Loading...
HomeMy WebLinkAbout20070936 Ver 1_Design Plans_20070801Since 1979 THE JOHN R. McADAMS COMPANY, INC. 77 Overlook Park CHARLOTTE, NORTH CAROLINA o ~ - c~ q 3,i,o DESIGN OF WATER QUALITYEXTENDED DETENTION WETLAND BCP-07000 June 2007 CAS 7 Research Triangle Park, NC Post Office Box 14005 Research Triangle Park, North Carolina 27709 2905 Meridian Parkway Durham, North Carolina 27713 800-733-5646 919-361-5000 919-361-2269 Fax Charlotte, NC 5311 Seventy-Seven Center Drive, Suite 66 Charlotte, North Carolina 28217 800-733-5646 704-527-0800 704-527-2003 Fax Derick B. Hopkins, EI Associate Project Engineer James W. Caldwell, PE Project Manager ``` N C~ .• `~ ~.... _ ./. N~ ~ wAr~~ c~u~u~rv ~~ AND STORM4WIT~{q BRAN Comprehensive Land Development Design Services www.johnrmcadams.com We help our clients succeed. Permit No. O `1 - O q 3•lc (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form maybe photocopied for use as an original DW Stormwater Management Plan Review: A complete stormwater management plan submittal includes an application form, a wet detention basin supplement for each basin, design calculations, and plans and specifications showing all basin and outlet structure details. I. PROJECT INFORMATION Project Name: 77 Overlook Park Contact Person: James W. C a l d w e 11 Phone Number: (919 13 61- 5 0 0 0 For projects with multiple basins, specify which basin this worksheet applies to: N/A elevations Basin Bottom Elevation 7 3 5.5 0 ft. (floor of the basin) Permanent Pool Elevation 7 3 7.0 ft. (elevation of the orifice) Temporary Pool Elevation 7 3 8.5 0 ft. (elevation of the discharge structure overflow) areas Permanent Pool Surface Area 210 51 sq. ft. (water surface area at the orifice elevation) Drainage Area 14.63 ac. (on-site and off-site drainage to the basin) Impervious Area 11.2 3 ac. (on-site and off-site drainage to the basin) volumes Permanent Pool Volume 15 , 7 8 8.2 5 cu. ft. (combined volume of main basin and forebay) Temporary Pool Volume 3 3 5 9 cu. ft. (volume detained above the permanent pool) Forebay Volume 3 0 0 0 cu. ft. (approximately 20% of total volume) Other parameters SA/DA1 3.0 (surface area to drainage area ratio from DWQ table) Diameter of Orifice 2 in. (2 to S day temporary pool draw-down required) Design Rainfall 1 in. Design TSS Removal 2 85 % (minimum 85% required) D ~~~Q~, `y ~ D Form SWU-102 Rev 3.99 Page 1 of 4 AUG ~ _ 2007 W~r, p.'E._N-R' WA --`I ~~DSt~r~N(~N Footnotes: When using the Division SA/DA tables, the correct SA/DA ratio for permanent pool sizing should be computed based upon the actual impervious % and permanent pool depth. Linear interpolation should be employed to determine the correct value for non- standard table entries. In the 20 coastal counties, the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide 90%TSS removal. The NCDENR BMP manual provides design tables for both 85%TSS removal and 90%TSS removal. II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. If a requirement has not been met, attach justification. Applicants Initials JWC a. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). 7wc b. The forebay volume is approximately equal to 20% of the basin volume. JWC c. The temporary pool controls runoff from the design storm event. JWC d. The temporary pool draws down in 2 to 5 days. JWC e. If required, a 30-foot vegetative filter is provided at the outlet (include non-erosive flow calculations) JWC f. The basin length to width ratio is greater than 3:1. JWC g. The basin side slopes above the permanent pool are no steeper than 3:1. Jwc h. A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail). JWC i. Vegetative cover above the permanent pool elevation is specified. JWC j. A trash rack or similar device is provided for both the overflow and orifice. JWC k. A recorded drainage easement is provided for each basin including access to nearest right- of-way. JWC 1. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified prior to use as a wet detention basin. JWC m. A mechanism is specified which will drain the basin for maintenance or an emergency. III. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one) 0 does ~ does not incorporate a vegetated filter at the outlet. This system (check one) 0 does H does not incorporate pretreatment other than a forebay. Form SWU-102 Rev 3.99 Page 2 of 4 Maintenance activities shall be performed as follows: After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re-seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads When the permanent pool depth reads Sediment Bottom El. 736.44 7 on 736.25~?~ feet in the main pond, the sediment shall be removed. feet in the forebay, the sediment shall be removed. BASIN DIAGRAM Dill in the blanks) Permanent Pool Elevation 7 3 7 Sediment Removal Elevation 7 3 5• g g 75 /° Bottom Elevation 7 3 5. 5 0 • 25% FOREBAY MAIN POND 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. Form SWU-102 Rev 3.99 Page 3 of 4 7. All components of the wet detention basin system shall be maintained in good working order. I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible parry. Print name: c z»,l ~ ~ M air ~t 5 Title: ~~~r~g-~L ~N ~" 1 `© l.l,C, Address: `~~ o ~CN L ~ Phone: ~;o~. ~Z(o_~3~~ c~ D ~ Signature: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I,C~~~~`l % %~~ ~G~L~%~il , a Notary Pub County of ,~io hereby certify that personally appeared before this ~ day of execution of the forgoing wet detention basin maintenance qi ;~; ~~~.x. ~~ ., , .,. SEAL My commission expires i~~~(, ~-~~%~~ z ~ Z~U for the of ~ ,/i ~, and acknowledge the due Witness my hand and official seal, Form SWU-102 Rev 3.99 Page 4 of 4 since X979 Research Triangle Park, NC Post Office Box 14005 Research Triangle Park, North Carolina 27709 2905 Meridian Parkway Durham, North Carolina 27713 800-733-5646 919-361-5000 919-361-2269 Fax Charlotte, NC 5311 Seventy-Seven Center Drive, Suite 66 Charlotte, North Carolina 28217 800-733-5646 704-527-0800 704-527-2003 Fax www.johnrmcadams.com THE JOHN R. McADAMS COMPANY, INC. July 30, 2007 Ms. Annette Lucas NC Division of Water Quality 401 Wetland Unit 2331 Crabtree Boulevard Raleigh, North Carolina 27604 Re: Stormwater Management Plan 77 Overlook Park (DWQ #07-0936) BCP-07000 Dear Ms. Lucas: 0 ~5~~~~~ ',} AUG 1 2007 pENR • WATT ~ALI1y "'NANO srort~~ Presented on behalf of Beacon #18 LLC is the 77 Overlook Park Stormwater Management Plan for your review and approval pursuant to the NC Division of Water Quality (DWQ) Permit # 07-0936 General Certification (GC) 3402. Previously the project was submitted for acceptance into the 401 Express Review Program. However, due to personnel constraints, the application to the 401 express review program was denied. Consequently, 77 Overlook Park is now being submitted for standard Stormwater Management Plan review. The project is located along the north side of "Lakeview Road" and the east side of "Interstate 77". The proposed site is 20.42 acres, and will consist of commercial buildings, as well as all other associated infrastructure. The site is adjacent "Long Creek", and a FEMA mapped floodplain. The project is located within the City of Charlotte jurisdiction, however, due to the close proximity of the FEMA mapped floodplain, the project will not be required to meet City of Charlotte Stormwater regulations. To meet DWQ standards, one extended detention wetland facility is proposed for the project. The extended detention wetland facility will be located along the east side of the site adjacent to "Long Creek". The site has been designed and graded so that all impervious associated with new development will reach the extended detention wetland facility. Please find enclosed for your review three copies of the following items: - Initial interest in participation in the express review program within the 401 oversite/express permitting unit (Summary Sheet) - USGS Quad - Mecklenburg County Soil Survey -Individual Post-Development drainage area map - U.S. Army Corps of Engineers General Permit Verification Comprehensive Land Development Design Services We help our clients succeed. Since 1.979 THE JOHN R. McADAMS COMPANY, INC. Ms. Annette Lucas NC Division of Water Quality July 30, 2007 Page2of2 - Approval of 401 Water Quality Certification with Additional Conditions - NCEEP acceptance - 401 Extended Detention Wetland Worksheets - Operation and Maintenance Agreements (1 original / 2 copies) - Stormwater Management Plan- Notebook Including: • Post Development Plan Exhibit - Full Size Site Plan drawings including: Drainage Area Maps, Grading Plan and Detail Sheets If you have any questions or require any additional information, please do not hesitate to contact me at (919) 361-5000. Sincerely, THE JOHN R. McADAMS COMPANY, INC. ~~~ / ~~ ~t/.