Loading...
HomeMy WebLinkAboutSW4210704_Plansheet - Other_20211210 (12)NOTE- THE CONTRACTOR SHALL OBTAIN A COPY OF THE NPDES STORM WATER PERMIT ISSUED WITH THE GRADING PERMIT AND COMPLY WITH ALL CONDITIONS AND REQUIREMENTS INCLUDING, BUT NOT LIMITED TO, MAINTAINING RAIN GAUGE AT THE SITE AT ALL TIME% AND PROVISION OF INSPECTIONS BOX TO HOUSE INSPECTIONS LOGS AND PLAN& INSPECTIONS REQUIRED BY THE NPDES PERMIT SHALL BE PROVIDED BY THE OWNER, HOWEVER. THE CONTRACTOR SHALL PROVIDE FOR MAINTENANCE OF EROSION CONTROL DEVICES AS RECOMMENDED IN THE MAINTENANCE INSPECTION LOGS. FLOOD CERTIFICATION The undersigned hereby certifies to the best of his knowledge and belief the location of the subject property has been checked against area HUD/FIA maps and Information provided by the Department of Housing and Urban Development and finds that: The subject ( ) property HAZARD AREA as defe-rmined by HUD/FIA flood map. The subject property is not located in a SPECIAL FLOOD HAZARD AREA as determined by HUD/FIA flood map. 00 The subject property islocated m an area which has not been mapped as to flood areas by HUD/FIA. SEDIMENT BASIN 1 SEDIMENT TRAP 2 SEDIMENT TRAP 3 SEDIMENT BASIN 4 SEDIMENT BASIN 5 SEDIMENT TRAP 6 WEIR LENGTH REQUIRED (Q1O) where h = 0.5' 48" RISER 20' SPILLWAY 14 ft 14 ft 30" RISER 15' SPILLWAY 42" RISER 20' SPILLWAY 4 ft CONSTRUCTION SEQUENCE 1' OBTAIN PLAN APPROVAL FROM NCDEQ AND ALL APPLICABLE PERMITS FROM OTHER REVIEWING AGENCIES. 2' FLAGGING 0FALL THE CONSTRUCTION/DENUDED LIMITS AND ANY OTHER BUFFERS SHALL BE PERFORMED PRIOR TO THE PREODNSTRUCTON MEETING. THE CONTRACTOR IS TO STAY WITHIN THE LIMITS OF CONSTRUCTION. ANY NEED TO CROSS THIS LIMIT LINE WILL NEED TO BE BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO ANY CROSS OVER. THE CLEARING LIMITS MUST BE FLAGGED PRIOR TO THE PRBCDNSTRUCTTON MEETING IN ORDER TO PREVENT ACCIDENTAL ENTRY OUTSIDE THE CLEARING LIMITS. ZL SET UP PRE -CONSTRUCTION MEETING ON SITE PRIOR TO ANY CONSTRUCTION, WITH THE OWNER, WITH ALL CONTRACTORS INVOLVED WITH LAND DISTURBANCE AND THE EROSION CONTROL INSPECTOR. 4. INSTALL STONE CONSTRUCTION ENTRANCE. 5 CLEAR AND GRUB THOSE AREAS NEEDED TO INSTALL EROSION CONTROL MEASURES IN THE SEQUENCE OUTLINED BELOW. EROSION CONTROL DEVICES ARE TO BE INSTALLED BASED ON DETAILS PROVIDED UNDER THE APPROVED PLANS, THE PLANS AND DETAILS ARE BASED ON THEN.C. EROSION AND SEDIMENT PLANNING AND DESIGN MANUAL~ AND RECOGNIZED BEST MANAGEMENT PRACTICES8MP�). ENSURE POSITIVE DRAINAGE TO ALL STRUCTURES ALONG DIVERSION BERMS. TQpSOlLSHAU-BE UTILIZED IN THE SLOPES TO THE EXTENT ALLOWED BY THE QEO-TECH ENGINEER OF RECORD. REMAINING TOPSOIL SHALL BE STORED ON LOTS CLOSE TO GRADE AND AS APPROVED BY THE OWNER' TOPSOIL BERMS MAY ALSO BE UTILIZED IN THE AREAS AND SIZES APPROVED BY THE OVNNER, 7, CI FAR ENOUGH TO INSTALL SEDIMENT TRAPS. INSTALL THE SEDIMENT TRAPS. CLEAR AREAS REQUIRED FOR THE INSTALLATION OF DIVERSION BERMS. INSTALL DIVERSION BERMS. 