
rl-
CO
[,-
m
C6
O
r
N
CO
R
r
U)
114:
1'
(9
r
0
LO
"
9
"
m
CO
t-
0
m
0?
o a)
cq
co
co
m
(D
m
(D
o)
C.0
cD
co
r-
LO
N
04
c�
-T
-T
o
N
CO
c6
7
1-
7
0
M
a)
21
m
2
=3
E
N
11
(D
co
'0
0
0
c
c"
cq
m
Cl)
N
co
Lo
(D
fl-
CO
0)
co
NNcli
a-
IL
0-
0-
a-
a-
LL
a)
LU
O
o
(D
n
z
a
D
—
"
m
0
(D
r-
m
M
N
NN
N
c
C:
r_
c
c
r_
r_
C:
C:
r_
C:
C:
r_
0
.0
0
.0
.0
.0
.0
o
.2
.2
.2
.2
2
L) mr_
Irz
iu
m
m
16
ism
to
is
ICU
'9
cc
CL
E
E
E
E
E
E
E
E
E
E
E
p
E
(D
0
C)
0
U
C7
C7
0
U
0
0
0
0
0
C)
t7
0
C)
0
0
C)
0
0
0
0
(D
0
0
o
r 6
N
C)
(0
O
CO
M
h
CA
M
It
CO
t-
00
0)
0
�t
04
CO
'14'
04
CO
im -j Z
N
N
NNco
m
m
co
Mm
Cl)
co
co
N
N
CO
m
0)
0
CO
h
0
N
0
w
w
CO
M
1-
0
M
FI-
r-
CO
N
cli
co
<0
CO
(D
r
LO
C>
CO
0)
co
(0
cli
(0
C,
-T
co
0
N
cq
(0 h I.- rP 4 C,5 i h o6 m 6 6 6 N ri 6 6 06 CO 6 N
O
m
Cl)
U')
co
CO
m
U')
m
CO
m
CO
m
CO
V)
co
m
ce)
co
CO
Cl)
co
co
co
co
Cl)
co
CO
co
co
co
m
m
co
m
m
-t
m
V
(1)
m
(0
0)
rF
N
M
co
CO
C)
CO
—
O
O
N
N
C>
ci
6
6
6
ci
ci
c
—
C:
C:
C:
C)
r-
C:
CD
r-
C)
r-
C:
C:
r-
r-
C
cli
Cl)
Cl)
m
0)
0
CO
C:>
N
C)
CO
co
co
co
r-
(0
Cl)
fl-
r-
0)
(D
1p
Lq
(9
U0
C)
CO
O
CR
(P
N
(D
CO
Cl
(N
N
0
(D
(0
h
't
dr
co
It
I-
co
m
m
C)
N
't
CO
0
00
00
0
0
(D
x M
CO
M
LO
<l)
LO
M
LO
M
LO
Cl)
CO
Cl)
LO
<n
m
(111)
m
<0
m
Cl)
m
Cl)
V
m
(n
CM
m
N
Cl)
cq
V)
cq
M
cq
M
m
co
m
Cl)
co
V)
(n
co
m
0
C)
(D
cli
r-
cli
m
cli
(0
C\l
CO
r-
C)
0
C)
co
co
00
00
r-
(0
r-
0
(D
Q)
r_
co
N
r
C?
N
r
r
N
CO
(9
rC?
OR
G)
CO
(9
N
M
O
CO
V
M
E
(D
LO
rl-
rr
'IT
Cl)
cli
rl-
00
m
0)
CD
N
rf
CO
CD
co
rl-
co
CD
:3
Mto
M
co
COCOLO
co
co
m
CO
m
CO
co
co
Ce)
C',
Ce)
m
Ce)
m
Cl)
m
m
co
cli
co
N
co
N
co
N
co
C\l
M
Ce)
m
Cl)
m
Cl)
m
Ce)
c')
Cl)
m
z
m
r-
cq
0
�2
�T
u)
C)
:�
<=>
t-
'q
m
LO
r-
c=)
00
cq
cq
cO
CD
0
co
C)
co
0)
C6
C�
0)
C�
0
CD
01
0
COO
(D
U')
�r
0
0
LO
0
(D
(D
LO
O
'IT
a
0
0
O
Cl)
OD
CIJ
(o
LO
CO
r-�
CO')
O
o
C)
C>
CD
C=)
)
C)
N
C,
C)
<D
CO
C>
r.-
C)
LO
U *)
C,
C)
Ln
<D
C>
(D
a
CL
C'�
r:
U)
CR
(P
h
N
V
O
q
1p
p
'It
114:
Cl?
p
V
0)
O
V
r-�
>
U')
CO
co
cq
CO
M
co
CO
M
M
co
0
U')
co
cl)
CO
m
(D
m
co
P,
0
co
1-
Cl)
co
0)
Cl)
co
C)
Iz
A
00
0)
0
CN)
m
cl)
N
co
�
N
co
CO
N
Cl)
I'-
Cl)
Cl)
(D
Mm
co
0)
Cl)
CO
0
Cl)
0
m
Cl)
0
o
0
U)
o
0
0
0
a
0
C)
0
C)
(-)
CO
0
0
V)
o
o
0
CD
V)
CL
1:
q
I�T
0�
r-�
M9
"
I;t
(q
"
(9
N
M<9
CO
"
(P
Iq
't
oq
ME
4'a
"
m
m
CO
114,
CD
(D
rl-
CO
m
m
�o
6)
(DM
m
co
0
N
m
2
> J
CO
co
co
CO
co
Nr
m
CO
C')
It
m
V)
Cl)
M
Cl)
M
Cl)
M
Cl)
m
co
co
0
co
co
C')
CV
co
N
co
N
co
C14
co
N
co
co
co
Cl)
co
ce)
V)
cli
C')
a
m
co
(0
1--
CO
'T
Nt-
C=)
0)
co
10
Cl)
�r
(0
-4-
t
C:)
m
M
m
r-:
N
I-
M
N
CO
';t
"t
0)
(3�
13)
C,
0)
Cl)
Cl)
C)
Lo
co
co
V)
c)
NN
co
m
—
Cl)
0
4
to
0)
N
c.
N
-Z
rl
CO
U')
ai
m
CO
�m
6
M0
Cl)
NIt
M
F-
NOo
(D
0)
CON
N
r-
co
-1
r--
t-
0
a C',
2
'D
CO
CO
CO
to
CO
0
cli
cli
C14
N
C14
>
0
0)
m
co
co
co
0)
00
co
CO
(D
Cl)
0
(0
1-
LOcli
co
0
co
It
-
1-
0
0N
0)
0
cl)
CO
CO
et
"
CO
f
C)p
'q:
9
(?
