HomeMy WebLinkAbout20211271 Ver 1_Correspondence_20211221Strickland, Bev From: Cohn, Colleen M Sent: Tuesday, December 21, 2021 12:20 PM To: Randy Ficarrotta; Barnes, Kyle W CIV USARMY CESAW (USA); Sara Duquette Subject: RE: [External] RE: Phobos Solar, LLC. - Phase II Yes, thank you. As requested, the application for Phobos Solar LLC Phase II, DWR#20211271 Version 1 has been withdrawn. Please reference DWR#20211271 on the resubmittal PCN to help our processing staff. Thank you, Colleen Cohn Environmental Specialist II North Carolina Department of Environmental Quality Division of Water Resources Raleigh Regional Office 380o Barrett Drive Raleigh, NC 27609 Office: 919-791-4258 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Randy Ficarrotta <RFicarrotta@kleinfelder.com> Sent: Tuesday, December 21, 2021 12:07 PM To: Cohn, Colleen M <colleen.cohn@ncdenr.gov>; Barnes, Kyle W CIV USARMY CESAW (USA) <Kyle.W.Barnes@usace.army.mil>; Sara Duquette <SDuquette@kleinfelder.com> Subject: RE: [External] RE: Phobos Solar, LLC. - Phase II CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hi Colleen, Yes, based on Kyle's response we would like to withdraw the current application and will resubmit with complete information as soon as possible. Does that suffice for your records? Thank you, Randy Ficarrotta Wetland Scientist/Ecologist 5775 Glenridge Drive NE Building B — Suite 585 Atlanta, GA 30328 d i 470.381.4234 o 1470.481.4512 m 1 678.358.9250 1 KLEINFELOER 3rvght People. Pfght Solutions. From: Cohn, Colleen M <colleen.cohn@ncdenr.gov> Sent: Tuesday, December 21, 2021 11:53 AM To: Randy Ficarrotta <RFicarrotta@kleinfelder.com>; Barnes, Kyle W CIV USARMY CESAW (USA) <Kyle.W.Barnes@usace.army.mil>; Sara Duquette <SDuquette@kleinfelder.com> Subject: RE: [External] RE: Phobos Solar, LLC. - Phase II External Email Hi Randy, I want to make sure that I am understanding correctly. Are you requesting to withdraw the current application (DWR20211271 Ver 1)? If you are withdrawing, I need a response that clearly states that you are withdrawing the application for DWR records. Thank you, Colleen Cohn Environmental Specialist II North Carolina Department of Environmental Quality Division of Water Resources Raleigh Regional Office 380o Barrett Drive Raleigh, NC 27609 Office: 919-791-4258 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Randy Ficarrotta <RFicarrotta@kleinfelder.com> Sent: Tuesday, December 21, 2021 11:29 AM To: Barnes, Kyle W CIV USARMY CESAW (USA) <Kyle.W.Barnes@usace.army.mil>; Cohn, Colleen M <colleen.cohn@ncdenr.gov>; Sara Duquette <SDuquette@kleinfelder.com> Subject: RE: [External] RE: Phobos Solar, LLC. - Phase II CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. That sounds like a reasonable plan, Kyle. Sorry for the back and forth. We'II submit a new PCN that captures the complete request as soon as possible. Thank you, Randy Ficarrotta Wetland Scientist/Ecologist 5775 Glenridge Drive NE Building B — Suite 585 Atlanta, GA 30328 2 d i 470.381.4234 o 1 470.481.4512 m 1 678.358.9250 �KLEINFELDER aright oeopie. Tight Solutions. From: Barnes, Kyle W CIV USARMY CESAW (USA) <Kyle.W.Barnes@usace.army.mil> Sent: Tuesday, December 21, 2021 9:46 AM To: Randy Ficarrotta <RFicarrotta@kleinfelder.com>; Cohn, Colleen M <colleen.cohn@ncdenr.gov>; Sara Duquette <SDuquette@kleinfelder.com> Subject: RE: [External] RE: Phobos Solar, LLC. - Phase II External Email Randy, At this point I feel it would be appropriate for Phobos Solar to withdraw the current request and submit a new one with all of the information on one application. The Corps requires that projects like this be submitted as a single and complete request. With all of the back and forth with Danielle and the new information you have discussed, I'm having a hard time keeping track of it all. You should submit a new PCN with the fence crossings and the power line impacts or any additional impacts proposed on one application. If you have questions please contact us pre - submittal. Kyle From: Randy Ficarrotta <RFicarrotta@kleinfelder.com> Sent: Monday, December 