8. INSTALL SILT FENCE BELOW SEDIMENT TRAPS AND SEED ALL DEVER8lONS AND MEASURES. Q' CLEAR AND GRUB REMAINDER OF THE SITE AND BEGIN GRADING. 10.AS THE SITE IS BROUGHT TO GRADE INSTALL STORM DRAINAGE AND IMMEDIATELY INSTALL INLET PROTECTION MEASURES. 11' STABILIZE THE SITE PER THE TIME TABLES LISTED ON THIS SHEET AS WELL AS SHEET NCQD1. 12.AS THE ROADWAY IS BROUGHT TO GRADE AND DITCHES ARE CUT IN, INSTALL DITCH MATTING PER TABLE ON THIS SHEET. 13`ONCE ROADWAY IS BROUGHT TO GRADE, INSTALL UTILITIES. GEE SHEETS 12 AND 14 FOR ADDITIONAL DETAILS AND SEQUENCING OF THE SEVER LINE INSTALLATION ACROSS THE STREAM. FOLLOWING INSTALLATION OF UTILITIES, REINSTALL MATTING OR RE -SEED PREVIOUSLY STABILIZED AREAS AS NECESSARY. 14LUP0V STABILIZATION OF THE SITE, UPON APPROVAL OF THE EROSION CONTROL ,^.0=E°��� ",`urnC,n^/ mr�^^� �n� ��mr� ^m� nv^o'T ,m/croonrrrr,r*/ CU^// mC REMOVED. SEDIMENT TRAPS AND BASINS SHALL BE FILLED. AREAS DISTURBED IN THIS PROCESS SHALL BE STABILIZED. 15'POLLOWlNQ STABILIZATION OF SITE, REQUEST CLOSURE OF THE GRADING PERMIT FROM THE NCDEQ EROSION CONTROL INSPECTOR. EROSION CONTROL NOTES 1_ THE CONTRACTOR SHALL MAINTAIN CLOSE CONTACT WITH THE EROSION CONTROL INSPECTOR. ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED THAT ARE NOT INDICATED ON THE PLANS BY THE EROSION CONTROL INSPECTOR. IT IS THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN EROSION ONBlTE, REGARDLESS OF THE MEASURES REQUIRED. ANY CHANGE IN THE EROSION CONTROL MEASURES AND/OR GRADING SHALL BE CALLED TO THE ATTENTION OF THE ENGINEER AND THE EROSION CONTROL INSPECTOR. ALL MEASURES MUST REMAIN OPERABLE UNTIL THE SITE IS S7ABIUZED. 2, EROSION CONTROL DEVICES SHALL BE DILIGENTLY MAINTAINED THROUGHOUT CONSTRUCTION. DEVICES SHALL BE INSPECTED AND REPAIRED AFTER EACH SIGNIFICANT RAINFALL 3. SEDIMENT TRAPS/BASINS ARE TO BE CLEANED OUT WHEN THE BASIN IS NO MORE THAN HALF FULL THEY SHALL BE CLEARED OF ALL SILT AND RESHAPED TO THE ORIGINAL DESIGN PARAMETER. 4. GRASS OR OTHERWISE STABILIZE ALL AREAS ASTHEY ARE BROUGHT WP TO GRADE. STABILIZE WITH GROUND COVER. (SEE G.C. PLAN NOTES FOR STABILIZATION REQUIREMENTS.) 5, STABILIZE WITH GROUND COVER ALL SLOPES, CUT OFFILL, WITHIN THE TlMEFRAME LISTED ON THE ADJOINING TABLE. 