HomeMy WebLinkAboutNCG050417_DMR_20211214Environmental
Quality
Stormwater Discharge Outfall (SDO)
Qualitative Monitoring Report
For guidance on filling out this form, please visit https://deq.nc.gov/about/divisions/energy-mineral-land-resources/
npdes-stormwater-gps
Permit No.: NCGO5000 or Certificate of Coverage No.: NCGO50417
Facility Name: _Zink Holdings LLC
County: _Guilford Phone No. _336-449-8000 Ext. 5431
Inspector: _William Nieland
Date of Inspection: _I1/22/2021
Time of Inspection: _15:57pm-16:z
Total Event Precipitation (inches): _0.4 nC 4 2W
t:ALFI�OD
L`VJ'rt �rrTlot"
permits require qualitative monitoring to be performed during a "measurable storm event."
A "measurable storm event" is a storm event that results in an actual discharge from the permitted site
outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm
interval does not apply if the permittee is able to document that a shorter interval is representative for
local storm events during the sampling period, and the permittee obtains approval from the local DEMLR
Regional Office.
By this signature, I certify that this report is accurate and complete to the best of my knowledge:
(Signature of Permittee or Designee)
Pagel of 3 S WU-242, Last modified 06/01/2018