Loading...
HomeMy WebLinkAbout20070468 Ver 1_Emails_20070730[Fwd: Re: Red Oak Park] Subject: [Fwd: Re: Red Oak Park] From: Annette Lucas <annette.lucas@ncmail.net> Date: Mon, 30 Ju12007 10:53:28 -0400 To: Amy Chapman <amy.chapman@ncmail.net> CC: Cyndi Karoly <cyndi.karoly@ncmail.net>, Ian McMillan <ian.mcmillan@ncmail.net> Amy, Cyndi asked if you would mind issuing the 401 for this project (07-0468). There should be a condition in the 401 that states that the forebay of the wet detention basin will be redesigned so that it comprises approximately 20 percent of the total wet detention basin volume. Thank you, Annette Subject: RE: Red Oak Park From: "David Rector" <david@sitesolutionspa.com> Date: Mon, 30 Ju12007 10:26:24 -0400 To: "Annette Lucas" <annette.lucas@ncmail.net> Yes, we will "revise" our forebay area to meet this requirement. We would accept the conditional approval. Thanks. David P. Rector, PE Site Solutions 2320 West Morehead Street Charlotte, NC 28208 Direct: 704.943.3188 Phone: 704.521.9880 Fax: 704.831.5684 http://www.sitesolutionspa.com/ -----Original Message----- From: Annette Lucas [mailto:annette.lucasC~ncmail.net] Sent: Monday, July 30, 2007 10: To: David Rector Cc: Cyndi Karoly; Ian McMillan; Subject: Re: Red Oak Park David, 18 AM Amy Chapman I have received your additional stormwater application materials and they are in compliance with the NC DWQ BMP Manual, with the exception of the undersized forebay in the wet detention pond. The proposed 2,844 cu ft forebay is less than 3 percent of the total volume of the pond (119,115 cu ft). The BMP Manual requires that the forebay have a volume that is approximately 20 percent of the total basin volume. We can issue the 401 Certification with the condition that this design problem be corrected. Please advise if that would be acceptable to you. Annette David Rector wrote: I Annette: 1 of3 7/31/2007 1:37 PM [Fwd: Re: Red Oak Park] The original executed O&M agreement should have been placed just inside the report book. Unfortunately, the submittal to you was made directly by our wetland consultants, Carolina Wetlands, and not us. They couldn't provide us with a copy of their transmittal letter. At any rate, we did make a copy of this document for our records. I will send this out via FedEx together with the wet pond worksheet and Swale worksheet. Pleased be advised that we aren't seeking credit for the grassed swales as we have already more than meet our water quality requirements with the pond and the limited runoff (<12o impervious area) for the park. Yes, we are more than anxious to get our 401 certification for this project. Upon receipt of these items will you signoff on our stormwater management plan in order for us to move forward on the 401 certification? Please advise. Respectfully. David P. Rector, PE Site Solutions 2320 West Morehead Street Charlotte, NC 28208 Direct: 704.943.3188 Phone: 704.521.9880 Fax: 704.831.5684 http://www.sitesolutionspa.com/ -----Original Message----- From: Annette Lucas [mailto:annette.lucas@ncmail.net Sent: Tuesday, July 24, 2007 1:07 PM To: David Rector Cc: Ian McMillan Subject: Re: Red Oak Park Hey David, I can tell you're anxious to get this one approved! I just wanted to point out a few things: First, we cannot accept submittals via email. Please mail or FedEx. Second, I am not able to locate your signed and notarized O&M agreement for the proposed wet detention pond. If I have missed it, please let me know. Thanks, Annette David Rector wrote: Here's the completed wet pond worksheet worksheet to you later this afternoon. I'll send the completed grass Swale David P. Rector, PE Site Solutions 2320 West Morehead Street Charlotte, NC 28208 Direct: 704.943.3188 Phone: 704.521.9880 Fax: 704.831.5684 http://www.sitesolutionspa.com -----Original Message----- 2 of 3 7/31/2007 1:37 PM