Loading...
HomeMy WebLinkAbout20100408 Ver 1_DWR Response to EBX Seagrove Ltr_20140107NCDENR North Carolina Department of Environment and Natural Resources Division of Water Resources Pat McCrory Governor Cara Conder EBX Neuse 1, LLC 909 Capability Drive, Suite 3100 Raleigh, NC 27606 Water Quality Programs Thomas A. Reeder Director January T 2014 John E. Skvarla, III Secretary DWQ Projeci 4: 2 Gi(1 -0408 Johnston County Re: Response to "Seagrove's Farm Buffer Transaction" letter from EBX Dear Mr. Conder: On January 7, 2014, Katie Merritt with the Division of Water Resources (DWR) received a letter from you notifying DWR that EBX Neuse 1, LLC (EBX) accidentally failed to docr.nnent 29,529 square feet (ft) of Neuse 03020201 buffer mitigation credits that were paid for by Standard Pacific of the Carolinas, LLC (SPC), on March 23, 2012, to satisfy a mitigation requirement for the Seagrove's Farm project (DWR #2005 -1985) in Apex, NC. Additionally, EBX failed to request their buffer authorization approval letter and did not give SPC an Affidavit documenting proof of purchase for the mitigation credits. At the time payment was received by SPC, the only two EBX mitigation banks that had available Neuse riparian buffer mitigation credits, were Forrest Creek (DWR #2008 -0229) and Rudolf (DWR #2010- 0408). However, due to the oversight described above, EBX does not have enough Neuse riparian buffer mitigation credits in either of these two banks to debit the entire 29,529 ft2 of mitigation they agreed to provide for SPC. Ms. Merritt performed a thorough investigation of the Seagrove's Farm project and determined that the 401/ Buffer authorization letter dated December 21, 2005 authorized 29,529 ft 2 of riparian buffer mitigation credit to be provided by the North Carolina Ecosystem Enhancement Program (NCEEP), not EBX. Therefore, prior to any mitigation being provided by EBX to SPC for this project, DWR must receive a 401/ Buffer authorization modification request in order to get approval to use a private mitigation bank instead ofNCEEP to satisfy their mitigation requirement. 401 and Buffer Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699 -1650 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919 - 807 -63001 FAX: 919-8076494 Internet: www.ncwaterquality.org An Equal Opportunity 1 Affirmative Action Employer EBX Neuse 1, LLC January 7, 2014 Page 2 of 2 Once EBX receives a 401/ Buffer authorization from SPC authorizing the use of a private mitigation bank to satisfy their mitigation requirement, EBX can proceed with the following: • After receiving the next credit release for the Rudolf Mitigation Bank, the bank's balance should be approximately 21,162 ft" of riparian buffer mitigation credits. EBX may then transfer the remaining 8,367 ftz of riparian buffer credits needed, from the Arrington Bridge Bank (DWR 92008- 1473v4) to the Rudolf Batik so that !he total balance remainin; in the Rudolf Bank is 29,529 ft`. • EBX shall debit 29,529 fe of riparian buffer credits from the Rudolf Bank for the Seagrove's Farm project • EBX shall provide an Affidavit to SPC for the mitigation and shall copy DWR on the correspondence, • No buffer credits shat l be provided by the Rudol [Bank to offset riparian buffer impacts for other projects until this issue is resolved. Please feel free to call Katie Merritt at (919) 807 -6371 if you have any questions regarding this correspondence. Sincerely, Karen Higgins, Supervisor 401 and Buffer Permitting Unit KAH/km cc:File Copy (Katie Merritt) Cherri Smith — DWR Raleigh Regional Office Central Files to be filed with 2005 -1985