HomeMy WebLinkAbout20211845 Ver 1_ePCN Application_20211209DW R
mrlsloa of ware. Resources
Pre -Construction Notification (PCN) Form
For Nationwide Permits and Regional General Permits
(along with corresponding Water Quality Certifications)
June 1, 2021 Ver 4.1
Initial Review
Has this project met the requirements for acceptance in to the review process?*
Yes
No
Is this project a public transportation project?*
Yes No
Change only if needed.
BIMS # Assigned*
20211845
Is a payment required for this project?
No payment required
Fee received
Fee needed - send electronic notification
Reviewing Office*
Mooresville Regional Office - (704) 663-1699
Information for Initial Review
1a. Name of project:
Wood Duck Dredging
1a. Who is the Primary Contact?*
Bob Wilson
1 b. Primary Contact Email: *
bwilson@therowboatcompany.com
Date Submitted
12/9/2021
Nearest Body of Water
Lake Norman
Basin
Catawba
Water Classification
WS-IV,B;CA Catawba River
Site Coordinates
Latitude:
35.65335
A. Processing Information
County (or Counties) where the project is located:
Iredell
Is this a NCDMS Project
Yes No
Is this project a public transportation project?*
Yes No
Pre -Filing Meeting Information
Longitude:
-80.88271
Version# *
1
What amout is owed?*
$240.00
$570.00
Select Project Reviewer*
Alan Johnson:eads\adjohnson1
1c. Primary Contact Phone:*
(704)361-9361
Is this a courtesy copy notification?*
Yes No
ID# Version
no longer required
Pre -fling Meeting or Request Date
Attach documentation of Pre -Filing Meeting Request here:
Click the upload button or drag and drop files here to attach document
File type most be PDF
1a. Type(s) of approval sought from the Corps:
Section 404 Permit (wetlands, streams and waters, Clean Water Act)
Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)
Has this PCN previously been submitted?*
Yes
No
1 b. What type(s) of permit(s) do you wish to seek authorization?
Nationwide Permit (NWP)
Regional General Permit (RGP)
Standard (IP)
1c. Has the NWP or GP number been verified by the Corps?
Yes No
Nationwide Permit (NWP) Number: 19 - Minor Dredging
NWP Numbers (for multiple NWPS):
1d. Type(s) of approval sought from the DWR:
401 Water Quality Certification - Regular 401 Water Quality Certification - Express
Non-404 Jurisdictional General Permit Riparian Buffer Authorization
Individual 401 Water Quality Certification
le. Is this notification solely for the record because written approval is not required?
For the record only for DWR 401 Certification:
For the record only for Corps Permit:
1f. Is this an after -the -fact permit application?"`
Yes No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
Yes No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
Yes No
1 h. Is the project located in any of NC's twenty coastal counties?
Yes No
1j. Is the project located in a designated trout watershed?
Yes No
B. Applicant Information
1d. Who is applying for the permit?
Owner Applicant (other than owner)
le. Is there an Agent/Consultant for this project?"
Yes No
2. Owner Information
2a. Name(s) on recorded deed:
Robert O. Wilson
2b. Deed book and page no.:
book 0772 page 990
2c. Contact Person:
Yes No
Yes No
2d.Address
Street Address
17015 Bridgeton Lane
Address Line 2
City
Huntersville
Postal / Zip Code
28078
2e. Telephone Number:
(704)361-9361
2g. Email Address:*
bwilson@therowboatcompany.com
C. Project Information and Prior Project History
1. Project Information
1 b. Subdivision name:
(if appropriate)
Crystal Bay
1c. Nearest municipality / town:
Mooresville, NO
2. Project Identification
2a. Property Identification Number:
4636-95-9809.000
2c. Project Address
Street Address
Crystal Circle, Lot 10
Address Line 2
City
Mooresville
Postal / Zip Code
28117
3. Surface Waters
3a. Name of the nearest body of water to proposed project:
Lake Norman
3b. Water Resources Classification of nearest receiving water:
WS-IV,B;CA Catawba River
3c. What river basin(s) is your project located in?*
Catawba
3d. Please provide the 12-digit HUC in which the project is located.
030501011203
4. Project Description and History
State / Province / Region
NO
Country
USA
2f. Fax Number:
2b. Property size:
.61
State / Province / Region
NO
Country
USA
4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:
Cleared, Unimproved lot with existing revetment on water's edge . Dock is installed. No other improvements.
4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?
