HomeMy WebLinkAboutNCS000424_Fletcher APPROVED SWMP_20211213Prepared By:
Stormwater Management Plan
tihapiny
Co�Yimwiilfe,�
1owAhcr
Town of Fletcher
NCS000424
December 6, 2021
APPROVED
t�ryj r -4 December 20, 2021
h!]Fii ��VID .
Jeanette P..11
MS4 Pro ram Co rd rotor
Table of Contents
PART l:INTRODUCTION.......................................................................................................................I
PART2: CERTMICATION......................................................................................................................2
PART 3: MS4 INFORMATION................................................................................................................3
3.1
Permitted MS4 Area......................................................................................................................3
3.2
Existing MS4 Mapping..................................... .......................................................... ................. .3
3.3
Receiving Waters..........................................................................................................................4
3.4
MS4 Interconnection..................................................................................................................... 5
3.5
Total Maximum Daily Loads(TMDLs)........................................................................................6
3.6
Endangered and Threatened Species and Critical Habitat.............................................................7
3.7
Industrial Facility Discharges........................................................................................................7
3.8
Non-Stormwater Discharges.........................................................................................................8
3.9
Target Pollutants and Sources.......................................................................................................8
Part 4: Stormwater Management Program ADMINISTRATION......................................................9
4.1 Organizational Structure................................................................................................................9
4.2 Program Funding and Budget......................................................................................................11
4.3 Shared Responsibility................................................................. .......................12
4.4 Co-Permittees..............................................................................................................................13
4.5 Measurable Goals for Program Administration...... ............. ........... ........ ................... ............. 13
PART 5: Public Education and Outreach Program...............................................................................15
Part 6: Public Involvement and Participation Program.....................................................................19
Pail 7: Illicit Discharge Detection and Elimination Program............................................................21
Part S: Construction Site Runoff Control Program............................................................................25
Part 9: Post -Construction Site Runoff Control Program...................................................................27
Part 10: Pollution Prevention and Good Housekeeping Programs.....................................................33
List of Tables
Table 1: Summary of MS4 Mapping
Table 2: Summary of MS4 Receiving Waters
Table 3: Summary of Approved TMDLs
Table 4: Summary of Federally Listed Species/Habitat Impacted by Surface Water Quality
Table 5: NPDES Stormwater Permitted Industrial Facilities
Table 6: Non-Stormwater Discharges
Table 7: Summary of Target Pollutants and Sources
Table 8: Summary of Responsible Parties
Table 9: Shared Responsibilities
Table 10: Co-Permittee Contact In Formation
Table 11: Program Administration BMPs
Table 12: Summary of Target Pollutants & Audiences
Table 11 Public Education and Outreach BMWs
Table 14: Public Involvement and Participation BMPs
Table 15: Illicit Discharge Detection and Elimination BMPs
Table 16: Qualifying Alternative Program Components for Construction Site Runoff Control Program
Table 17: Construction Site Runoff Control BMPs
Table 18: Qualifying Alternative Program(s) for Post -Construction Site Runoff Control Program
Table 19: Summary of Existing Post -Construction Program Elements
Table 20: Post Construction Site Runoff Control BMPs
Table 21: Pollution Prevention and Good Housekeeping BMPs
PART l: INTRODUCTION
The purpose of this Stormwater Management Plan (SWMP) is to establish and define the means by which
the Town of Fletcher will comply with its National Pollutant Discharge Elimination System (NPDES)
Municipal Separate Storm Sewer System (MS4) Permit and the applicable provisions of the Clean Water
Act to meet the federal standard of reducing pollutants in stormwater runoff to the maximum extent
practicable.
This SWMP identifies the specific elements and minimum measures that the Town of Fletcher will
develop, implement, enforce, evaluate and report to the North Carolina Department of Environmental
Quality (NCDEQ) Division of Energy, Minerals and Land Resources (,DEMLR) in order to comply with
the MS4 Permit number NCS000424, as issued by NCDEQ. This permit covers activities associated with
the discharge of Stormwater from the MS4 as owned and operated by the Town of Fletcher and located
within the corporate limits of the Town of FIetcher,
In preparing this SWMP, the Town of Fletcher• has evaluated its MS4 and the permit requirements to
develop a comprehensive 5-year SWMP that will meet the community's needs, address local water
duality issues and provide the minimum measures necessary to comply with the permit. The SWMP will
be evaluated and updated annually to ensure that the elements and minimum measures it contains
continue to adequately provide for permit compliance and the community's needs.
Once the SWMP is approved by NCDEQ, all provisions contained and referenced in this SWMP, along
with any approved modifications of the SWMP, are incorporated by reference into the permit and become
enforceable parts of the permit. Any major changes to the approved SWMP will require resubmittal,
review and approval by NCDEQ, and may require a new public comment period depending on the nature
of the changes.
NCS000424 SWMP
Town of Fletcher
December 6, 2021
Page 1
PART 2: CERTIFICATION
By my signature below I hereby certify, tinder penalty of law, that this document and all attachments were
prepared under my direction or supervision in accordance with a system designed to assure that qualified
personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or
persons who manage the system, or those persons directly responsible for gathering the information, the
information submitted is, to the best of my knowledge and belief, true, accurate, and complete.
I am aware that there are significant penalties for submitting false information, including the possibility of
fines and imprisonment for knowing violations.
I am also aware that the contents of this document shall become an enforceable part of the NPDES MS4
Permit, and that both the Division and the Environmental Protection Agency have NPDES MS4 Permit
compliance and enforcement authority.
❑ I am a ranking elected official.
® I am a principal executive officer for the permitted MS4.
❑ I am a duly authorized representative for the permitted MS4 and have attached the authorization made
in writing by a principal executive officer or ranking elected official which specifies me as (check one):
❑ A specific individual having overall responsibility for stormwater matters.
❑ A specific position having overall responsibility for stormwater matters.
Signature:
Print
Name:
Mark Biberdorf
Title:
Town Manager
�.�y
Signed this d of December 2021
NCS000424 SWMP
Town of Fletcher
December 6, 2021
Page 2
PART 3: M84 INFORMATION
3.1 Permitted MS4 Area
This SWMP applies throughout the corporate limits of the Town of Fletcher., including all regulated
activities associated with the discharge of stormwater from the MS4. The map below shows the Town's
boundary, as of the date of this document.
3.2 Existing MS4 Mapping
The most current MS4 mapping was completed in 2007 as part of a Stormwater Masteiplan. It included
230 outfall locations and analysis (135 major pipe outfalls). Existing culverts were studied in 2007 to
determine conditions and possible pipe failure analysis. Documentation consisted of culvert sizes,
conditions and locations. This Mapping has not been updated since 2007. The Town's 2007 Outfall
Map includes all pipe outfalls that were inventoried throughout the Town. A total of 230 outfall points
including pipes and channels, 59 pipes/culverts and 6 bridges were mapped. The number represented in
Table 1 represents an estimate of the mapped area and the estimated number of major outfalls.
NCS000424 SWMP
Town of Fletcher
December 6, 202I
Page 3
The Town of Fletcher Storinwater Master Plan was created to address the following stormwater related
items:
• Creating a National Pollutant Discharge Elimination System (NPDES) Phase II compliant
Stormwater Ordinance.
• NPDES compliant storinwater outfall inventory and illicit discharge detection.
• Town of Fletcher culvert capacity analysis.
• Detailed Wildwood Garden/ Higgins Branch analysis.
• Minimum Detailed Hoopers Valley Estates I Hoopers Creek Analysis.
• On -going Stormwater Conveyance System Maintenance.
A MS4 GIS map is not available on-line at this time. See BMP # 11 for plans to provide on-line maps.
Table 1: Summary of Current MS4 Mapping
Percent of MS4 Area Mapped
80
%
No. of Major Outfalls* Mapped
135
total
See BMPs 411 and 414 for updating mechanisms and timelines for improving the MS4 mapping.
*An outfall is a point where the MS4 discharges fi•orn a pipe or other conveyance (e.g. a ditch) directly
into sinface ivaters. Major outfalls are required to he mapped to meet permit requirements. A major,
outfall is a 36-inch diameter pipe or discharge fi•om a drainage area > 50-acres; and for industrial zoned
areas a 12-inch diameterpipe or a drainage area > 2-acres.
