HomeMy WebLinkAboutSW5211201_Plansheet - SCM Detail_20211221r CONSTRUCTION SEQUENCE
FOR WET DETENTION POND:
1. INSTALL EROSION CONTROLS.
2. CONSTRUCT DAM BASE AND AREAS BELOW THE
NORMAL POOL. CONSTRUCTION TO BE PERFORMED
UNDER THE INSPECTION OF THE GEOTECHNICAL
ENGINEER. SEED UPON COMPLETION.
3. INSTALL OUTLET PIPE, RIP -RAP APRON AND
STONE FILTER RING.
4. CONSTRUCT OUTLET STRUCTURE.
5. REMOVE ACCUMULATED SEDIMENT AND
SEED UPON COMPLETION.
15" HDPE WITH WATER TIGHT SEAL
PIPE TO BE BEDDED
PER DIRECTION OF GEOTECHNICAL
ENGINEER 3
3' MIN
APPROXIMATE SIZE
EXCAVATE AND BACKFILL
WITH COMPACTED
STRUCTURAL FILL AS
DIRECTED BY GEOTECHNICAL
ENGINEER
28'-15" HDPE 0 1.79%
SILT FENCE AS NEEDED
TOp
/�ERMFOjAT
E wF/R
?st7,3
4' MIN
EMBANKMENT WIDTH
6" TOPSOIL FOR ALL
AREAS ABOVE THE
NORMAL POND ELEVATION
6" CLAY SOIL
LINER ON INSIDE
FACE OF
EMBANKMENT
TRASH RACK
REFER TO DETAIL
THIS SHEET
TOP OF EMBANKMENT ELEVATION=262.0
6" TOPSOIL ABOVE
6" CLAY LINER
REFER TO DETAIL
100 YEAR STORM ELEVATION=261.33
ON LITTORAL SHELF
FOR INCREMENTAL
3
WEIR
1
10 YEAR STORM ELEVATION=260.79
4'x4' PRECAST
6FT LITTORAL 1
SHELF
CONCRETE RISER
(INSTALL STEPS
AS NECESSARY)
rZ
2
1 YEAR STORM ELEVATION=260.24
INV=259.0
1.0-INCH STORM ELEVATION=259.21
-\7 NORMAL POND ELEVATION=259.0
1 ELEV=257.0 -
1
4' MIN. ASTM C-923 SEAL
KEY BETWEEN BARREL & RISER.
RISER BASE TO BE FILLED
WITH CONC. TO INVERT OF
BARREL
8"X8"X1"X12" LONG ANGLE (6 TOT. REQUIRED) TO ANCHOR RISER TO
BASE. PROVIDE 2-3/4" A307 BOLTS FROM ANGLE TO RISER AND
2-A307 "J" HOOKS 3/4" DIA. X 12" LONG FROM ANGLE TO BASE.
ANGLE TO BE FIELD COATED WITH ZINC RICH PAINT AFTER
CONSTRUCTION. "J" HOOKS TO BE PLACED UNDER LOWER REINFORCING
STEEL
FILTER MEDIA (SEE NOTE 2)
FLOW
PRIOR TO INSTALLATION, MANUFACTURER SPECIFICATIONS OF FILTER MEDIA SHALL BE REVIEWED TO ENSURE THAT DISCHARGE FROM
FILTER MEDIA SHALL MEET OR EXCEED THE PROVISIONS OF THE CLEAN WATER ACT.
ENSURE THAT PUMP PRESSURE DOES NOT EXCEED FILTER MEDIA PRESSURE RATING.
FILTER MEDIA MAY BE, BUT NOT LIMITED TO, SAND MEDIA FILTRATION DEVICES, RATED FILTER FABRIC
BAGS OR POLYMER BASED DEWATERING PRACTICES.
PUMP STRAINER SHALL NOT BE IN CONTACT WITH BOTTOM OF POND.