6
0)
M
r,-:
(6
06
6
4
N"
OR
rl-:
(Ii
9
O
N<D
N
CO
MM
-
CD
N
-
-
-
-
-
M
CD
r-
21
m
2
O
N
11
(D
m
'0
0
0
E
'r
CO
(0
rl-
00
C)
O
C
N
M
V
CO
CD
r-
CO
M
0
N
<0
V
CO
r-
Cl)
C\j
cli
N
N
N
co
"
m
M
co
co
co
m
co
m
m
m
IL
0-
0-
0-
a-
a-
0-
0-
IL
IL
0-
a-
a-
a-
0-
0-
0-
a-
IL
0-
0-
a-
a-
LL
O
LU
o
(D
CO
to
[,-
00
0)
0
�;
N
M
't
0
(D
a
m
'IT
CO
0
r-
w
z
O
N
N
N
C14
cli
Cl)
Cl)
Cl)
Cl)
Cl)
co
co
Cl)
Cl)
rr
zr
v
v
v
c
r_
C:
r_
C:
C:
0
.0
.2
L) (D
ca r-
m
'
ru
m
r_ CL
20
20
iB
c6
c6
c6
2
2
T
20
20
20
C%j
0
C)
0
(D
0
(D
(D
(D
(D
0
C)
0
0
(D
to 0
r
-
00
It
0')
1;3-
co
t-
ce)
It
U)
(0
04
C>
0)
co
r (5
in -j Z
V)
Cl)
t1r)
LO
LO
U')
�r
�r
co
Co
—
Lr)
co
01
rG)
N
C?
(9
0)
U?
7
LO
I- C\j CO LO (D (D LO cY (Y) C%j C\j
-1 v
co
Cl)
V)
Cl)
co
C14
Cl)
04
Cl)
cli
co
N
co
04
co
04
co
CA
co
04
C0
04
co
0
C)
c
r_
r_
r_
c
C)
c
r_
c
c
c
r_
r_
C:
cli
m
(,0
r-
00
N
TL)
co
(0
C>
00
co
CO
to
U)
O
O
7
r
O
"
O
(9
07
V:
19
V
W�i
0 O.
r--
Cl)
Nn
cm
cm
LO
N
(0
N
(D
N
LO
N
V-
N
CO
N
N
N—
Cq
(D
(1)
M
M
M
M
M
co
<0
Cl)
Cl)
V)
V)
(1)
r_
O
O
(1)
C)
cli
LO
co
r-
00
00
00
C)
Q)
rl-:N
M
tl-
0',N
O
(D
(D
CO
M
E
CD
Cl)
�D
C\j
04
cn
04
u
N
0
CA
LO
"
CN
"
Z�
CD
N
:3
0 O^
co
M
m
m
Cl)
Cl)
co
co
Cl)
m
m
m
m
m
z
C14
cq
(D
LO
r-
qT
M
qT
.t
-;I-
CJ
cr)
0)
(D
00
Il-
(D
Cl)
V
(D
r-
r
04
co
04
0
C,
C�
o
6
6
C6
6
C14
C)
C)
C)
tl-
C,
C)
<D
U)
C>
C)
C)
w
CL
C9
r
CP
CR
"
V
M
114:
9
C?
N
(9
>
Cl)
(1)
cn
�;
Cl)
C.0
Cl)
co
Z�
co
N
N
co
�t
N
M
V)
N
m
(D
N
co
U')
N
co
't
N
(1)
CO
NN
co
N
Cl)
Cl)
O
C14
L2
�R
C)
C)
t-
0
a
LO
C,
")
LO
U-)
CL
f-:
C\l
oo
CO
Nr
(D
(D
M
(0
(0
00
E
tU
C)
CD
CD
CD
�o
C'i
'T
'o
'T
Z�
CD
> -j
Cl)
co
Cl)
co
m
m
m
m
C')
C')
NN
co
co
N
co
"
m
m
CN
co
m
m
co
<,)
C14
C=) C)
cor
0
�;
M
CO
CD
M
OD
co
—
(0
9
C)
C14
co
(D
(3)
Cl)
LO
LO
(D
CV
I�r
1--
to
t-
—
a
a)
cr
(D
Fq
't
C
(D
06
Cl)
6
LID
-:
(D
Mv-�
I-
(D
06
I--
06
N
6
0
06
(N
—:
d-
0
tU
O
4) (D
>
0
J to Lam,
0)
co
0
0
r-
C*4
OD
fl-
LO
0
0
04
(0
Cl)
a)
L()
LO
"
C?
"
rl�
C�
10?
C?
Lq
U?
7"
'a
0—
cT
Cl)
C)
M
r-
f�o
N
(D
CD
CD
IT
a)
21
m
2
=3
oi
O
(D
m
-0
2
0
0.
c
M
00
(0
0
M
04
r
LO
(0
1-
W
M
Cl)
IT
IT
IT
LO
LO
LO
U-)
U-)
U-)
U-)
LO
IL
0-
0-
a-
am
o
(D
0)
0
N
M
't
U)
(D
r--
0
M
a
r
N
n
z
C O
D z
'IT
LO
U)
LO
LO
LO
LO
LO
U')
U')
(D
(D
CD
CL 0)
>,.r- o
Co -j Z
C,
N
M
CO
(0
r-
00
0)
0
I
CL
0
C)
0
C)
0
(O
O
C)
C)
0
C)
0
C)
0
(O
(O
O
C)
0
C)
0
C)
C)
6
0
0
6
C5
0
0
6
6
6
0
0
6
6
0
0
0
6
6
0
6
6
6
It
N
'IT
m
'D
1--
(.0
�D
'a)
0
M
0
'IT
(D
Lq
'r
C�
(D
C9
r-
r,�
0)
C)
.
(0
Lq
r--
N
a)
0)
Cl?
[-
I?
c)
I?
ce)
r_-
o
tD
(0
6
LO
C?
Cl)
t
a
r*-�
0?
-
-
-
-
-
-
-
-
N
-
-
-
LO
-
(D
-
-
-
-
0)
(D
(D
LO
a
U)
a_-
(Ij
-t
I-
C�
'41,
En
r--
a
M
u)
u)
<D
M
M
N
0
C',
L
M
Mr-
M
C?
C?
('?
V:
V
V
C?
V:
V:
7
C�
V:
C?
N
0
0
0
0
0
0
0
a
a
0
0
0
0
0
0
0
0
a
0
0
0
0
ci
0
LO
LO
co
0)
V
CY)
(3)
(3)
0)
U)
C)
m
0
(D
U)
0)
U?
LO
(I
LO
(P
(.0
O
1-
Lq
(0
N
CD
CC!
m
(9
-
9
04
9
00
IQ
0)
cq
F-
rl-:
Cl
()rn
ID
<9
—
a)
00
ci
"T
Ui
U)
CV
cq
-,
(Y)
�
LO
fl-:
C)
fl-:
rLF
-
-
-
-
-
-
-
N
N
-
-
r-
M
-
-
N-
-
-
CO
��o
I-
(1) —
I_-
LO
0
00
0
00
W
0)
P-
0
N
CO
M(0
LO
0
r-
N0
Q.
M
C?
C?
M::�
.
V:
"
7
1?
14:
M
M
F
C)
C>
C>
CD
C)
(D
C>
CD
CD
(D
C>
C>
C)
C)
C>
C>
C>
C)
C)
C>
C>
C)
C)
2ca
:s
�2
�2
�2
�2
�2
�2
�2
�2
�2
�2
�2
�2
c2
�2
�2
�2
�2
c2
�2
�2
�2
�2
�2
2
C?
I?
C?
O
O
I?
C?
O
O
O
I?
C?
O
O
I?
I?
I?
O
C?
I?
I?
(D
10
co
0
C)
0
a
a
C,
0
a
a
0
C)
0
a
a
C,
C,
0
a
0
C)
0
O
O
C\j
0
C)
0
C)
0
(D
0
a
a
0
a
0
C)
0
(D
(D
0
a
0
C)
0
C)
C)
0
F
N
N
NN
N
N
N
N
N
N"
N
N
N
N
N
N
N
N
N
NN
N
C
x
C?