3.3 Receiving Waters
The Town of Fletcher MS4 is located within the French Broad River Basin and discharges directly into
receiving waters as listed in Table 2 below. Applicable water quality standards listed below are compiled
from the following NCDEQ sources:
o Waterbody Classification Mat3
o Impaired Waters and TM.DI Ma
o Most recent NCDEQ Final 303 d List
Table 2: Summary of MS4 Receiving Waters
NCS000424 SWMP
Town of Fletcher
December 6, 2021
Page 4
Receiving Water.Name
Stream
Index / AU
Number
Water
Quality
Classification
303(d) Listed Parameter .'
of Interest
Cane Creek
C
Benthos (Nar, AL, FW); Fish Tissue
Mercury (Nar, FC, NC)
Pinner Creek
C;Tr
Hoopers Creels
C;Tr
Kimsey Creek
C
Higgins Creek
C
Frady Lake
C
C — Class C (fishable/swimmable waters)
Tr — Trout Waters
Benthos (Nar, AL, FW) — Narrative Standard, Aquatic Life, Fresh Waters
Fish Tissue Mercury (Nar, FC, NC) All waters, river basins, and watershed in North Carolina
3.4 MS4 Interconnection
The Town of Fletcher MS4 is not interconnected with another regulated MS4 and directly discharges to
the receiving waters as listed in Table 2 above.
Town roadways interconnect with NCDOT state -maintained roads throughout the jurisdiction such as SR
25 Hendersonville Road, Route 1358 Fanning Bridge Road, Route 1006 Howard Gap Road, Route 1545
Cane Creek Road, Route 1547 Old Airport Road and multiple other secondary NCDOT roadways. At
this time a copy of the NCDOT statewide MS4 has not been made publicly available. Therefore, the
below responses are based purely on road ownership,
The ownership of the roadway was not used as a determining factor for inclusion in 2007 when the
Town's original stormwater outfall inventory was performed. The Town has not completed the MS4
system inventory. This BMP is scheduled to be performed during this corning permit cycle. Therefore,
we believe the Town's MS4 likely does interconnect with the statewide NCDOT MS4 and includes:
a. The interconnection is receiving stormwater from the NCDOT MS4. The number of
interconnections is unknown, The quantity will be determined and reported during this permit
Cycle.
b. The interconnection maybe discharging stormwater into the NCDOT MS4. The number of
interconnections is unknown. The quantity will be determined and reported during this permit
cycle.
c. The Town of Fletcher MS4 mapping does identify interconnections with the NCDOT MS4.
d. The Town of Fletcher MS4 mapping may include NCDOT MS4 outfalls.
NCS000424 SWMP
Town of Fletcher
December 6, 2021
Page 5
3.5 Total Maximum Daily Loads (TMDLs)
The TMDL(s) listed in Table 3 below have been approved within the MS4 area, as determined by the map
and list provided on the NCDEQ Modeling & Assessment Unit web page. The table also indicates
whether the approved TMDL has a specific stormwater Waste Load Allocation (WLA) for any watershed
directly receiving discharges from the permitted MS4, and whether a Water Quality Recovery Program
has been implemented to address the WLA.
Table 3: Summary of Approved TMDLs
Approximately 98% of the mercury deposited in NC is due to air emissions. Other minor sources may
include wastewater treatment plants and industrial wastewater dischargers. The Town of Fletcher has no
wastewater treatment facilities. There are several NPDES permit holders in Fletcher (see Section 3.7).
Local impacts of non -point source discharges are controlled by NCDEQ Water Quality programs such as
the Phase II Program. The Town of Fletcher has implemented its Phase II program by contracting with
Henderson County for permitting of stormwater managetnent measures. See other areas of this SWMP
for additional information on strategies for water quality recovery.
The following link provides additional information on the NC Statewide Mercury TMDL.
htt s://files.nc. ov/ncde /Water%20 uali /Plaiinin TMDL/FINAL%20TMDLS/Statewide/NCMercur
TMDL EPASubmit. df
NCS000424 SWMP
Town of Fletcher
December 6, 2021
Page 6
3.6 Endangered and Threatened Species and Critical Habitat
Significant populations of threatened or endangered species and/or critical habitat are identified within the
regulated MS4 urbanized area. Based upon a review of the Endangered and Threatened Species and
Species of Concern by County for North Carolina Map and Listed species believe to or known to occur in
North Carolina marl as provided by the U.S. Fish and Wildlife Service, the species listed in Table 4 have
the potential to occur within the regulated MS4 urbanized area. Of those species listed, Table 4
summarizes the species that may be significantly impacted by the quality of surface waters within their
habitat.
Table 4: Potential Federally Listed Species/Habitat Impacted by Surface Water Quality
-Scientific Name
Common name -
Species Group
Federal Listing Status
Haliaeetus leucocephalus
Bald Eagle
Vertebrate
BGPA
Glyptemys muhlenbergii
Bog Turtle
Vertebrate
T (S/A)
Myotis septentrionalis
Northern long-eared bat
Vertebrate
T
Alasmidonta raveneliana
Appalachian elktoe
Invertebrate
E
Sagottaroa fasciculata
Bunched arrowhead
Vascular Plant
E
Sarracenia rubra
ssp.jonesii
Mountain sweet
iteherplant
Vascular Plant
E
Helonias bullata
Swamp pink
Vascular Plant
T
BGPA — Bald and Golden Eagle Protection Act
T Threatened T (S/A) — Threatened due to similarity of appearance
E — Endangered
3.7 Industrial Facility Discharges
The Town of Fletcher MS4 jurisdictional area includes the following industrial facilities which hold
NPDES Industrial Stormwater Permits, as determined from the NCDEQ Maps & .Permit Data web page.
Table 5: NPDES Stormwater Permitted Industrial Facilities
Permit Number
Facility Name
NCS000424
Town of Fletcher SW Discharge, Individual (MS4)
NCG020167
OIdeastle Materials
NCG030011
Borg Warner Cooling S sterns
NCG030430
Blue Ridge Metals Corp.
NCG050030
Wilson Art International
NCG050399
Urn Raflatac, Inc,
NCG080866
Southeastern Freight Line
NCG140160
Southern Concrete Materials
NCGNE0208
DHL Express
NCGNE0428
Borg Warner Remanufacturing
NCGNE0547
U m Raflatac, Inc.
NCGNE0892
Smartrac Technology
NCS000424 SWMP
Town of Fletcher
December 6, 2021
Page 7
3.8 Non-Stormwater Discharges
The water quality impacts of non-storrnwater discharges Have been evaluated by the Town of Fletcher as
summarized in Table 6 below. The unpermitted non-storrnwater flows listed as incidental do not
significantly impact water quality. The Town of Fletcher has evaluated residential and charity car
washing for possible significant water quality impacts. Dry street sweeping is the method for street
cleaning.
The Division has not required that other non-stormwater flows be specifically controlled by the Town of
Fletcher.
Wash water associated with car washing that does not contain detergents or does not discharge directly
into the MS4 is considered incidental. However, these types of non-stormwater discharges that do
contain detergents have been evaluated by the Town of Fletcher to determine whether they may
significantly impact water quality. As a result of no complaints, and the small amount of visual
observations, it has been determined that residential and charity car washing with detergent is considered
incidental in the Town of Fletcher.
Table 6: Nan-Stormwater Discharges
Non-Stormwater Discharge
Water Quality Impacts
Water line and fire hydrant flushing
Incidental
Landscape irrigation
Incidental
Diverted stream flows
Incidental
Rising groundwater
Incidental
Uncontaminated groundwater infiltration
Incidental
Uncontaminated pumped groundwater
Incidental
Uncontaminated potable water sources
Incidental
Foundation drains
Incidental
Air conditioning condensate
Incidental
Irrigation waters
Incidental
Springs
Incidental
Water from crawl space pumps
Incidental
Footing drains
Incidental
Lawn watering
Incidental
Residential and charity car washing
Incidental
Flows from riparian habitats and wetlands
Incidental
Dechlorinated swimming pool discharges
hicidental
Street wash water
NIA
Flows from firefighting activities
Incidental
39 Target Pollutants and Sources
In addition to those target pollutants identified above, the Town of Fletcher is not aware of other
significant water quality issues within the permitted MS4 area.
NCS000424 SWMP
Town of Fletcher
December 6, 2021
Page 8
Table 7 below summarizes the water quality pollutants identified throughout Part 3 of this SWMP, the
likely activities/sources/targeted audiences attributed to each pollutant, and identifies the associated
SWMP program(s) that address each. In addition, the Town of Fletcher has evaluated schools,
homeowners and businesses as target audiences that are likely to have significant stormwater impacts.
