HomeMy WebLinkAbout20211271 Ver 1_More Info Requested_20211115Strickland, Bev
From: Cohn, Colleen M
Sent: Monday, November 15, 2021 5:22 PM
To: Danielle Sank; Barnes, Kyle W CIV USARMY CESAW (USA)
Subject: RE: [External] RE: Phobos Solar, LLC. - Phase II
Danielle,
I am reviewing the above referenced project, and in order to complete my review, some additional information is
required:
1. Multiple streams are depicted without buffers on the Wetland and Stream Impact Map -Overview included in the
response to the Request for Additional Information from the USACE. Please enumerate all riparian buffers as
overlays on the site plan. Please provide stream determinations for any stream features not subject to the Tar -
Pamlico Riparian Buffer Rules. [15A NCAC 02H .0502(a)(9)]
2. Impact maps do not differentiate between Zones 1 and 2 of the Tar -Pamlico Riparian Buffer. Please locate all of
the protected riparian buffers as overlays on the impact maps, clearly showing Zone 1 and Zone 2. [15A NCAC
02B .0611(b)(1(f)]
3. It appears that there is an additional fence crossing on sheet C-105 right under "Matchline Sheet C-102". Please
provide additional details on this fence crossing. [15A NCAC 02H .0502(c)]
4. Please provide an updated impact table that specifies the amount of fill and the amount of clearing for each
wetland impact. [15A NCAC 02H .0502(c)]
5. Please confirm that the applicant is requesting to change this submittal to a NWP 18.
6. Please provide an agent authorization letter delegating signature authority. A sample agent authorization letter
can be found on the USACE website. [15A NCAC 02H .0502(a)(11)]
Thank you,
Colleen Cohn
Environmental Specialist II
North Carolina Department of Environmental Quality
Division of Water Resources
Raleigh Regional Office
380o Barrett Drive
Raleigh, NC 27609
Office: 919-791-4258
E-mail correspondence to and from this address may be subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Danielle Sank [mailto:DSank@kleinfelder.com]
Sent: Thursday, November 11, 2021 4:25 PM
To: Barnes, Kyle W CIV USARMY CESAW (USA) <Kyle.W.Barnes@usace.army.mil>; Cohn, Colleen M
<colleen.cohn@ncdenr.gov>
Subject: RE: [External] RE: Phobos Solar, LLC. - Phase II
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Hi Kyle,
1
Glad to hear we can make NWP 18 work to bypass the current hold on the 2020 NWPs. I'm sure that will make this go
smoother on both our ends :)
As requested, the total square footage of fill for the fence posts to be installed in wetlands are outlined below.
Information of the fill per post and number of fence posts to be installed was obtained from Attachment C — Fence Plan
Sheets from the RAI submittal. There were no wetlands at Fence Crossings 4 and 5 - fence posts will be installed within
the stream riparian buffers and along the stream banks outside of the OHWM.
Fill Per Fence Post: 4`
Fence Crossing 1
Fence Crossing 2
Fence Crossing 3
tgth of Fence
g In Wetlands
(Linear FL)
75
104
Typical Width Bet e
Fence Posts (Ft)
10
10
No. Fence Posts To
Be Installed
141.3
26.25
262.6
Thank you again for your coordination on this project!
Colleen — please let me know if you have any questions or need any follow-up information on your end.
Thanks!
Danielle Sank
Project Professional / Ecologist
9009 Perimeter Woods Dr., Suite E
Charlotte, NC 28216
(P) 443-618-0066
KLEINFELDER
Htyht People. F.gnf Sniu[inru.
