Loading...
HomeMy WebLinkAbout20140019 Ver 1_CAMA Application_201312304 0. 74*) 20 1400,9 O CCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Pat McCrory Braxton C. Davis John E. Skvarla, III Governor Director p �^ cretary December 27, 2013 2013 MEMORANDUM TO: Karen Higgins, Compliance and Permitting Unit Supervisor Division of Water Resources; Water Quality Program FROM: Doug Huggett Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: Patrick and Donna Dickriede Project Location: 114 Grenville St., Manteo, Dare County Proposed Project: Bulkhead, shoreside dock, boadift Please indicate below your agency's position or viewpoint on the proposed project and return this form by 01/17/14 to 400 Commerce Avenue, Morehead City, NC 28557 (fax: 252- 247 - 3330). If you have any questions regarding the proposed project, please contact Kelly Russell at (252) 264 -3901. When appropriate, in -depth comments with supporting data are requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATE 1367 US 17 South, Elizabeth City, NC 27909 Phone: 252 - 264 -39011 FAX: 252-264-3723; Internet. www.nccoastalmanagement.net An Equal Opportunity 1 Affirmative Action Employer DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: Patrick Dickriede 2. LOCATION OF PROJECT SITE: 114 Grenville St. Manteo, Dare County on a canal leading to Shallowbag Bay Photo Index — 2006: 182-7235(D,15) 182 -1881 (R,12) State Plane Coordinates - X: 2986221 3. INVESTIGATION TYPE: CAMA, D &F 2000: 182 -2158 (U,9) 1995: Y: 800417 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 12/16/2013 Was Applicant Present - no 5. PROCESSING PROCEDURE: Application Received Complete - 12/20/2013 Office - Elizabeth City 6. SITE DESCRIPTION: (A) Local Land Use Plan — Dare County Land Classification From LUP — Conservation, transitional (B) AEC(s) Involved: ES, EW, PTA (C) Water Dependent: yes (D) Intended Use: private (E) Wastewater Treatment: Existing — none Planned - none connect to community system (F) Type of Structures: Existing — none Planned - bulkhead, dock, boatlift (G) Estimated Annual Rate of Erosion: 3 ft/ year Source - applicant 7. HABITAT DESCRIPTION: AREA DRFDGFD FII I Fn cunnp (A) Estuarine Shoreline 750 sq. ft. 100 sq ft. (B) EW, PTA 617 sq. ft. 392 sq. ft. (C) Other (D) Total Area Disturbed: 1367 sq ft (E) Primary Nursery Area: yes (F) Water Classification: SC Open: no PROJECT SUMMARY: The applicant proposes to construct 50 ft of new vinyl bulkhead an average of 12 ft waterward of normal water level (NWL) and construct a shoreside dock and a boatlift. Field Investigation Report Page 2 Project Setting The proposed project is located at 114 Grenville St. in the town of Manteo in Dare County. The property is located adjacent to a canal that leads to Shallowbag Bay. The size of the property is approximately 5393 sq ft and is approximately 3 ft above NWL. There currently are no man made structures on the property. The property is vegetated with typical yard grasses and pine trees. There are no known sites of archaeological significance on the property. The property has approximately 50 linear feet of shoreline and no delineated wetlands on the site. The adjacent property to the west has a vinyl bulkhead and a single family residence and the property to the south is currently undeveloped with a wooden bulkhead. The canal width in the project area is 65 ft. The canal and Shallowbag Bay are classified as SC in this area and are closed to shellfish harvesting. The water depths at the shoreline are approximately 1 ft and at the proposed bulkhead alignment approximately 3 ft. Development Proposal The applicant proposes to construct 50 linear feet of new vinyl bulkhead and fill behind the proposed bulkhead. The proposed bulkhead alignment is at an average of 12 ft waterward of NWL with a maximum distance of 15 ft from NWL. This bulkhead alignment is proposed at this location to line up with the