BMP POND DEWATERING
SEEDBED PREPARATION:
1. CHISEL COMPACTED AREAS AND SPREAD TOPSOIL THREE INCHES DEEP OVER ADVERSE SOIL CONDITIONS, IF AVAILABLE.
2. RIP THE ENTIRE AREA TO SIX INCHES DEEP.
3. REMOVE ALL LOOSE ROCK, ROOTS AND OTHER OBSTRUCTIONS, LEAVING SURFACE REASONABLY SMOOTH AND UNIFORM.
4. APPLY AGRICULTURAL LIME, FERTILIZER, AND SUPERPHOSPHATE UNIFORMLY AND MIX WITH SOIL (SEE SEEDING MIXTURE).
5. CONTINUE TILLAGE UNTIL A WELL -PULVERIZED, FIRM, REASONABLY UNIFORM SEEDBED IS PREPARED FOUR TO SIX INCHES DEEP.
6. SEED ON A FRESHLY PREPARED SEEDBED AND COVER SEED LIGHTLY WITH SEEDING EQUIPMENT OR CULTIPACK AFTER SEEDING.
7. MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR MULCH.
B. INSPECT ALL SEEDED AREAS AND MAKE NECESSARY REPAIRS OR RE-SEEDINGS WITHIN THE PLANTING SEASON, IF POSSIBLE. IF
STAND SHOULD BE MORE THAN 60% DAMAGED, RE-ESTABLISH FOLLOWING THE ORIGINAL LIME, FERTILIZER AND SEEDING RATES.
9. CONSULT S&EC ENVIRONMENTAL ENGINEERS ON MAINTENANCE TREATMENT AND FERTILIZATION AFTER PERMANENT COVER IS
ESTABLISHED.
LANDSCAPE NOTES:
ALL LANDSCAPING SHALL BE IN COMPLIANCE WITH THE NCDEQ BMP REQUIREMENTS.
LANDSCAPE CONTRACTOR SHALL PROVIDE A TWO-YEAR WARRANTY FOR BMP PLANTING SURVIVAL/REPLACEMENT.
AT THE END OF THE FIRST YEAR AND AT THE END OF THE TWO-YEAR WARRANTY PERIOD, ALL PLANTS THAT DO NOT SURVIVE MUST BE
REPLACED.
ESTABLISHMENT PROCEDURES, SUCH AS CONTROL OF INVASIVE WEEDS, ANIMAL AND VANDAL DAMAGE, MULCHING, RE -STAKING, WATERING, AND
MESH OR TUBE PROTECTION REPLACEMENT, SHALL BE IMPLEMENTED TO THE EXTEND NEEDED TO ENSURE PLANT SURVIVAL. STAKING MUST BE
REMOVED AFTER ESTABLISHMENT (APPROXIMATELY 12 MONTHS), TO PREVENT GIRDLING (STRANGLING) OF ALL WOODY PLANTS.
SOD WITHIN BMP AND SURROUNDING AREAS TO BE BERMUDA OR CENTIPEDE GRASS.
GRASS OR WILDFLOWER SEED MUST BE APPLIED AT THE RATES SPECIFIED BY THE SUPPLIERS. IF PLANT ESTABLISHMENT CANNOT BE ACHIEVED
WITH SEEDING BY THE TIME OF SUBSTANTIAL COMPLETION OF THE STORMWATER FACILITY PORTION OF THE PROJECT, THEN THE CONTRACTOR
SHALL PLANT THE AREA WITH WILDFLOWER SOD, PLUGS, CONTAINER PLANTS, OR OTHER MEANS TO COMPLETE THE SPECIFIED PLANTING AND
PROTECT AGAINST EROSION BEFORE WATER IS ALLOWED TO ENTER THE STORMWATER BMP FACILITY.