C?
C?
q
C?
1?
9
C?
C?
C?
C?
C?
09
1?
1?
9
(?
I?
C?
C?
q
q
0
C,
C>
Q
0
C.
C.
Q
Q
0
(D
CD,
Q
0
C.
C.
C>
Q
0
C,
C>
Q
Q
0
C>
C>
C)
0
C)
0
a
a
0
C>
C>
C)
0
C)
C)
0
a
0
C>
C>
C)
C)
(D
<
F
LO
U-)
U-)
LO
LO
LO
LO
LO
LO
LO
U-)
U-)
LO
V)
V)
V)
LO
U)
V)
LO
LO
-0
E
lt
0
C
C
D
C
C
C
C
C
C
C
C
D
C
C
C
C
C
C
C
C
C
CD
CD
70
io
cu
0 (D 0 (D 0 C> C> CD CD 0 (D 0 (D 0 C> C> C> CD 0 (D 0 (D (D
O
0
C)
0
C)
0
(D
0
a
a
0
C)
0
(D
0
(D
(D
0
a
0
C)
0
C)
C)
C14
1?
cli
N
C?
N
N
C\j
1?
C*4
"
C?
"
C?
cq
C?
cli
C?
N
C?
C\j
C\l
C\j
1?
C\j
1?
C\j
C14
(?
Clq
1?
cli
cli
C?
9
9
9
q
9
9
9
C)
<D
ID
(D
(D
O
C>
C)
C)
C)
<D
CD
CD
CD
O
O
C>
C)
C)
<D
ID
(D
(D
. 7co:
0
C)
0
C)
0
C)
0
C)
C)
0
C)
0
0
0
(D
(D
(D
a
0
CD
C>
(D
0
0
U)
9
U)
Lq
U?
U?
U?
Lq
U)
U)
Lq
V)
9
9
Cl
CD
0
Cl
Cl
CD
U)
N
-
-
-
-
-
-
-
-
-
-
(N
(N
CN
C\j
N
cli
"
cq
-
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
4�)
I?
I?
C�
C�
9
C?
C�
C�
C�
I?
C?
C�
C�
9
9
1?
C�
C�
I?
I?
C�
C�
0
CL
E
0
(0
(0
CD
(D
(0
(D
<0
<0
(D
<0
(D
(D
(D
C)
C)
C)
CD
0
CD
CD
CD
(D
Zi
I?
O�
O�
(?
C�
0�
G�
q
q
q
O�
O�
q
G�
I?
09
C?
C?
C?
C?
(?
q
0
N
Jam'
0
N
N
Q
04
C14
cq
C14
C14
cli
C\j
C\j
N
04
C.
(D
C.
Q
0
(D
CD,
Q
cq
0
(D
0
a
0
C)
0
C)
C)
0
a
0
a
0
a
a
0
a
0
(D
0
a
a
C
a CL
E
E
E
E
E
E
E
E
E
E
E
E
E
L2
o
0
0
0
0
C)
0
0
0
C)
0
0
0
C)
0
0
0
0
0
0
0
0
(D
(D
(D
(D
(D
(D
(D
(D
0
0
+
Cl)
C)
110
CO
'IT
cuo�
()
E
CL
Cl)
0)
co
(n
cl�
(9
1?
C)
U,
0
0
C>
Lcqo
U-)
co
C-4
t--
Iq
co
O
!�
0
(.0
LO
0)
4
00
m
ai
C*4
cq
cq
N
r
O
O-
C*4
0)
U)
CO
r
r
C)
-E
0
(D
V
LO
0
Ci
0)
0)
N
LO
N
co
0
00
0
N
0
0
0
'm
mr-:
C�
Lq
M9
C?
MOR
r-,
M
114:
U?
C?
a 0
Cl)
to
(D
r--r--
LO
<0
1-
-
0
C,
to
(D
MN
N
-
-
-
co
co
(1)
0�
0
MC)
co
f*-:
co
(P
rr
-
9
U)
o
o
,�
U
U)
CO
M
Q
r-
CO
II
�2
L,2
c�'
m
I'-
cO
C)
0
C�
m
NNcli
co
04
21
-
(0
V
'IT
-
N
C14
0)
0)
(D
fl-
r--
U)
I-
CO
M
0
W
V
M
0
0
N
I--
N
I-
a
fl-
cl)
?
'
V
cq
N
()R
ci
O
Lq
cy
r
ocr
(D
M
V
(D
1-
00
m
N
Ql
CO
m
m
m
mco
co
m
m
m
co
N
co
co
co
co
m
m
co
co
co
co
m
co
co
m
,
mo
7E
5�
>-
57-
>-
5:
LL
—
Chiu
(u
LU
(D
N
co
.
I--
o
r- 0
m
�t
o
co
r-
(�o
o
Ci
NN
N
z
D z
CL 0)
>,.r- o
Co -j Z
C14
C14
cli
C\j
0')
00
00
r-
N
co
LO
rl-
W
0)C)
N
M
rr
N
CL
0
C)
0
C)
0
(O
O
C)
C)
0
C)
0
C)
0
(D
(D
O
C)
0
C)
0
C)
C)
4) o
6
0
0
6
6
0
0
6
6
6
0
6
6
6
0
0
0
6
6
0
0
6
6
00
0)
r.-
00
1-
CC)
LO
(14
00
00
Lf)
It
04
0
LO
C%j
LO
00
(D
LO
00
(D
N
Lq
0)
()7
LQ
(9
V
M
CO
C?
"
I:
0>
M
0)
M
rl-:
O
O
(q
fl-:
IT
LO
OD
IT
IT
M
(D
0)
co
0)
r
M
C14
(D
<0
LO
LO
LO
q
M
N
(9
a
U)
N
0
"1"
00
(11
a,
(V
00C�
M
C�
C'�
"
C�
9
7
4)
o
0
0
o
0
a
a
0
0
o
0
0
o
0
0
a
0
0
0
0
0
C14
(D
(D
0)
(n
LO
Nm
U-)
r-
(VC�
(p
c�
(D
LO
0)
a
m
0
-t
F-
0)
Lr) - (_ r": r,-: r,-: 0) 9 Lq q Iq
rL
I-
fl-
-
I-
I-
(D
0-
-
-
-
LO
'44'
W
0
r-
0
1--
0
(D
IT
(0
'44'
(1) —
0
(0
(7)
(7)
1--
N
t-
(D
00
pj
(0
-�I-
N
N0)
0
00
W
It
t�
Q.
"
"
7
7
7
.
.
M7
7
"
ol
7
.
"
7
7
7
7
F
C)
C>
C>
C)
C)
(D
C>
CD
CD
(D
C>
C>
CD
C)
(D
C>
C>
C)
C)
C>
C>
C)
C)
2ca
Z
�2
�2
�2
�2
�2
�2
�2
�2
�2
�2
�2
�2
c2
�2
�2
�2
�2
c2
�2
�2
�2
�2
�2
2
O
I?
I?
O
O
I?
C?
O
O
O
I?
C?
O
O
I?
I?
C?
O
O
I?
I?
(D
(D
co
0
C)
0
a
a
C,
0
a
a
0
C)
0
a
a
(D
(D
0
(D
0
(D
0
O
O
C\j
0
C)
0
C)
0
(D
0
a
a
0
a
0
a
0
a
a
0
a
0
C)
0
C)
C)
F
N
N
NN
"
N
N
N
N
NN
N
N
N
N
N
N
N
NN
N
x
I?