existing adjacent bulkheads to the east and west. The property has experienced an excelerated erosion rate due to recent storms. The sand for the fill material would be hauled in from an upland source. The applicant also proposes to construct a 6 ft. by 50 ft. shoreside dock that would extend 2 ft. over land and 4 ft. wide over water. Adjacent to the dock the applicant proposes to construct a 12 ft. by 16 ft. boatlift. The proposed dock and boatlift would extend out from NWL 16 ft. Anticipated Impacts The proposed project would result in the filling of 617 sq ft of Estuarine Waters Public Trust Area of Environmental Concern (AEC) and 750 sq ft of Estuarine Shoreline AEC and also 22 cubic yards of fill material would be placed below NWL. The proposed dock and boatlift will shade 100 sq. ft. of Estuarine Shoreline AEC and 392 sq. ft. of Estuarine Waters Public Trust AEC. Temporary water turbidity would occur in the project area. Submitted by: Kelly Russell Date: 12/20/13 MAJOR PERMIT FEE MATRIX Applicant: PATRICK DICKRIEDE Selection Development Type Fee DCM•% DWQ % (14300 1601435100093 1625 6253) (24300 1602 435100095 2341) I. Private, non - commercial development that does not $250 100%($250) 0%($0) involve the filling or excavation of any wetlands or open water areas: ll. Public or commercial development that does not $400 100%($400) 0%($0) involve the filling or excavation of any wetlands or open water areas: III. For development that involves the filling and /or excavation of up to 1 acre of wetlands and /or open water areas, determine if A, B C, or D below applies: III(A). Private, non- commercial development, if $250 100%($250) 0%($0) General Water Quality Certification No. 3490 (See attached ) can be applied: III(B). Public or commercial development, if General $400 100%($400) 0%($0) Water Quality Certification No. 3490 (See attached) can be applied: III(C). If General Water Quality Certification No. $400 60%($240) 40%($160) 3490 (see attached) could be applied, but DCM staff determined that additional review and written DWQ concurrence is needed because of concerns related to water qualitior aquatic life: III(D). If General Water Quality Certification No. $400 60%($240) 40%($160) 3490 (see attached) cannot be applied: IV. For development that El involves the filling and /or $475 60%($285) 40%($190) excavation of more than one acre of wetlands and /or open water areas: i Project Narrative: Dickriede Location: 114 Grenville Street, Manteo, NC 27954 The project involves four components: r 3 • 50' new vinyl bulkhead on unnamed canal, • filling of approx. 600 sq. ft. of waters located behind the bulkhead, • 50' long and 6' wide dock, and • 14' wide by 16' long boat lift. DEC 13 2013 ! GOASTA.L n,'iWIA. UAENT ! _p The proposed bulkhead aligns with the existing adjacent bulkheads on the neighboring properties. The cumulative impacts of the neighboring properties' bulkheads have contributed to the erosion on the subject property. The area that requires fill (located behind the proposed bulkhead) is approximately 600 sq.ft. of public trust waters. A 6' (six -foot) wide parallel dock 50' in length is proposed. This dock will align with the existing dock on the neighboring property, 118 Grenville Street. Additionally, a side -lift boatlift is proposed with the lift bunks not extending more than 14' into the canal from the proposed dock. The lift will be 14' wide by 16' long. This lift will match the existing lift on the neighboring property at 118 Grenville Street. The water depth in the area of the proposed lift is 3' or greater in depth. There are no SAV's in the area. I have attached several pictures of the subject property and the canal for review. The development matches that of the adjacent properties and those on the canal. View looking down the unnamed creek toward Shallowbag Bay, showing the hardened shorelines, boatlifts, and floating docks. View showing the subject property and 118 Grenville 5t. improvements. View showing the subject property and the adjacent property owned by Nunemaker. Proposed bulkhead would align the two neighboring bulkheads, and the approx. 