From: Barnes, Kyle W CIV USARMY CESAW (USA) <Kyle.W.Barnes@usace.army.mil>
Sent: Wednesday, November 10, 2021 10:28 AM
To: Danielle Sank <DSank@kleinfelder.com>; Cohn, Colleen M <colleen.cohn@ncdenr.gov>
Subject: RE: [External] RE: Phobos Solar, LLC. - Phase II
External Email
Danielle,
Thank you for the follow up information. This clarifies how the fence will be installed and that
the vegetation will only be cut and maintained by cutting and no ground disturbing activities
will take place. The cutting isn't considered an impact with the Corps and the conversion is
minimal so I will not require mitigation because the wetland continues to function with
emergent vegetation. The only additional information I will need from you is the square
footage of fill associated with the fence post. Please give me the number of post within the
wetland at each crossing and the total amount of fill associated.
2
With this impact being so small I am changing the permit request to a Nationwide Permit #18.
If you haven't heard US Army Corps of Engineers HQ has placed a hold on issuing 16 permits
associated with Section 401 of the CWA that were renewed in 2020. NWP #51, of which you
requested to use for this project, is included in those 16. I can move forward with issuance
through the NWP #18 if you can get me the information indicated above. Also keep in mind
that this is only related to the Corps permit. You will need to continue to coordinate with the
DWR for impacts related to the protected riparian buffer. Let me know if you have any
questions.
Kyle
From: Danielle Sank <DSank@kleinfelder.com>
Sent: Friday, November 5, 2021 12:07 PM
To: Barnes, Kyle W CIV USARMY CESAW (USA) <Kyle.W.Barnes@usace.army.mil>; Cohn, Colleen M
<colleen.cohn@ncdenr.gov>
Subject: [Non-DoD Source] RE: [External] RE: Phobos Solar, LLC. - Phase II
Hi Kyle/Colleen,
Please see the attached letter with the requested supplemental information. Apologies on the delay getting this back to
you, it took a while to get a response back from our client.
Please let me know if you have any questions or issues uploading the doc.
Thanks!
Danielle
Danielle Sank
Project Professional / Ecologist
9009 Perimeter Woods Dr., Suite E
Charlotte, NC 28216
(P) 443-618-0066
4 ►CLE/NFELQER
From: Barnes, Kyle W CIV USARMY CESAW (USA) <Kyle.W.Barnes@usace.army.mil>
Sent: Wednesday, September 29, 2021 2:09 PM
To: Cohn, Colleen M <colleen.cohn@ncdenr.gov>; Danielle Sank <DSank@kleinfelder.com>
Subject: RE: [External] RE: Phobos Solar, LLC. - Phase II
External Email
Danielle,
3
I'm good with either submittal format as long as it works with Colleen and doesn't cause issues
with DWR's database.
Kyle
From: Cohn, Colleen M <colleen.cohn@ncdenr.gov>
Sent: Wednesday, September 29, 2021 8:48 AM
To: Danielle Sank <DSank@kleinfelder.com>; Barnes, Kyle W CIV USARMY CESAW (USA)
<Kyle.W.Barnes@usace.army.mil>
Subject: [Non-DoD Source] RE: [External] RE: Phobos Solar, LLC. - Phase II
Hi Danielle,
I believe you can use that form, but you can also CC me on any supplemental information you submit to Kyle via email. I
can then upload the emailed supplemental information into DWR's online database when I review the project.
Thanks,
Colleen Cohn
Environmental Specialist II
North Carolina Department of Environmental Quality
Division of Water Resources
Raleigh Regional Office
380o Barrett Drive
Raleigh, NC 27609
Office: 919-791-4258
E-mail correspondence to and from this address may be subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Danielle Sank [mailto:DSank@kleinfelder.com]
Sent: Wednesday, September 29, 2021 6:21 AM
To: Barnes, Kyle W CIV USARMY CESAW (USA) <Kyle.W.Barnes@usace.army.mil>
Cc: Cohn, Colleen M <colleen.cohn@ncdenr.gov>
Subject: [External] RE: Phobos Solar, LLC. - Phase II
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Hi Kyle,
Just wanted to provide an update following our conversation last Friday - I have reached out to our client to confirm
their long-term maintenance plans for the fence crossings at the wetland and stream areas. Once I hear back, I'll work to
submit a supplemental information request with the detailed impact maps, and additional BMP and
avoidance/minimization information as requested.
