Loading...
HomeMy WebLinkAbout20211850 Ver 1_ePCN Application_20211216fr.,f DW R mrlsloa of ware. Resources Pre -Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) December 6, 2021 Ver 4.2 Initial Review Has this project met the requirements for acceptance in to the review process?* Yes No Is this project a public transportation project?* Yes No Change only if needed. BIMS # Assigned* Version#* 20211850 1 Is a payment required for this project? No payment required What amout is owed?* Fee received $240.00 Fee needed - send electronic notification $570.00 Reviewing Office* Select Project Reviewer* Raleigh Regional Office - (919) 791-4200 Colleen Cohn:eads\cmcohn Information for Initial Review 1a. Name of project: Proposed Fuqiay-Varina Middle School 1a. Who is the Primary Contact?* Walter Cole of SSME 1 b. Primary Contact Email: * 1c. Primary Contact Phone:* wcole@smeinc.com (919)801-3798 Date Submitted 12/16/2021 Nearest Body of Water Kenneth Creek Basin Cape Fear Water Classification C Site Coordinates Latitude: Longitude: 35.56534-78.79614 A. Processing Information County (or Counties) where the project is located: Wake Is this a NCDMS Project Yes No Is this project a public transportation project?* Yes No 1a. Type(s) of approval sought from the Corps: Section 404 Permit (wetlands, streams and waters, Clean Water Act) Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) Has this PCN previously been submitted?* Yes No 1 b. What type(s) of permit(s) do you wish to seek authorization? Nationwide Permit (NWP) Regional General Permit (RGP) Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? Yes No Nationwide Permit (NWP) Number: NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: 401 Water Quality Certification - Regular Non-404 Jurisdictional General Permit Individual 401 Water Quality Certification 39 - Commercial/Institutional Developments le. Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: 1f. Is this an after -the -fact permit application?* Yes No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No 1 h. Is the project located in any of NC's twenty coastal counties? Yes No 1j. Is the project located in a designated trout watershed? Yes No B. Applicant Information 1d. Who is applying for the permit? Owner Applicant (other than owner) le. Is there an Agent/Consultant for this project? Yes No 2. Owner Information 2a. Name(s) on recorded deed: Wake County Board of Education 2b. Deed book and page no.: Book 018637, Page: 02627 2c. Contact Person: Chris Hildreth 2d.Address Street Address 111 Corning Road, Suite 190 Address Line 2 City Cary Postal / Zip Code 27518 2e. Telephone Number: (919)588-3581 2g. Email Address: childreth@wcpss.net 401 Water Quality Certification - Express Riparian Buffer Authorization State / Province / Region NC Country us 2f. Fax Number: Yes No Yes No U 4. Agent/Consultant (if applicable) 4a. Name: Walter Cole 4b. Business Name: S&ME, Inc. 4c.Address Street Address 3201 Spring Forest Road Address Line 2 City Raleigh Postal / Zip Code 27616 4d. Telephone Number: (919)801-3798 4f. Email Address:* wcole@smeinc.com C. Project Information and Prior Project History 1. Project Information 1 b. Subdivision name: (if appropriate) 1c. Nearest municipality / town: Fuquay-Varina 2. Project Identification 2a. Property Identification Number: 0666004705 2c. Project Address Street Address 1201 Bowling Road Address Line 2 City Fuquay-Varina Postal / Zip Code 27626 3. Surface Waters 3a. Name of the nearest body of water to proposed project: Kenneth Creek 3b. Water Resources Classification of nearest receiving water:* C 3c. What river basin(s) is your project located in?* Cape Fear 3d. Please provide the 12-digit HUC in which the project is located. 030300040501 4. Project Description and History State / Province / Region NC Country US 4e. Fax Number: 2b. Property size: 64.95 State / Province / Region NC Country US 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: * The site is currently divided into three land uses: agricultural, undeveloped wooded areas, and a decommissioned wastewater treatment facility formerly owned by the town of Fuquay- Varina. The surrounding land use is primarily residential or undeveloped with small pockets of agricultural land. The site is located approximately 1.25 miles south of the center of downtown Fuquay-Varina. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* Yes No Unknown 4f. List the total estimated acreage of all existing wetlands on the property: 4.80 4g. List the total estimated linear feet of all existing streams on the property: 3,298 4h. Explain the purpose of the proposed project: * Construction of a 1,450 student public middle school that will replace the existing Fuquay-Varina middle school, which is currently overcrowded and cannot accomodate the existing need. The replacement school will provide a track, football field, basketball court, softball field and bring provide all the current program elements required fora current WCPSS middle school. The existing Fuquay-Varina Middle School is overcrowded, is creating nuisance issues on public streets due to queing and parking, does not have a track or separate softball field, and faces a significant number of constraints limiting the ability of the school system to continue to utilize the site as a middle school through renovations. 