Loading...
HomeMy WebLinkAboutSW5211201_Plansheet - SCM Detail_20211221r CONSTRUCTION SEQUENCE FOR WET DETENTION POND: 1. INSTALL EROSION CONTROLS. 2. CONSTRUCT DAM BASE AND AREAS BELOW THE NORMAL POOL. CONSTRUCTION TO BE PERFORMED UNDER THE INSPECTION OF THE GEOTECHNICAL ENGINEER. SEED UPON COMPLETION. 3. INSTALL OUTLET PIPE, RIP -RAP APRON AND STONE FILTER RING. 4. CONSTRUCT OUTLET STRUCTURE. 5. REMOVE ACCUMULATED SEDIMENT AND SEED UPON COMPLETION. 15" HDPE WITH WATER TIGHT SEAL PIPE TO BE BEDDED PER DIRECTION OF GEOTECHNICAL ENGINEER 3 3' MIN APPROXIMATE SIZE EXCAVATE AND BACKFILL WITH COMPACTED STRUCTURAL FILL AS DIRECTED BY GEOTECHNICAL ENGINEER 28'-15" HDPE 0 1.79% SILT FENCE AS NEEDED TOp /�ERMFOjAT E wF/R ?st7,3 4' MIN EMBANKMENT WIDTH 6" TOPSOIL FOR ALL AREAS ABOVE THE NORMAL POND ELEVATION 6" CLAY SOIL LINER ON INSIDE FACE OF EMBANKMENT TRASH RACK REFER TO DETAIL THIS SHEET TOP OF EMBANKMENT ELEVATION=262.0 6" TOPSOIL ABOVE 6" CLAY LINER REFER TO DETAIL 100 YEAR STORM ELEVATION=261.33 ON LITTORAL SHELF FOR INCREMENTAL 3 WEIR 1 10 YEAR STORM ELEVATION=260.79 4'x4' PRECAST 6FT LITTORAL 1 SHELF CONCRETE RISER (INSTALL STEPS AS NECESSARY) rZ 2 1 YEAR STORM ELEVATION=260.24 INV=259.0 1.0-INCH STORM ELEVATION=259.21 -\7 NORMAL POND ELEVATION=259.0 1 ELEV=257.0 - 1 4' MIN. ASTM C-923 SEAL KEY BETWEEN BARREL & RISER. RISER BASE TO BE FILLED WITH CONC. TO INVERT OF BARREL 8"X8"X1"X12" LONG ANGLE (6 TOT. REQUIRED) TO ANCHOR RISER TO BASE. PROVIDE 2-3/4" A307 BOLTS FROM ANGLE TO RISER AND 2-A307 "J" HOOKS 3/4" DIA. X 12" LONG FROM ANGLE TO BASE. ANGLE TO BE FIELD COATED WITH ZINC RICH PAINT AFTER CONSTRUCTION. "J" HOOKS TO BE PLACED UNDER LOWER REINFORCING STEEL FILTER MEDIA (SEE NOTE 2) FLOW PRIOR TO INSTALLATION, MANUFACTURER SPECIFICATIONS OF FILTER MEDIA SHALL BE REVIEWED TO ENSURE THAT DISCHARGE FROM FILTER MEDIA SHALL MEET OR EXCEED THE PROVISIONS OF THE CLEAN WATER ACT. ENSURE THAT PUMP PRESSURE DOES NOT EXCEED FILTER MEDIA PRESSURE RATING. FILTER MEDIA MAY BE, BUT NOT LIMITED TO, SAND MEDIA FILTRATION DEVICES, RATED FILTER FABRIC BAGS OR POLYMER BASED DEWATERING PRACTICES. PUMP STRAINER SHALL NOT BE IN CONTACT WITH BOTTOM OF POND. BMP POND DEWATERING SEEDBED PREPARATION: 1. CHISEL COMPACTED AREAS AND SPREAD TOPSOIL THREE INCHES DEEP OVER ADVERSE SOIL CONDITIONS, IF AVAILABLE. 2. RIP THE ENTIRE AREA TO SIX INCHES DEEP. 3. REMOVE ALL LOOSE ROCK, ROOTS AND OTHER OBSTRUCTIONS, LEAVING SURFACE REASONABLY SMOOTH AND UNIFORM. 4. APPLY AGRICULTURAL LIME, FERTILIZER, AND SUPERPHOSPHATE UNIFORMLY AND MIX WITH SOIL (SEE SEEDING MIXTURE). 5. CONTINUE TILLAGE UNTIL A WELL -PULVERIZED, FIRM, REASONABLY UNIFORM SEEDBED IS PREPARED FOUR TO SIX INCHES DEEP. 6. SEED ON A FRESHLY PREPARED SEEDBED AND COVER SEED LIGHTLY WITH SEEDING EQUIPMENT OR CULTIPACK AFTER SEEDING. 7. MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR MULCH. B. INSPECT ALL SEEDED AREAS AND MAKE NECESSARY REPAIRS OR RE-SEEDINGS WITHIN THE PLANTING SEASON, IF POSSIBLE. IF STAND SHOULD BE MORE THAN 60% DAMAGED, RE-ESTABLISH FOLLOWING THE ORIGINAL LIME, FERTILIZER AND SEEDING RATES. 9. CONSULT S&EC ENVIRONMENTAL ENGINEERS ON MAINTENANCE TREATMENT AND FERTILIZATION AFTER PERMANENT COVER IS ESTABLISHED. LANDSCAPE NOTES: ALL LANDSCAPING SHALL BE IN COMPLIANCE WITH THE NCDEQ BMP REQUIREMENTS. LANDSCAPE CONTRACTOR SHALL PROVIDE A TWO-YEAR WARRANTY FOR BMP PLANTING SURVIVAL/REPLACEMENT. AT THE END OF THE FIRST YEAR AND AT THE END OF THE TWO-YEAR WARRANTY PERIOD, ALL PLANTS THAT DO NOT SURVIVE MUST BE REPLACED. ESTABLISHMENT PROCEDURES, SUCH AS CONTROL OF INVASIVE WEEDS, ANIMAL AND VANDAL DAMAGE, MULCHING, RE -STAKING, WATERING, AND MESH OR TUBE PROTECTION REPLACEMENT, SHALL BE IMPLEMENTED TO THE EXTEND NEEDED TO ENSURE PLANT SURVIVAL. STAKING MUST BE REMOVED AFTER ESTABLISHMENT (APPROXIMATELY 12 MONTHS), TO PREVENT GIRDLING (STRANGLING) OF ALL WOODY PLANTS. SOD WITHIN BMP AND SURROUNDING AREAS TO BE BERMUDA OR CENTIPEDE GRASS. GRASS OR WILDFLOWER SEED MUST BE APPLIED AT THE RATES SPECIFIED BY THE SUPPLIERS. IF PLANT ESTABLISHMENT CANNOT BE ACHIEVED WITH SEEDING BY THE TIME OF SUBSTANTIAL COMPLETION OF THE STORMWATER FACILITY PORTION OF THE PROJECT, THEN THE CONTRACTOR SHALL PLANT THE AREA WITH WILDFLOWER SOD, PLUGS, CONTAINER PLANTS, OR OTHER MEANS TO COMPLETE THE SPECIFIED PLANTING AND PROTECT AGAINST EROSION BEFORE WATER IS ALLOWED TO ENTER THE STORMWATER BMP FACILITY. ALL MATERIALS SHALL BE ACQUIRED FROM AN APPROVED NCDEQ PLANT VENDOR. PLANT MATERIAL SHOULD BE PURCHASED FROM A LOCAL SOURCE TO ENSURE SURVIVABILITY. LOCAL VENDORS FOR THIS SITE INCLUDE: - CILL IDE NATIVE PLANT NURSERY 919-662-5566 - GROWING WILD NURSERY 910-259-6361 - NC FOREST SERVICE 919-731-7988 - PLANT DELIGHTS NURSERY 919-772-4794 - TARHEEL NATIVE TREES 919-553-5927 IMMEDIATELY AFTER THE WET DETENTION BASIN IS ESTABLISHED, THE PLANTS ON THE VEGETATED SHELF AND PERIMETER OF THE BASIN SHOULD BE WATERED TWICE WEEKLY IF NEEDED UNTIL THE PLANTS BECOME ESTABLISHED (COMMONLY SIX WEEKS) NO PORTION OF THE WET DETENTION POND SHOULD BE FERTILIZED AFTER THE FIRST INITIAL FERTILIZATION THAT IS REQUIRED TO ESTABLISH THE PLANTS ON THE VEGETATED SHELF. LANDSCAPING NOTES: 1. CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE CODES AND ORDINANCES REGARDING LANDSCAPING. 2. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO ESTABLISH A HEALTHY STAND OF GRASS ON ALL SEEDED AREAS. 3. CONTRACTOR SHALL PROVIDE NATURAL TOPSOIL THAT IS FERTILE, FRIABLE, WITHOUT MIXTURE OF SUBSOIL MATERIALS, AND OBTAINED FROM A WELL DRAINED AVAILABLE SITE. IT SHALL NOT CONTAIN SUBSTANCES WHICH MAY BE HARMFUL TO PLANT GROWTH. TOPSOIL SHALL BE SCREENED AND FREE FROM CLAY, LUMPS, STONES, ROOTS, PLANTS, OR SIMILAR SUBSTANCES 1" OR MORE IN DIAMETER, DEBRIS, OR OTHER OBJECTS WHICH MIGHT BE A HINDERANCE TO PLANTING OPERATIONS. TOPSOIL SHALL CONTAIN AT LEAST 4-6% ORGANIC MATTER BY WEIGHT AND HAVE A PH RANGE OF 5.5 TO 7.0. 