The target audiences, as shown in Table 7 were identified due to the potential for these entities to
contribute to pollutants and because they are the groups that have probable ability to affect positive
change,
Table 7: Summary of Target Pollutants and Sources
Target.Pollutant(s)
Likely Source(s)/Target Audience(s)
SWMP :Program Addressing Target
Pollutant(s)/Audience(s)
Litter
Residents, Businesses, Schools
Public Education & Outreach, Public
Involvement & Participation
Yard Waste
Residents, Businesses, Schools
Public Education & Outreach Public
Involvement & Participation
Illicit discharges
Residents, Businesses, Industrial,
Public Education & Outreach, Public
public employees
Involvement & Participation, Illicit
Discharge Detection & Elimination
(IDDE)
Sediment
Construction Sites
Construction Site Runoff Control,
Post -Construction Site Runoff
Control
Illegal Dumping
Residents, Businesses, Industrial,
Public Education & Outreach,
public employees
Pollution Prevention & Good
Housekeeping
Improper Disposal of
Residents, Businesses, Industrial,
Public Education & Outreach,
Waste
public employees
Pollution Prevention & Good
Housekeeping
PART 4: STORMWATER MANAGEMENT PROGRAM ADMINISTRATION
4.1 Organizational Structure
hi the Town of Fletcher the Planning Director is designated as the Stormwater Program Administrator.
The Stormwater Administrator is responsible for operation of the SWMP, the MS4 Permitting and for
yearly reporting to NCDEQ. The Planning Director falls under the umbrella of the Town Manager, The
NCS000424 SWMP
Town of Fletcher
December 6, 2021
Page 9
Planning Director works closely with the Public Works Director for municipal operations and reporting as
specified in this SWMP.
Table S: Summary of Responsible Parties
SWIVIP Component
Responsible Position
Staff Name
Department
Stormwater Program
Planning Director
Eric Rufa
Planning and Zoning
Administration
SWMP Management
Planning Director
Eric Rufa
Planning and Zoning
Public Education &
Planning Director
Eric Rufa
Planning and Zoning
Outreach
Public Involvement &
Planning Director
Eric Rufa
Planning and Zoning
Participation
Illicit Discharge
Planning Director
Eric Rufa
Planning and Zoning
Detection &
Elimination
Construction Site
Planning Director
Eric Rufa
Erosion Control Local
Runoff Control
Implemented by
Natalie Berry, PE
Program
Henderson County
Engineering
Post -Construction
Planning Director
Eric Rufa
Phase II Local Program
Stormwater
Implemented by
Natalie Berry, PE
Management
Henderson County
Engineering
Pollution
Public Works Director
Iabbo Pressley
Public Works
Prevention/Good
Housekeeping for
Municipal Operations
NCS000424 SWMP
Town of Fletcher
December 6, 2021
Page 10
Municipal Facilities
Public Works Director
Jabbo Pressley
Public Works
Operation &
Maintenance Program
Spill Response Program
Planning Director
Eric Rufa
Planning and Zoning
Public Works Director
Jabbo Pressley
Public Works
MS4 Operation &
Planning Director
Eric Rufa
Planning and Zoning
Maintenance Program
Public Works Director
Jabbo Pressley
Public Works
Municipal SCM
Public Works Director
Jabbo Pressley
Public Works for
Operation &
Eric Rufa
scheduled maintenance
Maintenance Program
and rainfall event
inspections
Planning and Zoning
Outsourcing for annual
inspection/certifications
Pesticide, Herbicide &
Public Works Director
Jabbo Pressley
Public Works
Fertilizer Management
Program
Vehicle & Equipment
Public Works Director
Jabbo Pressley
Public Works
Cleaning Program
Pavement Management
Public Works Director
Jabbo Pressley
Public Works
Program
Total Maximum Daily
Planning Director
Eric Rufa
Planning and Zoning
Load (TMDL)
Requirements
4.2 Program Funding and Budget
hi accordance with the issued permit, the Town of Fletcher shall maintain adequate funding and staffing
to implement and manage the provisions of the SWMP and comply with the requirements of the NPDES
MS4 Permit. The budget includes the permit administering and compliance fee, which is billed by the
Division annually.
The Town of Fletcher's current stormwater program is funded under the Planning Department Budget.
An amount of $30,000 is currently budgeted for the program over the permit term.. Current analysis
shows the MS4 program to be under -funded. The Town is currently evaluating their budget in order to
have adequate funds for implementation of the SWMP and to comply with MS4 Permit requirements,
The Town currently has one frill time employee and one part-time employee in the Plaiming and Zoning
Department. Storinwater Program responsibilities are currently overseen by the Planning and Zoning
Director. The Public Works Director is also involved in elements of the SWMP, In order for the
NCS000424 SWMP
Town of Fletcher
December 6, 2021
Page I I
successful implementation of certain sections of this SWMP, it will be determined (BMP 44) if additional
funds will be required for adding staffing or contract employees.
Additional funding will be necessary to meet the requirements of the Town's MS4 Permit. Steps will be
taken to evaluate this need and put funding mechanisms in place (see BMP #3 and #4). In the last
2 fiscal years, the Town has increased their Stormwater budget which is at $30,000, Town Council is
aware of the recent Audit and creation of a new SWMP. There is a plan to go back to Council for the
next budget cycle (Jan -March) with a more accurate picture of cost needs to properly run the program.
The Town is currently in discussions with Land of Sky Regional Council to evaluate what can be funded
through Grants, aiding in the Town's fielding analysis.
4.3 Shared Responsibility
The Town of Fletcher will share the responsibility to implement the following minimum control
measures, which are at least as stringent as the corresponding NPDES M84 Permit requirement. The
Town of Fletcher remains responsible for compliance if the other entity fails to perform the permit
obligation, and may be subject to enforcement action if neither the Town of Fletcher nor the other entity
fully performs the permit obligation. Table 9 below summarizes who will be implementing the
component, what the component program is called, the specific SWMP BMP or permit requirement that
is being met by the shared responsibility, and whether or not a legal agreement to share responsibility is in
place. Listed in Table 9 are the current shared program that are in place.
Table 9: Shared Responsibilities
BMP #5 I Land of Sky Regional Council N
NCS000424 SWMP
Town of Fletcher
December 6, 2021
Page 12
4.4 Co-Permittees
There are no other entities applying for co-permittee status under the NPDES MS4 permit number
NCS000424 for the Town of Pletcher. Table 10 summarizes contact information for each co-permittee.
Table 10: Co-Permittee Contact Information
Co-Permittee MS4
Contact Person
phone &.E-Mail `
Interlocal `
Name
Agreement.
.
(Y/N)
NIA
4.5 Measurable Goals for Program Administration
The Town of Fletcher will manage and report the following Best Management Practices (BMPs) for the
administration of the Stormwater Management Program,
Table 11: Program Administration BMPs I
Permit 2.1.2 .and Part 4.. Annual Self -Assessment':
Ref. Measures to evaluate the performance and effectiveness of the SWMP program components at least annually.
Results sliall be used by thc.perinittee to modify the program components.as necessary to accomplish the intent
of the Stormwater Pro ram. The self -assessment re orting period is the fiscal year (July'1 -:Tune 30),
BMP A B C D
No. Description of BMP Measurable Gaal(s) Schedule for , Annual Reporting
Tm lementation Metric
1. Annual Self Assessment
Perform an annual evaluation of 1. Prepare, certify and 1 Annually 1. Yes/No
SWMP implementation, suitability of submit the Annual Self Pert -nit Years 1 — 4
SWMP commitments and any Assessment to NCDEQ
proposed changes to the SWMP prior to August 31 each
utilizing the NCDEQ Annual Self- year.
Assessment Template.
NCS000424 SWMP
Town of Fletcher
December 6, 2021
Page 13
Table 11: Program Administration BWs
2.
Permit Renewal Application
Audit stormwater program
I. Participate in an
1. TBD — Typically
1. Yes/No
implementation for compliance with
NPDES MS4 Permit
Permit Year 4
the permit and approved SWMP, and
Compliance Audit, as
utilize the results to prepare and
scheduled and performed
submit a permit renewal application
by EPA or NCDEQ.
package.
2. Self -audit and
2. Permit Year 5
2. Yes/No/Partial
document any
stormwater program
components not audited
by EPA or NCDEQ
utilizing the DEQ Audit
Template, Submit Self -
Audit to DEMLR
(required component of
permit renewal
application package).
3. Certify the stormwater
3. Permit Year 5
3. Date of permit renewal
permit renewal
application submittal
application (Permit
renewal application
form, Self -Audit, and
Draft SWMP for the next
5-year permit cycle) and
submit to NCDEQ at
least 180 days prior to
permit expiration.
Permit
2..1.1: Adequate Funding and Staffing
Ref.
The permittee shall maintain adequate funding and.staffing to unplement and manage the provisions of the
SWMP and meet all requirements of this permit.
BMP
A
B
C
D
No.
Description of BMP
Measurable Goal(s)
Schedule lor,
Implementation
Annual Reporting
Metric
3.