ALL MATERIALS SHALL BE ACQUIRED FROM AN APPROVED NCDEQ PLANT VENDOR. PLANT MATERIAL SHOULD BE PURCHASED FROM A LOCAL
SOURCE TO ENSURE SURVIVABILITY. LOCAL VENDORS FOR THIS SITE INCLUDE:
- CILL IDE NATIVE PLANT NURSERY 919-662-5566
- GROWING WILD NURSERY 910-259-6361
- NC FOREST SERVICE 919-731-7988
- PLANT DELIGHTS NURSERY 919-772-4794
- TARHEEL NATIVE TREES 919-553-5927
IMMEDIATELY AFTER THE WET DETENTION BASIN IS ESTABLISHED, THE PLANTS ON THE VEGETATED SHELF AND PERIMETER OF THE BASIN SHOULD
BE WATERED TWICE WEEKLY IF NEEDED UNTIL THE PLANTS BECOME ESTABLISHED (COMMONLY SIX WEEKS)
NO PORTION OF THE WET DETENTION POND SHOULD BE FERTILIZED AFTER THE FIRST INITIAL FERTILIZATION THAT IS REQUIRED TO ESTABLISH
THE PLANTS ON THE VEGETATED SHELF.
LANDSCAPING NOTES:
1. CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE CODES AND ORDINANCES REGARDING LANDSCAPING.
2. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO ESTABLISH A HEALTHY STAND OF GRASS ON ALL SEEDED AREAS.
3. CONTRACTOR SHALL PROVIDE NATURAL TOPSOIL THAT IS FERTILE, FRIABLE, WITHOUT MIXTURE OF SUBSOIL MATERIALS, AND
OBTAINED FROM A WELL DRAINED AVAILABLE SITE. IT SHALL NOT CONTAIN SUBSTANCES WHICH MAY BE HARMFUL TO PLANT
GROWTH. TOPSOIL SHALL BE SCREENED AND FREE FROM CLAY, LUMPS, STONES, ROOTS, PLANTS, OR SIMILAR SUBSTANCES 1"
OR MORE IN DIAMETER, DEBRIS, OR OTHER OBJECTS WHICH MIGHT BE A HINDERANCE TO PLANTING OPERATIONS. TOPSOIL
SHALL CONTAIN AT LEAST 4-6% ORGANIC MATTER BY WEIGHT AND HAVE A PH RANGE OF 5.5 TO 7.0.
4. CONTRACTOR SHALL BE RESPONSIBLE FOR THE WATERING AND THE MAINTENANCE OF ALL LANDSCAPED AREAS UNTIL THE LATER
OF; (a) THIRTY (30) DAYS FOLLOWING THE PLANTING OF THE GRASS AND SHRUBS, OR (b) THE DATE THAT STORE OPENS FOR
BUSINESS TO THE PUBLIC. CONTRACTOR SHALL ALSO BE RESPONSIBILITY FOR THE SURVIVAL OF THE BMP PLANTING MATERIALS
DURING THE TWO-YEAR WARRANTY PERIOD AND SHALL REPLACE ALL PLANTS THAT DO NOT SURVIVE AT THE END OF THE FIRST
YEAR AND AT THE END OF THE SECOND YEAR OF THE WARRANTY PERIOD.
5. CONTRACTOR TO VERIFY QUANTITIES PRIOR TO COMMENCING WORK.
6. ANY DISTURBED AREAS NOT SCHEDULED FOR HARDSCAPE, PLANTINGS, OR MULCH SHALL BE SEEDED LAWN. REFER TO SITE PLAN
FOR LOCATION OF AREAS TO BE SODDED.
7. NO PLANT SUBSTITUTIONS ARE PERMITTED WITHOUT WRITTEN APPROVAL OF THE OWNERS REPRESENTATIVE.
8. FOR NEW PLANTING AREAS, REMOVE ALL PAVEMENT, GRAVEL SUB -BASE AND CONSTRUCTION DEBRIS; REMOVE COMPACTED SOIL
AND ADD 18" NEW TOPSOIL OR TILL AND AMEND THE TOP 18" OF EXISTING SOIL TO MEET TOPSOIL/PLANTING MIX STANDARDS
FOR TREES.