4. CONTRACTOR SHALL BE RESPONSIBLE FOR THE WATERING AND THE MAINTENANCE OF ALL LANDSCAPED AREAS UNTIL THE LATER OF; (a) THIRTY (30) DAYS FOLLOWING THE PLANTING OF THE GRASS AND SHRUBS, OR (b) THE DATE THAT STORE OPENS FOR BUSINESS TO THE PUBLIC. CONTRACTOR SHALL ALSO BE RESPONSIBILITY FOR THE SURVIVAL OF THE BMP PLANTING MATERIALS DURING THE TWO-YEAR WARRANTY PERIOD AND SHALL REPLACE ALL PLANTS THAT DO NOT SURVIVE AT THE END OF THE FIRST YEAR AND AT THE END OF THE SECOND YEAR OF THE WARRANTY PERIOD. 5. CONTRACTOR TO VERIFY QUANTITIES PRIOR TO COMMENCING WORK. 6. ANY DISTURBED AREAS NOT SCHEDULED FOR HARDSCAPE, PLANTINGS, OR MULCH SHALL BE SEEDED LAWN. REFER TO SITE PLAN FOR LOCATION OF AREAS TO BE SODDED. 7. NO PLANT SUBSTITUTIONS ARE PERMITTED WITHOUT WRITTEN APPROVAL OF THE OWNERS REPRESENTATIVE. 8. FOR NEW PLANTING AREAS, REMOVE ALL PAVEMENT, GRAVEL SUB -BASE AND CONSTRUCTION DEBRIS; REMOVE COMPACTED SOIL AND ADD 18" NEW TOPSOIL OR TILL AND AMEND THE TOP 18" OF EXISTING SOIL TO MEET TOPSOIL/PLANTING MIX STANDARDS FOR TREES. 9. ADJUST TREE PLANTING LOCATIONS TO AVOID UNDERGROUND UTILITIES. PLANT 15' FROM ALL UNDERGROUND UTILITIES (SEWER AND STORM DRAINAGE, GAS, WATER, PHONE, AND ELECTRICAL LINES.) 20 I-ASTORMWATER MANAGEMENT SYSTEM DETAILS 1 NOT TO SCALE LEVEL LOW POINT , R STORMWATER� MANAGEMENT EASEMENT I ' MAIN POND AREA I I p� I II � w SOD AREAS ABOVE NORMAL POOL EL EVARON LITTORAL SHELF AREA=1,125 SF REFER TO DETAIL FOR PLANTINGS R PVC ELBOW " �;� SEE DETAIL -77 rrr 2 1 CONCRETE SHALL BE PLACED IN RISER AFTER ANGLES ARE SECURED TO BASE AND RISER. L59x5'xl.5' CONC. BASE REINFORCE WITH #4 BARS AT 12" O.C. TOP AND BOTTOM OF EACH DIRECTION PROVIDE 3" MIN. CLEARANCE BETWEEN EDGE OF CONC. AND STEEL REINFORCING. PROFILE OF WET POND DETENTION SYSTEM A � Y! /-ORCRAY WEIR- NOTE: 1.0" STORM ELEVATION IS 259.21 AND INTERMEDIATE WEIR IS ELEVATION 260.3. THERE IS ADDITIONAL STORAGE DESIGNED FROM THE 1.0" STORM ELEVATION TO THE INTERMEDIATE WEIR ELEVATION. EXISTING GRADE=259.5t 2 NOTE: PUMPS SHALL BE USED TO DRAIN 1 F THE POND WHEN NECESSARY. REFER TO DETAIL THIS SHEET FOR DEWATERING REQUIREMENTS. BOTTOM OF POND (TOP OF SEDIMENT STORAGE)=253.0�� r� (BOTTOM OF SEDIMENT STORAGE)=252.0f 6" CLAY SOIL - LINER MAIN POOL RISE TOP OF EMBANKMENT 262 ELEV=262.0 260 ....°, ........ ............ ............ _........ .... OUTLET CONTROL r`r­y_YSTRUCTURE REFER TO DETAILS THIS SHEET I 15" OUTLET PIPE REFER TO GRADING PLAN STORMWATER MANAGEMENT SYSTEM LAYOUT GRAPHIC SCALE 0 10 20 40 1 INCH = 20 FEET 80 UCTURE NOT SHOWN FOR CLARITY TRASH RACK) OUTLET CONTROL STRUCTURE - INCREMENTAL WEIR SCALE: N.T.S. 6" TOPSOIL FOR ALL AREAS ABOVE THE NORMAL POND ELEVATION FOREBAY BERM- 6" TOPSOIL ABOVE 6" CLAY LINER 3:1 ON LITTORAL SHELF 6Fi LITTORALSHELF 6:1 NOTES: 1. SEE DESIGN PLANS FOR SPECIFIED DIMENSIONS OF RISER. 