C?
C?
(?
C?
1?
9
1?
1?
1?
O
O
q
C?
I?
1?
9
(?
I?
C?
C?
(?
(?
0
C,
C>
Q
0
C.
C>
Q
Q
0
(D
C>
Q
0
(D
(D
C.
Q
0
C,
C>
Q
Q
0
C>
C>
(D
0
C)
0
a
a
O
C>
C>
C)
0
C)
C)
0
a
0
C>
C>
C)
(D
F
V)
C?
Ln
O
V)
LO
V)
LO
LO
LO
1?
LO
1?
LO
1?
U-)
1?
U-)
C?
LO
(?
LO
to
to
LO
V)
1?
V)
C?
Ln
O
V)
LO
LO
E
lt
9
q
9
9
9
9
9
9
9
9
q
q
0
C
C
D
C
C
C
C
C
C
C
C
D
C
C
C
C
C
C
C
C
D
CD
CD
(D
_0
io
cu
0 a 0 (D 0 C> C> CD CD C) (D C) (D C) C> C> C> (D C) a 0 (D (D
O
0
C)
0
C)
0
(D
0
a
a
0
C)
0
C)
0
a
a
0
a
0
C)
0
C)
C)
C14
1?
C%j
N
O
C\j
(?
N
O
C\j
1?
N
.
(?
.
I?
.
1?
clq
N
O
C\j
C\l
C\j
1?
C\j
1?
C\j
C14
1?
C14
1?
cli
cli
C?
C\j
(?
C\j
(?
9
9
9
q
9
9
9
CD—
C)
<D
ID
a
(D
O
C>
C)
C)
C)
<D
ID
a
CD
O
O
C>
(D
CD
<D
ID
a
a
0
CD
C>
(D
0
C)
C)
a
C)
0
C)
0
C)
0
C)
C)
(D
a
0
C)
0
0
0
(q
9
9
9
U)
Lq
9
9
U?
(D
Uj
Uj
9
V)
9
9
9
1?
9
Uj
Uj
U?
LO
F
r
N
N
N
-
-
N
N
-
-
-
-
N
-
(N
(N
cli
C\j
N
-
-
-
F
O
O
6
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
4.) rr
0
0
I?
I?
0
0
o
I?
o
0
C�
9
9
0
0
o
I?
I?
0
C�
0
CL
E
(D
CD
CD
CD
(0
(0
o
CD
(D
(D
<0
(D
CD
(D
o
0
0
CD
0
(0
(0
(D
(D
Zi
q
9
o
o
C�
0�
9
(?
q
q
O�
O�
q
G�
I?
1?
9
1?
1?
O�
O�
q
q
0
04
(D
C>
Q
N
"
C>
Q
C14
04
C\j
C\j
Q
04
C.
C.
C>
Q
0
CA
N
N
N
0
(D
0
a
0
C)
0
C)
C)
0
(D
0
a
0
a
a
0
a
0
a
0
a
a
6
4
-4
6
6
4
4
4
4
6
4
6
6
6
6
6
4
4
4
4
C
a CL
m
m
E
E
E
E
E
c,
E
10
E
E
E
E
Lo
0
0
0
0
0
0
0
6
0
(D
(D
(D
(D
(D
0
0
0
0
+
(D
CLh
tD
LO
LO
CO
LO
F--
'14'
1.-
CN
0
0
CO
CO
tl-
r-
N
t-
LO
LO
ay
C>
V
co
.
LO
fl-
0)
co
et'm
N
LO
co
0)N
r-
LO
-
M
0
C6
N
4
6
6
6
r
r
6
r
r
6
6
6
6
6
C14
O
O
W
r-
—
a
0
N
0
0)
0
0
W
'T
0
0
�t
I--
co
�3
0)
V:
M
M
r*-,
t
OR
Lq
(q
1p
7
M"
C�
9
cp
0)
1p
ct
a—
—
—
—
—
—
—
co
co
0
0
U)
0
Lo
0
0
0
00
1-
C\j
0
0
N
C\j
C\j
0
r-
C14
0
0
0
11
9
C)
9
C>
cq
C>
q
C)
C)
O
C>
O
C>
O
CD
"t
(D
C?
C>
N
C>
O
CD
r
N
9
-
C?
-
Lq
-
f,-:
CD
U?
CD
CD
CD
CD
CD
CM
co
(0
En
m
0
C>
1.0
co
Ul)
co
co
co
"t
-
LO
M
0
LO
M
0
CO
cq
CV
"-:
C)
;�
V:
9
9
F-�
(q
U)
C)
r,�
C=�
W
C?
1p
M
h
CD
cy
N'T
-
-
-
to
a
0
0)
0
0
N0
-
-
-
9
cr
(D
C\l
04
co
m
m
co
CO
N
N
04
co
co
(D
co
co
co
ca
ca
co
co
co
co
co
't
m
m
m
m
m
co
Coo)
mo
mo
in
mo
co
m
m
co
co
cco)
coo
co
m
4i
7E
C)
C)
5:
C)
0
LL
—
(n
u
(u
W.
(D
It
LO
(D
fl-
00
0)
0
N
M
sr
LO
0
r-
W
M
0
N
M
It
LO
(0
I--
o
r- 0
N
cli
"
N
C14
cli
m
M
M
M
M
Cl)
M
m
(1)
(1)
d'
z
D z
CL 0)
Co -j Z
I
CL
C?
9
C?
q
9
co
9
C?
C?
I?
C?
C?
4) o
0
C,
C>
Q
0
(D
C>
Q
Q
0
(D
C>
Q
0
CI
CI
cli
C)
LO
O
O
It
!Zl
r--
(P
OJ
'IT
co
W
t
LO
v
r--
00
CO
0')
V,
6
V,
C6t
LO
Cl)
d1
cq
'DR
0
LO
0)
CC)
r--:
N
(D
r
V
(14
q
r
r
N
00
(9
r
(D
rl-
a
U)
CY)
OM
N
N
O
M
0�
cl�
O
a
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
LO
—
NN
Cl)
�
to
r
d1
Cl?
C>
m
(D
0)
Cl)
r--
M
Q
M
0")
Cl)
1'
M
M
(0
M
rl-
rLF
0)
N
(D
LO
V
—
V
CO
40
M0)
to—
0)
0)
m
1--
LO
t
0
a
oq
F
(D
C>
C>
C)
C)
C>
C>
C)
C)
C)
C>
C>
C)
C)
CDI
(D
2ca
�2
c,:'
�2
�2
�2
�2
�2
c,:'
c2
�2
�2
�2
C
S
S
CO)
2
C�
a
C�
9
0
C�
C)
co
0
C)
0
a
a
C,
0
a
a
0
C)
0
a
a
(D
(D
0
C)
0
C)
0
(D
0
a
a
0
C)
0
a
0
a
a
F
N
NN
N
N
N
N
CIA
CIA
N
N
N
N
N
N
x
0
(D
Cl
Q
0
C.
C>
Q
Q
0
C,
C>
Q
0
C.