9. ADJUST TREE PLANTING LOCATIONS TO AVOID UNDERGROUND UTILITIES. PLANT 15' FROM ALL UNDERGROUND UTILITIES (SEWER
AND STORM DRAINAGE, GAS, WATER, PHONE, AND ELECTRICAL LINES.)
20
I-ASTORMWATER MANAGEMENT SYSTEM DETAILS
1 NOT TO SCALE
LEVEL
LOW POINT
, R
STORMWATER�
MANAGEMENT
EASEMENT
I
' MAIN POND
AREA
I I
p� I
II
� w
SOD AREAS ABOVE
NORMAL POOL EL EVARON
LITTORAL SHELF
AREA=1,125 SF REFER TO
DETAIL FOR PLANTINGS
R
PVC ELBOW
"
�;� SEE DETAIL
-77
rrr
2
1
CONCRETE SHALL BE
PLACED IN RISER AFTER
ANGLES ARE SECURED
TO BASE AND RISER.
L59x5'xl.5' CONC. BASE REINFORCE WITH #4 BARS AT 12" O.C. TOP
AND BOTTOM OF EACH DIRECTION PROVIDE 3" MIN. CLEARANCE
BETWEEN EDGE OF CONC. AND STEEL REINFORCING.
PROFILE OF WET POND DETENTION SYSTEM
A �
Y!
/-ORCRAY WEIR-
NOTE: 1.0" STORM ELEVATION IS 259.21 AND INTERMEDIATE
WEIR IS ELEVATION 260.3. THERE IS ADDITIONAL STORAGE
DESIGNED FROM THE 1.0" STORM ELEVATION TO THE
INTERMEDIATE WEIR ELEVATION.
EXISTING GRADE=259.5t
2
NOTE: PUMPS SHALL BE USED TO DRAIN 1 F
THE POND WHEN NECESSARY. REFER TO DETAIL
THIS SHEET FOR DEWATERING REQUIREMENTS.
BOTTOM OF POND (TOP OF SEDIMENT STORAGE)=253.0��
r� (BOTTOM OF SEDIMENT STORAGE)=252.0f
6" CLAY SOIL -
LINER
MAIN POOL
RISE
TOP OF EMBANKMENT 262
ELEV=262.0
260
....°, ........ ............ ............ _........ ....
OUTLET CONTROL
r`ry_YSTRUCTURE REFER TO
DETAILS THIS SHEET
I 15" OUTLET PIPE
REFER TO GRADING PLAN
STORMWATER MANAGEMENT SYSTEM LAYOUT
GRAPHIC SCALE
0 10 20 40
1 INCH = 20 FEET
80
UCTURE NOT SHOWN FOR CLARITY
TRASH RACK)
OUTLET CONTROL STRUCTURE - INCREMENTAL WEIR
SCALE: N.T.S.
6" TOPSOIL FOR ALL
AREAS ABOVE THE
NORMAL POND ELEVATION
FOREBAY BERM-
6" TOPSOIL ABOVE
6" CLAY LINER 3:1
ON LITTORAL SHELF
6Fi LITTORALSHELF 6:1
NOTES:
1. SEE DESIGN PLANS FOR SPECIFIED DIMENSIONS OF RISER.
2. TRASH RACK DIMENSION CRITERIA SPECIFIED IS APPROXIMATE AND VARIES BY MANUFACTURER.
3. INSTALLATION OF TRASH RACK SHALL BE ACCORDING TO MANUFACTURER'S RECOMMENDATIONS.
4. ALL COMPONENTS OF TRASH RACK SHALL BE OF STAINLESS STEEL OR OTHER NON -CORROSIVE MATERIAL.
5. ALL MOUNTING HARDWARE SHALL BE OF STAINLESS STEEL OR OTHER NON -CORROSIVE MATERIAL.
TRASH RACK
ION CORROSIVE MATERIAL 5.5"
0 5.5" SPACING
5.5"
u u u u 5.5"
5.5"
NOTE: RISER
TRASH RACK SHALL BE INSPECTED
PERIODICALLY AND ANY DEBRIS ON
THE TRASH RACK IS TO BE REMOVED
AND PROPERLY DISPOSED OF.