600 sq.ft. behind the bulkhead would be filled. In closing, the entire shoreline of the canal is hardened minus this lot. The existing improvements form a straight shoreline. Many of the properties have boatlifts. What the owner of 114 Grenville Street is proposing matches the existing development patterns. Further, the property is located in a CAMA designated "Urban Waterfront Zone ". It is a shame that 13 State and Federal agencies have to review this application and that it will take up to 90 days for decision. Policy should be established so that proposed developments such as this may be permitted more efficiently with a General Permit. I request that this application is expedited and that this request is shared with the Director of CAMA. If they or you have questions, I may be reached at 252.423.0516 orjohmnanteo@gmail.com. OCM MP 1 APPLICATION for Mater Development Permit (last revised 12127/06) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant Landowner Information Business Name Project Name (if applicable) DICKRIEDE Applicant 1: First Name PATRICK MI Last Name DICKRIEDE Applicant 2: First Name DONNA MI Last Name DICKRIEDE If additional applicants, please attach an additional page(s) with names listed. Mailing Address 2794 Alton Hotel Ct. PO Box City Lake Ridge State VA ZIP 22192 Country USA Phone No. 703 - 492 - 6282 ext. FAX No. - - Street Address (if different from above) City State ZIP Email 2. AgentContractor Information Business Name Agent/ Contractor 1: First Name JOHN MI M Last Name ROBBINS III Agent/ Contractor 2: First Name MI Last Name Mailing Address PO Box PO BOX 1415 City Manteo State NC ZIP 27954 Phone No. 1 252 -423 - 0516 ext. Phone No. 2 - - ext. FAX No. Contractor # Street Address (d different from above) City State ZIP Email .J0�1 MaNTO G� GtQ?alL . c oV� <Form continues on back> Form DCM MP -1 (Page 2 of 4) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # DARE 114 GRENVILLE ST. d. Approximate elevation of tract above NHW (normal high water) or Subdivision Name City State Zip BAYVIEW MANTEO NC 27954- Phone No. Lot No.(s) (if many, attach additional page with list) - - ext. 12, 1 , , a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project PASQUOTANK UN -NAMED CANAL OFF OF SHALLOWBAG c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ❑Natural ®Manmade ❑Unknown ROANOKE SOUND e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ®Yes ❑No work falls within. MANTEO (CAMA URBAN WATERFRONT) 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) 50' 5,393 c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or NWL (normal water level) (If many lot sizes, please attach additional page with a list) 3' ❑NHW or ®NWL e. Vegetation on tract NATIVE GRASSES AND PINE f. Man -made features and uses now on tract NONE g. Identify and describe the existing land uses adiacent to the proposed project site. SINGLE FAMILY DWELLING WITH DOCK, BULKHEAD AND BOATLIFT ON WESTSIDE, UNDEVELOPED LOT WITH BULKHEAD ON THE EASTSIDE h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? (Attach zoning compliance certificate, if applicable) ❑Yes ❑No ❑NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ®No k. Has a professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes [-]No ®NA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes []No ®NA National Register listed or eligible property? <Form continues on next page> Form DCM MP -1 (Page 3 of 4) APPLICATION for Major Development Permit m. (i) Are there wetlands on the site? []Yes ®No (ii) Are there coastal wetlands on the site? ❑Yes ®No (iii) If yes to either (i) or (ii) above, has a delineation been conducted? ❑Yes ®No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. TOWN