20, 2021 3:05 PM To: Cohn, Colleen M <colleen.cohn@ncdenr.gov>; Barnes, Kyle W CIV USARMY CESAW (USA) <Kyle.W.Barnes@usace.army.mil>; Sara Duquette <SDuquette@kleinfelder.com> Subject: [URL Verdict: Neutral][Non-DoD Source] RE: [External] RE: Phobos Solar, LLC. - Phase II Good Afternoon Colleen, I apologize for the time lapsed since your request for additional information (RAI). As you may have seen in my email to Kyle below (I believe I copied you as well), there has been an unanticipated concern that the proposed underground electrical line is no longer feasible due to subsurface conditions on site. I picked up this project right before Danielle was going to send you her response to your RAI, and then was informed of the need to go aerial with the electrical line. I wanted to make sure with you and Kyle that we are still ok to proceed under our original application (with revisions based on the above situation) before submitting additional information, in order to capture everything needed and to reduce our cumulative time spent submitting and reviewing documents. I'm waiting to hear back from Kyle with his thoughts, but I'd appreciate hearing yours on the matter as well when you have a chance. Let me know if there is any 3 other information I can provide at this time and thank you again for your patience. Have a great day and I look forward to hearing from you, Randy Ficarrotta Wetland Scientist/Ecologist 5775 Glenridge Drive NE Building B — Suite 585 Atlanta, GA 30328 d i 470.381.4234 o 1 470.481.4512 m 1678.358.9250 KLEINFELDER HngneP ,pr RgMSoiur . From: Cohn, Colleen M <colleen.cohn@ncdenr.gov> Sent: Thursday, December 16, 2021 12:04 PM To: Randy Ficarrotta <RFicarrotta@kleinfelder.com>; Barnes, Kyle W CIV USARMY CESAW (USA) <Kyle.W.Barnes@usace.army.mil>; Sara Duquette <SDuquette@kleinfelder.com> Subject: RE: [External] RE: Phobos Solar, LLC. - Phase II External Email Hello all, Any updates on this and the response to the add info? Thanks, Colleen Cohn Environmental Specialist II North Carolina Department of Environmental Quality Division of Water Resources Raleigh Regional Office 380o Barrett Drive Raleigh, NC 27609 Office: 919-791-4258 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Randy Ficarrotta <RFicarrotta@kleinfelder.com> Sent: Wednesday, December 8, 2021 11:19 AM To: Barnes, Kyle W CIV USARMY CESAW (USA) <Kyle.W.Barnes@usace.army.mil>; Sara Duquette <SDuquette@kleinfelder.com> Cc: Cohn, Colleen M <colleen.cohn@ncdenr.gov> Subject: RE: [External] RE: Phobos Solar, LLC. - Phase II 4 CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hello Kyle, Thank you for forwarding the response from Colleen! I've been trying to familiarize myself as best I can with the project's history to date and I believe I'm now mostly caught up on its status. I also apologize for any lapse in communication during my transition onto the project, but I look forward to working with you and Colleen. With that said, I believe what occurred since Colleen's request for additional information is that Danielle had put most of her response together, when she received word that the Geotech crew now has concerns about subsurface conditions on site precluding the use of HDD for the underground electrical cable line. The thought now is to go overhead with that line, so I was going to bring that to your attention and see whether it is acceptable to modify our application to include this detail, as well as any additional (though presumably minor) impacts to resources based on such. I'm waiting on exhibits in order to determine the extent and locations of proposed overhead line resource crossings, but again I thought it would be reasonable to bring this situation up now in order to establish an approach in moving forward. If you could please let me know your thoughts on the implications of the above scenario, I'd greatly appreciate it. Thank you in advance for your time and attention to this, Randy Ficarrotta Wetland Scientist/Ecologist 5775 Glenridge Drive NE Building B — Suite 585 Atlanta, GA 30328 d i 470.381.4234 o 1470.481.4512 