~~ Derick B. Hopkins, EI Associate Project Engineer Stormwater and Environmental Department INITIAL INTEREST IN PARTICIPATION IN THE EXPRESS REVIEW PROGRAM WITHIN THE 401 OVERSITE/EXPRESS PERMITTING UNIT October 1, 2006 Version 4 o~ ~ o q -3~ Applicant Name: Beacon #18, LLC Attn: Mr. Jon Morris Applicant Address: 9335 Harris Corners Parkway, Suite 250 Charlotte, NC 27269 Applicant's phone number: (704) 926-1391 Fax number: (704) 598-6335 Applicant's email address: _ ion(a~beacondevelopment.com Consultant Name (if applicable): The John R. McAdams Company, Attn: James Caldwell Consultant address (if applicable): 2905 Meridian Parkway Durham, NC__ 27713 Consultant's phone number: (919) 361-5000 Fax number: (919) 361-2269 Consultant's email address: _caldwell(a~jonhrmcadams.com Type of action requested under the Express Review Program (check all that apply): ^ 401 Water Quality Certification ^ Isolated Wetland Permit ^ Stream Origin Determination # of Determinations Requested ^ Riparian Buffer Approval ^ Riparian Buffer Minor Variance ^ Coastal General "Major" Variance ^ Intermittent/Perennial Determination # of Determinations Requested ^ Isolated Wetland Determination linear feet or acres ~ Stormwater Management Plan (this fee is not additive when approval is combined with 401 Cert.) 1 # of Drainage Areas/Project Site Name of Project: 77 Overlook Park County: Mecklenburg Total project acreage: 20.42 (acres) Total built out impervious area: 11.23_(acres) Nearest Named stream + River Basin (from USGS topo map): Long Creek- Catawba Please provide a brief description of this project (attach site plan if available): Stormwater management facilities will not impact waters of the U.S. We are requesting approval of the Stormwater Management Plan for the development. The wetland stream and buffer imRacts were previouslypermitted under the 401 Certification on July 16, 2007 (DWQ# 07-0936 Please attach a map of site location using USGS 1:24,000 map and county soil survey. 1 Location of project site -please include reference to the county, nearest name town and highway number: The project is located along the north side of "Lakeview Road" and the east side of I-77, adjacent to Long Creek in Charlotte, North Carolina. Proposed impacts: 0 Acres of 404/401 wetlands 0 Acres of isolated wetlands 0 Linear feet of streams Linear feet of isolated streams Square feet of protected stream buffers Has consultant or applicant attended any DWQ-sponsored training sessions in the past two years? If so, please list which ones. No Has any DWQ staff visited the site?des, if yes, please provide DWQ staff name, Alan Johnson and date of visit: June 27, 2007. Which other environmental permits from other agencies will be needed for this project? Please list the permits and issuing agencies below: U.S. Army Corps of Engineers - 404 permit Action ID: SAW-2007-1932-390 DWO - 401 Certification DWQ # 07-0936 Does this project require approval under the State Environmental Policy Act or National Environmental Policy Act? No. Is this project an After-the-fact application or has this project received a previous Notice of Violation from DWQ? No. Does this project require approval of a Variance from the NC Environmental Management Commission? No. Are you aware of any local controversy concerning this project? If so, please describe the controversy and any measures that have been taken with respect to public involvement. No. This form must be submitted via email (c/o 401 express(a~ncmail.net), faxed (919-733-6893) or hand-delivered to the Parkview Building, 2321 Crabtree Blvd. Suite 250, Raleigh, NC 27604. Applicants who are selected to participate in the Express Review Program will be notified via fax within 2 days. Successful applicants will then be instructed regarding detailed procedures for full application (Note: Submittals of the review packages on Friday after 12:00 pm will be stamped as received on the next business day). Please contact Cynthia Van Der Wiele at 919-715-3473 if you have any questions regarding this form. 2 • `4J, v. ~' ~y ~~ s j j'. _ ~„, ~ `, '~ P i ~, " ~, r 1) / ~ ~.• •\, .~. ~.~,,;; ~ ~, "'mil \\, I i ,. ~' 1\~i ~ /.S - ~• / I ;. • . /• v / , ~ ~ . -^ \ti ` ~'. ~ f ,, r ~ ~ / r i., ~~~f .~.. `'' ~~,~ INiERCHANG£ 18 ~ ~ . ~ o ~~ ~'~ ' ~: ~ ~,` ,. ~`" ` y\, s=a ' ~.\; ~~ -~' i -~ ~~:~ ~I " i Ta ks •. .: ~'r ~' ~~ r J- ' ` .; J • ~~ ~ ~ ,; ;~ ~ ' t ~ : .':4~c~~-o/~ € ' , -s , ' ~~ i ~/ art ~` is f \`~,~r' ');fir *- 1 ' _ ~.. ` '~, ~~' ~~~ .~`~~:\.%~' r/ ~ •:~ it ~ ~ - '~~~ ~~~, ~\ ` 3 ~~" ~~~ - `~, .~ ,. A 1. '- ~ t f i . . f `r1 r i yp4 777- r_ i 1 I ~ ~,1 J~ 1 ~ ~ e~'. J ~ tii ~ t ~ h~.rIMLIP 'f T ~ .~ ~ i`~ ~ } !:.1'l ~ :' I _ \ ~ r•.-r~ Him .~ ~ if ~ r ,1!, w a.~ i . '~~?I12~ 'i i~ ~' f ~~ f { Er•`~'~ . _ ~1~Ud. Gr~'n; ~ -Ira t "T •~ ' S ~+ ~ , • j lf7 -- •n \ ` ..~' i i F :•t - - - ~ Met Obna{l~,,ij~f -- , zr~~~ j j 'b• ` 4 X'. .' ~:..:~-.~ e~!~rtJVrIO S: ..tilt i Trinity ~: j i, ~~ 1 ~ '~ ~` ,+~~. ri.~yr%~ lh 'iowaga r i ~ ~ ~ `Y S ~ • ' 't 4. D~Sausal t ! ~ ~ .,~ ti tr . a f -~; ), ~` ~` ~~ BrotkenBrAug{'"~r~ L' i ~ f h f )\.._.~..--- :~ ~ • it ~ "0 '`~ + i\.~ ,\j i-', f .` _. ~__~~~' ._- _'> _~'• k `• - • ^ 11 1 . • ° I f' ~ ~ ", `\ 1 r~ SCALE 1:24000 " , `, \ (T'" ~'° ` 1 ~~ ~ ~ \\ ~~~' 0 1 MILES '• ,. ~`" Kays `jf1~ `~'; j.\,~ ~\. ~~~ ~~ y 0 1000 YARDS ~`~~ r~ ~~' ~~ i ~\ `~3 , ~' 0 1 KILOMETER ((""'' V J L �I y �,.. A � ✓aD I / 3t w l i:it3 rrts r y may✓` � D.i Bs a r SHEET NUMBER 4 MECKLENBURG COUNTY, NORTH CAROLINA IrB ApD :- Paf Ap, CeD2 PaE. . el F.n't3 ApO CeD7 Ce82 Apl) Hc;3 WkD Heli `—.l B x O JaB i'VAt) :EnB M n C(40 _ rn eEi VaE3 Me8 App) Ce82 MeD. Croft EriF1 y eCeB", MeB - L 1 Ce)2 N f l_ O U r � Ci i hFi � B M .� PaF `PaE` CeD2 Cell? C J v CeR7 CO", aE Ce82 CeBZ 1 "'B C11 2 f�nB rL _ c B, nB T 0� �at3 ,y F irE3 Dn, Cue Ce.D2 .ii fill vnl5 Cell.) CeDl 1 e LnB 4i M0 —.. / Ce82 VaR m �✓ 2t�\ -- Cecil CeB_ U2 S MPB FnB u' dT N Ce82 v 0 R w MeD t FIB l-NeR i �- c Ce{39 Cr^D7 Q%fC'ti "CUB - EnB i, n HcB Ur .Uri _ ,��� 1d) W 8? cull I'caE ^r` i riB CuB vaq Enf� GeB? Brockenbrough n Enl3 6 F - FnB Airport GeV MC) ErL; \e t J vats .,� �nl ^.d C.eD2 �" � •s.�ai eQ h � 1 H,zB ,~~ ~ , :'~ i~ ~ \ ~ ~ ~~'~~ __ ," _, , ~%- ~~ \ ~~ ~ \ 730 6g LC ~~~ ~'.\ ~\ ~T (, ">1 y C. ~\ ` ~~ , ~ ~. ` .~ ~, `~ \ '30 '- - Preliminary ~ ~~ 1 -~ ~. `~ Phase 2 ` x `~' \ i' r> C. _i 1 ~ ~ / ~ ~ l \ ~ ~ ~ -1 v ,i X30 ~ 2 ,. o ~/ ~ ~~ , , Z ~ ~ ~, ,~ 1, ~~ ~ s ~ ,1 ~ ~~ I , ~ s~ ry r 6 ' ~~ 7so ~ j SITE BOUNDARY i ~; ~; ~ r I, ,, ~~ I;i / /,; p9L - j/ j % I / ~ TO WETLAND ~/' ~ AREA = 14.63 ac. i ~ . ~ 'ss ~ 1 ~i "Tc = 5.0 min. ' y y ~ ~/ \ \ \ \ \ \ I ~ GV ~ ~ ~1 \ \ \ / / ~ \ ~ \\ \~ j \ \ / N \ / S \\ ~ a\y ~\ Cpl L ~\ ... \ \ \ \\ ~~ ~ \\ \ I ~ \~ ~ \ ,``,~ i o~ ~~ 9~ ~ ~,, ~ ~~ N ~~ ~ 1 ;~ ~ ~ 59 ~ `~~~ ~, ~~~.. , ~n I /StlL / ` ~\\ ~~N \~ i / I N \\ \\ \,.,, ~, f ,~ ~ a y ~ ~ ~~~ `\j ~ ~s ~~ ~ ~ ~ ~~~ ~ / ~ lJ ~ \\ ~ ~ ~ ~~ \ i ,~ ~~~ , ~ ~ ~ `~ po\ v, ~ .'~, ~ > > ' ~ ' / s`` L Bld 2 '''" FF 7 5. ~ ~ ¢ ,~. F 761 ~/ ~~ qti ~ 9, . J I;. A ~ ~ 112,500 SF ~ 40, 00 F _ 4 ~ 6 r ~ ~~ o (~ qL _ ~ ~ i~ `t ~ `~':% ' C y / N ~ / `~ ~' ~Li N ~ ),S~ r~ ~ ~/°L C ~i ~ y~/ i ti ~I I k ~ y zi ~ i 1 i I !~i= !. / ~ ~; ~ ~ ~' i - o l ~9L n ~ ~ '~~ / 1 I ~pLL/ ;~ ,: ,., . ,% y,~ ~ ~ ~, ,~ ~ ~ ~~~ ,~ ~_... ~ ~ ~ _ ~~ ~ ice/ ..._.. ,,~ .. S6L ~~~ ~ ~ ~~°bL _.. ,.., ~ .. ... ~ OSL DIY -_ ~ - ~ ~ I ~~------- _ . 5- ,L ~ ' ~,5 ~ 1 inch = .100 "~f"t: PROJECT N0. BCP-07000 THE JOHN R. McADAMS „~' FILENAME: BCPO7000-SWX COMPANY, INC. ~ 77 OVERLOOK PARK C scALE: ENGINEERS/PLANNERS/SURVEYORS y ~'~=~OO~ C ,NORTH CAROLINA RESEARCH TRIANGLE PARK, NC (~/] DATE: O6-Z~ -O7 DRAINAGE AREA MAP (gOg)Hgg115000 ZIP 27709-4005 :~~::r~~~~ Its. ~ ~'~L-'(Jt)7-lft,`t'w~{?