OF MANTEO MUNICIPAL SERVICE - -, i i i o. Describe existing drinking water supply source. f TOWN OF MANTEO MUNICIPAL WATER SERVICE of equipment and where it is to be stored. p. Describe existing storm water management or treatment systems. - - - - TOWN OF MANTEO STORM DRAINAGE SYSTEM 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ❑Commercial ❑Public/Govemment ® Private /Community b. Give a brief description of purpose, use, and daily operations of the project when complete. - PROPOSED BULKHEAD FOR SHORELINE STABILIZATION - PROPOSED DOCK FOR WATER ACCESS - PROPOSED BOAT LIFT FOR PRIVATE / RESIDENTIAL USE c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. JET PUMP WITH VIBRATORY EXCAVATOR TO INSTALL PILINGS AND SHEATHING d. List all development activities you propose. BULKHEAD, DOCK, LIFT, BACKFILL BEHIND BULKHEAD e. Are the proposed activities maintenance of an existing project, new work, or both? NEW WORK f. What is the approximate total disturbed land area resulting from the proposed project? 1,000 ®Sq.Ft or ❑Acres g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes ®No ❑NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. NO DISCHARGES PROPOSED, MINIMAL SURFACE RUNOFF ANTICIPATED i. Will wastewater or stormwater be discharged into a wetland? ❑Yes ®No ❑NA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes []No ®NA j. Is there any mitigation proposed? ❑Yes ®No ❑NA If yes, attach a mitigation proposal. <Form continues on back> Form DCM MP -1 (Page 4 of 4) APPLICATION for Major Development Permit 6. Additional Information In addition to this completed application form, (MP -1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) — (f) are always applicable to any major development application. Please consult the application instruction booklet on how to properly prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross - sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name CHRISTINE M. NUNEMAKER Phone No. NA Address 201 W. ALBEMARLE DR., NAGS HEAD, NC 27959 Name JOHN AND AMY DIXON Phone No. NA Address 118 GRENVILLE ST., MANTEO, NC 27954 Name Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. h. Signed consultant or agent authorization form, if applicable. i. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1 -10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 7. Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow -up monitoring of the project. I further certify that the information provided in this application is trutUul to the best of my kga)vledge. Date NOVEMBER 25, 2013 Print Name JObKW.. VOBBINS III Please indicate application attachments pertaining to your proposed project. ®DCM MP -2 Excavation and Fill Information ❑DCM MP -5 Bridges a ❑DCM MP -3 Upland Development ®DCM MP-4 Structures Information ^I .ciV D i Cul erts i DEC 13 2013 << GGASTAL 1,V,r,It1GF_P ENT ELi,7A[,EIP, "ITY Form DCM MP -2 EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and /or fill activities. All values should be given in feet. 1. EXCAVATION ®This section not applicable a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated. cubic yards. c. (i) Does the area to be excavated include coastal wetlands /marsh d. (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ❑None (ii) Describe the purpose of the excavation in these areas: High - ground excavation in cubic yards. 2. DISPOSAL OF EXCAVATED MATERIAL ®This section not applicable a. Location of disposal area. b. Dimensions of disposal area. C. (i) Do you claim title to disposal area? d. (i) Will a disposal area be available for future maintenance? ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA (ii) If no, attach a letter granting permission from the owner. (ii) If yes, where? e. (i) Does the disposal area include any coastal wetlands /marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected_ ❑CW ❑SAV ❑SB ❑WL ❑None (ii) Describe the purpose of disposal in these areas: f. (i) Does the disposal include any area in the water? []Yes [--]No ❑NA (ii) If yes, how much water area is affected? Access Other Channel (NLW or Canal Boat Basin Boat Ramp Rock Groin Rock (excluding Breakwater shoreline NWL ) stabilization) Length Width Avg. Existing Depth N A NA Final Project Depth N A NA 1. EXCAVATION ®This section not applicable a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated. cubic yards. c. (i) Does the area to be excavated include coastal wetlands /marsh d. (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ❑None (ii) Describe the purpose of the excavation in these areas: High - ground excavation in cubic yards. 2. DISPOSAL OF EXCAVATED MATERIAL ®This section not applicable a. Location of disposal area. b. Dimensions of disposal area. C. (i) Do you claim title to disposal area? d. (i) Will a disposal area be available for future maintenance? ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA (ii) If no, attach a letter granting permission from the owner. (ii) If yes, where? e. (i) Does the disposal area include any coastal wetlands /marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected_ ❑CW ❑SAV ❑SB ❑WL ❑None (ii) Describe the purpose of disposal in these areas: f. (i) Does the disposal include any area in the water? []Yes [--]No ❑NA (ii) If yes, how much water area is affected? 3. SHORELINE STABILIZATION El This section not applicable (!f development is a wood groin, use MP-4 — Structures) a. Type of shoreline stabilization: b. Length: 50' ®Bulkhead ❑ Riprap ❑Breakwater /Sill ❑Other: Width: 1' c. Average distance waterward of NHW or NWL: 12.3' d. Maximum distance waterward of NHW or NWL: 15' e. Type of stabilization material: f. (i) Has there been shoreline erosion during preceding 12 VINYL months? ®Yes ❑No ❑NA (ii) If yes, state amount of erosion and source of erosion amount information. T OBSERVATION g. Number of square feet of fill to be placed below water level. h. Type of fill material. Bulkhead backfill 617' Riprap COARSE SAND Breakwater /Sill Other i. Source of fill material. UPLAND PIT 4, OTHER FILL ACTIVITIES El This section not applicable (Excluding Shoreline Stabilization) a. (i) Will fill material be brought to the site? NYes UNo UNA If yes, (ii) Amount of material to be placed in the water 32 CU. YDS. (iii) Dimensions of fill area 50'X 12.3' (iv) Purpose of fill BACKFILL BEHIND BULKHEAD TO MATCH NEIGHBORING PROPERTIES b. (i) Will fill material be placed in coastal wetlands /marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (V1/L)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL ®None (ii) Describe the purpose of the fill in these areas: 5. GENERAL a. How will excavated or fill material be kept on site and erosion b. What type of construction equipment will be used (e.g., dragline, controlled? backhoe, or hydraulic dredge)? BULKHEAD WILL BE CONSTRUCTED PRIOR TO ANY EXCAVATOR, BACKHOE, AND GOOD OLD PHYSICAL LABOR BACKFILLING BY SOME HARD WORKING LOCALS c. (i) Will navigational aids be required as a result of the project? d. (i) Will wetlands be crossed in transporting equipment to project ❑Yes ®No ❑NA site? ❑Yes ®No []NA (ii) If yes, explain what type and how they will be implemented. (ii) If yes, explain steps that will be taken to avoid or minimize environmental impacts. NOVEMBER 25, 2013 JOHN M. ROBBINS III E� Date _.f AP ame DICKRIEDE " pli nt ignature Project Name Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all-other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY /MARINA CHARACTERISTICS a. (i) Is the docking facility /marina: ❑Commercial ❑PubliclGovernment ®Private /Community c. (i) Dock(s) and /or pier(s) (ii) Number 1 (iii) Length 50' (iv) Width 6' (v) Floating []Yes ®No e. (i) Are Platforms included? ❑Yes ®No If yes: (ii) Number (iii) Length (iv) Width (v) Floating ❑Yes ❑No Note: Roofed areas are calculated from driptine