Adequate Funding and Staff
Explore options to obtain adequate
1. Work with other Town
1. Permit Year 1.
1. Yes/No/Status
program funding to fully fund the
officials to prepare a gap
stormwater program,
analysis.
2. Evaluate methods and
2. Permit Year 2.
2. Yes/ No/Status
options for obtaining
additional funding.
NCS000424 SWMP
Town of Fletcher
December 6, 2021
Page 14
Table 11: Program Administration BMPs
3. Implement action
3. Permit Year 4,
3. Yes o Status
items for obtaining the
chosen funding
raechanisni.
4.
Evaluate need for additional staffing.
Evaluate need for additional staffing
1. Work with other Town
1. Permit Year 2,
1. Yes/No/Status
and/or contract services.
officials to determine if
additional staffing and/or
contract services will be
required for successfully
implementing the
S WMR
2. Based on findings,
1. Permit Year 4.
1. Yes/No/Status
create a timeline for
hiring additional staff or
contract services and
determine job
description/duties.
PART 5: PUBLIC EDUCATION AND OUTREACH PROGRAM
The Town of Pletcher will implement a Public Education and Outreach Program to distribute educational
materials to the community or conduct equivalent outreach activities about the impacts of storm water
discharges on water bodies and steps the public can take to reduce pollutants in storm water runoff.
The target audiences and identified pollutants listed in Part 39 of this SWMP, which will be addressed by
the Public Education and Outreach Program, are summarized in Table 12 below. In addition, the Town of
Fletcher is required to inform businesses and the general public of the hazards associated with illicit
discharges, illegal dumping and improper disposal of waste.
Table 12: Summary of Target Pollutants & Audiences
Target Pollutants/Sources
Target Audiences)
Litter
General Public, Residents, Businesses, Schools
Yard Waste
Residents, Businesses, Schools
Illicit Discharges
Residents, Businesses, Industrial, public employees
Sediment
Construction Sites
Illegal Dumping
Residents, Businesses, Industrial, public employees
Improper Disposal of Waste
Residents, Businesses, Industrial, ublic employees
NCS000424 SWMP
Town of Fletcher
December 6, 2021
Page 15
The Town of Fletcher will manage, implement, and report the following public education and outreach
BMPs.
Table 13: Public Education and Outreach BMPs
Permit::
3.2.2 and 3.2.4:. Outreach to Targeted Audiences
Ref.
Measures to identify the specific elements and implementation of a Public Education and Outreach Prograra to ,
share educational materials to ,the coimnunity or conduct equivalent outreach activities about the it of `.
stormwater discharges on water bodies and how the public cau reduce pollutants in stormwater runoff. The
permittee shall provide educational information to ,identified target audiences on pollutants/sources identified in `
table 12 above, and shall document the extent of exposure of each media, event or activity, including those
elements implemented locally or through a cooperative agreement.
BMP
A
B
C
D
No
Description of BMP
Measurable Goal(s) '
Schedule for
Ini lementation
Annual Reporting
Metric
S.
Partnership with Land of Sky Council of Governments
The Town will contract with the Land
1, Execute a legal
I . Pen -nit Year 2
1.
of Sky Regional Council (LOSRC) to
agreement with LOSRC
Yes/No/Status
implement programs and create
to provide educational
materials for public education and
materials and activities
outreach to residents, youth,
that target Town of
businesses, and commercial property
Fletcher audiences as
owners within the Town's
listed in Table 12.
jurisdiction. Include social media.
2. Provide education and
2.Annually
2. Report event type,
outreach to target
Permit Years 2 5.
number of contacts made
audiences on topics per
and topics addressed.
Table 12 each year so
that all topics and
audiences have been
addressed by permit year
5.
6.
Update literature
The Town will evaluate their current
1. Inventory current
1. Permit Year 1.
1. Yes/No/Status
handout and, if necessary, create an
literature. Evaluate
updated brochure that can be used
whether current literature
throughout the permit period. ICey
is appropriate for use and
placement of brochures will be
if not create and have
determined and distributed at Town
printed new materials.
Hall.
2, Place literature hi key
2, Permit Years I - 5.
2. Yes/No/Status
locations at the Town
Hall facility. Replace
monthly,
NCS000424 S WMP
Town of Fletcher
December 6, 2021
Page 16
Table 13: Public Education and Outreaeb BMPs
7.
Participate in a public event
The Town will pass out general
1. Man a booth at one
1. Permit Years 3-5,
1. Yes/No/Status
stormwater awareness literature at a
public event to distribute
Number of contacts
minimum at one public event lead by
literature.
made
the Town and display informative
2. For the events, create a
2. Permit Year 3
2. Yes/No/Status
information related to stormwater.
display and/or other
visual materials with
specific information
about pollutants of
concern such as litter,
nutrients, non -point
source pollution, waste
disposal. Include how to
help material pertaining
to the target audience(s).
Permit..
.2.1.7, 3.2.3 and 3.6.5(c): Web Site
Ref.
Measures to provide a web site.designed to convey the program's messages) and provide online materials .
including ordinances, or other regulatory mechanisms, or a list. identifying the ordinances or other regulatory
mechanisms, providing the legal authority necessary to.implement and enforce the requirements of the permit .
And SWMP. ' The web page. shall also provide developers with all relevant post -construction requirements,
design standards, checklists and/or other materials.
BMP
A
B
C
D
No.
Description of BMP
Measurable. .Goal(s) ::
..Schedule for .
Implementation
Annual Reporting . ,
Metric
8.
Stormwater Page on the Town's Website
The Stormwater web page will be
1. Make improvement to
1. Permit Years 1
1. Yes/No/Status
updated to include at a minimum the
the Stormwater web page
through 3.
Date that it was rolled
following stormwater related items;
to include listed items.
out.
NCS000424 SWMP
Town of Fletcher
December 6, 2021
Page 17
Table 13: Public Education and Outreach BMPs
• Links to pertinent permitting
2. Maintain the web
2. Annually, Permit
2. Yes/No/Status
authorities.
page, including any
Years 1-5.
• Links to Applicable
updates and resolving
Ordinances.
technical issues.
• The MS4 Permit and
SWMP,
• Hotline and instructions for
reporting illicit discharges
and other environmental
issues.
• Opportunities for public
involvement.
• General stormwater
awareness information.
Permit
3.2.5: Stormwater Hotline
Ref.
Measures for a storinwater hotline/helpline for the purpose of public education and outreach.
A
B
_`C
D
BMP
No..
Description of BAH
Measurable Goal(s)
Schedule foi
Implementation
Annual Reporting
Metric
9.
Advertise the Stormwater Hotline
Provide the hotline number and .
1. Provide the hotline
1. Continuously
1. Yes/No/Status
protocol to the general public and
and pertinent information
Permit Years 1-5
business community.
on the Stormwater Web
page and in all new
stormwater literature.
10.
Train Hotline Staff
Train staff on SOP to direct hotline
1. Develop SOP for
1. Pennit Year 1
1. Yes/No/Status
calls to appropriate responders.
managing hotline calls.
2. Train staff on SOP.
2. Annually
2. Number trained
Permit Years 1-5
NCS000424 SWMP
Towai of Fletcher
December 6, 2021
Page 18
PART 6: PUBLIC INVOLVEMENT AND PARTICIPATION PROGRAM
This SWMP identifies the minimum elements and implementation of a Public Involvement and
Participation Program that complies with applicable State, Tribal and local public notice requirements,
The Town of Fletcher will manage, implement and report the following public involvement and
participation BMPs.
Table 14: Public Involvement and Participation BMPs
Permit
3.3.1: Public Input...
Ref.
Mechanisms for public involvement that provide for input on stormwater .issues aad the stormwater progratu.
BMP
A
B
C
D
No.
Description of BMP
Measurable Goal(s)
Schedule for
Annual Reporting . .
Implementation
Metric
1L
Town Meetings
Stormwater issues and program
1. Advertise Board
1. Annually
1. Yes/No/Status
implementation items will be brought
meetings and agendas on
Permit Years I - 5.
to the Town Council. Citizens can
web site.
provide input.
12.
Stormwater Website Page
Provide a contact person and e-mail
1. See BMP #8 and #9.
1. See BMP 48 and #9.
1. See BMP #8 and #9.
address for citizen's questions related
to stormwater on the Stormwater
2. Inform relevant Town
2. Permit Year 1.
2. Yes/No/Status
website page. Provide a link to the
departments about this
Town's MS4 mapping for availability
protocol,
to the public.
3. Provide a link to the
3. Perinit Year 5
3. Yes/No/Status
Town's MS4 mapping.
Date it became available.
Permit `
3.3.2. Volunteer Opportunities
Ref..
Measures to provide volunteer opportunities designed to promote ongoing citizen participation.