~ f_°c~i,~rrf,:: plc°~~~rrl~u~r~; ~ ~,~. ~;j~.~~i: ")rat ~:~;tt~i ~'t~`:~~~i"I` ~;~:iC}~ ~1.> :~~I ~~'I`1~)'ti~~~l~`:)'~'~;~~t~'.~"I`I'I' ~'rt~F't~"~.. ~~#t34'T'.~° ~ `'~ic#~.i;t'.I~`£~ :'~k',(:Y11: ~~€`~iCti~"t ~~~rl"tllt~t'S .'~tt'ttx ~~t". kt}Cl ~''~fYr'k"tk l~,l>-~:4, ~??~:~ l~~~~'ri1 `c;,xt~~rs 'ar~l:.Rrt `s~uit~ ~} ~;~~~ ntl ~C)i~;i'~t1C331 g~fs',,,,~°€', i.16~tc`;'~~.~tly, r£,,,~~ r~.iti1:°`.rrt~i~~'r, t~~s~•rr~t~,}: ~~r~t~tt'7'7-~.,e~i~vv tr~~€ "Cr~rr~ rt~r•t~-ti'r-t~ ~ t:'~,rrrf~rt°i•b•ii~ `~t~r t>~i;;at>•~t +>s~ ~ ~~~ ac;r~ trt~t at t~~ intcr~ecta ~f l-~~ .~€rx 1.~~•~,:rii~.:~,t~ ~,~ ;,~~~t ~ ,- :,~~„ ..~;~? :,: i,•. i~t~ txr~ ~a~:t ~3tlt.kt+ ~~t't`~i''~ IM~tr ~:°riM~ ~r ~z~~~t.rt~n r~vittt ~,i3Tt'+$I"Eti_ttiirt €st ~`itlt ~•s`te41 r',s~tsf t'!'3a~wiltS~~ d£; ~t',r'~°L ~R L;i)%Ci~11~1'L'~:~ f'~~'C~ itt+~il~» In c~rclE~i- t~; t`a~ttii ~c~r~ti:~Ec' f>i~r ~ a~t~ tc~ £~() Ixr~c`:,i` feet ~sf ~tr~~;~~ tl-~* ;:e-'rr;ir~~~: s~~l ~tzr;l~~ ~~°r~c~~at t>~ t6~cx '~£~r-ti4 ~`<rr-,jlit~~ t;~£,~;~t~*~ ~~n~~t~a~:a~rr 'rt- rain (tiC"1?1~:1' in ~~~ec~ arrrc~~rrrt r~~t~rn~e~l Fr the tit ~.~?1~~ ~irt~i€~rrt ter rf'crr~ tt~~ r`~~ttir~it r~f,t~~ linaar f~•,~r €~f~°~ir•~ ~;rier• ~t~r~:~r~il~~ the t:`ta~~ Pia C<i~ e~' ~i3~,irt. € "~rt~Ir~ tt , t:'tri( {~;?~(3'~0101. C"`«rr~it•trr'tierrt ititr~ '>tr~~r~it:tiratr<tt ~at•~~e «1Ct ttre ~rr~ lt`t"ti ~h~~ h>>r in t~ix~1~° s~ftr the r-ltt~~ hit r~rarl~ 1'>~tl ~°~ t~~ttt t,~ t iri~ '~t '~' [? ~' <~a~> r:s~ e~c*c ~s t;c~ ~~' s~f c* ~rt~~~at sl~~~:rtairt~t~~ii°~ t the ~:'~-r tta<i~t it :~{3ree~ t:r~ zrc.s~ ~ r€•~ ~£~r~~il~ifit~ t,~~° ti~z`_r~~iti atit~n v4'~arl r~r uiretl in ~t~rra li~nc~ ~~itti tht :~()t h~~t~v~•t~~r tl~c tit'l~i~`~It arr ttxrw C~>~rr ~~ apt` ;ra ~~~x's '1'4`lrir~ ~ttxrr [~i~trict, clattxrt :`~„~ it~it*r l ~t~ :~.~)~~11,[a~s1i' €„6t~~; ~' i.: s , il'f ~C:lt:~fzt ~'~ «src r ,~ . 3.i [ "~~ ? ~~~} .ia.3~=7 ~{.~ ~iV~i"~i s~t3Z~ ~~<~.ll't 1, l~wr, 1 :v4 1=='# zi~~t1"<<~z•i~,.~t~~r~: ;,, . <s ;fii {iettrl E'>r~t~ir ~ttr7tt~cr; ,: ~~ ~~ i>r~~ des°rt~ir '~txs~ihr ~~~ ~~ ~', :,,- ~-~,,, ~, :,~i =..c€1 ~}° tt~i< <ik~c~~~t• is°f.•r~.~i,~~£°£l ~i£~rr~aat }~rc~~icii~£~ it ,~, ~.~ ;t,r»~~t~l~tc~ ire ~liict ~~~~r£l~n~:~ with ttr~; ,i 11.1'f'~ ? ~~,t;t,i€?~ . ~:: ~:, °3~~IC1{lt2`k ~iYS(~ -"iti ~.a.i .3 i;ii:.'t~ ~il.it~lti. r~CiV krt~~f?~~~l ~t~ i~h.. F1tt~.~~iCi~ is ri i,Stt3tiT1~ t,71 i,~G', ibitit Ki ~TE};i: ;t,t,t >;i~ _~rlh':t ~'I~ili}S 1Y2cLY ~`1~3j !?'~ ' .,{~.;.' zc~ sl'al£)(3 LtiC~$'~ C)!'f~£'T, it T'CS~!"P'~'..Ct+:ill firtlt°3 :Sl$%~.%£YI s"4~5'~Tt~~)i'is111: ~s .<:i ~{ ~; ,- ~ :.'}{t,.tlc~`.S2 t , t= `~i:ltli ~ af,., ii=i~si „i ~.(`tI.11H)I1 t~dlL i'i, !txSil,'c3 ~"'~'I~i'~A tSi7lt i~ iii' 31~trtl~#i~ l,~t' ~13I~iC;,3X~~1f331 at }i ~ i~~- §iF ~ 3=t~t 3 s te:'t s, ~c.'..{.. ~1 ~ "~ t is .' C < 7l~a~3 SI .- 1 ~ t?t (SC`tJ SAC}O~~ 1(iti Ifi.3,li 11~v l,It, i~l'CT`, i3( .[7,<<?E3; ./.Js'~3n€ . , v,i l~,titFx ~F .slhs tlf 'si2iSt~.,i..., tEi. - ...iii S. .21,+tii i. <{~ ? 'ITtdlil ~ cSlitS Ut,(t~ S~iL €; A~)iS alit;.~ t~.tl~` ichJ(ItEfiia~ ~'t i3 :~~ ~I >`i?E.~ e, cl iiY[I,1 `~{ '`. titl[~1 d~~ ~[Slt v' t t ',sT Iii .Tits sib ~':~ it SY tt1f+1 i ~ i ..'7"Bill ~~ ~~i s,:~~*£Hil'4 }i~c' ~~ tSY14~ c.ittt-%;'1 k~[t a,-~ ~ l`~i F ,'v< ~t ttYt.`sF 1ri, i ,r 121izilllic t~ 'U i~~t t1F i': l~, <Kii~.l[1 E.1331 ~<{ It ii~Fl2 Ltt7 is [l~,~}~3~'wlt ~~<t +LT-?1..ri-~~ z,st;l.li?ivl. :.,_ I1.fEix. ~? 5 i.+, i . S .ui. .., U. LF~' ~3341'i ~lu, t' i;tfLi€1)CITL tl ii ;,'. .1~ 1<`Fii{tt ;t,Fiv~Tt3~.:$,1L~17~ t)r` ;?, ,. _tl:u~s tl>~3.I .1 '. `. i.?..ttti-:;C'E,~ lli F.. ~=.13 -<::' .i~sz'~E-! tii: {faf[E32b3 i.v' 4`'wf J113C, :4f~~ (t'ii3eitii .tilt i?tsi aye°i~4 ~,~[ss'~hlc; i'S l~ts`4' z`AL`t9`~'trV t,tl ~~ts ~~ iii! ~ i : ~ ,i( ih~ a ~i. i~as,; +ts + _i E?tt it t- ttta;.llttt-;it ,~,,, cit ~~ c:att,it t~~,.~c ~ ~ ;,°ii s tt : u,r` , yi t`-c r, ~..' ~ <t. i , .ass 1 ~ ,itt=t~91? ¢t~(7 ti~j, .,t tt~:L t~?t Stt1F1Y71"i=,%1~~tlYd. ... ~,,S,i ~ a.l~`ti S..i_;~Ci CU `~; ::...i-., 1'r-t S.. ?in.7s .t.. si d~ tt 2-~ 1Ti.t .u ,s 1, 4 tti['f. d{I 11(~'IrSttltt:2~ ~. !S4)t-i -f(.' i 4°n iiit;I` <.~ts~tt~ i " £ { { - ~ti t its :~.'It'tilitit:: t i_fl1?., ,itlttii ~: tit: `y~lc ~... =:~llE+i.~C ?„-.' ~4i : +tt F- it)it ~,~ 4~5"c1~~ 1 ~ /l-;z~i~ir (r~~~~EC3k1+:= .~~ )-, '_ ~t';'ti(~ 1 ~(i ( 7 c{tStitri(E +tt~. ~:~i .i. (?~ §i%. _ t?i'`,.'IIi'i tTit' ~L'l~}itCl Il,~ ~~;,,`it; ~ . i5':i`>i~I~ t,'li3r`12it,« StI~3~t'i:t iEt I"fi'4?lt~~tt1()It td7lC~t;t~ t~le i ]"ai ,l,?; "1f>.'1 it r '' ~ „ ~ t x ; r ~ ~ ~.~St'Y~ICIIf ~;~ ( r}a~ 1 i~ ~~>€Ilil x'ill~`;YlC. :'1r'I:~i;~t ~ ;>E ~ a ;~ . .I=. i_ ~ c7F r£~ ~ i ,t r ~.~Y~ '~c,~ rr~£~~t ~;z~t~tncr t41i s ~~Sli~ ~,c'i?iit+1_t;'T1l e ~ E?it .~!-Flip 4'> ,.?1.,dtastl •~itt'ti ti«E TL't~~'~ r~ta° ~f£"£'Y3'11Y~.~>r~ C~~ ~~~Il~. i`"~~£1~1;a1~.H~1~~r a~.~ E,3~.}~.sltfi .ii,~.;}F €~~'~"1~°I' iit2:tti ~ ct;; i ,; tiiii =31 [f s, ~, + it- ~): ; ~` ''I dti' i3'.c ~ .a.~ .ti>_~7t.. ~'.ill~'?;l: z _. ?tt;xkttu€l. ilT3~ 3t ?i1C :at~r~lt)t1~,~f t~"18 ~~13~"YYllt. C~~'t~1E' ~'.P3I"44)~~ ~I;:.'s?iL ' Pt` ~ I~it'" ~}j .~.? ~'#~C,i~i.' ~+tild;: I ~~~. `'' .. ~.,~"I~l(11:i ,.~ (~. ~'~~ °~~~ ''t;Fi.3 ~ _'~~< ~. ~,:'t~r`~a~ ~~~.~u~~tc€r~ fii~..ial ... 4~s:.s ~ ~~:.,<!`'~~~~ ._.._._._ ............. . ~........~....~~_ ~:~~c~_ .lulu ~ 1C1'~ I~s~~ir:s~i,:ir~ :7;~t~: e~~`;' ri{"i~atic~t~: Flult~ ~{}.: ll~~ '"h:~ ;': =~:~i~~;:~~;,~~ f, € ~• cc~r~~t~~~iti~: tc~ t~r~=~ ~lr~~i~, tl~e: I~t:~Yic"~€ 1~~-~:I t~t~~~ac~r~ t~~ ie: g~u]ce °~`ca ~l ~~ Yt".•Y~I't' ~}_<. Syi~,€tli.t' it) ~.~f~ -~j, ~~~t:s~~~;(Yil1~`i~~'tc' ~7u :i~l<:!{„~Ii'~~ `',i11-l~tGCi()ft 7zi"t`f;ti 0`"4`141 t}e.,..~~~ttt ~.ttt~ t~,~:::..arr~-t~ ~5,r, ~~ } la~~Jl)~~~i~:i~•z.htk~~3...'<> ~F,€~t~,7~tc ~~~~ ~t~t`~re~~ t~t~~ix~~:, (:~s~~~ .li`lllrnitifti~~l. dlr. I,a~~~rlaY-cl "'. l~l~tl~t~r o~ ~ o ~ ~ 77 Overlook Park Design of Extended Detention Wetland Facility Proiect Description Located along the north side of "Lakeview Road", and the east side of Interstate 77 is the proposed commercial development of 77 Overlook Park. The proposed site is 20.42 acres. The site is located adjacent to a FEMA mapped floodplain, and therefore is exempted from detention. Currently the site is comprised predominantly of open and wooded areas with very little impervious areas. In the post- development condition the site will consist of commercial building, as well as all other associated infrastructure. The site is proposed to be phased in two parts. This report is associated with the first phase of the project. However, the wetland has been designed to handle the full build-out of the site. Due to the fact that the site is located adjacent to a FEMA mapped floodplain, no detention will be required. However, there a proposed significant stream impacts that will require a 401 permit. As a condition of this permit the site will be required to treat all impervious areas for 85% TSS (Total Suspended Solids) removal. To accomplish this required treatment, a single extended detention wetland facility is proposed. • The extended detention wetland facility is sized according to methods found in the April 1999 NCDENR Division of Water Quality "Stormwater Best Management Practices". Please refer to the design summary immediately following this narrative and the design calculations for further information. The extended detention wetland is also designed to safely convey the 100-year storm event without overtopping the dam embankment. Please refer to the design summary immediately following this narrative and the design calculations for further information. Calculation Methodology • Rainfall Data: Is taken from NOAA Atlas 14. Two sets of precipitation data are used based on guidance form NOAA. The first set of data is the statistically derived partial duration set. It is recommended that this data be used for storms events smaller than the 20 to 25 year storms. The second set of data is the statically derived annual maxima set. This set of data is recommended for all storms greater than the 20 to 25 year storms. All storms are modeled as frequency type storms. • Soil Data: To create a conservative design all soils within the watershed draining to the wetland • are assumed to be Hydraulic Soil Group ("HSG") `D'. 