(D
:3
0
0
CD
C>
C)
0
C)
0
a
a
0
C>
C>
C)
0
C)
C)
<
F
U)
LO
V)
LO
V)
LO
LO
LO
LO
LO
U-)
U-)
LO
LO
LO
LO
tilt
C)
CD
CD
CD
CD
C>
C>
CD
C)
C)
CD
CD
CD
C)
C>
C>
(D
_0
'a
cu
C) a 0 (D 0 C> C, CD CD C) (D C) (D C) C> C>
O
C)
C)
0
(D
0
C)
C)
0
(D
(D
C',
q
C,
9
lz�
9
N
9
C',
q
cli
lO
cli
lO
M-
C>
cp
cp
C>
C>
m
m
m
C>
cp
cp
C>
C>
C)
<D
ID
O
(D
O
C>
C)
C)
C)
<D
ID
O
(D
O
O
. 7co:
1?
9
C?
q
9
9
9
9
9
9
9
9
9
9
9
9
cq
N
N
N
N
N
N
N
N
cq
0
C)
C>
C,
0
(D
(D
a
a
0
C>
C>
0
0
C)
C)
0
LO
Cl
LO
LO
Cl
Cl
CD
CD
0
Cl
Cl
LO
LO
U?
Cl
—
—
(N
N
N
N
N
ci
N
r
r
r
(N
0
0
0
0
0
0
0
0
0
0
0
0
0
4�)
I?
U?
C�
C�
9
oU?
U?
LO
I?
U?
C�
I?
00
ce)
ce)
m
E
CD
co
co
C)
C)
CD
CD
0
CD
CD
co
co
(0
C)
Zi
C?
q
C�
lz�
9
0
0
o9
9
q
G�
O�
lz�
0
0
N
C>
N
N
(D
C.
Q
Q
0
C,
C>
04
04
C14
C.
0
a
0
a
0
a
0
a
C)
0
(D
0
a
0
C)
C)
00
N
LO
r_ CL
E
-c6
E
E
E
E
E
(D
o
0
T
(D
o
0
o
0
(D
(D
(D
(D
(D
(D
(D
0
0
0
0
0
C)
(D
+
(D
CL
0
t
0
0)
0
t�
0)
0
0
0
co
0
0)
LO
Nt
C)
E
0
r-
0
fl-
0
U')
N
(D
(D
0
N
0
0
C>
v
6
ci
CV
-E
co
0
co
0
0
N
0)
N
(D
r
C6
"
OR
CR
O7
CP
U?
C?
(9
OR
It
a
co
co
0
r-
0)
0
0
0
0
0
0
Cf)
0
0
0
0
0
0
11
9LO
C)
C>
CD
CD
C>
C>
CD
CD
CD
C>
C>
CD
CD
C>
C>
LU
I-
t
co
0
a
w
N
a
—
LO
a
CD
N
0
0
U?
M
C14
OR
(l?
U?
LO
cy
(D
O
0)
cr
o
co
0)
t�-
<
(.0
t�-
00
z
(D
co
a
04
m
LO
Lo
U")
LO
CO
ca
7D
co
co
LO
LO
Zo
0
C)
LO
m
m
m
U)
w
Co
m
m
co
m
m
m
m
m
m
m
m
m
m
4i
C
LL
57-
57-
5:
5:
5:
iz
6
u
LU
(D
r-
co
0)
<D
N
CO
'It
U')
CD
[--
00
0)
0
r
N
o
r- 0
't
t
t
LO
LO
LO
LO
LO
LO
U)
U)
LO
(D
(D
(D
d
z
nz
ai
qC
LLI
E
0
0
M
O
0
16
E
z
co
to
E
CN
rr
0
CL
C0
C)
0
CD
CD
C)
"14:
C?
>
U')
U-)
4-,
ce)
ce)
Cl)
Cl)
Cl)
C)
C)
0
CL
m
m
W
qT
't
Nt
Nt
cli
cli
(Ij
(Ij
cli
CD
0
(D
(D
0
CD
C�
0�
()R
"
7
0�
coLO
Iq
1q,
00
0)
Q
(Ij
co
co
co
LO
co
LO
co
(0
ce)
(0
0
(D
(D
CL
m
%
.0
E
z
3
3
5
5
5
3
(D
CD
0
CD
CD
C)
CD
kF
C
0
C
C
0
C
co
—1
(D
CL
L)
m
(D
(D
a)
a)
a)
(D
.0
(n
CD
0
CD
>
o
q
o
o
0
'ED
0
0
CL
0
-C
0rr
(1)
2
ce)
3
to
(D
rl-
co z
a
0
a CL
0
C)
O
c c o
W
C,4
co
q
LO
Z
U')
(0
CD
00
(D
(P
ce)
C\l
rl-
m
0
N
"n
cli
ce)
Cl) It
I(Y) t
LO
ce)
(0
ce)
(D
Cl)
0 0)
Nf
00
Co
tom-
m
a)
to
0)
O
C)
C)
c
CD
C)
(0
00
(P
(P
())
tl�
(?
cq
It
It
LO
(0
(D
ce)
Cl)
(Y)
ce)
ce)
Cl)
O
9
Il-
V-
co
cli
t—
m
C)
E
Cl)
Cl)
ce)
ce)
CY)
z
(D
0)
0)
co
Ce)
CL
V.
(0
r-
0)
0
C6
-1 co
C)
CD
C
CD
�
(ODR
CL
O
OR
OR
"
D
C11
N
C)
IT
LO
IT
co
LO
m
LO
C)
(D
>
ce)
Cl)
m
co
co
co
0
CD
C
CD
0
CD
9
"
9
9
V:
C?
•2
C4 N
:�Y
(D Iq
U) 00
M
U')
ce)
co
co
ce)
co
cy)
COO)(OP-Lou')
C11
(D
O
C\l
C)
IT
ice-
CD
0
rl�
fll-
co
CO
Q
6
(0
t,,-
Nt
CV
CV
CL
(5
Ncli
't
Nt
Nt
cli
cli
cli
(D
zr-
00
m
m
O�
cli
C9
00
r��
ao
024
LL
cli
cli
C\l
E
N
CN
<
C
(Dm
'a
0
rr
4)
0
CL
E
ii
O
UJ
O
0
(D
d
z
.r— 6
-1 z
0- 0)
co :3 z
0
-
(N
co
-,t
m
(D
0
C)
C)
0
(D
6
6
6
ci
Z7-
C\I
ce)
(?)
CF)
0)
Cl?
�:
LQ
�2
9
�2
�2
C�
C)
aw
ti
C)
cr)
(1)
CD
1q,
(0
9
N
C?
C?
ll�
Cl?
CD
C3
(D
C)
C)
C)
C)
C?
W
Ce)
�
LO
LQ
14T
C?
(D
C?
f-
C)
—
—
—
—
—
C)
It
00
LO
a)
CIL
O
C?
C?
C?
C?
CD
C)
C)
C)
C)
CD
�2
�2
CD
C!
a
O
O
a
C!
C)
C)
C)
C)
C)
CD
(D
a
0
C)
C)
0
a
N
N
N
N
-2
x
aa
0
a
a
a
=$
C)
O
O
O
C)
C)
L)
Q
0
C)
C)
0
Q
<
CD
to
LO
LO
LO
LO
E
(D
io
C)
C)
C)
C)
C)
C)
z
CD
0
a
a
0
a
a
9
9
9
9
C)
cli
C%j
N
N
cq
0
C"
0
cli
a
C%j
a
C%j
0
C%j
Q
cli
W
0 9
m
9
9
9
9
C?
2
C3
cp
C)
C)
cp
al
CD
0
C)
C)
0
(D
C)
N
cli
cli
cli
C\I
CD
0
CD
CD
0
a
If
CD
o
CD
CD
o
CD
a
o
o
o
C!