2. TRASH RACK DIMENSION CRITERIA SPECIFIED IS APPROXIMATE AND VARIES BY MANUFACTURER. 3. INSTALLATION OF TRASH RACK SHALL BE ACCORDING TO MANUFACTURER'S RECOMMENDATIONS. 4. ALL COMPONENTS OF TRASH RACK SHALL BE OF STAINLESS STEEL OR OTHER NON -CORROSIVE MATERIAL. 5. ALL MOUNTING HARDWARE SHALL BE OF STAINLESS STEEL OR OTHER NON -CORROSIVE MATERIAL. TRASH RACK ION CORROSIVE MATERIAL 5.5" 0 5.5" SPACING 5.5" u u u u 5.5" 5.5" NOTE: RISER TRASH RACK SHALL BE INSPECTED PERIODICALLY AND ANY DEBRIS ON THE TRASH RACK IS TO BE REMOVED AND PROPERLY DISPOSED OF. TRASH RACK DETAIL .� "° % Jr L SA 5.0' GRASS FOREBAY WEIR AT ELEV=258.0 FOREBAY TOP ELEV= 261.0 WIDTH AT TOP = 2.0 FT FOREBAY ENTRANCE SHALL BE DEEPER THAN FOREBAY EXIT 4" PVC SCREW CAP RISER STRUCTURE FOR CLEANING ACCESS 12" MIN. P 4%4" PVC TEE PERM. POND ELEV.=259.0 SEDIMENT STORAGE TOP FOREBAY BOTTOM ELEV=257.0 1 "DIA. HOLE DRILLED v INTO BOTTOM CAP PVC DRAIN OUTLET NOTE: PUMPS SHALL BE USED TO DRAIN THE FOREBAY WHEN NECESSARY. REFER TO DETAIL THIS SHEET FOR DEWATERING REQUIREMENTS. NORMAL POND ELEVATION BOTTOM OF SEDIMENT - STORAGE/EXIT ELEV=256.5 FOREBAY ENTRANCE SHALL BE DEEPER THAN FOREBAY EXIT SHALLOW LAND ZONE HERBACEOUS PLANTS 1 L- s TYPICAL LITTORAL SHELF VEGETATION DETAIL SCALE: N.T.S. SCIENTIFIC NAME COMMON NAME PLANTING ZONE QUANTITY NURSERY CONTAINER TYPE 6" TOPSOIL FOR ALL AREAS ABOVE THE NORMAL POND ELEVATION BOTTOM OF SEDIMENT STORAGE/ENTRANCE ELEV=256.0 FOREBAY SHALLOW WATER ZONE HERBACEOUS PLANTS POND (NORMAL POOL) SPACING PLANTING SEASON Jancus effusus Soft Rush SHALLOW WATER 47 PEAT POT 6' O.C. SPRING/SUMMER Iris virginica Blue Flag Iris SHALLOW WATER 47 PEAT POT 6' O.C. SPRING/SUMMER Schoenoplectus tabernoemontani Soft Stem Bulrush SHALLOW WATER 47 PEAT POT 6' O.C. SPRING/SUMMER Eupotoriadelphus maculatus Spotted Trumpetweed SHALLOW LAND 47 PEAT POT 6' O.C. SPRING/SUMMER Eupotorium purpureum Joe-Pye Weed SHALLOW LAND 47 PEAT POT 6' O.C. SPRING/SUMMER Rhynchosporo colorato Storrush Whitetop SHALLOW LAND 47 PEAT POT 6' O.C. SPRING/SUMMER "STORMWATER MANAGEMENT NOTES: i. THE DEVELOPER OR HIS AGENT SHALL CONTACT THE DESIGN ENGINEER WHEN THE BEST MANAGEMENT PRACTICE(S) ARE CONSTRUCTED AND ABOUT TO BECOME OPERATIONAL SO A FINAL INSPECTION CAN BE PERFORMED TO DETERMINE COMPLIANCE WITH THE APPROVED PLAN CAN BE PERFORMED. 2. ANNUAL MAINTENANCE INSPECTION AND REPORT REQUIRED - THE OWNER OF A PERMITTED STRUCTURAL STORMWATER BMP/CONTROL SHALL ANNUALLY SUBMIT A MAINTENANCE AND INSPECTION REPORT FOR EACH BMP TO THE STORMWATER ADMINISTRATOR. ANNUAL INSPECTIONS SHALL BEGIN WITHIN ONE YEAR OF THE RECORDATION OF ANY DEED(S) SHOWING STORMWATER BMPs/CONTROL STRUCTURES. J. UPON COMPLETION OF THE PROJECT, AND BEFORE A CERTIFICATE OF OCCUPANCY SHALL BE GRANTED, THE ENGINEER OF RECORD SHALL CERTIFY THAT THE COMPLETED PROJECT IS IN ACCORDANCE WITH THE APPROVED STORMWATER MANAGEMENT PLANS AND DESIGNS. 