0 ~~~~~~ AUG 1 D 2001 '"~~~-rr • HEC-HMS Version 2.2.2, by the U.S. Army Corp of Engineers, is used to produce the post- . development runoff hydrographs. • Haestad Methods PondPack V8 is used to develop the outlet rating curve for the spillway. This curve is subsequently placed in HEC-HMS to create the Hydraulic and Hydrologic model. • Time of Concentration: To create a conservative design the Time of Concentration ("Tc") is assumed to be 5.0 minutes. Discussion of Results and Conclusion Based on the "Stormwater Best Management Practices", and calculation methodology presented above the extended detention wetland will succeed in treating the site for 85% TSS removal and safely convey the 100-year storm without endangering the dam embankment. If the development is built as proposed within this report, all applicable design criteria will be met. However, modifications to the proposed development that change assumption made in this report will invalidate this report. Some modification may include, but are not limited to: 1. Changes in the amount of proposed site impervious surface area. 2. Changes in proposed grading, to affect drainage breaks presented in post-development. • C7 • 77 Overlook Park Desing Summary Wetland 1 BCP-07000 Design Summary Watershed Characteristics Drainage Area = 14.63 ac. Impervious Area = 11.23 ac. SCS Curve Number = 94 (Assumes all "HSG" D soils) Time of Concentration 5.00 min. Water Quality Design Water Quality Volume = 33270 ft3 (1 " Rainfall Runof fl Water Quality Elevation = 738.39 ft Surface Area Required = 20628 ftZ Surface Area Provided = 21051 ft2 Water Quality Drawdown = 4.36 days Drawdown C7ifice = 2 inch diameter inverted PVC Pond Design Top of Dam Elevation = 741 ft Toe of Dam Elevation = 733 ft Heigh to Dam = 8 ft Maximum Im oundment = 2.619 ac-ft Spillway Design Riser-Barrel Stucture Riser = 5'x5' Box (Internal Dimensions) Crest = 738.5 ft Barrel = 45 LF of 36" O-RING RCP @ 0.50% Upstrem Invert = 734.00 ft Downstream Invert = 733.78 ft • • Anti-Seep 2 concrete collars s aced 15 a art with a minimum ro'ection of 1.70'. Anti-Float 8'x8'x30" Concrete anti-float block attached to riser. Energy Dissipator Rip-Rap Apron NCDOT Class "B" Rip-Rap 18'L x 21'W x 22"T Performance Summary 100-Year Elevation = 740.23 ft Free Board = 0.77 ft Note: 100-Year model ran with a T.W. condition of 738.50' due to FEMA flood lain immediately downstream. D.B. Hopkins, EI 6/25/2007 o~-Dg3c, Background InfoYmation • 77 Overlook Park BCP-07000 ~,~_> ~ _~, ,~. f.- ~ k`. F i;~,; ~ .•. a ~€v :~:.:..: s;. i • Copyright (C) 1998, Maptech, Inc. Precipitation Frequency Data Server Page 1 of 5 ~-' POINT PRECIPITATION +~ ,~.~~ FREQUENCY ESTIMATES ~ `~ :`~ • FROM NOAA ATLAS 14 ~.M„ n~~- North Carolina 35.33 N 80.85 W 741 feet from "Precipitation-Frequency Atlas of the United States" NOAA Atlas 14, Volume 2, Version 3 G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland, 2004 Extracted: Wed Jun 20 2007 Confidence Limits Seasonality Location Maps.. Other Info. GIS data Maps Help Precipitation Freauencv Estimates (inched ARI* ^5 10 15 30 60 120 ^3 ^6 12 24 48 ^4 ^7 10 20 30 45 60 (years) mm mm mm mm mm min hr hr hr hr hr day day day day day day day 0.39 0.63 0.79 1.08 1.35 1.56 1.67 2.03 2.40 2.79 3.26 3.66 4.21 4.83 6.48 7.99 10.04 11.95 0 0.47 0.74 0.94 1.29 1.62 1.89 2.01 2.44 2.90 3.36 3.92 4.39 5.02 5.74 7.65 9.39 11.76 13.95 0 0.54 0.87 1.10 1.56 2.00 2.34 2.51 3.06 3.63 4.22 4.89 5.41 6.11 6.90 9.02 10.92 13.42 15.75 10 0.60 0.96 1.21 1.76 2.29 2.69 2.90 3.53 4.22 4.89 5.65 6.22 6.98 7.81 10.11 12.10 14.71 17.15 25 0.66 1.06 1.34 1.98 2.64 3.14 3.42 4.18 5.02 5.81 6.68 7.33 8.17 9.03 11.58 13.65 16.37 18.95 50 0.71 1.13 1.43 2.15 2.91 3.48 3.84 4.70 5.67 6.54 7.50 8.21 9.12 9.99 12.72 14.85 17.63 20.30 100 0.75 1.19 1.50 2.30 3.17 3.83 4.25 5.22 6.33 7.28 8.32 9.11 10.09 10.96 13.87 16.04 18.85 21.59 200 0.78 1.24 1.56 2.44 3.42 4.16 4.68 5.76 7.03 8.04 9.18 10.03 11.08 11.94 15.04 17.21 20.04 22.86 500 0.82 1.30 1.64 2.61 3.74 4.61 5.25 6.50 7.99 9.09 10.34 11.29 12.44 13.26 16.61 18.78 21.60 24.50 1000 0.85 1.34 1.68 2.72 3.98 4.94 5.71 7.09. 8.76 9.90 11.24 12.28 13.49 14.29 17.83 19.97 22.77 25.73 Text version of table ~ These precipitation frequency estimates are based on a partial duration series. ARI is the Average Recurrence Interval. • Please refer to the documentation for more information. NOTE: Formatting forces estimates near zero to appear as zero. • http://hdsc.nws.noaa. gov/cgi-bin/hdsc/buildout.perl?type=pf&series=pd&units=us&statena... 6/20/2007 Precipitation Frequency Data Server Partial duration based Point Precipitation Frequency Estimates Wersion: 3 35.33 h 80.85 W 741 ft • • • 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 c s ++ a a a 0 ~o .,, a U a L d Page 2 of 5 1 2 3 4 5 6 7 $ 910 20 30 40 50 80100 140 200 300 S00 700 1000 Average Recurrence Interval Cyears) Wed Jun 20 16:28:14 2007 Duration 5-min 48-hr ~- 30-day -at- 10-min + 3-hr -~ 4-day ~- - 15-min -+- %-t•~r -a-- 7-day --e- 60-day --?~ 30-min -e- 12-hr + 10-day -+- 60-min -~- 24-hr -~- 20-day -$- http://hdsc.nws.noaa. gov/cgi-bin/hdsc/buildout.perl?type=pf&series=pd&units=us&statena... 6/20/2007 Precipitation Frequency Data Server Page 3 of 5 Partial duration based Point Precipitation Frequency Estimates Version: 3 35.33 N 80.85 W 741 ft • • • C L C C C C E L i L L L L L L i 71 7~ T a T T ~ T T T •.+ ..~ •.~ •.r •.~ I t t t S S t t S t N N N N N ~0 N N N N E 9 E E E E 9 I I I I I I I I I ~ ~~ 'O ~ 'i3 ~ 'O ~ 'D I 1 I I I I N M ~ 4D d0 N OD ~ 1D OD I I I I I I I I I 1 If1 m U] m m m .~. .-~ .-~ N M ~ M R V7 h 9 Ifl m m If1 0 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 -, c a m A c 0 ~o .Q .~ U a i a "' '"' M ~ ~ Duration "' '"' N M v ~o Wed Jun 20 16:28:14 2007 Average Recurrence Interval Cyears) 1 -x- 2 -e- 100 - 5 -+- 2n8 -e- 10 -~- 500 + 25 -~- 1000 ~- Confidence Limits - * Upper bound of the 90% confidence interval Precipitation Fre uency Estimates (inches) ARI** 5 10 15 30 60 120 3 6 12 24 48 4 7 10 20 30 45 60 (years) min min min min min min hr hr hr hr hr day day day day day day day 0.43 0.68 0.85 1.17 1.46 1.71 1.83 2.22 2.62 3.00 3.50 3.92 4.49 5.15 6.86 8.44 10.54 12.51 0 0.51 0.81 1.02 1.41 1.76 2.07 2.21 2.68 3.17 3.62 4.23 4.71 5.36 6.12 8.09 9.92 12.32 14.57 0.59 0.94 1.20 1.70 2.18 2.56 2.75 3.35 3.96 4.55 5.26 5.80 6.52 7.35 9.55 11.53 14.07 16.45 10 0.65 1.04 1.31 1.90 2.48 2.94 3.17 3.86 4.59 5.27 6.07 6.66 7.44 8.32 10.70 12.77 15.41 17.91 25 0.72 1.14 1.45 2.14 2.85 3.43 3.74 4.55 5.45 6.25 7.17 7.85 8.71 9.62 12.25 14.41 17.16 19.80 50 0.76 1.22 1.54 2.32 3.15 3.80 4.19 5.11 6.14 7.03 8.05 8.80 9.72 10.64 13.47 15.68 18.50 21.23 100 0.81 1.28 1.62 2.48 3.42 4.18 4.64 5.68 6.86 7.83 8.94 9.76 10.76 11.68 14.69 16.94 19.80 22.60 200 0.85 1.34 1.70 2.64 3.70 4.55 5.11 6.28 7.60 8.65 9.86 10.75 11.83 12.73 15.93 18.20 21.07 23.94 500 0.89 1.41 1.78 2.83 4.06 5.05 5.76 7.09 8.64 9.79 11.12 12.11 13.30 14.15 17.62 19.89 22.74 25.68 1000 0.93 1.46 1.83 2.97 4.33 5.43 6.28 7.74 9.48 10.68 12.10 13.17 14.45 15.27 18.94 21.19 24.00 27.00 'The upper bound of the confidence interval at 90% confidence level is the value which 5% of the simulated quantile values fora given frequency are greater than. *" These precipitation frequency estimates are based on a partial duration series. ARI is the Average Recurrence Interval. Please refer to the documentation for more information. NOTE: Formatting prevents estimates near zero to appear as zero. * Lower bound of the 90% confidence interval http://hdsc.nws.noaa. gov/cgi-bin/hdsc/buildout.perl?type=pf&series=pd&units=us&statena... 6/20/2007 • • • Precipitation Frequency Data Server Please refer to the documentation for more information. NOTE: Formatting prevents estimates near zero to appear as zero. Maps - These maps were produced using a direct map request from the U.S. Census Bureau Mapping and Cartographic Resources Tiger Map Server. Please read disclaimer for more information. Page 4 of 5 http://hdsc.nws.noaa. gov/cgi-bin/hdsc/buildout.perl?type=pf&series=pd&units=us&statena... 