(D
C)
C)
C)
CD
CD
C)
C)
0
CD
CD
0
C)
(D
C!
C�
C�
C�
C�
C!
C)
C)
C)
C)
C)
C)
7E
I?
a
O
O
C?
I?
cq
C)
C)
C)
C)
C)
C)
0
CL
(D
(D
(D
(D
(D
+
Cl)
It
co
(D
E
ce)
co
r-:
t-:
CD
C!
I-
"
-t
U
I-
ll�
9 a
co 7
C)
V
U)
lq-
co
co
O
Vj
ce)
Cl)
LO
It
rl-:
00
rl-:
CD
II
U?
CD
I-
CD
E
4
CD
0)
V)
LO
co
f-
9
0
Imo-C?
06tD
C)
I-
m
CIL
II
to
m
O
N
co
to
(D
rl-
(D
o
o
cli
m
d
LO
a
d
z
z
rPROJECT
' ' 0�ffljjjF� DATE
7/23/2021
NAME PROJECT NO
ua Varina Middle School 20-111
BY
Fuquay Varina, INC CLH
CHECKED BY
Riprap Apron Outlet Protection
FES No.= SCM Al
Pipe Dia=
24
in
Q10 =
14.62
cfs
Qfull =
37.70
cfs
Vfull =
12.00
fps
From Fig. 8.06.b.1:
From Fig. 8.06.b.2:
Zone
D50
DMAX
Riprap Class
Apron Thickness
Apron Length
Apron Width = 3xDia
Riprap Apron Outlet Protection
FES No.= SCM A2
Pipe Dia=
30
in
Q10 =
4.18
cfs
Qfull =
118.20
cfs
Vfull =
24.00
fps
From Fig. 8.06.b.1:
From Fig. 8.06.b.2:
Zone
D50
D MAX
Riprap Class
Apron Thickness
Apron Length
Apron Width = 3xDia
Q10/Qfull =
V/Vfull =
V=
Q10/Qfull =
V/Vfull =
V=
DESIGN PHASE
PRELIM
CONSTR
REVISION
RECORD
OTHER
(SPECIFY)
0.39
0.93
11.1 fps
3
10 in
17 in
1
24 in
16 ft
6 ft
0.04
0.42
10.2 fps
14 in
23 in
2
36 in
25 ft
8 ft
/ X /
Riprap Apron Outlet Protection
FES No.= CULVERT
Pipe Dia=
24
in
Q10 =
7.24
cfs
Qfull =
61.50
cfs
Vfull =
19.60
fps
From Fig. 8.06.b.1: Zone
From Fig. 8.06.b.2
Q10/Qfull = 0.12
V/Vfull = 0.67
V = 13.2 fps
6
D50
= 14 in
DMAX
= 23 in
Riprap Class
= 2
Apron Thickness
= 36 in
Apron Length
= 20 ft
Apron Width = 3xDia
= 6 ft
Riprap Apron Outlet Protection
FES No.= BY-PASS
Pipe Dia=
24
in
Q10 =
28.91
cfs
Qfull =
51.97
cfs
Vfull =
16.97
fps
From Fig. 8.06.b.1: Zone
From Fig. 8.06.b.2
Q10/Qfull = 0.56
V/Vfull = 1.02
V = 17.4 fps
3
D50
= 10 in
DMAX
= 15 in
Riprap Class
= 1
Apron Thickness
= 22.5 in
Apron Length
= 16 ft
Apron Width = 3xDia
= 6 ft
DATE
DESIGN PHASE
PRELIM
CONSTR
/ X /
DATE
PROJECT NAME
PROJECT NO
M-15 Fuguay Varina Middle School
PROJECT NO
REVISION
RECORD
LOCATION
BY
Fuquay Varina, INC
CLH
OTHER
(SPECIFY)
CHECKED BY
Riprap Apron Outlet Protection (to Flat Ground)
FES No.= FES A5
Q10/Qfull =
0.56
Pipe Dia= 30 in
V/Vfull =
1.02
Q10 = 25.17 cfs
V =
9.7
fps
Qfull = 45.18 cfs
Vfull = 9.45 fps
Outlet Conditions: Flat area,
no defined channel
From Fig. 8.06.a:
D50
=
8
in
DMAX
=
12
in
3 o
Riprap Class
=
B
Apron Thickness
=
18
in
Outlet W = Do + La
Apron Length (L)
=
18
ft
diameter (Do)
Width (W 1) = 3xDia
=
8
ft
La —''
Width (W2) = Dia + L
=
21
ft
T ilwater < 0.50o
Riprap Apron Outlet Protection (to Flat Ground)
FES No.= FES B5
Q10/Qfull =
0.49
Pipe Dia= 36 in
V/Vfull =
1.02
Q10 = 69.62 cfs
V =
20.5
fps
Qfull = 142.76 cfs
Vfull = 20.06 fps
Outlet Conditions: Flat area,
no defined channel
From Fig. 8.06.a:
D50
=
20
in
DMAX
=
30
in
3 o
Riprap Class
=
B
Apron Thickness
=
45
in
Outlet W = Do + La
Apron Length (L)
=
20
ft
diameter (Do)
Width (W 1) = 3xDia
=
9
ft
La —''
Width (W2) = Dia + L
=
23
ft
T ilwater � 0.5Do
O8tM MANUAL
F000AY-\//-�R!NA
north corofino
OPERATIONS & MAINTENANCE MANUAL
STORMWATER CONTROL STRUCTURE
CONSTRUCTED WETLANDS
Owner(s): Wake County Board of Education
Address: I I I Corning Road, Suite 190
Phone Number: 919-588-3594
Site/Subdivision Plan #
Location: 1201 Bowling Road, Fuquay-Varina, NC 27526
Prepared by: CLH Design P.A.
Receiving Water Course: Kenneth Creek
Date:
Date Constructed:
OPERATIONS AND MAINTENANCE MANUAL
PROJECT NAME: Fuquay-Varina Middle School M-15
Constructed Wetlands
This manual establishes procedures for maintenance and operation of the Wetland SCM Al
in accordance with the Town of Fuquay-Varina's Land Development Ordinance as set forth
in Section 9-1405(e) MAINTENANCE.
Contractor: (List below)
Impoundment & Dam
Spillway
MAINTENANCE OF CONSTRUCTED WETLAND AREAS
Vegetation —The drainage areas have a ground cover of wetland plantings outside of the ponding
area, which if properly maintained will prevent erosion of the embankment and provide an easy
surface for inspection. The grass will be most difficult to obtain in the area subject to water level
fluctuation, and has been planted above the inundated areas. Wetland plants are located within all
water level fluctuation areas. Check vegetation conditions within the constructed wetland area
and replace if necessary any damaged plant materials
Re -Seeding —Periodic re -seeding may be required to establish grass on areas where seed did not
take or have been destroyed. Before seeding, fertilizer (12-12-12) should be applied at a
minimum rate of 12 to 15 pounds per 1,000 SF. The seed should be evenly sown at a rate of
three pounds per 1,000 SF. The seed should be covered with soil to the depth of approximately
1/4". Immediately following the planting, the area should be mulched with straw.
Mowing —Grass mowing, brush cutting and removal of weed vegetation will be necessary for
the proper maintenance of the areas. All area slopes and vegetation should be mowed when the
grass exceeds 8" in height. Acceptable methods include the use of weed whips or power brush
cutters and mowers.