I believe you had said that the supplemental request needed to be submitted through DWR - could you please confirm if
this is the correct submittal and that I would want to check the "More Information Response" ? The DWR contact for this
project is Colleen Cohn. Once submitted, would Colleen forward the submittal to you?
4
New Submission (nc.gov)
Thank you!
Danielle
Danielle Sank
Project Professional / Ecologist
9009 Perimeter Woods Dr., Suite E
Charlotte, NC 28216
(P) 443-618-0066
KLE/NFELDER
Bright People. Night Sd irks
From: Barnes, Kyle W CIV USARMY CESAW (USA) <Kyle.W.Barnes@usace.army.mil>
Sent: Thursday, September 23, 2021 11:00 AM
To: Danielle Sank <DSank@kleinfelder.com>
Cc: Cohn, Colleen M <colleen.cohn@ncdenr.gov>
Subject: RE: Phobos Solar, LLC. - Phase II
External Email
Danielle,
I left you a message on your voicemail today to discuss this project further. I am reviewing the
information and the impact zones are not clear on the maps. You submitted a large set of
plans and we need to define the specific sites. Additionally I need to know why the crossings
need to be cleared and grubbed. On other sites I have been involved with fence installation
was performed in jurisdictional areas by cutting the pathway and only disturbing the
jurisdictional areas with the poles leaving the root mat intact. The only impact would be the
pole and conversion of the wetland. Please let me know when you would be available to
discuss this project. Thank you.
Kyle
From: Danielle Sank <DSank@kleinfelder.com>
Sent: Wednesday, September 15, 2021 3:45 PM
To: Barnes, Kyle W CIV USARMY CESAW (USA) <Kyle.W.Barnes@usace.army.mil>
Subject: [Non-DoD Source] RE: Phobos Solar, LLC. - Phase II
Hi Kyle,
Yes, for both the wetland and stream crossings the applicant proposes to mechanically clear trees and shrubs just within
the 10 ft wide corridors (impact areas) which would give them enough clearance for the fence installation equipment.
The majority of the fencing will sit at ground level, except for the fence posts which will be stabilized by concrete and
will incur permanent impacts. For the stream crossings, the fence posts will be installed along the stream banks and
5
outside of the OHWM and the pre -construction elevations will be maintained. Between fence posts, the fencing will
cross parallel to the stream bank elevations and sit above the stream channel as not to obstruct downstream
flow. Following the installation, it's assumed that the fence corridors will be annually maintained with tree/shrub
removal but still allow for natural recruitment of herbaceous vegetation in order to maintain soil stability in the area.
My sincere apologies for the missing info, but I hope this has helped you with your review. Please let me know if you
have any other questions moving forward.
Thank you!
Danielle Sank
Project Professional / Ecologist
9009 Perimeter Woods Dr., Suite E
Charlotte, NC 28216
(P) 443-618-0066
I� LK EINFE'LQER
enghr People. F,gnt blu[ioni
From: Barnes, Kyle W CIV USARMY CESAW (USA) <Kyle.W.Barnes@usace.army.mil>
Sent: Wednesday, September 15, 2021 1:07 PM
To: Danielle Sank <DSank@kleinfelder.com>
Subject: Phobos Solar, LLC. - Phase II
External Email
Danielle,
I'm the Corps agent reviewing the PCN you submitted for the subject project in Nash County.
Within the project description I didn't see the proposed installation methodology. Within the
areas that the fencing will be crossing jurisdictional waters and wetlands will the applicant be
mechanically clearing the project area?
Kyle Barnes
Regulatory Project Manager
US Army Corps of Engineers
Wilmington District
Washington Field Office
910-251-4584
We at the U.S. Army Corps of Engineers Regulatory Branch are committed to improving service
to our customers. We would appreciate your feedback on how we are performing our
duties. Our automated Customer Service Survey is located at:
Blockedhttp://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0
<Blockedhttp://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0>
6
Thank you for taking the time to visit this site and complete the survey.