Yes No Unknown
4f. List the total estimated acreage of all existing wetlands on the property:
0
4g. List the total estimated linear feet of all existing streams on the property:
0
4h. Explain the purpose of the proposed project:
Dredge the waterfront adjacent the lot.
41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:
Removal of approximately 150 cubic yards of silt and sand from waterfront. Excavator from shore will place spoils upslope of riparian buffer and installed silt fence.
5. Jurisdictional Determinations
5a. Have the wetlands or streams been delineated on the property or proposed impact areas?*
Yes No Unknown
Comments:
5b. If the Corps made a jurisdictional determination, what type of determination was made?*
Preliminary Approved Not Verified Unknown N/A
Corps AID Number:
5c. If 5a is yes, who delineated the jurisdictional areas?
Name (if known):
Agency/Consultant Company:
Other:
6. Future Project Plans
6a. Is this a phased project?*
Yes No
Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity?
no
D. Proposed Impacts Inventory U
1. Impacts Summary
1a. Where are the impacts associated with your project? (check all that apply):
Wetlands Streams -tributaries Buffers
Open Waters Pond Construction
6. Buffer Impacts (for DWR)
6a. Project is in which protect basin(s)?
Check all that apply.
Neuse Tar -Pamlico
Catawba Randleman
Goose Creek Jordan Lake
Other
6b. Impact Type
6c. Per or Temp
6d. Stream name
6e. Buffer mitigation required?
6f. Zone 1 impact
6g. Zone 2 impact
buffer impact from excavator
T
Lake Norman
No
300
6h. Total buffer impacts:
Zone 1 Zone 2
Total Temporary impacts: 300.00 0.00
Zone 1 Zone 2
Total Permanent impacts: 0.00 0.00
Zone 1 Zone 2
Total combined buffer impacts: 300.00 0.00
61. Comments:
impact only from tracks of excavator to perform work.
E. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:
Project designed to work from shore where easy access to lake. Spoils will be deposited upslope of buffer in area protected by silt fence. Once dried,
spoils will be graded into existing topography, seeded and strawed.
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:
Silt fence will be constructed upslope of buffer. Long reach excavator will be used to minimize landward disturbances.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State?
Yes No
2b. If this project DOES NOT require Compensatory Mitigation, explain why:
minimal impact
F. Stormwater Management and Diffuse Flow Plan (required by DWR)
1. Diffuse Flow Plan
la. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules?
Yes No
If no, explain why:
Not applicable
2. Stormwater Management Plan
2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?"
Yes No
2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)?
Yes No
Comments:
G. Supplementary Information
1. Environmental Documentation
la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?"
Yes No
2. Violations (DWR Requirement)
2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or
Riparian Buffer Rules (15A NCAC 2B .0200)?"
Yes No
3. Cumulative Impacts (DWR Requirement)
3a. Will this project result in additional development, which could impact nearby downstream water quality?"
Yes No
3b. If you answered "no," provide a short narrative description.
Current development will NOT be expanded through this maintenance operation
4. Sewage Disposal (DWR Requirement)
4a. Is sewage disposal required by DWR for this project?"
Yes No N/A
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or habitat?'
Yes No
5b. Have you checked with the USFWS concerning Endangered Species Act impacts?*
Yes No
5c. If yes, indicate the USFWS Field Office you have contacted.
Asheville
5d. Is another Federal agency involved?*
Yes No Unknown
u
5e. Is this a DOT project located within Division's 1-8?
Yes No
5f. Will you cut any trees in order to conduct the work in waters of the U.S.?
Yes No
5g. Does this project involve bridge maintenance or removal?
Yes No
5h. Does this project involve the construction/installation of a wind turbine(s)?*
Yes No
51. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.?
Yes No
5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?
USFWS, NC Wildlife
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as an Essential Fish Habitat?
Yes No
6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?
NC Fish & Wildlife
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?*
Yes No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?*
Catawba Indian Nation
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain?*
Yes No
8c. What source(s) did you use to make the floodplain determination?
FEMA maps
Miscellaneous
Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when
possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred.
Click the upload button or drag and drop files here to attach document
woodduck to be dredged.pdf 183.92KB
File must be PDF or KMZ
Comments
Signature
*
By checking the box and signing below, I certify that:
• The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief'; and
• The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time.
• I have given true, accurate, and complete information on this form;
• I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
• I intend to electronically sign and submit the PCN form.
Full Name:
Robert O. Wilson
Signature
aAw--owkaw
Date
12/9/2021