Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout20130588 Ver 1_Certification of Completion_20131220Page 4 of 4
DWQ Project No.: ZO 13D 6e,>
Applicant: fJ ns)T . 1),'U i si
County: `Mar -4- /J
Project Name: —5101 H = Ncr•�, tj Br-,A e'* 13 our-,— 'Tui -kPu Cr•e j g or\ Sit 1113
Date of Issuance of 401 Water Quality Certification: -Sv rN e 1 0., 201'3
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent
modifications, the applicant is required to return this certificate to the 401 Transportation Permitting Unit, North Carolina Division of
Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699 -1650. This form may be returned to DWQ by the applicant, the
applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these.
Applicant's Certification
I, , hereby state that, to the best of my abilities, due care and diligence was used in the
observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401
Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials.
Signature: Date:
Agent's Certification
1, hereby state that, to the best of my abilities, due care and diligence was used in the
observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401
Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials.
Signature: Date:
Engineer's Certification
Partial Final
1, C' Ayr, t--i c- S S hn u , (Vl c 1., c ,. e , as a duly registered Professional Engineer in the State of North Carolina, having
been authorized to observe (periodically, weekly, full time) the construction of the project,for the Permittee hereby state that, to the
best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to
be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and
specifications, and other supporting materials.
Signature _ th.0 A I A AA , 1��,� , o Registration No. ('}
Date
`��` � 1� Vin. ..:... of //nom E. ✓�r '�!
'
o•,rV�'ls)�A 4�i ?,
�0 a 02466� II�Z1i3
q x
Sii
N�. U
�c�,8 , �4