41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used: * The proposed new middle school will be able to accomodate 1,450 students and will consist of three stories totaling approximately 242,547 square feet. In addition to the primary school building, construction will include landscaping, lighting, stormwater management facilities (a bioretention cell), athletic fields, and the installation of utilities to support the parking area. Construction will be performed by standard commercial construction equipment. No specialized equipment not regularly seen on commercial projects is anticipated. 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* Yes No Unknown Comments: 5b. If the Corps made a jurisdictional determination, what type of determination was made?* Preliminary Approved Not Verified Unknown N/A Corps AID Number: SAW-2020-01295 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Walter Cole Agency/Consultant Company: S&ME Other: 5d. List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR S&ME performed a delineation of the site and submitted a PJD to the USACE on July 24, 2020. The USACE preformed a site visit to verify the delineation on August 20, 2020. A copy of the confirmation email and associated Feature Exhibit are attached. 6. Future Project Plans 6a. Is this a phased project?* Yes No 6b. If yes, explain. A portion of the site to the east has been reserved as a potential site for an elementary school in the future. Construction of the elementary school is not currently being planned by the school system and potential impacts are unknown at this time. Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? A portion of the site to the east has been reserved as a potential site for an elementary school in the future. Construction of the elementary school is not currently being planned by the school system and potential impacts are unknown at this time. D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): Wetlands Streams -tributaries Buffers Open Waters Pond Construction 2. Wetland Impacts U 2a1 Reason (?) 2b. Impact type* (?) 2c. Type of W. 2d. W. name* 2e. Forested* 2f. Type of Jurisdicition* 2g• Impact ?) area road crossing P Headwater Forest WC1 Yes Corps 0.100 road crossing P Headwater Forest WC1 Yes Corps (acres) 0.002 grading P Headwater Forest NW Yes Corps (acres) 0.150 acres) grading P Headwater Forest QWC2 Yes Corps 0.200 (acres) 2g. Total Temporary Wetland Impact 2g. Total Permanent Wetland Impact 0.000 0.452 2g. Total Wetland Impact 0.452 21. Comments: Impacts 1 and 2 are required for site access roads, resulting in a permanent loss of 0.10 acres for Impact 1 and 0.002 acres for Impact 2. At Impact 1, a culvert will be installed to allow for the continued passage of water off site. The remainder of the impact will be the result of grading and fill for the proposed road. Impact 2 will solely be the result of grading and fill for the additional proposed access road. Impact 3 results in a permanent loss of 0.15 acres of wetland for grading required to support the program elements which have been mandated by the school system. Impact 4 results in a loss of 0.20 acres of wetland due to grading to support the parking facilities required by the Town of Fuquay-Varina and the school system. E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: This site was purchased by WCPSS for the purpose of constructing a new elementary school (E-49) and a replacement middle school for the existing middle school. Early master planning desired the two schools to be cited as a Campus so the facility could collaborate and work as a cohesive unit. When 5-acres of wetlands were identified on site, the middle school was shifted to useable land area to the east and the future elementary school will be located on the usable land area to the west (+/-14 acres). NCDOT requires that all schools separate bus and parent traffic. The bus/staff entrance is located from the north where an existing public right of way is located. This drive is located as far north as possible parallel to required landscape buffers. The resultant width shows the grading ever so slightly encroaching into the wetlands. The parent drive to the south is similar and is located parallel to the south property line outside the required riparian buffer. The resultant width encroaches into the wetlands. Other impacted wetland areas are a result of program elements required to meet state standards for a public middle school and WCPSS standards. The proposed area to be cleared has been minimized as much as practicable in the design of the project. Appropriate sediment and erosion control practices equaling those outlined in the most recent version of the "North Carolina Sediment and Erosion Control Planning and Design Manual" will be used to minimize impacts to the wetlands. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Specific attention will be paid to ensure grading is only performed to the extent needed for the proposed project and all grading not required will be avoided. Additional impacts to the jurisdictional stream will be avoided through the use of appropriate sediment and erosion control devices. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? Yes No 2c. If yes, mitigation is required by (check all that apply): DWR Corps 2d. If yes, which mitigation option(s) will be used for this project? Mitigation bank Payment to in -lieu fee program Permittee Responsible Mitigation 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. Yes No 4b. Stream mitigation requested: (linear feet) 0 4d. Buffer mitigation requested (DWR only): (square feet) 0 4f. Non -riparian wetland mitigation requested (acres) 4c. If using stream mitigation, what is the stream temperature: 4e. Riparian wetland mitigation requested: (acres) 0.45 4g. Coastal (tidal) wetland mitigation requested: (acres) 4h. Comments While 0.45 acres of impact were identified, the standard 2:1 mitigation ratio will most likely require 0.9 acres of mitigation credit. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan la. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes No If no, explain why: Outside of region identified in one of the NC Riparian Buffer Protection Rules. 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? * Yes No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? Yes No 2c. Does this project have a stormwater management plan (SMP) reviewed and approved under a state stormwater program or state -approved local government stormwater program? Yes No N/A - project disturbs < 1 acre 2d. Which of the following stormwater management program(s) apply: Local Government State Local Government Stormwater Programs Phase II NSW USMP Water Supply Please identify which local government stormwater program you are using. Town of Fuquay-Varina Comments: The project proposes two constructed stormwater wetlands. The proposed stormwater management plan is currently in the second review with the Town. A copy of the proposed plan is attached. G. Supplementary Information 1. Environmental Documentation la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* Yes No 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)?* Yes No Comments: * The project does not meet the thresholds to require preparation of an environmental document pursuant to the requirements of the National or State Environmental Policy Act. 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * Yes No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality? * Yes No 3b. If you answered "no," provide a short narrative description. The project is not expected to spur additional development. The structures will accommodate an existing need and will utilize the local workforce. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* Yes No N/A 4b. Describe, in detail, the treatment methods and dispositions (non -discharge or discharge) of wastewater generated from the proposed project. If the wastewater will be treated at a treatment plant, list the capacity available at that plant. The Town of Fuquay-Varina will accept and treat wastewater generated by the proposed project. 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* Yes No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* Yes No 5d. Is another Federal agency involved?* Yes No 5e. Is this a DOT project located within Division's 1-8? Unknown Yes No 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? Yes No 5g. Does this project involve bridge maintenance or removal? Yes No 5h. Does this project involve the construction/installation of a wind turbine(s)?* Yes No 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? Yes No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? The NC Natural Heritage Program online data explorer (https://www.ncnhp.org/data) and US Fish and Wildlife Service Information for Planning and Consultation (IPaC) report. No critical habitat was identified within the site and no element occurrences of protected species have been observed within the site or within one mile of the site. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat? * Yes No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat? The USFWS IPaC report and the National Marine Fisheries Service Essential Fish Habitat Mapper (https://www.habitat.noaa.gov/protection/efh/efhmapper/) 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* Yes No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* The North Carolina State Historic Preservation Office web mapping tool HPOWEB (https://www.ncdcr.gov/aboutthistory/division-historical-resources/gis- maps-and-data). 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain?* Yes No 8c. What source(s) did you use to make the floodplain determination?* The project engineer and the FEMA firm maps 3720066500K dated October 3, 2006 and 3720065600J and 3720066600JJ, dated May 2, 2006. The FEMA firmette is attached. Miscellaneous Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred. Click the upload button or drag and drop files here to attach document 002 - SP-2021-15 - Stormwater Calculations 2nd SP 8.5 x 11 BW.pdf 12.28MB C00.00 - Cover Sheet. pdf 1.66MB C00.01 - Overall Site.pdf 1.26MB 20-111 Wetland Impact Map Package.pdf 4.06MB FEMA firmette.pdf 755.31 KB Figure 4 - Feature Exhibit.pdf 3.55MB project _report _fuquay_vadna_ middle _school _33907_33907.pdf 1021.52KB USACE Confirmation Email.pdf 136.95KB USFWS IPaC Report.pdf 222.07KB DWR Pre -Filing Meeting Request Form.pdf 49.75KB Prefiling Meeting Request.pdf 165.07KB M15 SME Authorization 7.24.20.pdf File must be PDF or KMZ 61.3KB Comments Signature By checking the box and signing below, I certify that: • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief'; and The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: Ashley Bentz Signature Date 12/16/2021