6/20/2007 'The lower bound of the confidence interval at 90% confidence level is the value which 5°k of the simulated quantile values for a given frequency are less than. "These precipitation frequenq estimates are based on a partial duration maxima series. ARI is the Average Recurrence Interval. Precipitation Frequency Data Server LEGEND Other Maps/Photographs - Page 5 of 5 - State - Connector - County ® Stream Indian Resv '';~~ Military Area ®Lake) Pond) Ocean ~=~ National Park - Street ` Other Park -Expressway C] C i ty -Highway 0 ~- County 6 .8 mi Scale 1:228583 2 11 *aUera~e--true scale depends or4monitor$ esolutian View USGS digital orthophoto quadrangle (DOQ) covering this location from TerraServer; USGS Aerial Photograph may also be available from this site. A DOQ is acomputer-generated image of an aerial photograph in which image displacement caused by terrain relief and camera tilts has been removed. It combines the image characteristics of a photograph with the geometric qualities of a map. Visit the USGS for more information. • Watershed/Stream Flow Information - Find the Watershed for this location using the U.S. Environmental Protection Agency's site. Climate Data Sources - Precipitation frequency results are based on data from a variety of sources, but largely NCDC. The following links provide general information about observing sites in the area, regardless of if their data was used in this study. For detailed information about the stations used in this study, please refer to our documentation. Using the National Climatic Data Center's (NCDC) station search engine, locate other climate stations within: +/-30 minutes ~ ...OR... +/-1 degree of this location (35.33/-80.85). Digital ASCII data can be obtained directly from NCDC. Hydrometeorologicalbesign Studies Center DOC/NOAA/National Weather Service 1325 East-West Highway Silver Spriug, MD 20910 (301) 713-1669 Questions?: HDSC.Ouestions~noaa.eov Disclaimer • http://hdsc.nws.noaa. gov/cgi-bin/hdsc/buildout.perl?type=pf&series=pd&units=us&statena... 6/20/2007 fl~ .o~ia R0.9"'ld r1lJ.R"'W Precipitation Frequency Data Server Page 1 of 5 ~' POINT PRECIPITATION ~`~,~'~'~ FREQUENCY ESTIMATES • FROM NOAA ATLAS 14 ~.~„ „<.~ North Carolina 35.33 N 80.85 W 741 feet from "Precipitation-Frequency Atlas of the United States" NOAA Atlas 14, Volume 2, Version 3 G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland, 2004 Extracted: Wed Jun 20 2007 Confidence Limits. Other Info. ~~ GIS data ~~ Maps ~~ Help ~~ D `~P*_ 5 10 15 30 60 120 3 10 20 30 45 60 ~ ~ min min min min min min hr day day day day day 0 0.43 0.69 0.86 1.19 1.50 1.74 1.85 5.29 7.04 8.65 10.82 12.84 0.53 0.85 1.08 1.53 1.96 2.29 2.46 6.75 8.82 10.68 13.12 15.40 10 0.59 0.95 1.20 1.74 2.26 2.66 2.87 7.73 10.01 11.98 14.56 16.98 25 0.66 1.05 1.33 1.98 2.63 3.13 3.41 4.16 5.00 5.78 6.65 7.31 8.14 9.00 11.53 13.60 16.30 18.87 50 0.70 1.12 1.42 2.14 2.90 3.47 3.82 4.68 5.64 6.51 7.47 8.18 9.08 9.95 12.67 14.79 17.56 20.22 100 0.74 1.18 1.49 2.29 3.15 3.81 4.23 5.20 6.31 7.25 8.29 9.08 10.05 10.91 13.82 15.97 18.78 21.51 200 0.78 1.24 1.56 2.43 3.40 4.15 4.66 5.74 7.00 8.01 9.14 9.99 11.04 11.89 14.98 17.15 19.96 22.77 500 0.82 1.30 1.63 2.60 3.73 4.59 5.23 6.48 7.96 9.05 10.30 11.25 12.39 13.21 16.55 18.71 21.52 24.40 1000 0.85 1.33 1.67 2.71 3.96 4.92 5.69 7.06 8.72 9.86 11.20 12.23 13.44 14.23 17.76 19.89 22.68 25.62 Text version of table 'These precipitation frequency estimates are based on an annual maxima series. AEP is the Annual Exceedance Probability. • Please refer to the documentation for more information. NOTE: Formatting forces estimates near zero to appear as zero. http://hdsc.nws.noaa. gov/cgi-bin/hdsc/buildout.perl?type=pf&series=am&units=us& staten... 6/20/2007 I Freauencv Estimates (inches Precipitation Frequency Data Server Annual Maxima based Point Precipitation Frequency Estimates Version: 3 35.33 N $0.85 W 741 ft • • • 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 c s a a R c 0 m .Q .~ U a i d Page2of5 2 3 4 5 6 7 8 910 20 30 40 50 80 100 140 200 300 Annual Exceedance Probability C1-in-Y) Wed Jun 20 16:27:48 2007 500 700 1000 Duration 5-min 48-hr -~- 30-day ~ 10-min + 3-hr -~- 4-day -~- 15-min + ~-t-~r -e- 7-day -a- 60-day -?~ 30-ruin -e- 12-hr + 10-day -+- 60-min -~- 24-hr ~- 20-day ~- http://hdsc.nws.noaa. gov/cgi-bin/hdsc/buildout.perl?type=pf&series=am&units=us&staten... 6/20/2007 Precipitation Frequency Data Server Annual Maxima based Point Precipitation Frequency Estimates Version: 3 35.33 h 80.85 W 741 ft • • • 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 it 10 9 8 7 6 5 4 3 2 1 0 c t +> a m a c 0 +o +> .Q •M V a L a Page 3 of 5 C C C L !r C >= L L L L L L i L i 7~ 7~ T T T T T a T T ~~ •.r I t t S t t t t t t N N N N N N N N N N E £ E E E £@ 1 I I 1 1 I 1 I I ~ ~~ ~ 'O 'a '6 ~ ~ ~ I I I 1 I I N M ~ SO @ N OD ~ ~D OD I I I I I I I I i I 117 @ h7 @ @ @ .r .~ N M ~ M ~ V7 h @ U7 @ @ Ir1 @ '" '" ~ `D Q` D u r a t i o n +~ ~-+ N M v .D Wed Jun 20 16:27:48 2007 Annual Exceedance Probability C1-in-Y) t i n 2 -e- t i n 100 - t i n 5+ i i r~ ` 0 0 -y- 1 in 10 -e- 1 in 500 + 1 to 25 -~- 1 in 1000 -$- Confidence Limits - II * Upper bound of the 90% confidence interval II Precipitation Freauencv Estimates (inches) AEP** 5 10 15 30 60 120 3 6 12 24 48 4 7 10 20 30 45 60 (1-in- min min min min min min hr hr hr hr hr day day day day day day day 0 0.47 0.75 0.94 1.30 1.63 1.90 2.03 2.46 2.92 3.34 3.89 4.33 4.93 5.64 7.45 9.13 11.34 13.42 0 0.58 0.92 1.17 1.66 2.13 2.51 2.69 3.27 3.88 4.44 5.14 5.67 6.37 7.19 9.33 11.27 13.75 16.08 10 0.64 1.03 1.30 1.88 2.45 2.91 3.14 3.82 4.55 5.22 6.01 6.60 7.37 8.24 10.59 12.64 15.26 17.73 25 0.71 1.14 1.44 2.14 2.84 3.42 3.73 4.53 5.43 6.22 7.14 7.82 8.68 9.58 12.20 14.35 17.09 19.72 50 0.76 1.21 1.53 2.31 3.13 3.79 4.17 5.09 6.12 7.00 8.01 8.76 9.68 10.60 13.41 15.62 18.42 21.15 100 0.80 1.28 1.62 2.47 3.41 4.16 4.62 5.66 6.83 7.80 8.90 9.72 10.72 11.63 14.63 16.87 19.72 22.51 200 0.84 1.34 1.69 2.63 3.69 4.54 5.09 6.25 7.57 8.62 9.82 10.71 11.79 12.68 15.87 18.13 20.99 23.85 500 0.89 1.41 1.77 2.82 4.05 5.03 5.74 7.07 8.60 9.75 11.07 12.06 13.25 14.10 17.55 19.81 22.65 25.58 1000 0.92 1.45 1.82 2.95 4.31 5.41 6.25 7.71 9.44 10.64 12.05 13.12 14.39 15.21 18.86 21.10 23.90 26.89 "The upper bound of the confidence interval at 90%confidence level is the value which 5%of the simulated quantile values fora given frequency are greater than I hese precipitation tequency estimates are based on an annual maxima series. AEP is the Annual Exceedance Probability. Please refer to the documentation for more information. NOTE: Formatting prevents estimates near zero to appear as zero. * Lower bound of the 90% confidence interval http://hdsc.nws.noaa.gov/cgi-bin/hdsc/buildout.perl?type=pf&series=am&units=us&staten... 6/20/2007 Precipitation Frequency Data Server Page 4 of 5 ~ Precipitation Frequency Estimates (inches) AEP** • (1-in- 5 10 15 30 60 120 3 6 12 24 48 4 7 10 20 30 45 60 ~ min min min min min min hr hr hr hr hr day day day day day day day 0 0.40 0.63 0.80 1.10 1.38 1.59 1.70 2.07 2.46 2.88 3.37 3.77 4.34 4.96 6.66 8.20 10.32 12.29 0 0.49 0.78 0.99 1.41 1.80 2.09 2.25 2.74 3.26 3.83 4.45 4.93 5.60 6.32 8.34 10.12 12.50 14.72 10 0.54 0.87 1.10 1.60 2.08 2.43 2.62 3.20 3.82 4.49 5.20 5.73 6.47 7.24 9.45 11.34 13.87 16.22 25 0.60 0.96 1.22 1.81 2.41 2.84 3.09 3.79 4.54 5.35 6.17 6.77 7.60 8.40 10.86 12.86 15.50 18.02 50 0.64 1.02 1.29 1.95 2.64 3.13 3.44 4.23 5.09 6.01 6.90 7.56 8.46 9.28 11.91 13.95 16.67 19.28 100 0.67 1.07 1.35 2.07 2.85 3.42 3.79 4.66 5.64 6.68 7.65 8.37 9.33 10.16 12.96 15.03 17.79 20.48 200 0.70 1.11 1.40 2.18 3.06 3.69 4.13 5.09 6.18 7.35 8.41 9.19 10.22 11.04 14.01 16.09 18.89 21.64 500 0.73 1.15 1.45 2.31 3.31 4.04 4.57 5.66 6.92 8.27 9.44 10.31 11.42 12.22 15.42 17.50 20.31 23.14 1000 0.75 1.18 1.48 2.39 3.49 4.28 4.91 6.10 7.48 8.99 10.23 11.17 12.35 13.14 16.51 18.56 21.37 24.26 * The lower bound of the confidence interval at 90% confidence level is the value which 5% of the simulated quantile values for a given frequency are less than. *" These precipitation frequency estimates are based on an annual maxima series AEP is the Annual Exceedance Probability. Please refer to the documentation for more information. NOTE: Formatting prevents estimates near zero to appear as zero. Maps - • These maps were produced using a direct map request from the U S Census Bureau Mapping and Cartographic Resources Tiger Mao Server. Please read disclaimer for more information. LEGEND • - State Connector - County Stream Indian Resv :Military Area LakelPand~Ocean ,;::;~ Nat i ono I Park - Street Other Park Expressway 0 City -Highway ,r) .