BMP
A
B
C
p
No.
Description of BMP
Measurable Goals)
Schedule for
Annual Reporting
Implementation
Metric
13.
Identify Volunteer Groups Existing in the Area
Create a list of existing volunteer
1. Create a Iist of
1. Permit Year 2.
1. Yes/No/Status
groups that could have potential for
potential volunteer
improving stormwater issues and
groups and document
reducing pollutants. Focus would be
their main focus.
participation with residents,
commercial businesses, and/or
students.
NCS000424 SWMP
Town of Pletcher
December 6, 2021
Page 19
Table 14: Public Involvement and Participation BMPs
2. Contact at least one of
2. Annually
2. Yes/No/Status
the volunteer groups and
Permit Years 2-5
establish an activity
focused on stormwater
issues.
3. Implement a minimum
3. Annually
3. Date and type of
of one citizen
Permit Years 3-5.
event, number of
participation activity
participants
focused on stormwater
issues.
U
Create a Torun Park Clean-up Day
Create and Implement a Town Park
1. flan a clean-up day
1. Permit Year 2.
1. Yes/No/Status
Clean-up Day Event.
for one of the Town's
Parks. Decide how it will
be advertised, who will
run it, and what
equipment is needed.
2. Implement Town Park
2. Annually
2. Date of event and
Clean-up Day. Document
Permit Yeats 3-4.
number of participants
how many volunteers,
what took place, take
pictures.
NCS000424 SWMP
Town of Fletcher
December 6, 2021
Page 20
PART 7: ILLICIT DISCHARGE DETECTION AND ELIMINATION PROGRAM
The Town of Fletcher will develop, manage, implement, document, report and enforce an Illicit Discharge
Detection and Elimination Program which shall, at a minimum, include the following illicit discharge
detection and elimination BMPs.
Table 15: Illicit Discharge Detection and Elimination BMPs
Permit
3.4.1:. MS4 Map
Rd.
Measures to develop, update and maintain a municipal storm sewer system map including stormwater .
conveyances, flow direction, major outfalls and waters of the United States receiving stormwater discharges.
BMP
A
B
C
D.
No.
Description of BMP
Measurable Goal{s) :
Schedule for
_ . implementation
Annual Reporting ;
Metric
15.
Update MS4 Major Outfalls and Municipal Storm Sewer System Map
Create a strategy to update the
1. Evaluate existing
1. Permit Year 1.
1. Yes/No/Status
existing Outfall Map and complete a
inaterials and create a
new municipal storm sewer system
scope for moving
map starting with the existing maps
forward in the creation of
and information provided in the
a new MS4 Map, Put
Town's 2007 Star€nwater Masterplan.
measures in place for the
Map to include inlets, pipe systems
effort to be completed.
and sizes, flow directions, culvert
locations, major outfalls and strea€ns.
2. Create New MS4 Map
2. Permit Year 2.
2. Yes/No/Status
and determine areas to be
Report currently 1Q10wn
inventoried by creating
number of major outfalls,
three inventory areas that
comprise approximately
1/3 of the Town's
jurisdictional area.
3. Perform an inventory
3. Annually
3. Yes/No/Status
and inspections of
Permit Years 3-5.
Report number of major
outfalls and sewer
outfalls added and total.
systems within one
inventory area and add to
the map.
4. Continuously update
4. Annually
4. Yes/No/Status
the MS4 Map
Permit Years 4-5.
Report number of major
documenting any new
outfalls added and total.
additions/changes to
inventoried areas.
Permit
3.4 2: Regulatory Mechanism
Ref..
Measures to provide air IDDE.ordinance or other regulatory mechanism that provides legal authority to
prohibit, detect, and eliminate illicit connections and discharges,` illegal dumping and spills into.the MS4,
including enforcement procedures and actions. -
A
B
C
D:
NCS000424 SWMP
Town of Fletcher
December 6, 2021
Page 21
Table 15: Illicit Discharge Detection and Elimination BAIPs
BMP Schedulefor Annual Reporting
No Description of BMP Measurable GoaC(s) Im Cementation Metric
16. Maintain Legal Authority
Review existing Ordinance 1. Review ordinance and 1. Permit Year 1. 1. Yes/No/Status
confirming the Town's legal make any necessary
authority to enforce and take actions changes. Document any
for prohibiting, detecting and revisions.
eliminating illicit discharges and
connections and illegal dumping and
spills.
Develop and implement a written
1. Create a written IDDE
1, Permit Year 1
1. Yes/No/Status
IDDE Plan which includes an
Plan using current Town
assessment of the most vulnerable
resources, include
areas for illicit discharges. Use the
procedures and
current MS4 mapping for all known
documentation to address
outfalls and determine on paper areas
a) though e) in Permit
of higher risk by studying factors
Ref. 3.4.3.
such as location to industries, zoning,
2. Submit the IDDE Plan
2. Permit Year 1
2. Yes/No/Status
higher concentration of population,
areas along Cane Creek, watershed
to DEQ for approval.
Report date submitted.
considerations.
3. Implement the IDDE
3. ContinuousIy
3, Yes NO/Status
plan.
Permit Years 2-5.
is. I Review and Enhancements to the IDDE Plan
NCS000424 SWMP
Town of Fletcher
December 6, 2021
Page 22
Table 15: Illicit Discharge Detection and Elimination BMPs
Review the IDDE Plan and make any
1. Review annually and
1, Annually
1. Yes/No/Status
necessary improvements.
snake necessary
Permit Years 2-5,
improvements to the
IDDE Plan.
Permit
3.4.4:. IDDE Traelcing
Ref:
Measures for tracking and documenting the .date(s) an illicit discharge, illicit confection or illegal dumping was
observed, the results of the investigation, any follow-up of the investigation, the date the investigation was
closed, the issuance of enforcement actions, and the ability to identify chronic violators,
BMP
A
B
C
D `
No.
Description of BMP
Measurable Goal(s)
Schedule for '
Annual Reporting
Implementation
Metric
19.
Track all known illicit discharge, illicit connection and illegal dumping events
Create a tracking mechanism for
1. Create a documenting
1. Permit Year 1
1. Yes/No/Status
documenting where illegal activities
data sheet, that can be
took place, what was done to inform
used by the appropriate
the violator, records of all
municipal departments
correspondence, records of all
for tracking of all
activities related to the illegal activity
activities related to the
and final resolutions.
IDDE,
2, Perform IDDE
2. Annually
2, Number of illegal
Inspections using the
Permit Years 2-5.
activities documented,
data sheet.
Yes/No/Status
Permit
3,4.5: ' Staff IDDE Training
Ref,
Measures to provide training for municipal staff and contractors .who, as part of their normal job
responsibilities, may observe. an illicit discharge, illicit connection, illegal dumping or spills, Training shall
include how. to identify and report illicit discharges, illicit connections, illegal. dumping and spills. Each staff
training event shall be documented, including the a enda/materials, date, and number of staff participating.
BMP
A
B .
C
D
No.
Description of BMP
Measurable Goal(s)
Schedule for
Annual Reporting
hn lementation
Metric
20.
Staff Training
Create a program to train Town staff
1. Develop training
1, Permit Year 2
1. Yes/No/Status
in IDDE procedures and hotline
program,
protocol (see BMP 10).
2. Train public works
2. Permit Year 2 and new
2. Yes/No/Stanis
staff that will be using
employees within first
Number trained
the IDDE Plan and new
year hired.
employees that will be
involved in IDDE, when
hired.
21.
Review Public Works Standard Operating Procedure (SOP)
NCS000424 SWMP
Town of Fletcher
December 6, 2021
Page 23
Table 1.5: Illicit Discharge Detection and Elimination BMPs
Review and adopt any necessary
1. Make the written SOP
1. Permit Year 4
1. Yes/No/Status
changes to the Town's Public Works
available to Public
Standard Operating Procedure (SOP)
Works Staff and provide
so field staff can identify and report
an SOP and stormwater
stormwater issues, illicit discharges,
awareness orientation for
illegal dumping, etc. Include
staff.
procedures for stormwater items such
2,0-eate an informational
2. Permit Year 4
2. Yes/No/Status
as storm sewer, ditch and culvert
maintenance, street maintenance, and
poster which summarizes
public works staff review of MS4
SOP.
map and outfall locations.
3. Post informational
3. Continuously
3. Yes/No/Status
poster in key locations
Permit Years 4-5
for quick reference by
staff members,
Permit
3.4.6: IDDE Reporting
Ref.
Measures for the public and staff to report illicit discharges, illegal d.uinping and spills. The mechanism shall be
publicized to facilitate reporting and shall .be managed to provide rapid response by appropriately trained
personnel.