4. A FINAL INSPECTION OF THE SITE AND STORMWATER MANAGEMENT BMP/CONTROLS TO BE SCHEDULED WITH AND COMPLETED BY THE PROJECT ENGINEER. 5. NCDEQ AND THEIR ASSIGNS HAVE RIGHT TO ACCESS THE STORMWATER CONTROL(s) FOR INSPECTIONS OR MAINTENANCE AS NECESSARY. 6. THE ENGINEER'S CERTIFICATION OF COMPLETION WILL BE REQUIRED PRIOR TO THE FINAL PLAT OR CERTIFICATE OF OCCUPANCY. THE STORMWATER CONTROL IS TO BE INSPECTED TO ENSURE IT IS FUNCTIONING AS DESIGNED AND HAS FULL DESIGN VOLUME PRIOR TO ISSUANCE OF THE FINAL CERTIFICATE OF OCCUPANCY. 11, THE PROPERTY OWNER IS RESPONSIBLE FOR MAINTAINING THE STORMWATER CONTROLS(s) ACCORDING TO THE APPROVED MAINTENANCE PLAN AND DIRECTION OF NCDEQ STAGE STORAGE TABLE STAGE ELEVATION CONTOUR INCREMENTAL TOTAL (FT) (FT) AREA (SF) STORAGE (CF) STORAGE (CF) 0.0 259.0 3250 0 0 0.5 259.5 4095 1836 1836 0.9 259.9 4525 1724 3560 (WQV) 1.0 260.0 4635 458 4018 2.0 261.0 5760 5198 9216 3.0 262.0 6880 6320 15536 STORMWATER MANAGEMENT DESIGN RIVER BASIN: NEUSE RECEIVING STREAM: TURKEY CREEK STREAM INDEX: 27-86-3-(1) CLASSIFICATION: C; NSW HUC: 03020203 LATITUDE/LONGITUDE: N35.859314', W-78.177350' 1\_.0001 WET POND DESIGN SUMMARY TYPICAL LITTORAL SHELF PLANTING SCHEDULE DRAINAGE AREA TO WET POND: 1.23 ACRES SITE IMPERVIOUS AREA TO WET POND: 0.90 ACRES OFF -SITE DESIGN IMPERVIOUS AREA TO WET POND: 0.00 ACRES TOTAL DESIGN IMPERVIOUS AREA TO WET POND: 0.90 ACRES PRE -DEVELOPED TO POST -DEVELOPED POST -DEVELOPED POST -DEVELOPED POST -DEVELOPED POND TO POND THRU POND BYPASS COMBINED DRAINAGE AREA: 2.00 AC 1.23 AC 0.77 AC CURVE NUMBER: 55.5 86.5 55.0 TIME OF CONCENTRATION: 10 MIN 5 MIN 10 MIN 1.0" STORM EVENT: 0.182 CFS 0.011 CFS 1-YEAR STORM EVENT: 0.123 CFS 3.210 CFS 0.028 CFS 0.034 CFS 0.062 CFS 10-YEAR STORM EVENT: 2.831 CFS 7.306 CFS 1.181 CFS 1.022 CFS 2.203 CFS 100-YEAR STORM EVENT: 8.707 CFS 12.83 CFS 7.593 CFS 3.246 CFS 10.84 CFS OPERATION & MAINTENANCE BMP element: Potential roblem: Now I will remadkda the problem The entire BMP Trash/debris is present Remove the troth/debris e Perimeter of the wd detention basin Areas of bare soil and/or erosive gullies have formed Regrode the soil if necessary to remove the gully, and then plant a ground cover and water until lt is established. Provide lime and a one -fire fertilizer application Vegetation is too short or too long Maintain vegetation at a height of approximately Six inches. The inlet device: pipe or swale The pipe is clogged. Unclog the pipe. Dispose of the sediment oN-site. The pipe is cracked or Replace the pipe. otherwise damaged Erosion is occurring in the Regrade the Swale If necessary Swale. to smooth it over and provide