~-C,~unty.6 .8 mi Scale 1:22883 2 11 *avera~e--true scale depends on mon6tor$ esolution http://hdsc.nws.nogg.gov/cgi-bin/hdsc/buildout.perl?type=pf&series=am&units=us&staten... 6/20/2007 Precipitation Frequency Data Server • Other Maps/Photographs - z Page 5 of 5 View USGS digital orthophoto quadrangle (DOOI covering this location from TerraServer; USGS Aerial Photograph may also be available from this site. A DOQ is acomputer-generated image of an aerial photograph in which image displacement caused by terrain relief and camera tilts has been removed. It combines the image characteristics of a photograph with the geometric qualities of a map. Visit the USGS for more information. • Watershed/Stream Flow Information - Find the Watershed for this location using the U.S. Environmental Protection Agency's site. Climate Data Sources - Precipitation frequency results are based on data from a variety of sources, but largely NCDC. The following links provide general information about observing sites in the area, regardless of if their data was used in this study. For detailed information about the stations used in this study, please refer to our documentation. Using the National Climatic Data Center's (NCDC station search engine, locate other climate stations within: +/-30 minutes ...OR... +/-1 degree of this location (35.33/-80.85). Digital ASCII data can be obtained directly from NCDC. Hydrometeorological Design Studies Center DOC/NOAA/National Weather Service 1325 East-West Highway Silver Spring, MD 20910 (301) 713-1669 Questions?: HDSC.Ouestiais,~a,noaa.eov Disclaimer • http://hdsc.nws.noaa.gov/cgi-bin/hdsc/buildout.perl?type=pf&series=am&units=us&staten... 6/20/2007 o~-~q3c~ HEC--HMS Inputs and HEC-HMS Output .7 77 Overlook Park BCP-07000 ~ ~~ l!! 1 Q \ ~\ \ \ \ ~ _~1 CA 9 ~ o, v ~- _' -- , ~ ,~*~- _ ~ ~ ~:. ~ao~~ ~ a~ `~ ~ `i ~~ \ ~` '~ ~~?~. ~~ o ~ ~ ~'so ~ ~ ~ ~~`,~ ~ Ez II _ \ \ A ~`~ _ ,, `~ ~~`~ G , ~~r-~~ '~~ = Preliminary ~ ~ ''~ ~ "~ ~~~~~~~\~>~~J~~~~l~~> _ ~~~ . ,~7 Phase 2 ~ ~ ~' ~~.. ~ w, SBA o~~i / I I i - ~ I / / ~ y ~ ~/ N / r 9~ y i ''a / y OLL/ ~i - / s~~~ / BI 9~ ~ FB175. `~ ~ F 76'I~ ~ 40 00 F ~, ~ i / 112,500 SF ~,~~ x i i ~q~~/ °~ / ~ I ,~ a I n / m ~ I H J ~~ / n I I ~~~ yV L ~ ~ k L ~ ~ ~OLL ~~ I N / ~~~ k 4. / / ~ i~ ~ _ -e ~ ~ ~ ~~ I ~ __~~4~-_~- _. ~~ I ~ °` PROJECT N0. BCP-07000 FILENAME: gCP07000-SWX 77 OVERLOOK PARK SCALE: .~ ,._, oo, CHARLOTTE, NORTH CAROLINA DATE: O6 - Z ~ - O 7 DRAINAGE AREA MAP z ~,~ \ \ ~~ ~, ,\ \\ `` ~ ,\ \ ~\ \\ l / i.~l 1~~~~, Y oc n~ G. L i0i~ ,~ 7 Iii/ n1N m ~~ n ~, ,. AY ~1/ ~~~ { __ ~ ~~ j / ~ j , ..` ~ / ~ J~ L // / ~ ` /\% / /~ 1/° tlL/ 1 inch = X00- ft_, -_ _.. , __ _ _ ~ '~.`. - , ~ THE JOHN R. McADAMS COMPANY, INC. ENGINEERS/PLANNERS/SURVEYORS RESEARCH TRIANGLE PARK. NC P.O. BOX 14005 ZIP 27709-4005 (919) 361-5000 ~ 77 Overlook Park BCP-07000 HYDROLOGIC CALCULATIONS Post-Development To Wetland [. SCSCURVE NlT11iBE12S,; _. ;' ..'~ Cover Condition SCS CN Comments Im ervious 98 - O en 80 Assume ood condition Wooded 77 Assume good condition Il' POST-bEFN'I~~ .` ..F A. Watershed Breakdown Total Basin Area 14.63 acres Total Offsite Area 0.28 acres Total Onsite Area 14.35 acres D.B. Hopkins, EI 6/20/2007 Contributing Area SCS CN Area [acres] Comments On-site im ervious 98 11.23 - On-site o en 80 3.12 Assume ood condition On-site wooded 77 0.00 - Off-site im ervious 98 0.00 - Off-site o n 80 0.28 Assume ood condition Off-site wooded 77 0.00 - Total area = Composite SCS CN = 14.63 acres 0.0229 sq.mi. 94 B. Time of Concentration Information Time of concentration is assumed to be minimum of S minutes • Time of Concentration = 5.00 minutes SCS Lag Time = 3.00 minutes (SCS Lag = 0.6• Tc) = 0.0500 hours Time Increment = 0.87 minutes (= 0.29*SCS Lag) PostDev-HECHMSInputs.xls 1 OF 1 HEC-HMS Project: BCP-07000 Basin Model: To Wetland s To Wetland • Wetland HMS * Summary of Results Project BCP-07000 Run Name 10-Year • Start of Run 07Jun07 0000 Basin Model To Wetland End of Run 08Jun07 0000 Met. Model 10-Year Execution Time 21Jun07 1042 Control Specs lmin-dt Hydrologic Discharge Time of Volume Drainage Element Peak Peak (ac Area (efs) ft) (sq mi) To Wetland 92.677 Wetland 45.979 • 07 Jun 07 1204 5.1252 0.023 07 Jun 07 1211 4.3480 0.023 • HMS * Summary of Results Project BCP-07000 Run Name 100-Year • Start of Run 07Jun07 0000 Basin Model To Wetland End of Run 08Jun07 0000 Met. Model 100-Year Execution Time 21Jun07 1042 Control Specs lmin-dt Hydrologic Discharge Time of Volume Drainage Element Peak Peak (ac Area (cfs) ft) (sq mi) To Wetland 118.63 Wetland 55.861 • 07 Jun 07 1204 7.9766 0.023 07 Jun 07 1212 7.1974 0.023 • o ~ - 09 3~.0 C7 Extended Detention Wetland Design C7 77 Overlook Park BCP-07000 77 Overlook Park BCP-07000 Stage-Storage Function • Project Name: 77 Overlook Park Designer: D. B. Hopkins, EI Job Number: BCP-07000 Date: 6/20/2007 D.B. Hopkins, EI 6/20/2007 Average Incremental Accumulated Estimated Contour Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/ S-S Fxn ~fPPr~ (fPPt~ (~Fl (SFl (CFl (CF) (feet) 737.0 0.0 21051 738.0 1.0 24912 22982 22982 22982 1.01 739.0 2.0 28830 26871 26871 49853 1.96 740.0 3.0 33116 30973 30973 80826 2.98 741.0 4.0 37556 35336 35336 116162 4.06 • Storage vs. Stage ~aoooo X20000 t o000o y = 22700x11fi47 RZ = 0.9993 80000 m rn c 60000 to 40000 20000 0 0.0 1.0 2.0 3.0 4.0 5.0 Stage (feet) Ks= 22700 b = 1.1647 • 1 OF 1 77 Overlook Park STAGE-STORAGE FUNCTION D.B. Hopkins, EI BCP-07000 6/20/2007 • _> Stage - Ks = b = Zo = Storage Function 22700 1.1647 737 Elevation ~ ~~~ Stora e [feet] [cfJ [acre-fee ~ 737 0 0.000 737.2 3483 0.080 737.4 7808 0.179 737.6 12521 0.287 737.8 17505 0.402 738 22700 0.521 738.2 28070 0.644 738.4 33591 0.771 738.6 39243 0.901 738.8 45013 1.033 739 50890 1.168 739.2 56865 1.305 739.4 62930 1.445 739.6 69079 1.586 739.8 75306 1.729 740 81607 1.873 740.2 87978 2.020 740.4 94415 2.167 740.6 100914 2.317 740.8 107473 2.467 741 114089 2.619 • • Page 1 77 Overlook Park Extended Detention Wetland BCP-07000 Water Oualitv Pond Design Sheet s xs = 22700 b = 1.1647 Calculation of Ruuoff Volume required for storage The runoff to the pond for the 1"storm detention requirement is calculated using the SCS curve number method. Impervious azeas that directly enter the pond are counted as Directly Connected Impervious Areas (DCIAs). No infiltration calculation will be provided for these azeas. Areas not directly connected will be accounted for in a composite curve number. Using basic SCS runoff methodology, with no adju: to initial abstractions (0.2*S and 0.8*S). Impervious Area, directly connected (DCIA) _ @CN= Other azeas draining to pond (not DCIA) _ @CN= Runoff from DCIAs => ~tments made 11.23 acres 98 3.40 acres 80 Precipitation amount = 1.0 inches S = 0.204 inches (calculated) Q* = 0.791 inches (calculated) • Runoff volume = 32241 CF Runoff from non-connected areas => Precipitation amount = 1.0 inches S = 2.500 inches (calculated) Q* = 0.083 inches (calculated) Runoff volume = 1029 CF Therefore, total runoff from reci itation in uestion = 33270 CF This amount of runoff must be stored in the pond above normal pool elevation, and be released in a period of two (2) to five (5) days, by an inverted PVC siphon, the invert end of which is set at permanent pool elevation. • D.B. Hopkins, EI 6/20/2007 1 OF 2 77 Overlook Park Extended Detention Wetland D.B. Hopkins, EI BCP-07000 6/20/2007 • Calculation of depth required for runoff storage pool (above normal pool) Normal pool depth (above invert) = 0.00 feet Storage provided at permanent pool depth = 0 CF (calculated) Total storage required for normal + storage pool = 33270 CF Stage (above invert) associated with this storage = 1.39 feet Therefore, depth required above normal pool for storm storage = 1.39 feet Therefore set crest of