BMP
A
B
C
D
N0
Description of BMP
Measurable Goal(s)
Schedule for
Implementation
Annual. Reporting
Metric
22.
Stormwater Hotline
A Stormwater Hotline will be
1. See BMPs #8, #9 and
1, See BMPs 98, 49 and
1. See BMPs #8, 99 and
maintained for Town's citizens to ask
#10.
#10.
#10.
questions and report stormwater
issues. The hotline number will be
available on the Town's Website and
in educational literature (See BMPs
#81 #9 and # 10).
NCS000424 SWMP
Town of Pletcher
December, 6, 2021
Page 24
PART 8: CONSTRUCTION SITE RUNOFF CONTROL PROGRAM
In accordance with 15A NCAC 0211.0153, the Town of Fletcher relies upon the North Carolina
Sedimentation Pollution Control Act (SPCA) of 1973 as a qualifying alternative program to meet a
portion of the NPDES MS4 Permit requirements for construction site runoff control measures. The
SPCA requirements include reducing pollutants in stormwater runoff from construction activities that
result in land disturbance of greater than or equal to one acre and includes any construction activity that is
part of a larger common plan of development that would disturb one acre or more. The state SPCA
Program is either delegated to a city/town, delegated to a county, or implemented by NCDEQ in non -
delegated areas.
Table 16: Qualifying Alternative Program Components for Construction Site Runoff Control Program
Permit
Reference
State or Local Program Name
Legal
Authority
-
Implementing Entity
Meets Whole
or Part .of. . `.
Requirement
3.5.1 -
Henderson County
15A NCAC
Henderson County
Whole
3.5.4 i
Delegated SPCA Program*
Chapter 04
NCDEQ
Approved
Delegation &
Resolution R-
07-4 between
Henderson
County and the
Town of
Fletcher
* The local delegated SPCA Program ordinance(s)/regulatory mechanism(s) can be found at:
litt s://www.liendei'sonCOnii ne.gov/waterresotircesl a e/orosion-control-local- pro rani-0
The Town of Fletcher also implements the following BMPs to meet NPDES MS4 Permit requirements.
NCS000424 SWM.P
Town of Fletcher
December 6, 2021
Page 25
Table 17: Construction Site Runoff Control BMl's
Train municipal staff who receive
1. 'Train municipal staff
1. Annually Permit Years
1. Number of staff
calls from the public on the protocols
on proper handling of
1-5
trained
for referral and tracking of
construction site runoff
construction site runoff control
control complaints.
complaints.
24.
Stormwater Hotline and Town's Stormwater Webpage
The Stormwater Hotline will be
1. See BMPs 48, 49 and
1. See BMPs #8, #9 and
1. See BMPs 48, 99 and
maintained for citizen's use for
#10.
#10
410
reporting sediment run-off from
construction sites and for questions
concerning construction site
activities. (See BMPs #8, #9 and
#10.)
Permit
3.5.5: Waste Management
Ref.
Measures to require construction site operators to control waste such as discarded building materials, concrete
truck washout, chemicals, litter and sanitary waste at the. construction site that may cause adverse impact to
water quality.
BMP
A
B
C
D
No..
Description of BMP
Measurable .Goal(s) .
Schedule for
Im lementation
Annual Reporting
Metric
25.
Ordinance for Waste Management
Review current Town Ordinance and
1. Review current
1. Permit Year 1
1, Yes/No/Status
Henderson County Resolution to
Ordinance and
determine authority and to ensure
Henderson County
proper legal authority concerning
Resolution.
construction site waste management.
2. Update the Town
2. Permit Year 1
2. Yes/No/Status
Develop and implement an ordinance
to require construction site operators
Ordinance and County
to control waste.
Resolution to provide
enforcement authority.
3. Maintain legal
Continuously, after
3. Yes/No/Status
authority.
ordinance is adopted.
26.
Waste Management Contractor Information Materials
Develop information materials for
1. Create a document
1. Permit Year 3
1, Yes/No/Status
contractors to address waste
that can be referenced
management on construction sites.
from the Town's
website.
NCS000424 SWMP
Town of Fletcher
December 6, 2021
Page 26
PART 9: POST -CONSTRUCTION SITE RUNOFF CONTROL PROGRAM
This SWMP identifies the minimum elements to develop, implement and enforce a program to address
stormwater runoff from new development and redevelopment projects that disturb greater than or equal to
one acre, including projects less than one acre that are part of a larger common plan of development or
sale, that are located within the Town of Fletcher and discharge into the MS4. These elements are
designed to minimize water quality impacts utilizing a combination of structural Storrnwater Control
Measures (SCMs) and/or non-structural BMPs appropriate for the community, and ensure adequate long-
term operation and maintenance of SCMs.
In accordance with 15A NCAC 02H .0153 and .1017, the Town of Fletcher implements the following
State post -construction program requirements, which satisfy the NPDES Phase 11 MS4 post -construction
site runoff control requirements as Qualifying Alternative Programs (QAPs) in the MS4 area(s) where
they are implemented.
Table 18: Qualifying Alternative Prograin(s) for Post -Construction Site Runoff Control Program
State QAP Name
State Requirements .
Local Ordhiance / Regulatory..
Meehan ism Reference
None
N/A
N/A
Table 19: Summary of Existing Post -Construction Program Elements
NCS000424 SWMP
Town. of Fletcher
December 6, 2021
Page 27
Permit Requirements for
Municipal Ordinance/Code Reference(s)
Date Adopted
Plan Review and Approval
and/or Document Title(s)
3.6.2(a) Authority
Legal Agreement between Henderson Co.
8-9-2010
and the Town of Fletcher
3.6.3(a) & 15A NCAC 02H.0153(c)
Town of Fletcher Land Development
Adopted:
Federal, State & Local Projects
Code
11-14-2005
Article 6. Environmental Protection 6.5
Amended:
Water Quality Protection
04-08-2019
3.6.3(b) Plan Review
Town of Fletcher Land Development
Adopted:
Code
11-14-2005
Article 6. Environmental Protection 6.5 F
Amended:
and
04-08-2019
3.6.3(c) O&M Agreement
Town of Fletcher Land Development
Adopted:
Code
11-14-2005
Article 6. Environmental Protection 6.5 K
Amended:
04-08-2019
3.6.3(d) O&M Plan
Town of Fletcher Land Development
Adopted:
Code
11-14-2005
Article 6. Environmental Protection 6.5 K
Amended:
04-08-2019
3.6.3(e) Deed
Currently not addressed in the Land
Restrictions/Covenants
Development Code. (See BMP #30)
3.6.3(f) Access Easements
Town of Fletcher Land Development
Adopted:
Code
11-14-2005
Article 6. Environmental Protection 6.5 K
Amended:
04-08-2019
Permit Requirements for
Municipal Ordinance/Code Reference(s) ..;
Date Adopted .
Inspections and Enforcement
and/or:Document Title(s) `
3.6.2(b) Documentation
Town of Fletcher Land Development
Adopted:
Code
11-14-2005
Article 6. Environmental Protection 6.5 L
Amended:
and M
04-08-2019
3.6.2(c) Right of Entry
Town of Fletcher Land Development
Adopted:
Code
11-14-2005
Article 6. Environmental Protection 6.5 O
Amended:
04-08-2019
3.6.4(a) Pre -CO Inspections
Town of Fletcher Land Development
Adopted:
Code
11-14-2005
Article 6. Environmental Protection 6.5
Amended:
M. 1,
04-08-2019
3.6.4(b) Compliance with Plans
Town of Fletcher Land Development
Adopted:
Code
11-14-2005
Article 6. Environmental Protection 6.5 L
Amended:
and M
04-08-2019
NCS000424 SWMP
Town of Fletcher
December 6, 2021
Page 28
3.6.4(c) Annual SCM Inspections
Town of Fletcher Land Development
Adopted:
Code
11-14-2005
Article 6. Environmental Protection 6.5 O
Amended:
04-08-2019
3.6.4(d) Low Density Inspections
Currently not specifically addressed in the
Land Development Code. (See BMP #28)
3.6.4(e) Qualified Professional
Town of Fletcher Land Development
Adopted:
Code
11-14-2005
Article 6. Environmental Protection 6.5 O
Amended:
04-08-2019
Permit Requirements for
Municipal Ordinance/Code.Reference(s) .
Date Adopted.
Fecal Coliform Reduction
and/or Document Title(s)
3.6.6(a) Pet Waste
Town of Fletcher Land Development
Adopted:
Code
11-14-2005
Article 6. Environmental Protection 6.6 A
Amended:
04-08-2019
3.6.6(b) On -Site Domestic
Henderson Co Septic Program and Water
Wastewater Treatment
and Well Program
The annual reporting metrics for the post construction program are provided in Table 20: Post
Construction Site Runoff Control BMPs below.