m 1 678.358.9250 KLEINFELDER From: Barnes, Kyle W CIV USARMY CESAW (USA) <Kyle.W.Barnes@usace.army.mil> Sent: Wednesday, December 8, 2021 9:21 AM To: Sara Duquette <SDuquette@kleinfelder.com>; Randy Ficarrotta <RFicarrotta@kleinfelder.com> Cc: Cohn, Colleen M <colleen.cohn@ncdenr.gov> Subject: FW: [External] RE: Phobos Solar, LLC. - Phase II External Email Sara and Randy, 5 As requested I am forwarding Colleen's response to Danielle's November 11th email. This email is in response to a request for additional information regarding the fencing installation at the Phobos Solar site. Let me know if you have any additional questions. Kyle From: Cohn, Colleen M <colleen.cohn@ncdenr.gov> Sent: Monday, November 15, 2021 5:22 PM To: Danielle Sank <DSank@kleinfelder.com>; Barnes, Kyle W CIV USARMY CESAW (USA) <Kyle.W.Barnes@usace.army.mil> Subject: [Non-DoD Source] RE: [External] RE: Phobos Solar, LLC. - Phase II Danielle, I am reviewing the above referenced project, and in order to complete my review, some additional information is required: 1. Multiple streams are depicted without buffers on the Wetland and Stream Impact Map -Overview included in the response to the Request for Additional Information from the USACE. Please enumerate all riparian buffers as overlays on the site plan. Please provide stream determinations for any stream features not subject to the Tar - Pamlico Riparian Buffer Rules. [15A NCAC 02H .0502(a)(9)] 2. Impact maps do not differentiate between Zones 1 and 2 of the Tar -Pamlico Riparian Buffer. Please locate all of the protected riparian buffers as overlays on the impact maps, clearly showing Zone 1 and Zone 2. [15A NCAC 02B .0611(b)(1(f)] 3. It appears that there is an additional fence crossing on sheet C-105 right under "Matchline Sheet C-102". Please provide additional details on this fence crossing. [15A NCAC 02H .0502(c)] 4. Please provide an updated impact table that specifies the amount of fill and the amount of clearing for each wetland impact. [15A NCAC 02H .0502(c)] 5. Please confirm that the applicant is requesting to change this submittal to a NWP 18. 6. Please provide an agent authorization letter delegating signature authority. A sample agent authorization letter can be found on the USACE website. [15A NCAC 02H .0502(a)(11)] Thank you, Colleen Cohn Environmental Specialist II North Carolina Department of Environmental Quality Division of Water Resources Raleigh Regional Office 380o Barrett Drive Raleigh, NC 27609 Office: 919-791-4258 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Danielle Sank [mailto:DSank@kleinfelder.com] Sent: Thursday, November 11, 2021 4:25 PM To: Barnes, Kyle W CIV USARMY CESAW (USA) <Kyle.W.Barnes@usace.army.mil>; Cohn, Colleen M <colleen.cohn@ncdenr.gov> Subject: RE: [External] RE: Phobos Solar, LLC. - Phase II 6 CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hi Kyle, Glad to hear we can make NWP 18 work to bypass the current hold on the 2020 NWPs. I'm sure that will make this go smoother on both our ends :) As requested, the total square footage of fill for the fence posts to be installed in wetlands are outlined below. Information of the fill per post and number of fence posts to be installed was obtained from Attachment C — Fence Plan Sheets from the RAI submittal. There were no wetlands at Fence Crossings 4 and 5 - fence posts will be installed within the stream riparian buffers and along the stream banks outside of the OHWM. Fill Per Fence Post: 'd' height x �.' diameter Length of Fence Crossing In Wetlands )Linear Ft) 75 1c4 23 Typical Width Betty Fence Posts (Ft) 10 10 10 No. Fence Posts To Be Installed 10 2 Total Total Fill (Sq. Ft,l 113.04 141.3 28.26 262.6 Thank you again for your coordination on this project! Colleen — please let me know if you have any questions or need any follow-up information on your end. Thanks! Danielle Sank Project Professional / Ecologist 9009 Perimeter Woods Dr., Suite E Charlotte, NC 28216 (P) 443-618-0066 1 LK EINFELDER Brighr Penple. F.gnr Sakifi01. From: Barnes, Kyle W CIV USARMY CESAW (USA) <Kyle.W.Barnes@usace.army.mil> Sent: Wednesday, November 10, 2021 10:28 AM To: Danielle Sank <DSank@kleinfelder.com>; Cohn, Colleen M <colleen.cohn@ncdenr.gov> Subject: RE: [External] RE: Phobos Solar, LLC. - Phase II External Email Danielle, Thank you for the follow up information. This clarifies how the fence will be installed and that the vegetation will only be cut and maintained by cutting and no ground disturbing activities will take place. The cutting isn't considered an impact with the Corps and the conversion is 7 minimal so I will not require mitigation because the wetland continues to function with emergent vegetation. The only additional information I will need from you is the square footage of fill associated with the fence post. Please give me the number of post within the wetland at each crossing and the total amount of fill associated. With this impact being so small I am changing the permit request to a Nationwide Permit #18. If you haven't heard US Army Corps of Engineers HQ has placed a hold on issuing 16 permits associated with Section 401 of the CWA that were renewed in 2020. NWP #51, of which you requested to use for this project, is included in those 16. I can move forward with issuance through the NWP #18 if you can get me the information indicated above. Also keep in mind that this is only related to the Corps permit. You will need to continue to coordinate with the DWR for impacts related to the protected riparian buffer. Let me know if you have any questions. Kyle From: Danielle Sank <DSank@kleinfelder.com> Sent: Friday, November 5, 2021 12:07 PM To: Barnes, Kyle W CIV USARMY CESAW (USA) <Kyle.W.Barnes@usace.army.mil>; Cohn, Colleen M <colleen.cohn@ncdenr.gov> Subject: [Non-DoD Source] RE: [External] RE: Phobos Solar, LLC. - Phase II Hi Kyle/Colleen, Please see the attached letter with the requested supplemental information. Apologies on the delay getting this back to you, it took a while to get a response back from our client. Please let me know if you have any questions or issues uploading the doc. Thanks! Danielle Danielle Sank Project Professional / Ecologist 9009 Perimeter Woods Dr., Suite E Charlotte, NC 28216 (P) 443-618-0066 KLiC EINFELL)ER Bnght People_ Right Sd rtienc From: Barnes, Kyle W CIV USARMY CESAW (USA) <Kyle.W.Barnes@usace.army.mil> Sent: Wednesday, September 29, 2021 2:09 PM 8 To: Cohn, Colleen M <colleen.cohn@ncdenr.gov>; Danielle Sank <DSank@kleinfelder.com> Subject: RE: [External] RE: Phobos Solar, LLC. - Phase II External Email Danielle, I'm good with either submittal format as long as it works with Colleen and doesn't cause issues with DWR's database. Kyle From: Cohn, Colleen M <colleen.cohn@ncdenr.gov> Sent: Wednesday, September 29, 2021 8:48 AM To: Danielle Sank <DSank@kleinfelder.com>; Barnes, Kyle W CIV USARMY CESAW (USA) <Kyle.W.Barnes@usace.army.mil> Subject: [Non-DoD Source] RE: [External] RE: Phobos Solar, LLC. - Phase II Hi Danielle, I believe you can use that form, but you can also CC me on any supplemental information you submit to Kyle via email. I can then upload the emailed supplemental information into DWR's online database when I review the project. Thanks, Colleen Cohn Environmental Specialist II North Carolina Department of Environmental Quality Division of Water Resources Raleigh Regional Office 380o Barrett Drive Raleigh, NC 27609 Office: 919-791-4258 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Danielle Sank [mailto:DSank@kleinfelder.com] Sent: Wednesday, September 29, 2021 6:21 AM To: Barnes, Kyle W CIV USARMY CESAW (USA) <Kyle.W.Barnes@usace.army.mil> Cc: Cohn, Colleen M <colleen.cohn@ncdenr.gov> Subject: [External] RE: Phobos Solar, LLC. - Phase II CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hi Kyle, Just wanted to provide an update following our conversation last Friday - I have reached out to our client to confirm their long-term maintenance plans for the fence crossings at the wetland and stream areas. Once I hear back, I'll work to 9 submit a supplemental information request with the detailed impact maps, and additional BMP