principal spillway at stage = 1.39 feet and EL = 738.39 feet At principal spillway crest, storm pool storage provided = 33270 CF • `r11 u 2OF2 77 Overlook Park Surface Area for BMP Wetland D.B. Hokins, EI BCP-07000 6/20/2007 • I. Surface Area Check for Extended Detention Wetland Impervious Area = 11.23 acres Drainage Area = 14.63 acres Impervious = 76.8% Average Depth = 3.00 ft. From the NCDENR Stormwater BMP Handbook (4/99), the in the Piedmont is as follows: Lower Boundary => 80.0 Site % impervious => 76.8 Upper Boundary => 90.0 Area Required = 20628 sq.ft. Area Provided = 21051 sq.ft. Results :Surface Area Requirements Are Met Required for Wetlands required SA/DA ratio for 85% TSS Removal 3.0 3.00 4.0 3.36 2.78 3.24 3.24 2.68 3.74 3.10 • • • • 77 Overlook Park Extended Detention Wetland BCP-07000 Inverted Siphon Design Sheet D siphon = No. siphons = Ks = b= Cd siphon = Normal Pool Elevation = Volume @ Normal Pool = Siphon Invert = WSEL @ 1" Runoff Volume = 2 inches 1 22700 1.1647 0.60 737.00 feet 0 CF 737.00 feet 738.39 feet WSEL (feet) Vol. Stored (cf) Siphon Flow (cfs) Avg. Flow (cfs) Incr. Vol. (cf) Incr. Time sec) 738.390 33270 0.120 738.270 29993 0.114 0.117 3277 27992 738.150 26725 0.108 0.111 3268 29357 738.031 23513 0.102 0.105 3212 30528 737.911 20362 0.095 0.099 3151 31909 737.791 17279 0.088 0.092 3083 33577 737.671 14272 0.080 0.084 3007 35657 737.552 11353 0.072 0.076 2920 38366 737.432 8536 0.062 0.067 2816 42133 737.312 5847 0.050 0.056 2689 47986 737.192 3327 0.035 0.042 2520 59460 Drawdown Time = 4.36 da s D.B. Hopkins, EI 6/20/2007 • 77 Overlook Park BCP-07000 • Input Data => Concrete Present => Inside Width of Riser Box = 5.00 feet Inside Length of Riser Box = S.UO feet Inside Height of Riser Box = 4.50 feet Wall Thickness = 8.00 inches Unit Weight of Concrete = 142.0 PCF OD of barrel exiting manhole = 45.5 inches Size of drain pipe (if present} = 8.0 inches Trash Rack water displacement = 71.00 CF Total amount of concrete: Riser Walls = 68.000 CF Adjust for openings.• C~ Anti-Flotation Calculation Sheet Opening for barrel = 11.291 CF Opening for drain pipe = 0.349 CF Total Concrete present, adjusted for openings = Weight of concrete present = Amount ojwater displaced => Displacement by riser = 180.500 CF Displacement by trash rack = 75.000 CF Displacement by Emergency Drain trash rack = 8 CF D.B. Hopkins, EI 6/21/2007 Nate: tiC }'~oductc lists uitrt art. of niarh+>la co3icret~ at 14. PCh. 56.359 CF 8003 lbs Total water displaced by riser barrel structure = 263.500 CF Weight of water displaced = 16442 Zbs Anit-Float Page 1 77 Overlook Park D.B. Hopkins, EI BCP-07000 6/21/2007 • Calculate amount of concrete to be added to riser => Safety factor to use = 1.1 ~ {Eecc~snm~~~d t.l S or higiar? Must add = 10906 lbs concrete for buoyancy Concrete unit weight for use = 142 PCF (note above observation for NCP concrete) Therefore, must add = 76.801 CF of concrete Calculate size of base for riser assembly => Side = 8.000 feet Thickness = 3U.0 inches Concrete Present = 160.000 CF OK Check validity of base as designed => Total Water Displaced = Total Concrete Present = • Total Water Displaced = Total Concrete Present = Actual safety factor = 423.500 CF 216.359 CF 26426 lbs 30723 lbs 1.16 UK Results of design => Side of Base = 8.00 feet Base Thickness = 30.00 inches CY of concrete total in base = 5.93 CY • Anit-Float Page 2 • 77 Overlook Park BCP-07000 36" RCP Anti-Seep Collars Anti-Seep Collar Design Sheet This sheet will, given the barrel length of interest and minimum seep collar projection from the barrel, determine the number of anti-seep collars to place along the barrel section, and the expected spacing of the collars. Design Requirements => Anti-seep collars shall increase the flow path along the barrel by 15%. Anti-seep collars shall be spaced a maximum of 14X the minimum collar projection or 25 feet, whichever is less. Anti-Seep Collar Design => D.B. Hopkins, EI 6/21/2007 Flow Length Min. Calc'd # Max. ~F# of :-` ~iek Pond along barrel Projection of collars Spacing eollairsf Spacing Spacing ID (feet) (feet) required (feet) u~s~ ~ _`(feet)'~ _ OK? ~a~; ^~~^~, ~~.~;., :~~ ;~~ 36" RCP 45.0 1.70 1.99 23.8 ~~ 2, 00 r ,~ , _ 15 YES r.:. ., .,, ... _. _,_, • Note: If spacing to use is greater than the maximum spacing, add collars until the spacing to use is equal to or less than the maximum spacing allowable for the collar design. Anti-seep collars shall be used under the structural fill portions of all berms/dams unless an approved drainage diaphragm is present at the downstream end of the barrel. • 77 Overlook Park BCP-07000 • NRCD Land Quality Section Pipe Design Entering the following values will provide you with the expected outlet velocity and depth of flow in a pipe, assuming the Mannings roughness number is constant over the entire length of the pipe. flow Q in cfs : 46 Flow depth (ft) = 2.22 slope S in % :0.50% Outlet velocity (fps) = 8.186 pipe diameter D in in.: 36 Manning number n :0.012 NRCD Land Quality Section NYDOT Dissipator Design Results Pipe diameter (ft) 3.0 Outlet velocity (fps) 8.1864 Apron length (ft) 18.00 D.B. Hopkins, EI 6/20/07 AVG DIAM STONE THICKNESS • (inches) CLASS (inches) 3 A 9 »6 B 22« 13 B or 1 22 23 2 27 CALCULATION: Minimum TW Conditions: W = Do + La = 3' + 18' = 21.0 ft CONCLUSION: USE NCDOT CLASS `B' RIP RAP 18'L g 21'W x 22" THK • HEC-HMS Project: BCP-07000 Basin Model: To Wetland To Wetland C7 Wetland • HMS * Summary of Results for Wetland • Project BCP-07000 Start of Run 07Jun07 0000 End of Run 08Jun07 0000 Execution Time 21Jun07 1042 Run Name 10-Year • Computed Results Basin Model To Wetland Met. Model 10-Year Control Specs lmin-dt Peak Inflow 92.677 (efs) Date/Time of Peak Inflow 07 Jun 07 1204 Peak Outflow 45.979 (cfs) Date/Time of Peak Outflow 07 Jun 07 1211 Total Inflow 4.20 (in) Peak Storage 1.6367 (ac-f t) Total Outflow 3.56 (in) Peak Elevation 739.67 (f t) • HMS * Summary of Results for Wetland • Project BCP-07000 Start of Run 07Jun07 0000 End of Run 08Jun07 0000 Execution Time 21Jun07 1042 Run Name 100-Year • Computed Results Basin Model To Wetland Met. Model 100-Year Control Specs imin-dt Peak Inflow 118.63 (cfs) Data/Time of Peak Inflow 07 Jun 07 1204 Peak Outflow 55.861 (efs) Date/Time of Peak Outflow 07 Jun 07 1212 Total Inflow 6.53 (in) Peak Storage 2.0385(ac-f t) Total Outflow 5.89 (in) Peak Elevation 740.23 (f t) • Job File: C:\Documents and Settings\hopkins\Desktop\Cox Property\WETLAND.PPW Rain Dir: C:\Documents and Settings\hopkins\Desktop\Cox Property\ -------------------------- -------------------------- JOB TITLE -------------------------- -------------------------- • • Project Date: 6/7/2007 Project Engineer: Derick B. xopkins Project Title: Overlook Park Project Comments: S/N: 621701207003 The John R. McAdams Company PondPack Ver. 8.0058 Time: 10:36 AM Date: 6/21/2007 Table of Contents Table of Contents 1 . ******************** OUTLET STRUCTURES ********************* Wetlandl........ Outlet Input Data .................. 1.01 Individual Outlet Curves ........... 1.04 Composite Rating Curve ............. 1.06 • • S/N: 621701207003 The John R. McAdams Company PondPack Ver. 8.0058 Time: 10:36 AM Date: 6/21/2007 • Type.... Outlet Input Data Page 1.01 Name.... Wetlandl File.... C:\DOCUments and Settings\hopkins\Desktop\Cox Property\WETLAND.PPW Title... Project Date: 6/7/2007 Project Engineer: Derick B. Hopkins Project Title: Overlook Park Project Comments: REQUESTED POND WS ELEVATIONS: Min. Elev.= 737.00 ft Increment = .20 ft Max. Elev.