TRASH RACK DETAIL
.�
"°
%
Jr
L SA
5.0' GRASS FOREBAY
WEIR AT ELEV=258.0
FOREBAY TOP ELEV= 261.0
WIDTH AT TOP = 2.0 FT
FOREBAY ENTRANCE SHALL BE
DEEPER THAN FOREBAY EXIT
4" PVC SCREW CAP RISER STRUCTURE
FOR CLEANING ACCESS
12" MIN.
P
4%4" PVC TEE
PERM. POND ELEV.=259.0
SEDIMENT STORAGE TOP
FOREBAY BOTTOM
ELEV=257.0
1 "DIA. HOLE DRILLED v
INTO BOTTOM CAP
PVC DRAIN OUTLET
NOTE: PUMPS SHALL BE USED TO DRAIN
THE FOREBAY WHEN NECESSARY. REFER TO DETAIL
THIS SHEET FOR DEWATERING REQUIREMENTS.
NORMAL POND ELEVATION
BOTTOM OF SEDIMENT -
STORAGE/EXIT
ELEV=256.5
FOREBAY ENTRANCE SHALL BE
DEEPER THAN FOREBAY EXIT
SHALLOW LAND ZONE
HERBACEOUS PLANTS
1 L-
s
TYPICAL LITTORAL SHELF VEGETATION DETAIL
SCALE: N.T.S.
SCIENTIFIC NAME COMMON NAME PLANTING ZONE QUANTITY NURSERY CONTAINER TYPE
6" TOPSOIL FOR ALL
AREAS ABOVE THE
NORMAL POND ELEVATION
BOTTOM OF SEDIMENT
STORAGE/ENTRANCE
ELEV=256.0
FOREBAY
SHALLOW WATER ZONE
HERBACEOUS PLANTS
POND
(NORMAL POOL)
SPACING PLANTING SEASON
Jancus effusus
Soft Rush
SHALLOW WATER
47
PEAT POT
6' O.C.
SPRING/SUMMER
Iris virginica
Blue Flag Iris
SHALLOW WATER
47
PEAT POT
6' O.C.
SPRING/SUMMER
Schoenoplectus tabernoemontani
Soft Stem Bulrush
SHALLOW WATER
47
PEAT POT
6' O.C.
SPRING/SUMMER
Eupotoriadelphus maculatus
Spotted Trumpetweed
SHALLOW LAND
47
PEAT POT
6' O.C.
SPRING/SUMMER
Eupotorium purpureum
Joe-Pye Weed
SHALLOW LAND
47
PEAT POT
6' O.C.
SPRING/SUMMER
Rhynchosporo colorato
Storrush Whitetop
SHALLOW LAND
47
PEAT POT
6' O.C.
SPRING/SUMMER
"STORMWATER MANAGEMENT NOTES:
i. THE DEVELOPER OR HIS AGENT SHALL CONTACT THE DESIGN ENGINEER WHEN THE
BEST MANAGEMENT PRACTICE(S) ARE CONSTRUCTED AND ABOUT TO BECOME
OPERATIONAL SO A FINAL INSPECTION CAN BE PERFORMED TO DETERMINE
COMPLIANCE WITH THE APPROVED PLAN CAN BE PERFORMED.
2. ANNUAL MAINTENANCE INSPECTION AND REPORT REQUIRED - THE OWNER OF A
PERMITTED STRUCTURAL STORMWATER BMP/CONTROL SHALL ANNUALLY SUBMIT A
MAINTENANCE AND INSPECTION REPORT FOR EACH BMP TO THE STORMWATER
ADMINISTRATOR. ANNUAL INSPECTIONS SHALL BEGIN WITHIN ONE YEAR OF THE
RECORDATION OF ANY DEED(S) SHOWING STORMWATER BMPs/CONTROL
STRUCTURES.