dimensions. g. (i) Number of slips proposed 1 (ii) Number of slips existing NA i. Check the proposed type of siting: ® Land cut and access channel ❑Open water; dredging for basin and /or channel ❑Open water; no dredging required ❑Other; please describe: k- Typical boat length: 28' m. (i) Will the facility have tie pilings? ❑Yes ®No (ii) If yes number of tie pilings? El This section not applicable b. (i) Will the facility be open to the general public? ❑Yes ®No d. (i) Are Finger Piers included? ❑Yes ®No If yes: (ii) Number (iii) Length (iv) Width (v) Floating ❑Yes ❑No f. (i) Are Boatlifts included? ®Yes ❑No If yes: (ii) Number 1 (iii) Length 16' (iv) Width 14' h. Check all the types of services to be provided. ❑ Full service, including travel lift and /or rail, repair or maintenance service ❑ Dockage, fuel, and marine supplies ❑ Dockage ( wet slips ") only, number of slips: ❑ Dry storage; number of boats: ❑ Boat ramp(s); number of boat ramps: ❑ Other, please describe: NA j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). OPEN RUNABOUT I. (i) Will the facility be open to the general public? ❑Yes ®No . 2. DOCKING FACILITY /MARINA OPERATIONS ®This section not applicable a. Check each of the following sanitary facilities that will be included in the proposed project. ❑ Office Toilets ❑ Toilets for patrons; Number: Location: ❑ Showers ❑ Boatholding tank pumpout; Give type and location: 13 b. Describe treatment type and disposal location for all sanitary wastewater. c. Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? e. (i) Give the location and number of "No Sewage Discharge" signs proposed. (ii) Give the location and number of " Pumpout Available" signs proposed. f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? h. Give the number of channel markers and "No Wake" signs proposed. i. Give the location of fuel - handling facilities, and describe the safety measures planned to protect area water quality. j. What will be the marina policy on overnight and live- aboard dockage? k. Describe design measures that promote boat basin flushing? I. If this project is an expansion of an existing marina, what types of services are currently provided? m. Is the marina /docking facility proposed within a primary or secondary nursery area? ❑Yes ❑No Form M. 4 4 ' tr zr'ture and- of n. Is the marina /docking facility proposed within or adjacent to any shellfish harvesting area? ❑Yes ❑No o. Is the marina/docking facility proposed within or adjacent to coastal wetlands /marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ❑None p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ❑Yes []No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 3. BOATHOUSE (including covered lifts) ® This section not applicable a. (i) Is the boathouse structure(s): ❑Commercial ❑Public/Government ❑Private /Community (ii) Number (iii) Length (iv) Width Note: Roofed areas are calculated from dripline dimensions. 4. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP -2, Excavation and Fill.) ®This section not applicable a- (i) Number (ii) Length (iii) Width 5. BREAKWATER (e.g., wood, sheetpile, etc.) ®This section not applicable a. Length b. Average distance from NHW, NWL, or wetlands c. Maximum distance beyond NHW, NWL or wetlands 6. MOORING PILINGS and BUOYS ®This section not applicable a. Is the structure(s): ❑Commercial E--]Public/Government ❑Private /Community c- Distance to be placed beyond shoreline Note: This should be measured from marsh edge, if present. e. Arc of the swing 7. GENERAL b. Number d. Description of buoy (color, inscription, size, anchor, etc.) 13 .;' , 4 a. Proximity of structure(s) to adjacent riparian property lines 0' Note: For buoy or mooring piling, use arc of swing including length of vessel. c. Width of water body 65' e. (i) Will navigational aids be required as a result of the project? []Yes ®No ❑NA (ii) If yes, explain what type and how they will be implemented. b. Proximity of structure(s) to adjacent docking facilities. 