and avoidance/minimization information as requested. I believe you had said that the supplemental request needed to be submitted through DWR - could you please confirm if this is the correct submittal and that I would want to check the "More Information Response" ? The DWR contact for this project is Colleen Cohn. Once submitted, would Colleen forward the submittal to you? New Submission (nc.gov) Thank you! Danielle Danielle Sank Project Professional / Ecologist 9009 Perimeter Woods Dr., Suite E Charlotte, NC 28216 (P) 443-618-0066 KLE/NFELDER Bright People. Night Sokokra From: Barnes, Kyle W CIV USARMY CESAW (USA) <Kyle.W.Barnes@usace.army.mil> Sent: Thursday, September 23, 2021 11:00 AM To: Danielle Sank <DSank@kleinfelder.com> Cc: Cohn, Colleen M <colleen.cohn@ncdenr.gov> Subject: RE: Phobos Solar, LLC. - Phase II External Email Danielle, I left you a message on your voicemail today to discuss this project further. I am reviewing the information and the impact zones are not clear on the maps. You submitted a large set of plans and we need to define the specific sites. Additionally I need to know why the crossings need to be cleared and grubbed. On other sites I have been involved with fence installation was performed in jurisdictional areas by cutting the pathway and only disturbing the jurisdictional areas with the poles leaving the root mat intact. The only impact would be the pole and conversion of the wetland. Please let me know when you would be available to discuss this project. Thank you. Kyle From: Danielle Sank <DSank@kleinfelder.com> Sent: Wednesday, September 15, 2021 3:45 PM To: Barnes, Kyle W CIV USARMY CESAW (USA) <Kyle.W.Barnes@usace.army.mil> Subject: [Non-DoD Source] RE: Phobos Solar, LLC. - Phase II 10 Hi Kyle, Yes, for both the wetland and stream crossings the applicant proposes to mechanically clear trees and shrubs just within the 10 ft wide corridors (impact areas) which would give them enough clearance for the fence installation equipment. The majority of the fencing will sit at ground level, except for the fence posts which will be stabilized by concrete and will incur permanent impacts. For the stream crossings, the fence posts will be installed along the stream banks and outside of the OHWM and the pre -construction elevations will be maintained. Between fence posts, the fencing will cross parallel to the stream bank elevations and sit above the stream channel as not to obstruct downstream flow. Following the installation, it's assumed that the fence corridors will be annually maintained with tree/shrub removal but still allow for natural recruitment of herbaceous vegetation in order to maintain soil stability in the area. My sincere apologies for the missing info, but I hope this has helped you with your review. Please let me know if you have any other questions moving forward. Thank you! Danielle Sank Project Professional / Ecologist 9009 Perimeter Woods Dr., Suite E Charlotte, NC 28216 (P) 443-618-0066 I� LK EINFELDER Bnghr People. R.gln Somionm. From: Barnes, Kyle W CIV USARMY CESAW (USA) <Kyle.W.Barnes@usace.army.mil> Sent: Wednesday, September 15, 2021 1:07 PM To: Danielle Sank <DSank@kleinfelder.com> Subject: Phobos Solar, LLC. - Phase II External Email Danielle, I'm the Corps agent reviewing the PCN you submitted for the subject project in Nash County. Within the project description I didn't see the proposed installation methodology. Within the areas that the fencing will be crossing jurisdictional waters and wetlands will the applicant be mechanically clearing the project area? Kyle Barnes Regulatory Project Manager US Army Corps of Engineers Wilmington District Washington Field Office 910-251-4584 11 We at the U.S. Army Corps of Engineers Regulatory Branch are committed to improving service to our customers. We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: Blockedhttp://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0 <Blockedhttp://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0> Thank you for taking the time to visit this site and complete the survey. 12