Table 20: Post Construction Site Runoff Control BMPs
Permit .
3.6..5(a), 3.6.5(b), and 4.1.3:.'Minimum Post -Construction Reporting Requirements
Ref:
Measures to document activities over.the course of the fiscal year (July 1 June 30) including appropriate
information to accurately describe rogress, status, and results.
BMP
A
B
C
D
No.
Description of BMP
Measurable Goal(s)
Schedule for
Annul Reporting
Implementation lementation
Metric
27.
Standard Reporting
Implement standardized tracking,
1. Track number of low
1. Continuously
1. Number of plan
documentation, inspections and
density and high -density
Permit Years 1-5
reviews performed for
reporting mechanisms to compile
plan reviews performed.
low density and high
appropriate data for the annual self-
density.
assessment process. Data shall be
2. Track number of low
2. Continuously
2. Number of plan
provided for each Post -Construction/
density and high -density
Permit Years 1-5
approvals issued for low
Qualifying Alternative Program
plans approved.
density and high density.
being implemented as listed in Tables
3. Maintain a current
3. Continuously
3. Sunnnary of number
18 and 19.
inventory of low -density
Permit Years 1-5
and type of SCMs added
projects and constructed
to the inventory; and
SCMs including SCM
number and acreage of
type or low -density
low -density projects
acreage, location and last
constructed,
inspection date.
4. Track number of SCM
4, Continuously
4. Number of SCM
inspections performed.
Permit Years 1-5
inspections,
NCS000424 SWMP
Town of Pletcher
December 6, 2021
Page 29
Table 20: Post Construction. Site Runoff Control BN1[Ps
5. Track number of low-
5. Continuously
5. Number of low -
density inspections
Permit Years 1-5
density projects
performed,
inspections.
6. Track number and
6. Continuously
6, Number and type of
type of enforcement
Permit Years 1-5
enforcement actions
actions taken.
taken/issued,
Permit
3.6.2:.; Legal Authority
Ref.
Measures to maintain adequate.legal authorities through' ordinance or.other regulatory mechanism to; (a) review
designs and proposals for new development and redevelopment to determine whether adequate stormwater
control measures will be. installed, implemented,and maintained; .(b) request information such as stormwater
plans, inspection reports, monitoring results, and other information deemed necessaty.to evaluate compliance
with the Post-Construction.Stormwater Management Program, and (c) enter private property for the purpose of
inspecting at reasonable topes any facilities, equipment, practices, or operations related to stormwater
discharges to.determine whether there is compliance with the Post -Construction Stormwater Management
Program.
BMP
A
B
C
D
No
Description of BMP
Measurable.Goa1(s)
Schedule for
Implementation
Anrual Reporting
Metric
28.
Evaluation of Ordinance and Existing Agreement with Henderson County to implement the Town of Fletcher's
Post Construction Stormwater Pro ram.
The in -place Agreement with
t. Develop an ordinance
1. Permit Year 1,
1. Yes/No/status
Henderson County for implementing
and mechanism for deed
Report code reference
the Post -Construction Stormwater
restrictions, covenants,
and projected adopted
Program for the Town of Fletcher
and low -density
dates.
shall be reviewed in its entirety along
inspections,
2. Proceed with any
2. Permit Year 2.
2. Yes/No/Status
with related mechanisms such as
Town's ordinance, County
required legal processes
Ordinance, and both websites,
such as Council or Board
approvals.
3. Implement changes
3. Permit year 3.
3. Yes/No/Status
and make any necessary
updates to public
materials.
Permit
3.6.3: , Plan Review and Approval
Ref,
Measures to maintain plan review and. approval authority, standards and procedures to; (a) Require Federal,
State, ;and local government projects to comply with Post -Construction Program requirements throughout the
entire M$4 permitted area, uinless the entity is subject to.its own NPD.ES MS4 permit or. a qualifying alternative
program., (b) Conduct site plan reviews of.all new development and redeveloped sites that disturb greater than .:.
or equal to one:acre,'and sites that.disturb less than one acre that are pant of a larger common plan of
development or sale for compliance.with .15A NCAC 0211.1017 :and the ,qualifying alternative programs that
apply within your jurisdiction, (c) Ensure that each project has an Operation and Maintenance ;Agreement that
complies with 15A NCAC 02H ,1050(12), (d) Ensure that each project leas an Operation and Maintenance Plan
that complies with 15A NCAC 02H ..1050(13), (e) Ensure that each project has. recorded deed restrictions and
protective covenants, that require the project to be maintained consistent with approved .plans, and (f) Ensure
that each SCM and associated maintenance accesses be protected in a permanent recorded easement per 15A ,` .
NCAC `02H 1050 (9) and (10). -
NCS000424 SWMP
Town of Fletcher
December 6, 2021
Page 3 0
Table 20: Post Construction Site Runoff Control BMPs
BMP
A
B
C
D
No.
Description of BMP
Measurable Goal(s)
Schedule for
Annual Reporting
-
Implementation
Metric
24.
Agreement with Henderson County for executing Plan Reviews and Approvals.
An agreement is currently in place for
1. Obtain data from
1. Continuously,
1, Report number of Post
Henderson County to review and
Henderson County for
Construction Approvals
approve plan submittals for post
the Town to track
which have been
construction stormwater projects
projects within their
implemented,
within the Town of Fletcher. The
jurisdiction, Include
Town's own projects will be
how many projects and
reviewed and approved by NCDEQ
their final status.
regional office staff.
Permit
3.6.4:. Inspections and Enforcement
Ref.
Measures to maintain inspection and enforcement .authority, standards and procedures to: (a) Conduct post -
construction inspections prior to issuing a Certificate of Occupancy or a Temporary Certificate of Occupancy,
Alternatively, the project owner may .provide a surety bond to guarantee compliance with the approved plan(s),
(b) Ensure that the project.has been constructed in accordance with the approved plan(s), (c) Ensure annual
inspection of each permitted SCM to ensure compliance with the approved Operation and. Maintenance
Agreement, (d) Ensure inspection of low density projects at least once during the permit.terrn, and (c) Require
that inspections be conducted by a qualified professional.
BMP
A
B `.
C
D
No.
Description of BMP
Measurable Goal(s)
....Schedule for :
Annual Reporting ,
Im lementation
Metric
30.
Inspections of low -density projects
Establish the legal authority for
1. Code revision and
1. Permit Year 3(See
1, Yes/No/Status
inspection of low -density projects.
implementation as part of
BMP 428)
BMP 928.
2. Perform inspections of
2. After BMP ##28 is in
2. Yes/No/Status
Low -Density Projects
place and then each
How many were
project a minimum of
inspected.
once within the 5-year
permit terra, with a
minimum goal of 50%
year 4, and 50% year 5.
31.
Inspection of Post Construction Stormwater SCMs
Develop a schedule and detailed
1. Inspect all the post
1, Each SCM shall be
1. Number of SCMs
strategies for inspection of post
construction SCMs
inspected at a minimum
inspected and how many
construction SCMs,
within the Town's
once within the 5-year
SCMs there are.
jurisdiction and take
permit term, with a
appropriate actions for
minimum goal of 20%
SCMs that are out of
per year.
compliance.
NCS000424 SWMP
Town of Pletcher
December 6, 2021
Page 31
Table 20: Post Construction Site Runoff Control BWs
Permit :
3.6.6: Fecal Coliform Reduction
Ref,
Measures to control, to the maximum extent practicable, sources of fecal coliform per 15A NCAC 02H
.1017(7), At a minimum, the program shall include: (a) A pet waste management component, which maybe .
achieved by revising an existing litter ordinance, and (b) An on -,site dornestic wastewater treatment system
component, if applicable, which maybe. coordinated with local county health department, to ensure proper
operation and maintenance of such systems.
A
B
C
D.
BMP
No
Description of BMP
. .
Measurable Goal(s)
Schedule for
Implementation
Annual Reporting
Metric
32.
Pet Waste Management
Review pet waste management
1. Evaluate what is
1. Permit Year 3.
1. Yes/No/status
currently being implemented within
currently in place.
2, if determined
2. Permit Year 4.
2. Yes/No/Status or Not
the Town. Evaluate if there is a need
to expand this initiative.
additional mechanisms
needed
are needed for pet waste
control provide for these
measures,
NCS000424 SWMP
Town of Fletcher
December 6, 2021
Page 32
PART 10: POLLUTION PREVENTION AND GOOD HOUSEKEEPING PROGRAMS
This SWMP provides a comprehensive pollution prevention and good housekeeping strategy for the
Town of Fletcher municipal facilities and operations. Pollution prevention and good housekeeping is
accomplished through the implementation of seven required programs, which collectively address the
ultimate goal of preventing or reducing pollutant runoff from municipal operations such as parks and
open space maintenance, fleet and building maintenance, new construction and land disturbances, and
municipal storm sewer system maintenance.