J. UPON COMPLETION OF THE PROJECT, AND BEFORE A CERTIFICATE OF OCCUPANCY
SHALL BE GRANTED, THE ENGINEER OF RECORD SHALL CERTIFY THAT THE
COMPLETED PROJECT IS IN ACCORDANCE WITH THE APPROVED STORMWATER
MANAGEMENT PLANS AND DESIGNS.
4. A FINAL INSPECTION OF THE SITE AND STORMWATER MANAGEMENT BMP/CONTROLS
TO BE SCHEDULED WITH AND COMPLETED BY THE PROJECT ENGINEER.
5. NCDEQ AND THEIR ASSIGNS HAVE RIGHT TO ACCESS THE STORMWATER
CONTROL(s) FOR INSPECTIONS OR MAINTENANCE AS NECESSARY.
6. THE ENGINEER'S CERTIFICATION OF COMPLETION WILL BE REQUIRED PRIOR TO THE
FINAL PLAT OR CERTIFICATE OF OCCUPANCY. THE STORMWATER CONTROL IS TO
BE INSPECTED TO ENSURE IT IS FUNCTIONING AS DESIGNED AND HAS FULL
DESIGN VOLUME PRIOR TO ISSUANCE OF THE FINAL CERTIFICATE OF OCCUPANCY.
11, THE PROPERTY OWNER IS RESPONSIBLE FOR MAINTAINING THE STORMWATER
CONTROLS(s) ACCORDING TO THE APPROVED MAINTENANCE PLAN AND DIRECTION
OF NCDEQ
STAGE STORAGE TABLE
STAGE
ELEVATION CONTOUR
INCREMENTAL
TOTAL
(FT)
(FT) AREA (SF)
STORAGE (CF)
STORAGE (CF)
0.0
259.0 3250
0
0
0.5
259.5 4095
1836
1836
0.9
259.9 4525
1724
3560 (WQV)
1.0
260.0 4635
458
4018
2.0
261.0 5760
5198
9216
3.0
262.0 6880
6320
15536
STORMWATER
MANAGEMENT DESIGN
RIVER BASIN:
NEUSE
RECEIVING STREAM:
TURKEY CREEK
STREAM INDEX:
27-86-3-(1)
CLASSIFICATION:
C; NSW
HUC:
03020203
LATITUDE/LONGITUDE:
N35.859314', W-78.177350'
1\_.0001
WET POND DESIGN
SUMMARY
TYPICAL LITTORAL SHELF PLANTING SCHEDULE
DRAINAGE AREA TO WET POND:
1.23 ACRES
SITE IMPERVIOUS AREA TO WET POND:
0.90 ACRES
OFF -SITE DESIGN IMPERVIOUS AREA TO WET POND:
0.00 ACRES
TOTAL DESIGN IMPERVIOUS AREA TO WET POND:
0.90 ACRES
PRE -DEVELOPED TO
POST -DEVELOPED POST -DEVELOPED
POST -DEVELOPED
POST -DEVELOPED
POND
TO POND
THRU POND
BYPASS
COMBINED
DRAINAGE AREA: 2.00 AC
1.23 AC
0.77 AC
CURVE NUMBER: 55.5
86.5
55.0
TIME OF CONCENTRATION: 10 MIN
5 MIN
10 MIN
1.0" STORM EVENT:
0.182 CFS
0.011 CFS
1-YEAR STORM EVENT: 0.123 CFS
3.210 CFS
0.028 CFS
0.034 CFS
0.062 CFS
10-YEAR STORM EVENT: 2.831 CFS
7.306 CFS
1.181 CFS
1.022 CFS
2.203 CFS
100-YEAR STORM EVENT: 8.707 CFS
12.83 CFS
7.593 CFS
3.246 CFS
10.84 CFS
OPERATION & MAINTENANCE
BMP element:
Potential roblem:
Now I will remadkda the problem
The entire BMP
Trash/debris is present
Remove the troth/debris
e Perimeter of the wd
detention basin
Areas of bare soil and/or
erosive gullies have formed
Regrode the soil if necessary to
remove the gully, and then plant
a ground cover and water until lt
is established. Provide lime and
a one -fire fertilizer application
Vegetation is too short or too
long
Maintain vegetation at a height
of approximately Six inches.
