Loading...
HomeMy WebLinkAboutSW4210704_Plansheet - Other_20211210 (13)NOTES: 1. ALL MATERIALS, METHOD OF INSTALLATION, TRAFFIC CONTROL AND ANY OTHER CONDITIONS OF THE ENCROACHMENT AGREEMENT SHALL BE PROVIDED BY THE CONTRACTOR IN CONFORMANCE WITH DAVIDSON COUNTY AND N.C.D.O.T. STANDARDS. ALL PAVEMENT MARKINGS AND SIGNS 'SHALL BE IN CONFORMANCE WITH THE LATEST EDITION OF THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) & NCDOT STANDARDS. 2. THE CONTRACTOR. SHALL PROVIDE FOR STRIPPING AND PAVEMENT MARKINGS WITHIN THE AREAS OF CONSTRUCTION. TRANSPORTATION SHALL APPROVE STRIPING LAYOUT PRIOR TO APPLICATION OF ANY PAINT. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATION OF ALL EXISTING UTILITIES, AND SHALL CONTACT PERSONNEL OF THE N.C.D.O.T. AND THE OWNERS OF ANY UTILITIES 5 DAYS PRIOR TO ANY CONSTRUCTION ACTIVITIES. 4. CONTRACTOR SHALL RELOCATE EXISTING SIGNS, WATER METERS, MAIL BOXES, ETC... THAT ARE LOCATED WITHIN THE ROAD WIDENING. 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING A COPY OF THE ENCROACHMENT AGREEMENT AND WIDENING AGREEMENTS AND SHALL COMPLY WITH ALL CONDITIONS OF THESE AGREEMENTS. 6. ALL DIMENSIONS ARE TO THE FACE OF CURB IN CURB AND GUTTER SECTIONS AND TO THE EDGE OF PAVEMENT IN RIBBON PAVED SECTIONS. 7. CONTRACTOR SHALL COORDINATE WITH UTILITY COMPANIES FOR TEMPORARY BRACING OF POLES OR REALLOCATIONS IF NECESSARY. OWNER SHALL PAY UTILITY COMPANY COSTS. 8. THE OWNER SHALL BE RESPONSIBLE FOR OBTAINING OFF -SITE CONSTRUCTION EASEMENTS WHEREVER NECESSARY. GENERAL NOTES: 1. The Contractor shall be responsible for any damage to gas or water pipes, public or private sewers, drains or culverts, railroad or traffic signal cables, telephone or power conduits, or other structures. When utility lines that are to be removed are encountered within the area of operations, the Contractor shall notify the Owner's representative in ample time for the necessary measures to be taken to prevent interruption of the services. Reasonable care has been exercised in showing the location of existing utilities on the plans. The exact location of such utilities is not known in all cases. The Contractor shall explore the area ahead of the grading operation by observations, electronic devices, and by personal contacts with utility companies, and locate such utilities in advance of the trenching or grading operations, and shall conduct his work so as to eliminate or minimize damage to the existing structures or utilities. 2. As indicated on the Grading/Drainage/Erosion Control Plan, the General Contractor shall be responsible for the provision and routine maintenance of erosion control devices, either indicated or required by Division of Land Resources Personnel, necessary to comply with the Sedimentation Pollution Control Act of 1973 and amendments thereto. Any fines resulting from the improper provision or maintenance of required devices shall be burdened by the General Contractor. 3. The General Contractor shall be responsible for conformance with all current local, state, and OSHA safety codes during all phases of the work. Contract prices established for the work shall include costs associated with the provision of safety equipment, and personnel necessary to complete the work, including but not limited to, trench bracing, and personnel licensed by OSHA as competent for evaluating soil stability. BEFORE YOU DIG! CALL 811 N.C. ONE -CALL CENTER IT'S THE LAW! PAVEMENT MARKING SCHEDULE PAVEMENT MARKING LINES PAY ITEM DESCRIPTION AA - 4" WHITE EDGE LINE AB - 4" WHITE 10' SKIP LINE AC - 4" WHITE 2' MINISKIP AD - 4" WHITE SOLID LANE LINE AO - 24" WHITE STOP BAR AT - 8" YELLOW DIAGONAL LINE AU - 4" YELLOW DOUBLE CENTER LINE PAVEMENT MARKING SYMBOLS PAY ITEM BD - LEFT TURN ARROW BE - RIGHT TURN ARROW BF - STRAIGHT ARROW •••)r► NOTE: THE CONTRACTOR SHALL BE RESPONSIBLE FOR AND INCLUDE COSTS ASSOCIATED WITH THE PROVISION OF A DETAILED TRAFFIC CONTROL PLAN. THIS PLAN SHALL BE PHASED TO CONFORM WITH THE CONTRACTOR'S CONSTRUCTION SEQUENCE, AND SHALL BE SUBMITTED TO THE FOLLOWING N.C.D.O.T. OFFICE FOR REVIEW AND APPROVAL PRIOR TO ANY CONSTRUCTION ACTIVITIES: 1.5" S9.5B OVERLAY j VARIES (36' MAX.) TYPICAL PAVEMENT SECTION DETAILS NOT TO SCALE 40' 30' 20' 10' 0 J w J 40' 80, SCALE: 1 "=40' 30' R/W (60' TOTAL) 18' MAX.) 5' 6'* VARIES (12' MAX.) 12' 12' 12' 6'* SHOULDER TURN LANE HOULI 1. 5" S9.5B OVERLAY ON ENTIRE ROAD 1.5" S9.5B 1.5" S9.5B -1'/FT EX. ROADWAY 4" I19.OB 5" B25.OB 4" I19.OB 24' f VARIES 5" B25.OB ' 6' (MAX.) kk TYPICAL SECTION ROADWAY WIDENING BIESECKER ROAD ENTRANCE NOT TO SCALE * SHOULDER WIDTHS MAY BE REDUCED TO 4' IN FRONT OF OFF —SITE PROPERTIES TO KEEP THE LIMITS OF CONSTRUCTION WITHIN THE 60' PUBLIC R/W z 1- U U) w 0 r w Z 0 � a E-4 WA wF- OAzz 0�D 000 Z�R� QU V V) 0- t,,)W}X E-4 < A SHEET NO. z a z 7h v a, 0 rn NN