HomeMy WebLinkAboutSW4210704_Plansheet - Other_20211210 (9)•
ST
:
f STA 0+00
H 0 FC 1 c
. ...... S RIP -RAP
NNTA LED OVER j
/;, ej '(SEE CONSTF�U,�TIOK f3 E:1
EX. SEWER LINE
�SEQUENCE;
J
LA4
MH
W
0+8P(.'00
MH B-8
ST7
+0.87 98.03
MH "' -ABTA _75e 320+
72A
BEFORE YOU DIG! OVADA AVE.)
1+54
55
CALL 811 (52- RT.)
N.C. ONE -CALL CENTER STAz Q AAVE.
T,
IT'S THE LAW.
Imp
SEE COFFE 17AM. D
TAIL
EX. S.S.E. AND' CONS R' 6TiON,,SE6ULNCJE 0
MH, OF-3
C-4
FOR S TR EtX M 60,0 SS 141 'STA� 2+ .99
00 L0 (SEE ERQpIpNCpNfR%P ,' LAI�S) S
1 T-A 0+00/OUTFALL+ TO -DE-SAC) -DOCCETT6 AVE. tUL
Z
�$EE PROFILE ',A"- THIS SHEET) z 20 oo
NOTE: PUMP STREAM AROUND WORK AREA Z V) Pe) (3
C14
(0 Q0
n 0
z t Z
0
LLJ
LLJ
(n Z
P INTAKE uj
0
IL (L < a)
PUMP ui
- - ------- ...... ------ ...... STREAM
15'
0
0
STA 4+70-90
A PROFILE.: E
SEE'P . ...... ....
SHEET 71 Q
RIP -RAP APRON
.... .. . . . . ......... ... .... & CHECK DAM WITH
PUMP P
#57 STONE FACE
§S
DISCHARGE HOSE
All
CONSTRUCTION SEQUENCE FOR ALL STREAM CROSSINGS 40' CONST. EASEMENT DEWATERING BASIN L� . .........
....... .... .
O
0
4,
f
/,e
LAJ 1. CONTRACTOR SHALL INSTALL TEMPORARY CREEK CROSSING AS POLYETHYLENE FABRIC
8 MIL THICK (TYP.)
CLASS I RIP -RAP (TYP.) c1*4
DETAILED. THE TEMPORARY CREEK CROSSING SHALL BE PLAN
V INSTALLED ON THE UPSTREAM PORTION OF THE EASEMENT, AN %
ADEQUATE DISTANCE TO ALLOW SEWER LINE INSTALLATION. SANDBAGS (TYP.)
WATER �SYRFAC ---- -- -
2
O'l PRIOR TO INSTALLING THE SEWER LINE ACROSS THE CREEK, THE ---
2 N
r( CONTRACTOR SHALL INSTALL A TEMPORARY DAM UPSTREAM OF THE 0
CONSTRUCTION ACTIVITIES, AND PUMP THE STREAM FLOW AROUND THE
AREA OF DISTURBANCE. THE TEMPORARY DAM SHALL BE OF A CONCRETE FILL 0
STREAM BOTTOM(ROCK) 04
-ERODIBLE MATERIAL SUCH AS SAND BAGS OR PLASTIC SHEETING 0)
NON
PROPOSED PIPELINE 0 _J
MH A-13 OVER STONE. SECTION A A
STA 2+05.62
NOTES:
3. UPON COMPLETION OF THE SEWER LINE INSTALLATION CROSSING
THE CREEK, THE CONTRACTOR SHALL STABILIZE ALL DISTURBED AREAS 1. CONSTRUCT COFFER DAM AND UTILIZE
DEWATERING BASIN TO DRAIN WORK AREA. IN
WITH RIP -RAP (SEE DETAIL). 2. PUMP STREAM AROUND WORK AREA.
0
3. CONVERT COFFER DAM TO STREAM
4. UPON COMPLETION OF RIP -RAP, THE CONTRACTOR SHALL REMOVE CROSSING WHEN NO LONGER NEEDED.
4. CARE MUST BE TAKEN TO AVOID
THE TEMPORARY DAM, AND TERMINATE BYPASS PUMPING. CONTAMINATION TO THE STREAM FROM LLJ
POURED CONCRETE SEALANT.
m
5. AT WHICH TIME THE SEWER LINE INSTALLATION HAS PASSED ALL
COFFER DAM LLJ 0
TESTING, AND THE AREA SEEDED, THE CONTRACTOR SHALL REMOVE Li
THE TEMPORARY CREEK CROSSING, AND RE-ESTABLISH ORIGINAL FOR BY-PASS PUMPING PIPELINE STREAM CROSSINGS Y LLJ
40' 30' 20' 10' 0 W. 80' LIJ CD 0 1
E 0 AVE. CREEK BANK ELEVATIONS. M F-- < Lli <
0 0 < u i C) a, = C)
E-SH No. 4 SCALE: 1 "=40'
5' MR. g4atut MOP
M i OF-
Ti )P-=F-
INV Oul 49. �2
I V1 I I INV IN1=7132.13 I I
730 1 761) 1 1 1 r 1 46" 1 MIN. �90 780 1 1 1 1 INV 0 T=
LJ LJ
C)
LJ cf)
LLJ
MF :tC-j
TO )=722.00
D
It =711.30
INV 0 JT=711.10 IN't 1 65170
__-3v WIN I NV IN 1§7-X2 I I I I
INV 0 =76�.52
720 apH% i NV-1 1751) 1 1 �801 70 <
114S LED OV --R EX FINAL GRADE
r
all. 10' FL��tOA) 0
EX. 7 9.8± <
�-4
Mm OF-2A Pr I
MH O:,_
E-I M no
INV 91=732.74 1 %Jr- z
III �D �D
INV OUT----1JU.71 NV ER -R;Av1 �01.flrj
m INV 1 .62 Of
0
V OUT 70.42 z
r 4t rN%.-r I I I <
0
E .. >-
1 36- IMIN. E50
710 770 1 1 7601 11 E-4
If-,. 1_1 I I Ill I Ill
/-7 MIN
0
SHEET 8
SHEET NO.,,,,
00
80.00 L.F. 8" D.1, 7 .53 LI.T_ 92.65 L.F. 18- D.11 1 0
IPA I
IR- R 41 1860 1 1256.9 18 a-2- SE vizo R 0 _3�% D 0
S EWER oxi
1 1 m 1-01- ON
0+00 1+00 2+00 3+5�� 4+00 5+00 6+00 1+00 2+00
F6-.,' 8
INTAKE