= 741.00 ft OUTLET CONNECTIVITY ---> Forward Flow Only (Upstream to DnStream) <--- Reverse Flow Only (DnStream to Upstream) <---> Forward and Reverse Both Allowed Structure No. Outfall E1, ft E2, ft ----------------- ---- ------- --------- --------- Inlet Box RI ---> BA 738.500 741.000 Culvert-Circular BA ---> TW 733.775 741.000 TW SETUP, DS Channel • • S/N: 621701207003 The John R. McAdams Company PondPack Ver. 8.0058 Time: 10:36 AM Date: 6/21/2007 • Type.... Outlet Input Data Name.... Wetlandl Page 1.02 File.... C:\Documents and Settings\hopkins\Desktop\COX Property\WETLAND.PPW Title... Project Date: 6/7/2007 Project Engineer: Derick B. Hopkins Project Title: Overlook Park Project Comments: OUTLET STRUCTURE INPUT DATA Structure ID = RI Structure Type = Inlet Box ----------------- # of Openings ------------- = 1 ------ Invert Elev. = 738.50 ft Orifice Area = 25.0000 sq.ft Orifice Coeff. _ .600 Weir Length = 20.00 ft Weir Coeff. = 3.000 K, Submerged = .000 K, Reverse = 1.000 Kb;Barrel = .000000 (per ft of full flow) Barrel Length = .00 ft Mannings n = .0000 • S/N: 621701207003 The John R. McAdams Company PondPack Ver. 8.0058 Time: 10:36 AM Date: 6/21/2007 Type.... Outlet Input Data Name.... Wetlandl Page 1.03 File.... C:\Documents and Settings\hopkins\Desktop\Cox Property\WETLAND.PPW Title... Project Date: 6/7/2007 Project Engineer: Derick B. Hopkins Project Title: Overlook Park Project Comments: OUTLET STRUCTURE INPUT DATA Structure ID = BA Structure Type ----------------- = Culvert-Circular ------------------- No. Barrels = 1 Barrel Diameter = 3.0000 ft Upstream Invert = 733.78 ft Dnstream Invert = 734.00 ft Horiz. Length = 45.00 ft Barrel Length = 45.00 ft Barrel Slope = -.00500 ft/ft OUTLET CONTROL DATA... Mannings n = .0120 Ke = .5000 Kb = .006159 Kr = .5000 Hw Convergence = .001 (forward entrance loss) (per ft of full flow) (reverse entrance loss) +/- ft INLET CONTROL DATA... Equation form = 1 Inlet Control K = .0098 Inlet Control M = 2.0000 Inlet Control c = .03980 Inlet Control Y = .6700 T1 ratio (HW/D) = 1.163 T2 ratio (HW/D) = 1.309 Slope Factor = -.500 C7 Use unsubmerged inlet control Form 1 equ. below T1 elev. Use submerged inlet control Form 1 equ. above T2 elev. In transition zone between unsubmerged and submerged inlet control, interpolate between flows at T1 & T2... At T1 Elev = 737.26 ft ---> Flow = 42.85 cfs At T2 Elev = 737.70 ft ---> Flow = 48.97 cfs S/N: 621701207003 The John R. McAdams Company PondPack Ver. 8.0058 Time: 10:36 AM Date: 6/21/2007 J • • Type.... Individual Outlet Curves Page 1.04 Name.... wetlands File.... C:\DOCUments and Settings\hopkins\Desktop\Cox Property\WETLAND.PPW Title... Project Date: 6/7/2007 Project Engineer: Derick B. Hopkins Project Title: Overlook Park Project Comments: RATING TABLE FOR ONE OUTLET TYPE Str ucture ID = RI ( Inlet Box) --- Ups ---------- tream ID -------- = (P ---------- ond water ------- Surface) DNS tream ID = BA ( Culvert-Ci rcular) Pond WS. Device (into) Converge Next D S HGL Q SUM DS Chan. TW Elev. Q HW HGL DS HGL DS HGL E rror Error TW Error ft cfs ft ft ft + /-ft +/-cfs ft +/-ft -------- 737.00 -------- .00 ------- -- REVERSE: ------ Flow is ------- - closed off ----- ------ ------- ------- 737.20 .00 REVERSE: Flow is closed off 737.40 .00 REVERSE: Flow is closed off 737.60 .00 REVERSE: Flow is closed off 737.80 .00 REVERSE: Flow is closed off 738.00 .00 REVERSE: Flow is closed off 738.20 .00 REVERSE: Flow is closed off 738.40 .00 REVERSE: Flow is closed off 738.50 .00 ... ... ... ... ... 738.50 .000 WS below an invert; no flow. 738.60 13.45 73.8.60 738.60 738.60 .000 .000 738.50 .000 DS HGL+Loss > crest: Flow set to Downstream outlet. 738.80 23.28 738.80 738.80 738.80 .000 .000 738.50 .000 DS HGL+Loss > crest: Flow set to Downstream outlet. 739.00 30.05 739.00 739.00 739.00 .000 .000 738.50 .000 DS HGL+Loss > crest: Flow set to Downstream outlet. 739.20 35.57 739.20 739.20 739.20 .000 .000 738.50 .000 DS HGL+Loss > crest: Flow set to Downstream outlet. 739.40 40.36 739.40 739.40 739.40 .000 .000 738.50 .000 DS HGL+Loss > crest: Flow set to Downstream outlet. 739.60 44.60 739.60 739.60 739.60 .000 .000 738.50 .000 DS HGL+Loss > crest: Flow set to Downstream outlet. 739.80 48.49 739.80 739.80 739.80 .000 .000 738.50 .000 DS HGL+Loss > crest: Flow set to Downstream outlet. 740.00 52.09 740.00 740.00 740.00 .000 .000 738.50 .000 DS HGL+Loss > crest: Flow set to Downstream outlet. 740.20 55.46 740.20 740.20 740.20 .000 .000 738.50 .000 DS HGL+Loss > crest: Flow set to Downstream outlet. 740.40 58.64 740.40 740.40 740.40 .000 .000 738.50 .000 DS HGL+Loss > crest: Flow set to Downstream outlet. 740.60 61.64 740.60 740.60 740.60 .000 .000 738.50 .000 DS HGL+Loss > crest: Flow set to Downstream outlet. 740.80 64.50 740.80 740.80 740.80 .000 .000 738.50 .000 DS HGL+Loss > crest: Flow set to Downstream outlet. 741.00 67.25 741.00 741.00 741.00 .000 .000 738.50 .000 DS HGL+Loss > crest: Flow set to Downstream outlet. S/N: 621701207003 The John R. McAdams Company PondPack Ver. 8.0058 Time: 10:36 AM Date: 6/21/2007 r~ Type.... Individual Outlet Curves Name.... Wetlandl Page 1.05 File.... C:\Documents and Settings\hopkins\Desktop\COX Property\WETLAND.PPW Title... Project Date: 6/7/2007 Project Engineer: Derick B. Hopkins Project Title: Overlook Park Project Comments: RATING TABLE FOR ONE OUTLET TYPE • Structure ID = BA (Culvert-Circular) -------------------------------------- Mannings open channel maximum capacity : .00 cfs UPStream ID = RI (Inlet Box) DNStream ID = TW (Pond Outfall) Pond WS. Device (into) Converge Next DS HGL Q SUM DS Chan. TW Elev. Q HW HGL DS HGL DS HGL Error Error TW Error ft -------- cfs ft -------- ------ ft ft +/-ft + /-cfs ft +/-ft 737.00 - -- .00 REVERSE: ------ ------- ------ - Flow is closed off ----- ------- ------- 737.20 .00 REVERSE: Flow is closed off 737.40 .00 REVERSE: Flow is closed off 737.60 .00 REVERSE: Flow is closed off 737.80 .00 REVERSE: Flow is closed off 738.00 .00 REVERSE: Flow is closed off 738.20 .00 REVERSE: Flow is closed off 738.40 .00 REVERSE: Flow is closed off 738.50 .00 ... ... ... ... ... 738.50 .000 WS below an invert; no flow. 738.60 13.45 738.60 738.50 738.50 .000 .000 738.50 .000 FULL FLOW... Lfu11=45.OOft Vh=.056ft HL=.l00ft 738.80 23.28 738.80 738.50 738.50 .000 .000 738.50 .000 FULL FLOW... Lfu11=45.OOft Vh=.169ft HL=.300ft 739.00 30.05 739.00 738.50 738.50 .000 .000 738.50 .000 FULL FLOW... Lfu11=45.OOft Vh=.281ft HL=.499ft 739.20 35.57 739.20 738.50 738.50 .000 .000 738.50 .000 FULL FLOW... Lfu11=45.OOft Vh=.394ft HL=.699ft 739.40 40.36 739.40 738.50 738.50 .000 .000 738.50 .000 FULL FLOW... Lfu11=45.OOft Vh=.507ft HL=.900ft 739.60 44.60 739.60 738.50 738.50 .000 .000 738.50 .000 FULL FLOW... Lfu11=45.OOft Vh=.619ft HL=1.099ft 739.80 48.49 739.80 738.50 736.50 .000 .000 738.50 .000 FULL FLOW... Lfu11=45.OOft Vh=.731ft HL=1.299ft 740.00 52.09 740.00 738.50 738.50 .000 .000 738.50 .000 FULL FLOW... Lfu11=45.OOft Vh=.844ft HL=1.500ft 740.20 55.46 740.20 738.50 738.50 .000 .000 738.50 .000 FULL FLOW... Lfu11=45.OOft Vh=.957ft HL=1.700ft 740.40 58.64 740.40 738.50 738.50 .000 .000 738.50 .000 FULL FLOW... Lfu11=45.OOft Vh=1.069ft HL=1.901ft 740.60 61.64 740.60 738.50 738.50 .000 .000 738.50 .000 FULL FLOW... Lfu11=45.OOft Vh=1.182ft HL=2.l00ft 740.80 64.50 740.80 738.50 738.50 .000 .000 738.50 .000 FULL FLOW... Lfu11=45.OOft Vh=1.294ft HL=2.299ft 741.00 67.25 741.00 738.50 738.50 .000 .000 738.50 .000 FULL FLOW... Lfu11=45.OOft Vh=1.407ft HL=2.SOOft S/N: 621701207003 The John R. McAdams Company PondPack Ver. 8.0058 Time: 10:36 AM Date: 6/21/2007 Type.... Composite Rating Curve Name.... Wetlandl Page 1.06 File.... C:\Documents and Settings\hopkins\Desktop\Cox Property\WETLAND.PPW Title... Project Date: 6/7/2007 Project Engineer: Derick B. Hopkins . Project Title: Overlook Park Project Comments: ***** COMPOSITE OUTFLOW SUMMARY **** CUMULATIVE HGL CONVERGENCE ERROR .000 (+/- ft) WS Elev, Total Q Elev. Q ft cfs 737.00 .00 737.20 .00 737.40 .00 737.60 .00 737.80 .00 738.00 .00 738.20 .00 738.40 .00 738.50 .00 738.60 13.45 738.80 23.26 739.00 30.05 739.20 35.57 739.40 40.36 739.60 44.60 739.80 48.49 740.00 52.09 740.20 55.46 740.40 58.64 740.60 61.64 740.80 64.50 741.00 67.25 • -------- Converge TW Elev Error ft +/-ft 738.50 .000 738.50 .000 738.50 .000 738.50 .000 738.50 .000 738.50 .000 738.50 .000 738.50 .000 738.50 .000 738.50 .000 738.50 .000 738.50 .000 738.50 .000 738.50 .000 738.50 .000 738.50 .000 738.50 .000 738.50 .000 738.50 .000 738.50 .000 738.50 .000 738.50 .000 Notes ----------------------- Contributing Structures ----------------------- (no Q: RIBA) (no Q: RIBA) (no Q: RIBA) (no Q: RIBA) (no Q: RIBA) (no Q: RIBA) (no Q: RIBA) (no Q: RIBA) (no Q: RIBA) RIBA RIBA RIBA RIBA RIBA RIBA RIBA RIBA RIBA RIBA RIBA RIBA RIBA S/N: 621701207003 The John R. McAdams Company PondPack Ver. 8.0058 Time: 10:36 AM Date: 6/21/2007