erosion control devices such as reinforced turf matting or riprop to avoid future problems with erosion. The forebay Sediment has accumulated to a depth greater than the Search for the source of the sediment and remedy the original design depth for problem if possible. Remove the sediment storage. sediment and dispose of it in a location where if will not cause Impacts to streams or the BMP. Erosion has occu 'de i anal erosion protection Such as reinforced turf matting or riprop if needed to prevent future erosion problems. Woods are present. Remove the reeds, preferably by hand. If pesticide is used, wipe it on the plants rather than s ro 'n The vegetated shelf professional practices show that pruning is needed Prune aoco ng to bast professional practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, efc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establlsh the ground cover if a soil fed Indicates it is necessary. Weeds are present. Remove the reeds, preferably by hand. If pesticide is used, wipe It on the plants rather than spraying. The main treatment area Sediment has accumulated to a depth greater than the rc for the source of the sediment and remedy the original design sediment problem if possible. Remove the storage depth. sediment and dispose of it in a location where if will not cause Im ets to streams or the BMP. Algalgrowthcovers over of the area, nsu a pro ese...i remove and control the a I growth. Cattails. phrogm s or other invasive plank cover 50X of Remove plants by wiping them with pesticide (do no the basin surface. a ro The embank rubs have started grow Remove shrubs immediately. on the embankment Evidence of muskrat or beaver Use traps to remove mu rots activity is present. and consult a professional to remove beavers. A tree has Started to grow on the embankment. Consult a ddm safety specialist to remove the free. An annual lnnspectlon by an Make all needed repairs. appropriate professional shows I'dthe embankment needs re ir. If a liable The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment oN-sife. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of damage have occurred at the outlet. Contact the local NC Division of Water Quality Regional Office, or fhs 401 Oversight Unit at 919-733-1786, TRIANGLE S.....I....T....E.............D E S I G N a Bovuman company CONSULTANT: Bowman North Carolina, Ltd. (Formerly Triangle Site Design, PLLC) 4004 Barrett Drive, Suite 101 Raleigh, NC 27609 (919) 553-6570 mlowder@bowman.com FIRM# F-1445 SEAL: OWNER/DEVELOPER: Glandon Forest Equity, LLC 3825 Barrett Drive Suite 100 Raleigh, NC 27609 919 -459-2601 919-459-2604 fx ggbarnes@vanguardpg.com IQ (LAYOUT COORD: MEL PLANNING MGR. MEL DRAWING BY: MEL INITIAL DATE: October 15, 2021 JOB NUMBER: 004220 TITLE: STORMWATER MANAGEMENT DETAILS SHEET NUMBER: 1 0 FDG# - - - - - Middlesex (Nash Co)