6. ALL EROSION CONTROL DEVICES ARE TO REMAIN IN THE PLACE UNTIL THE SITE IS PROPERLY STABILIZED WITH GROUND COVER. ALL UPSTREAM AREAS MUST BE STABILIZED PRIOR TO REMOVAL QFEROSION CONTROL DEVICES. ONCE THIS OCCURS, REMOVE SEDIMENT GRADE TO FINAL ELEVATIONS AND STABILIZE. 7. REMOVE EROSION CONTROL DEVICES ONLY UPON RECEIPT OF APPROVAL FROM EROSION CONTROL INSPECTOR. EL [FBLL MATERIALS ARE TO BE BROUGHT ONTO THIS PROJECTOR WASTE MATERIALS ARE TUBE TAKEN FROM THIS PROJECT, THIS INFORMATION MUST BE DISCLOSED AND SHOWN ON THE EROSION CONTROL AND GRADING PLAN. BORROW AREAS AND DUMP SITES ARE CONSIDERED TO BE PART OFTHIS PROJECT AND THE OWNER IS RESPONSIBLE FOR GTA8{Ll2A7DN AND EROSION CONTROL MEASURES AT THESE SlTES, 0. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SITE EROSION CONTROL MAINTENANCE DURING CONSTRUCTION. IN ADDITION, THE CONTRACTOR SHALL BE gEGP0VGl8LE FOR KEEPING ALL ITEMS/RECORDSREQU{RED BY THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT. 10. AS OF MARCH 11 2003, ALL CONSTRUCTION SITES ONE (1) ACRE OR MORE, REQUIRES A NPDES PERMIT.THEREFORE: -WRITTEN DOCUMENTATION OF DEVIATION FROM APPROVED PLAN MUST BE NOTED ON THE APPROVED PLANS' -WRITTEN DOCUMENTATION OF AN EMERGENCY SITUATION WHERE SEDIMENT HAS BEEN DISCHARGED OFF SITE MUST BERECORDED. ALSO, CONTRACTOR'S ACTIONS TO REPAIR AND RETURN AREA TO PRE -STORM CONDITION MUST BE RECORDED. -THE PERMlTTEE SHALL INSPECT ALL EROSION AND SEDIMENTATION CONTROL FACILITIES EVERY SEVEN DAYS AND WITHIN 24HOURS DFA 1 INCH RAINFALL. FINDINGS SHALL BE RECORDED AND PRESENTED UPON INSPECTOR'S REQUEST. -THE CONTRACTOR SHALL PROVIDE RAIN -RECORDING DEVICE AND RECORD EACH RAINFALL. -ANY FAILURES THAT CAUSE VlSB]LE SEDIMENTATION TO LEAVE THE APPROVED DISTURBED LIMITS SHALL BE CORRECTED IMMEDIATELY AND DOCUMENTED. -A COPY OF THE NPDES PERMIT SHOULD BE KEPT ON SITE FOR REFERENCE. 11. THE CONTRACTOR SHALL HAVE. ON SITE THE MEANS TO REMOVE ANY SEDIMENT TRACKED ONTO THE STREET. IF CONDITIONS REQUIRE. EQUIPMENT MUST BE ON SITE TO WASH TIRES OF VEHICLES PRIOR TO ENTERING STREET. APRONS FROM FROM TOP/THROAT ELEV INV OUT TO INV IN AREA SUB TOTAL C Tc I(l 0) Q10=CIA CFS Q10(total) PIPE HW/D PIPE DIAM. (IN) LENGTH (L.E.) SLOPE ni ", ,o= NOTE: owwcn SHALL PROVIDE C.M.P.= CORRUGATED METAL PIPE ~~^�~ ^--^''~-'' - 8' TOP WIDTH APPROVE ��n*� TO ANY FILL wArsn/^L ecIwo rLxoco. ALL EL = 740.0 nu-wxrEn/xLxw000wpAorzuw*zuAuso BE wnw/TonEn BY SOILS cwo'wscn TO BE TRASH RACK EMER. SPILL. P*ov/osu BY OWNER. TOP OF RISER ^/ -------\. EL. = 738.5 n = 737.5 60"x6O" ANTI SEEP COLLAR TEWP3^ W/ 4" SCHD 40 PVC BARREL 4" FLEXIBLE HOSE AND 4" STEEL NIPPLE REMOVABLE 6" PLATE INV OUT EL. 