Loading...
HomeMy WebLinkAboutGW1-2021-07898_Well Construction - GW1_20211102 WELL CONSTRUCTION RECORD (GW-1) For Internal Use Only: 1.Well n actor Informati 34 WATER+ZONES FROM TO DESCRIPTION Well Contractor N e (� — A ft. ft. ft. ft. NC Well Contractor Certification Number 15 OUTERCASING for:multi-cased:well3`_ORTiINER ifia Morgan Well & Pumps I N C FROM TO DIAMETER' THICKNESS MATERIAL ft. fL 61/8 i" sdr21 PVC Company Name ? (� .,16 JNNER CASING ORITUBING ""eothermal closed3oo - 2.Well Construction Permit#: � 1 FROM TO DIAMETER THICKNESS T MATERIAL List all applicable well construction permits(z.e.UIC,County,State,Variance,etc) ft. ft. in. 3.Well Use(check well use): ft. fL in. Water Supply Well: tt L7-SC REE N r_ :IT- >. Y . :-_ .; FROM TO DIAMETER SLOT SIZE THICKNESS MATERIAL ❑Agricultural ❑Municipal/Public ft. ft. in. ❑Geothermal(Heating/Cooling Supply) jRResidential Water Supply(single) ft. ft. in. ❑Industrial/Commerciai ❑Residential Water Supply(shared) ;18 GROUT ❑h-i ation ❑Wells>100,000 GPD FROM TOj` MATERIAL EMPLACEMENT METHOD&AMOUNT Non-Water Supply Well: 0 rc• 20 rt• bentonite poured ❑Monitoring ❑Recovery Injection Well: ft. ft. ❑Aquifer Recharge ❑Groundwater Remediation .19�SAND/GRAVEL=P.ACK ita'livable ❑Aquifer Storage and Recovery Cl Salinity Barrier FROM TO MATERIAL EMPLACEMENT METHOD ❑Aquifer Test ❑Stormwater Drainage ft. ft. ❑Experimental Technology ❑Subsidence Control ❑Geotherrnal(Closed Loop) ❑Tracer 20DRTrT7NGiOGattack=additioualhee`ts;ifnecess �. _'_ FROM TO DESCRIPTION color hardness,soil/rock type,gain size,etc. ❑Geothermal(Heating/Cooling Return) ❑Other(explain under#21 Remarks) Q ft. 1 ft. 4.Date Well(s)Completed: 0 (�z� I2_( Well ID# t S ft. 3 ft dlyA 5a.Well Location: 3 SStt. .�ntt. / Facility/Owner Name Facili ID#(if applicable) ft. ft. 11 S� Y1 A W�bIr� ��,'G\\\�� ft. ft. _ il Physical Address,City,and Zip ft. fL County Parcel Identification No.(PIN) 5b.Latitude and longitude in degrees/minutes/seconds or decimal degrees: (ifwell field,one Iattlong is sufficient) 22. tcafion t " s ':•'1 3S.Sako N W 6.Is(are)the well(s): Permanent or ❑Temporary Vae Certified Well Contractor Date ng ibis farm,I hereby certify that the well(s)was(were)constructed in accordance with 7.Is this a repair to an existing well: ❑Yes or NNo 15A NCAC 02C.0100 or 15A NCAC 02C.0100 Well Construction Standards and that a copy If this is a repair,fill out known well construction information and explain the nature of the of this record has been provided to the we.11 owner. repair under#21 remarks section or on the back of this fonn. 23.Site diagram or additional well details: 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page'to provide additional well construction info construction,only I GW-I is needed. Indicate TOTAL'NUMBER of wells (add'See Over'in Remarks Box).You may also attach additional pages if necessary. drilled:+ 24.SUBMITTAL INSTRUCTIONS 9.Total well depth below land surface: (ft.) Submit this GW-1 within 30 days of well completion per the following: For multiple wells list all depths i(different(example-3@200'and 1@100� 24a. For All Wells: Original form'to Division of Water Resources (DWR), 10.Static water level below top of casing: (ft') Information Processing Unit,1617 MSC,Raleigh,NC 27699-1617 If water level is above casing,use"+" 11.Borehole diameter: 6 (in.) 24b.For Injection Wells: Copy to DWR,Underground Injection Control(IUC) o + Program, 1636 MSC,Raleigh,NC 21 7699-1636 12.Well construction method: Ro`a'1••y 24c.For Water Supply and Open-Loop Geothermal Return Wells:Copy to the (i.e.auger,rotary,cable,direct push,etc.) county environmental health departulent of the county where installed f FOR WATER SUPPLY WELLS ONLY: 24d.For Water Wells producing over 100,000 GPD: Copy to DWR,CCPCUA air pressure Permit Program,1611 MSC,Raleigh,NC 27699-1 6 1 1 13a.Yield(gpm) Method of test: air Disinfection type:3\\TJrwvU Amount: UrL� i Form GW-1 North Carolina Department of Environmental Quality-Division of Water Resources Revised 6-6-2018