0' d. Water depth at waterward end of structure at NLW or NWL -4.5 8. OTHER ®This section not applicable a. Give complete description: NOVEMBER 25, 2013 Date e I � DICKRIEDE i -:n ! ,3 I Project Name JOHN M. ROBBINS III (AGENT) A rca t ame plicant rgnature DICKRIEDE PROPOSED RIPARIAN LOCATION: 114 GRENVILLE ST, MANTEO, NC BOAT LIFT -- ��. - - -- LIFT BUNKS NOT TO EXCEED 14' INTO CANAL FROM DOCK, SAME AS ADJACENT LIFT Q 118 GRENVILLE CANAL NORMAL WATER LEVEL APPROX DEPTH 3' IMPROVEMENT DOCK ALIGNS WITH ADJACENT BULKHEAD AT 118 GRENVILLE STREET MAX DISTANCE 13' - -- OF FILL FROM EDGE OF BULKHEAD TO EXISTING BULKHEAD SHORELINE ALIGNS WITH ADJACENT RIPARIAN BULKHEADS 600 SQ.FT. OF FILL TO I-] T MATCH HEIGHT OF ADJ. BULKHEAD •� - • �_IIIIII :111111_ -° BE PLACED BELOW WATER LINE BEHIND BULKHEAD CK :111111 = 111111_ - 111111= 111111- 1111II_IIIIII= 111111 ,ul IIIII= 111111= 111111. -11 111111 - 111111 111111 1111_ 111111 - 111111- 111111- VINYL BULKHEAD AND , ASSOCIATED MEMBERS; ALIGN WITH ADJACENT RIPARIAN BULKHEADS R t V 0 EC 13 2013 MA.S TML M" IASE `v' ENT _�- EXISTING EARTH NOVEMBER 26, 2013 DICKRIEDE CAMA APPLICATION The aerial photo shows the subject property on the unnamed man -made canal that connects to Shallowbag Bay. The terminus of .he canal is the engineered stormwater basin at HWY 24/264 located across from Chesley Mall. All of the properties with the -_xception of the subject property have a hardened structure on the shoreline. All of the bulkheads on the creek form a straight line :)n both banks. The owner's requested improvements match that of the other properties on the canal. The cumulative impacts of :he LAMA permitted docks, lifts, and bulkheads on the neighboring properties have increased the erosion of the subject property. ALINNARM Sm SITE LEGEND ROAN= EX. PIPE SOUKD - EX. REBAR 0 - 1/2" REBAR SET FLUSH 0 - EX. 4" X 4' CONC. MON ❑ - CONC. MON. SET A - EX. P/K NAIL - P/K NAIL SET �$( - CALCULATED POINT ® - WATER METER PHONE PEDESTAL � C.A.T.V. UTILITY POLE I��°oposea GUY WIRE FIRE HYDRANT 1:1 T X /L ® - ELECT. TRANS. \ AG - ABOVE GRADE BG - BELOW GRADE EXISTING BULKHEAD w NuNeMAkIf R LOT 13 S63.03'00'W 160.00' s o- - -^ - - -- d -- - CARO _ Quo SEAL L -2592 f e RAY V T N Ln 0 CU m 18' ASPHALT N NOTES: 1. THIS SURVEY IS SUBJECT TO ANY FACTS THAT MAY BE DISCLOSED BY A FULL AND ACCURATE TITLE SEARCH. 2. AREA BY COORDINATE COMPUTATION = *5,393 S.F. (LAND) 3. F.I.R.M. ZONE; AE; B.F.E.: 8.2' (PER F.I.S.) + 1.0' FREEBOARD 4. PIN NO.: 10 988019 60 1142 5. RECORDED REFERENCE: MB 2, PG. 162; DS 880, PG. 592 6. MINIMUM BUILDING LINES (MBL) SHOWN HEREON ARE PER THE CURRENT LOCAL ZONING REGULATIONS. OTHER SETBACKS AND /OR RESTRICTIONS MAY APPLY AND MUST BE VERIFIED PRIOR TO CONSTRUCTION. 7. ELEVATIONS (NAVD 1988): AS 0— L AFT DEi' 13 2013 DocK�A iDRo P .sED -- r I- I I I I. LOT 12 1 I I I i I ,p / C K R► e b 01 0 I I I I I I I I I I 15' MBL GRENALLE ST. (25' R /W) LINE TABLE ��UNE LENGTH BEARING 3.71 •E 2.12 S89'25'37 "W CONCRE RETAINII WALL EXISTING enr-r % - = -- CALC. POINT ® R/W US 64 PER PCH, SL 32 1/2' REBAR �- 0.3' 6C _ N63153700 -E - -- - -- 574.00' - -- - - -- -- OF _ OR. N691pj'S4•E 100.14 CL QV N%W ST. MY SUPERVISION FROM AN CERTIFY TUAL SURVEY MADE UNDER MY SUPERVISION (DEED IOCTE�REDCTH T THE BOUNOARESNOSURVEZANIAT ED AS DRAWN FROM THATDTHESRATIO 0 PRECISION IN AS CALCULATED IS j /1Q Opp +. THAT T}{IS)� PLAT MEETS THE REQUIREMENTS OF THE STANDARDS OF PRACTICE FOR LAND SURVEYING IN NORTH CAROLINA 21 NCAC 56.1600). _jM THIS 1� -- DAY OF / U Y 20 13 .avn vC TVI( L -2592 PA Mn I CK �c DSURVEY POR ONNA D LOT 12 — BAYVIEW HOMES -I ANTE - NAGS HEAD TOWNSHIP — DARE COUNTY _ NTEO 20 10 0 20 1 inch = 20 ft. ORTH CAROLINA SEABOARD SURVEYING & PLANNINC, INC. C -1536 JW 103E W. WOOD HILL DR., P.O. BOX 58, NAGS HEAD, NC 27959 1M OFFICE: (252) 480 -9998 FAX: (252) 480 -0571 *' I