733.4 WITH 4!' THREADED HOLE TO FLANGED . DINT RECEIVE THE 4" NIPPLE WITH GASKET (2) #8 REBAR PREFABRICATED BARREL TO RISER BOTTOM EL . (WATERTIGHT CONNECTION) 732.9 / INV. EL ~~ 7333 ' ' )=84 Cr' NOT TO SEA� JOOU PSI CONCRETE POURED IN AND AROUND BASE SECTION NOTE: OWNER SHALL PROVIDE SOILS ENGINEER TO APPROVE SUBGRADE AND KEYWAY PRIOR TO ANY FILL MATERIAL BEING PLACED. ALL FILL MATERIAL AND COMPACTION WILL ALSO ocMONITORED oYSOILS ENGINEER mBE rnomoco BY OWNER. SEDIMENT BASIN No. i 2.25 5.1 NEW STABILIZATION TIME FRAMES SITE AREA DESCRIPTION STABILIZATION TIME FRAME EXCEPTIONS PERIMETER DIKES, SWAI ES, DITCHES AND SLOPES 7 DAYS NONE HIGH QUALITY WATER (HWQ) ZONES 7 DAYS NONE SLOPES STEEPER THAN 3:1 7 DAYS IF SLOPES ARE 10' OR LESS IN LENGTH, AND ARE NOT STEEPER THAN 2: 1, 14 DAYS ARE ALLOWED. SLOPES 3:1 OR FLATTER 14 DAYS 7 DAYS FOR SLOPES GREATER THAN 50'IN LENGTH ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 14DAYS NONE, EXCEPT FOR PERIMETERS AND HOW ZONES **BANDED GASKETS ARE ALLOWED IN LIEU OF FLANGED JOINT FOR ALUMINIZED STEEL PIPE. MINIMUM BAND WITH OF 24" WITH STRAP AND ANCHOR TO CONCRETE BASE. NOTE: C.M.P. = CORRUGATED METAL PIPE ~'`�` ~^ SOILS WIDTH APPROVE SUBGRADE AND KEYWAY PRIOR TO EL = 7283 ANY FILL MATERIAL BEING PLACED. ALL / ~-'3�P�L mu w���� mm COMPACTION �rmw WILL ALSOTRASHRACK BE wowITnnso BY so|Ls swn/wccn TO BE T0P OF RISER L = 726'� pnomosu BY owxcn 66"x66" ANTI 30" SEEP COLLAR C.M.P. X TEMP 2^ W/ 4" SCHD 40 PVC BARREL 4- FLEXIBLE HOSE AND 4" STEEL NIPPLE REMOVABLE 6" PLATE WITH 4" THREADED HOLE TO FLANGED , DINT RECEIVE THE 4" NIPPLE WITH GASP ET (2) #8 RE R PREFABRICATED BARREL TO RISER BOTTO E (WATERTIGHT CONNECTION) ' CF I NOT TO SCALE 3000PSI CONCRETE POURED IN AND AROUND BASE SECTION SEDIMENT BASIN No. 4 NOTE: C.M.P. = CORRUGATED METAL PIPE 8' TOP WIDTH B_ = 752.2 TRASH RACK SPILL. TOP OF RISER ^/ ~� EL = 75O� ^�h� _. �^°� � -------- � ' 60"x6O" ANTI 42" SEEP COLLAR TEMP 3" FAIRCLOTH SKIMMER W/ S.7- ORIFICE RISER 2.5 2.5 W/ 4- SCHD 40 PVC BARREL 4" FLEXIBLE HOSE AND 4" STEEL NIPPLE INV0T -� EL.~~ 721^0 WITH REMOVABLE - PLATE FLANGED T THREADED'� --- `` RECEIVE THE 4� NIPPLE � WITH """�E' (2) #8 °="=` PREFABRICATED BARREL TO RISER BOTTOM EL. (WATERTIGHT CONNECTION) ' 7YV)x2.0yH)=85CF I NOT TO SCALE 3000PSl CONCRETE POURED IN AND AROUND BASE SECTION SEDIMENT BASIN No. 5 INNOUT 1-98 me MM mmmm mmmm 4-48 5-8 6-3 COS 4-1 2-3A 0.40 6.9 0.7 1.8 1.0 3 11 3 1 5.3% VEGETATED 3 5 0.11 3.99 0.36 1.7 0,4 rO.O 2 t24 4-4B 6.9 1.0 3 1 3 1 5.2% VEGETATED 0.035 0.19 4.76 0.61 2.2 0.8 .0.80 E 0. Li Lq 00 00 La in ry III LIJ CD ry SHEET NO. 15 M.-