Erosion —Erosion occurs when the water concentrates causing failure of the vegetation or when
vegetation dies and sets up the environment for rill erosion and eventually gullies from the
stormwater runoff The areas should be inspected. Proper care of vegetative areas that develop
erosion is required to prevent more serious damage to the site. Rills and gullies should be filled
with suitable soil compacted and then seeded. Methods described earlier on vegetation should be
used to properly establish the grass surface. Where eroded areas are detected, the cause of the
erosion should be addressed to prevent a continued maintenance problem. Frequently, problems
result from the concentration of runoff to one point of the constructed wetland area instead of a
uniform distribution of runoff This can be corrected by reshaping, to more evenly distribute the
runoff to areas not experiencing erosion problems.
Rodent Control —Generally in this urban environment, rodents are not a problem. Rodents such
as groundhogs, muskrats and moles are attracted to moist, wet areas and can be quite dangerous
to structural integrity and proper performance of the earthwork and drainage. Groundhogs and
muskrats thrive on burrowing into the manmade earthwork, which become pathways for seepage.
In the event that burrows are detected within the constructed wetland area, the rodents should be
dealt with by removal.
Trash and Debris —Trash acts as a barrier to stormwater infiltration and attracts unwanted pests.
The constructed wetland area should be kept clear of debris such as loose bottles, cans, food
containers and other forms of rubbish. The area should be cleared of debris as needed, but no
less than twice a year.
MAINTENANCE OF SPILLWAYS AND CONTROL STRUCTURE
Inspection of Conduits —Conduits should be inspected thoroughly once a year. Conduits should
be visually inspected at the joints. Pipes should be inspected for proper alignment (sagging),
elongation and displacement at joints, cracks, leaks, surface wear, loss of protective coating,
corrosion and blocking. Problems with conduits most often occur at joints and special attention
should be given to them during inspection. Joints should be checked for gaps caused by
elongation or settlement and loss of joint filler material. Open joints can permit erosion of the
earthwork and possibly the piping of soil material through the joints. A depression in the soil
surface over the pipe may be signs that soil is being removed from around the pipe.
OPERATION
Drainpipes —Drainpipes should always be operable so that the water can be drawn down in the
event of severe rain or for repairs or maintenance.
Record Keeping —Operation of constructed wetland area should include recording of the
following:
Annual Inspection ReportsA collection of written inspection reports should be kept on record
in Section IV of this manual. Inspection should be conducted annually. Copies should be
provided to the Town of Cary Stormwater Management Section of the Engineering Department.
2
Observations —All observations should be recorded. Where periodic inspections are performed
following significant rainfall, these inspections should be logged into the Periodic Inspection,
Operations and Maintenance Form in Section IV of this manual.
Maintenance —Written records of maintenance and/or repairs should be recorded on the Periodic
Inspection, Operation and Maintenance Form in Section IV of this manual.
Other Operational Procedures —The owner should maintain a complete and up-to-date set of
plans (as -built drawings) and all changes made to the constructed wetland area over time should
be recorded on the as-builts.
Sedimentation and Dredging —Sedimentation from on -site and off -site soils will eventually
result in the clogging of drainage conduits and will have to be removed. The frequency of this
sediment removal can be reduced by ensuring that the site areas around the building be stabilized
with a vegetative ground cover such that it restrains erosion. This would include a periodic
application of fertilizer and/or other treatment necessary to promote a stable ground cover and
minimize sedimentation to the pond. The removed material should be hauled offsite to a suitable
landfill site or mounded somewhere on site and stabilized with a ground cover sufficient to
restrain erosion.
Example Maintenance Schedule for constructed wetland Areas
Description
I Method
lFrequency
I Time of year
SOIL
Inspect and repair erosion
Visual
Monthly
All year
PLANTS
Removal and replacement of
See planting
Twice a year
As directed by
all dead and diseased
specifications
landscaper
vegetation considered beyond
treatment
Removal of cattails and other
By hand or
As needed
As needed
invasive species
through hand
application of
herbicide
Watering of plant material
By hand
Daily
Immediately after
shall take place at the end of
completion of project
each day for fourteen
consecutive days and after
planting is completed
POND AREA
Sediment in forebay has
Visual
Annual
During inspection
accumulated
Algae Cover
Visual
Annual
Summer months
Permanent Pool Elevation
returns to normal < 5-days
after large storm
IV. INSPECTION, OPERATION AND MAINTENANCE CHECKLISTS
WETLAND INSPECTION CHECKLIST
Date
Time
Constructed Wetland Pond
Fuquay-Vaina, NC
INSPECTORS
SPILLWAYS • DRAINS • OUTLETS
ACTION
CHECK/CIRCLE
CONDITION NOTED
OBSERVATIONS
R
E
P
A
I
R
S
M
O
N
I
T
O
R
I
N
V
E
S
T
I
G
A
T
I
V
E
Principal Spillway
Type:
trash rack/debris
cracks/deteri oration
improper alignment
cracks/deteri oration
joint deterioration
seepage/piping
Undercutting
Erosion
Debris
Lake Drain/Other Outlets
Type:
Gate/valves
Operability
RECORDED
DATE TIME RAIN POOL WEATHER GENERAL BY
LEVEL CONDITIONS OBSERVATIONS OR
COMMENTS
DATE I MAINTENANCE PERFORMED
DATE I EQUIPEMENT OPERATED
COMMENTS CORDED
C
COMMENTS RECORDED
BY
WETLAND INSPECTION CHECKLIST
Date
Time
Constructed Wetland Pond
Fuquay-Varina, NC
INSPECTORS
EMBANKMENT • POOL
ACTION
CHECK/CIRCLE
CONDITION NOTED
OBSERVATIONS
R
E
P
A
I
R
S
M
O
N
I
T
O
R
I
V
E
S
T
I
G
A
T
I
V
E
U/S SLOPE
vegetation
beaching/slides/cracks
undermining/erosion
rodent burrows
CREST
ruts/erosion
cracks/settlement
poor alignment
D/S SLOPE
vegetation/erosion
rodent burrows
slough/slides/cracks
seepage/wetness
POOL
erosion/ground cover
sedimentation
water quality
ABUTMENT
vegetation/erosion
slough/slides/cracks
seepage/wetness
GENERAL COMMENTS, SKETCHES & FIELD MEASUREMENTS
F000AY-\//-�R!NA
north corofino
OPERATIONS & MAINTENANCE MANUAL
STORMWATER CONTROL STRUCTURE
CONSTRUCTED WETLANDS
Owner(s): Wake County Board of Education
Address: I I I Corning Road, Suite 190
Phone Number: 919-588-3594
Site/Subdivision Plan #
Location: 1201 Bowling Road, Fuquay-Varina, NC 27526
Prepared by: CLH Design P.A.
Receiving Water Course: Kenneth Creek
Date:
Date Constructed:
OPERATIONS AND MAINTENANCE MANUAL
PROJECT NAME: Fuquay-Varina Middle School M-15
Constructed Wetlands
This manual establishes procedures for maintenance and operation of the Wetland SCM A2
in accordance with the Town of Fuquay-Varina's Land Development Ordinance as set forth
in Section 9-1405(e) MAINTENANCE.
