Loading...
HomeMy WebLinkAboutSW4210704_Plansheet - Other_20211210 (9)• ST : f STA 0+00 H 0 FC 1 c . ...... S RIP -RAP NNTA LED OVER j /;, ej '(SEE CONSTF�U,�TIOK f3 E:1 EX. SEWER LINE �SEQUENCE; J LA4 MH W 0+8P(.'00 MH B-8 ST7 +0.87 98.03 MH "' -ABTA _75e 320+ 72A BEFORE YOU DIG! OVADA AVE.) ­1+54 55 CALL 811 (52- RT.) N.C. ONE -CALL CENTER STAz Q AAVE. T, IT'S THE LAW. Imp SEE COFFE 17AM. D TAIL EX. S.S.E. AND' CONS R' 6TiON,,SE6ULNCJE 0 MH, OF-3 C-4 FOR S TR EtX M 60,0 SS 141 'STA� 2+ .99 00 L0 (SEE ERQpIpNCpNfR%P ,' LAI�S) S 1 T-A 0+00/­OUTFALL+ TO -DE-SAC) -DOCCETT6 AVE. tUL Z �$EE PROFILE ',A"- THIS SHEET) z 20 oo NOTE: PUMP STREAM AROUND WORK AREA Z V) Pe) (3 C14 (0 Q0 n 0 z t Z 0 LLJ LLJ (n Z P INTAKE uj 0 IL (L < a) PUMP ui - - ------- ...... ------ ...... STREAM 15' 0 0 STA 4+70-90 A PROFILE.: E SEE'P . ...... .... SHEET 71 Q RIP -RAP APRON .... .. . . . . ......... ... .... & CHECK DAM WITH PUMP P #57 STONE FACE §S DISCHARGE HOSE All CONSTRUCTION SEQUENCE FOR ALL STREAM CROSSINGS 40' CONST. EASEMENT DEWATERING BASIN L� . ......... ....... .... . O 0 4, f /,e LAJ 1. CONTRACTOR SHALL INSTALL TEMPORARY CREEK CROSSING AS POLYETHYLENE FABRIC 8 MIL THICK (TYP.) CLASS I RIP -RAP (TYP.) c1*4 DETAILED. THE TEMPORARY CREEK CROSSING SHALL BE PLAN V INSTALLED ON THE UPSTREAM PORTION OF THE EASEMENT, AN % ADEQUATE DISTANCE TO ALLOW SEWER LINE INSTALLATION. SANDBAGS (TYP.) WATER �SYRFAC ---- -- - 2 O'l PRIOR TO INSTALLING THE SEWER LINE ACROSS THE CREEK, THE --- 2 N r( CONTRACTOR SHALL INSTALL A TEMPORARY DAM UPSTREAM OF THE 0 CONSTRUCTION ACTIVITIES, AND PUMP THE STREAM FLOW AROUND THE AREA OF DISTURBANCE. THE TEMPORARY DAM SHALL BE OF A CONCRETE FILL 0 STREAM BOTTOM(ROCK) 04 -ERODIBLE MATERIAL SUCH AS SAND BAGS OR PLASTIC SHEETING 0) NON PROPOSED PIPELINE 0 _J MH A-13 OVER STONE. SECTION A A STA 2+05.62 NOTES: 3. UPON COMPLETION OF THE SEWER LINE INSTALLATION CROSSING THE CREEK, THE CONTRACTOR SHALL STABILIZE ALL DISTURBED AREAS 1. CONSTRUCT COFFER DAM AND UTILIZE DEWATERING BASIN TO DRAIN WORK AREA. IN WITH RIP -RAP (SEE DETAIL). 2. PUMP STREAM AROUND WORK AREA. 0 3. CONVERT COFFER DAM TO STREAM 4. UPON COMPLETION OF RIP -RAP, THE CONTRACTOR SHALL REMOVE CROSSING WHEN NO LONGER NEEDED. 4. CARE MUST BE TAKEN TO AVOID THE TEMPORARY DAM, AND TERMINATE BYPASS PUMPING. CONTAMINATION TO THE STREAM FROM LLJ POURED CONCRETE SEALANT. m 5. AT WHICH TIME THE SEWER LINE INSTALLATION HAS PASSED ALL COFFER DAM LLJ 0 TESTING, AND THE AREA SEEDED, THE CONTRACTOR SHALL REMOVE Li THE TEMPORARY CREEK CROSSING, AND RE-ESTABLISH ORIGINAL FOR BY-PASS PUMPING PIPELINE STREAM CROSSINGS Y LLJ 40' 30' 20' 10' 0 W. 80' LIJ CD 0 1 E­ 0 AVE. CREEK BANK ELEVATIONS. M F-- < Lli < 0 0 < u i C) a, = C) E-SH No. 4 SCALE: 1 "=40' 5' MR. g4atut MOP M i OF- Ti )P-=F- INV Oul 49. �2 I V1 I I INV IN1=7132.13 I I 730 1 761) 1 1 1 r 1 46" 1 MIN. �90 780 1 1 1 1 INV 0 T= LJ LJ C) LJ cf) LLJ MF :tC-j TO )=722.00 D It =711.30 INV 0 JT=711.10 IN't 1 65170 __-3v WIN I NV IN 1§7-X2 I I I I INV 0 =76�.52 720 apH% i NV-1 1751) 1 1 �801 70 < 114S LED OV --R EX FINAL GRADE r all. 10' FL��tOA) 0 EX. 7 9.8± < �-4 Mm OF-2A Pr I MH O:,_ E-I M no INV 91=732.74 1 %Jr- z III �D �D INV OUT----1JU.71 NV ER -R;Av1 �01.flrj m INV 1 .62 Of 0 V OUT 70.42 z r 4t rN%.-r I I I < 0 E .. >- 1 36- IMIN. E50 710 770 1 1 7601 11 E-4 If-,. 1_1 I I Ill I Ill /-7 MIN 0 SHEET 8 SHEET NO.,,,, 00 80.00 L.F. 8" D.1, 7 .53 LI.T_ 92.65 L.F. 18- D.11 1 0 IPA I IR- R 41 1860 1 1256.9 18 a-2- SE vizo R 0 _3�% D 0 S EWER oxi 1 1 m 1-01- ON 0+00 1+00 2+00 3+5�� 4+00 5+00 6+00 1+00 2+00 F6-.,' 8 INTAKE