The inlet device: pipe or
swale
The pipe is clogged.
Unclog the pipe. Dispose of the
sediment oN-site.
The pipe is cracked or
Replace the pipe.
otherwise damaged
Erosion is occurring in the
Regrade the Swale If necessary
Swale.
to smooth it over and provide
erosion control devices such as
reinforced turf matting or riprop
to avoid future problems with
erosion.
The forebay
Sediment has accumulated to
a depth greater than the
Search for the source of the
sediment and remedy the
original design depth for
problem if possible. Remove the
sediment storage.
sediment and dispose of it in a
location where if will not cause
Impacts to streams or the BMP.
Erosion has occu
'de i anal erosion
protection Such as reinforced turf
matting or riprop if needed to
prevent future erosion problems.
Woods are present.
Remove the reeds, preferably by
hand. If pesticide is used, wipe it
on the plants rather than
s ro 'n
The vegetated shelf
professional practices
show that pruning is needed
Prune aoco ng to bast
professional practices
to maintain optimal plant
health.
Plants are dead, diseased or
Determine the source of the
dying.
problem: soils, hydrology, disease,
efc. Remedy the problem and
replace plants. Provide a
one-time fertilizer application to
establlsh the ground cover if a
soil fed Indicates it is necessary.
Weeds are present.
Remove the reeds, preferably by
hand. If pesticide is used, wipe It
on the plants rather than
spraying.
The main treatment area
Sediment has accumulated to
a depth greater than the
rc for the source of the
sediment and remedy the
original design sediment
problem if possible. Remove the
storage depth.
sediment and dispose of it in a
location where if will not cause
Im ets to streams or the BMP.
Algalgrowthcovers over
of the area,
nsu a pro ese...i remove
and control the a I growth.
Cattails. phrogm s or other
invasive plank cover 50X of
Remove plants by wiping
them with pesticide (do no
the basin surface.
a ro
The embank
rubs have started grow
Remove shrubs immediately.
on the embankment
Evidence of muskrat or beaver
Use traps to remove mu rots
activity is present.
and consult a professional to
remove beavers.
A tree has Started to grow on
the embankment.
Consult a ddm safety specialist
to remove the free.
An annual lnnspectlon by an
Make all needed repairs.
appropriate professional shows
I'dthe embankment needs
re ir. If a liable
The outlet device
Clogging has occurred.
Clean out the outlet device.
Dispose of the sediment oN-sife.
The outlet device is damaged
Repair or replace the outlet
device.
The receiving water
Erosion or other signs of
damage have occurred at the
outlet.
Contact the local NC Division of
Water Quality Regional Office, or
fhs 401 Oversight Unit at
919-733-1786,
TRIANGLE
S.....I....T....E.............D E S I G N
a Bovuman company
CONSULTANT:
Bowman North Carolina, Ltd.
(Formerly Triangle Site Design, PLLC)
4004 Barrett Drive, Suite 101
Raleigh, NC 27609
(919) 553-6570
mlowder@bowman.com
FIRM# F-1445
SEAL:
OWNER/DEVELOPER:
Glandon Forest Equity, LLC
3825 Barrett Drive
Suite 100
Raleigh, NC 27609
919 -459-2601
919-459-2604 fx
ggbarnes@vanguardpg.com
IQ
(LAYOUT COORD: MEL
PLANNING MGR. MEL
DRAWING BY: MEL
INITIAL DATE: October 15, 2021
JOB NUMBER: 004220
TITLE: STORMWATER
MANAGEMENT
DETAILS
SHEET NUMBER:
1 0
FDG# - - - - - Middlesex (Nash Co)