Contractor: (List below)
Impoundment & Dam
Spillway
MAINTENANCE OF CONSTRUCTED WETLAND AREAS
Vegetation —The drainage areas have a ground cover of wetland plantings outside of the ponding
area, which if properly maintained will prevent erosion of the embankment and provide an easy
surface for inspection. The grass will be most difficult to obtain in the area subject to water level
fluctuation, and has been planted above the inundated areas. Wetland plants are located within all
water level fluctuation areas. Check vegetation conditions within the constructed wetland area
and replace if necessary any damaged plant materials
Re -Seeding —Periodic re -seeding may be required to establish grass on areas where seed did not
take or have been destroyed. Before seeding, fertilizer (12-12-12) should be applied at a
minimum rate of 12 to 15 pounds per 1,000 SF. The seed should be evenly sown at a rate of
three pounds per 1,000 SF. The seed should be covered with soil to the depth of approximately
1/4". Immediately following the planting, the area should be mulched with straw.
Mowing —Grass mowing, brush cutting and removal of weed vegetation will be necessary for
the proper maintenance of the areas. All area slopes and vegetation should be mowed when the
grass exceeds 8" in height. Acceptable methods include the use of weed whips or power brush
cutters and mowers.
Erosion —Erosion occurs when the water concentrates causing failure of the vegetation or when
vegetation dies and sets up the environment for rill erosion and eventually gullies from the
stormwater runoff The areas should be inspected. Proper care of vegetative areas that develop
erosion is required to prevent more serious damage to the site. Rills and gullies should be filled
with suitable soil compacted and then seeded. Methods described earlier on vegetation should be
used to properly establish the grass surface. Where eroded areas are detected, the cause of the
erosion should be addressed to prevent a continued maintenance problem. Frequently, problems
result from the concentration of runoff to one point of the constructed wetland area instead of a
uniform distribution of runoff This can be corrected by reshaping, to more evenly distribute the
runoff to areas not experiencing erosion problems.
Rodent Control —Generally in this urban environment, rodents are not a problem. Rodents such
as groundhogs, muskrats and moles are attracted to moist, wet areas and can be quite dangerous
to structural integrity and proper performance of the earthwork and drainage. Groundhogs and
muskrats thrive on burrowing into the manmade earthwork, which become pathways for seepage.
In the event that burrows are detected within the constructed wetland area, the rodents should be
dealt with by removal.
Trash and Debris —Trash acts as a barrier to stormwater infiltration and attracts unwanted pests.
The constructed wetland area should be kept clear of debris such as loose bottles, cans, food
containers and other forms of rubbish. The area should be cleared of debris as needed, but no
less than twice a year.
MAINTENANCE OF SPILLWAYS AND CONTROL STRUCTURE
Inspection of Conduits —Conduits should be inspected thoroughly once a year. Conduits should
be visually inspected at the joints. Pipes should be inspected for proper alignment (sagging),
elongation and displacement at joints, cracks, leaks, surface wear, loss of protective coating,
corrosion and blocking. Problems with conduits most often occur at joints and special attention
should be given to them during inspection. Joints should be checked for gaps caused by
elongation or settlement and loss of joint filler material. Open joints can permit erosion of the
earthwork and possibly the piping of soil material through the joints. A depression in the soil
surface over the pipe may be signs that soil is being removed from around the pipe.
OPERATION
Drainpipes —Drainpipes should always be operable so that the water can be drawn down in the
event of severe rain or for repairs or maintenance.
Record Keeping —Operation of constructed wetland area should include recording of the
following:
Annual Inspection ReportsA collection of written inspection reports should be kept on record
in Section IV of this manual. Inspection should be conducted annually. Copies should be
provided to the Town of Cary Stormwater Management Section of the Engineering Department.
2
Observations —All observations should be recorded. Where periodic inspections are performed
following significant rainfall, these inspections should be logged into the Periodic Inspection,
Operations and Maintenance Form in Section IV of this manual.
Maintenance —Written records of maintenance and/or repairs should be recorded on the Periodic
Inspection, Operation and Maintenance Form in Section IV of this manual.
Other Operational Procedures —The owner should maintain a complete and up-to-date set of
plans (as -built drawings) and all changes made to the constructed wetland area over time should
be recorded on the as-builts.
Sedimentation and Dredging —Sedimentation from on -site and off -site soils will eventually
result in the clogging of drainage conduits and will have to be removed. The frequency of this
sediment removal can be reduced by ensuring that the site areas around the building be stabilized
with a vegetative ground cover such that it restrains erosion. This would include a periodic
application of fertilizer and/or other treatment necessary to promote a stable ground cover and
minimize sedimentation to the pond. The removed material should be hauled offsite to a suitable
landfill site or mounded somewhere on site and stabilized with a ground cover sufficient to
restrain erosion.
Example Maintenance Schedule for constructed wetland Areas
Description
I Method
lFrequency
I Time of year
SOIL
Inspect and repair erosion
Visual
Monthly
All year
PLANTS
Removal and replacement of
See planting
Twice a year
As directed by
all dead and diseased
specifications
landscaper
vegetation considered beyond
treatment
Removal of cattails and other
By hand or
As needed
As needed
invasive species
through hand
application of
herbicide
Watering of plant material
By hand
Daily
Immediately after
shall take place at the end of
completion of project
each day for fourteen
consecutive days and after
planting is completed
POND AREA
Sediment in forebay has
Visual
Annual
During inspection
accumulated
Algae Cover
Visual
Annual
Summer months
Permanent Pool Elevation
returns to normal < 5-days
after large storm
IV. INSPECTION, OPERATION AND MAINTENANCE CHECKLISTS
WETLAND INSPECTION CHECKLIST
Date
Time
Constructed Wetland Pond
Fuquay-Vaina, NC
INSPECTORS
SPILLWAYS • DRAINS • OUTLETS
ACTION
CHECK/CIRCLE
CONDITION NOTED
OBSERVATIONS
R
E
P
A
I
R
S
M
O
N
I
T
O
R
I
N
V
E
S
T
I
G
A
T
I
V
E
Principal Spillway
Type:
trash rack/debris
cracks/deteri oration
improper alignment
cracks/deteri oration
joint deterioration
seepage/piping
Undercutting
Erosion
Debris
Lake Drain/Other Outlets
Type:
Gate/valves
Operability
RECORDED
DATE TIME RAIN POOL WEATHER GENERAL BY
LEVEL CONDITIONS OBSERVATIONS OR
COMMENTS
DATE I MAINTENANCE PERFORMED
DATE I EQUIPEMENT OPERATED
COMMENTS CORDED
C
COMMENTS RECORDED
BY
WETLAND INSPECTION CHECKLIST
Date
Time
Constructed Wetland Pond
Fuquay-Varina, NC
INSPECTORS
EMBANKMENT • POOL
ACTION
CHECK/CIRCLE
CONDITION NOTED
OBSERVATIONS
R
E
P
A
I
R
S
M
O
N
I
T
O
R
I
V
E
S
T
I
G
A
T
I
V
E
U/S SLOPE
vegetation
beaching/slides/cracks
undermining/erosion
rodent burrows
CREST
ruts/erosion
cracks/settlement
poor alignment
D/S SLOPE
vegetation/erosion
rodent burrows
slough/slides/cracks
seepage/wetness
POOL
erosion/ground cover
sedimentation
water quality
ABUTMENT
vegetation/erosion
slough/slides/cracks
seepage/wetness
GENERAL COMMENTS, SKETCHES & FIELD MEASUREMENTS