Pollution prevention and good housekeeping for municipal operations includes the following programs:
1. Municipal Facilities Operation and Maintenance Program
2. Spill Response Program
3. MS4 Operation and Maintenance Program
4. Municipal SCM Operation and Maintenance Program
5. Pesticide, Herbicide and Fertilizer Management Program
6. Vehicle and Equipment Maintenance Program
7. Pavement Management Program
The Town of Fletcher will manage, implement and report the pollution prevention and good
housekeeping BMPs as specified in Table 21 below for each required program.
Table 21: Pollution Prevention and Good Housekeeping BNIPs
Permit
3,7.1: Municipal Facilities Operation and Maintenance Program
Ref.
Measures to.manage facilities that are owned and operated.by the permittee and have the potential for generating polluted .
stormwater. runoff The permittee shall maintain.a current inventory of in . i pal facilities; perform facility inspections
and routine maintenance; establish specific frequencies, schedules, and standard documentation; provide staff training on
general stormwater awareness and implementhrg pollution provention and good housekeeping practices.
BAP
A
B
C
D
No,
.Description of BMP
Measurable Goal(s)
Schedulefor
Annual Reporting
Implementation
Metric
33.
Inventory of Municipal Facilities
Create an inventory of all Municipal
1. List of all municipal
1. Permit Year 1.
1. Yes/No/Status
Facilities, including location,
facihtics.
Number of facilities.
function,and document what
2. Perform a site
2. Permit Year 2.
2. Yes/No/Status
activities or framework have the
inspection of municipal
Number of facility site
potential to generate stormwater
facilities to determine
visits.
runoff pollution.
and document items of
potential for spills or
stormwater pollution.
Review in place SPCC
plans and update as
necessary.
NCS000424 SWMP
Town of FIetcher
December 6, 2021
Page 33
Table 211: Pollution Prevention and Good Housekeeping BMPs
3. D Develop SPCC
3. Permit Year 2.
3, Yes/No/Status
plans for facilities that
Number of facilities that
are determined to need
require a new SPCC Plan
them.
34.
Public Works Standard Operating Procedure (SOP)
Review Public Works Department's
I . See BMP 421.
1.See BMP #21.
1, See BMP #21.
Standard Operating Procedure (SOP).
See BMP 421.
Permit
3.7.2: Spill Response Program
Ref.
Measures for facilities and operations ,that store and/or.use.materials that have the potential to contaminate stormwater
runoff if spilled. The perinittee shall maintain written spill response procedures and train staff on spill response
procedures,
A
B
C
D
BMP.
:.
No.
Description of BMP
Measurable Goal(s)
Schedule for
Implementation
Annual Reporting
Metric
35.
Spill Potential and Response Procedures
Any municipal facility that stores or
1, Create written spill
1. Permit Year 2,
1. Yes/No/Status
works with materials which have the
response procedures and
potential to contribute to polluted
provide to staff
run-off shall be identified and written
Consider pertinent
spill response procedures put in
locations to post
place,
document.
2. Review procedures
2. Annually
2. Yes/No/Status
with all relevant staff.
Permit
3.7.3: MS4 Operation and Maintenance Program
Ref.
Measures to minimize pollutants in the.stormwater collection. system. The pennittee shall provide operation and
maintenance staff training on stormwater awareness and pollution prevention, perform MS4 inspections,maintain the
collection system including catch basins and conveyances; and establish specific frequencies, schedules, and standard
documentation,
A
B
C
D
BMP
No.
Description of BMP ' .
_ .
Measurable Goals)
Schedule for
Implementation
Annual Reporting `
Metric
36.
Staff Training for Operation and Maintenance Activities
Create a list of operation and
1. Create list and means
1. Permit Year 1,
1. Yes/No/Status
maintenance activities to be
for documentation of O
performed by the Public Works staff.
& M duties.
Train staff in maintenance
2. Inspect and Maintain
2.20% of the MS
2. Report number of
procedures, stormwater awareness
and pollution prevention,
the MS4 collection
system each year, to
storm drains/catch basins
system. Document dates
accomplish full
cleaned,
and where the
maintenance of the entire
maintenance took place,
system within the 5-year
permit period.
NCS000424 SWMP
Town of Fletcher
December 6, 2021
Page 34
Table 21: Pollution Prevention and Good Housekeeping BMPs
Permit
3.7.4. Municipal SCM Operation and Maintenance Program
Ref.
Measures to manage municipally -owned,' operated, and/or maintained structural storn-twater.control measures .(SCMs) that
are installed for compliance with the perrnittee's.post-construction.program. The per€nittee shall maintain a current
inventory of SCMs, perform SCM inspections and maintenance, and shall establish specific frequencies, schedules, and
documentation.
BMP
A
B
C
D
No.
Description of BMP
Measw able Goals)
Schedule for.
Annual Reporting
Implementation
Metric
37.
Schedule and Training for Municipal SCMs O & M.
Review the Town's Operation and
1. Complete an inventory
1. Permit Year 1.
1. Number of municipal
Maintenance Agreements for all
of all municipal SCMs.
As required by each
SCMs.
municipal SCM's. Create a schedule
Complete maintenance
specific municipal
Report how many SCMs
and train staff to perform regular
and inspections, create
SCM's 0 & M
were inspected and
maintenance and inspections as
documentation of when,
Agreement,
imintained.
required of each SCM,
what was done, issues
and corrective measures.
2. Complete an annual
2. Annually.
2. Report date of annual
inspection of each
certification of each
municipal SCM by
municipal SCM,
appropriate personnel for
required certification.
Permit
3.7.5; Pesticide, Herbicide and Fertilizer Management Program
Ref.
Measures to minimize water quality impacts fi•orm the use of landscape chemicals.. The perrnittee shall provide routine
pollution prevention and chemical use, storage and handling training, and shall ensure compliance with permits and
applicator certifications.` - -
BM.I'
A ..
B
C
D
No.
Description of BMP
Measurable Goal(s)
Schedule for
Annual Reporting
.:'
Im lementation ._
Metric
38.
Pesticide, Herbicide, Fertilizer Applicator Training
Town staff that are responsible for
1. Create a list of all
1, As required by
1. Report how many are
application of pesticides, herbicides
Town employees that
certification schedule.
certified,
and fertilizers shall be certified in
hold certifications and
proper storage, handling and
their certification
application of landscape chemicals.
number.
2. Traiin all staff on the
2. Annually.
2. Yes/No/Status
storage and handling of
landscape materials and
pollution prevention
procedures.
Permit `
3.7.6: Vehicle and Equipment Maintenance Program.
Ref.
Measw•es to prevent and.minimize contamination of stormwater runoff from areas used for municipal vehicle and
equipment maintenance and/or. cleaning. The perrnittee shall ensure that municipal industrial facilities subject to NPDES
industrial permitting comply with those permit requirements, provide routine.pollution preventiontraining to staff,
erfortm routine inspections, and establish specific frequencies schedules and documentation, .
a
A
B
C
D
NCS000424 SWMP
Town of Fletcher
December 6, 2021
Page 35
Table 21: Pollution Prevention and Good Housekeeping BMPs
BMP
No
Description of BMP
Measurable Goal(s)
Schedule.for.
Im lementation
Annual Reporting
Metric
39.
Vehicle and Equipment Cleaning and Maintenance Facility Inspection
Perform routine inspections to ensure
1. Develop an inspection
1, Permit year 2.
1. Yes/No/Status
that vehicle and equipment facilities
checklist.
are following proper procedures to
2. Inspect facilities
2. Annually alter year 2.
2, Yes/No/Status
minimize water quality impacts from
where vehicle and
Number of inspections.
vehicle and equipment cleaning and
equipment maintenance
maintenance.
is performed. Record
results and any issues
and how issues were
resolved.
Permit
3.7.7. Pavement Management Program
Ref.
Measures to.reduce pollutants in stormwater runoff from municipally -owned streets, roads, and parking lots within the
permiitee's corporate limits. The perrnittee shall implement measures to control litter, leaves, debris, particulate and fluid
pollutants associated with vehicles, and establish specific frequencies, schedules, and documentation.
A
B
C.
D
BMP
.
No
Description of BMP
Measurable Goals)
Schedule for
Implementation
Annual Reporting .
Metric
40.
Street Sweeping
Review street sweeping schedule and
1. Document the Street
1, Annually.
1. Report miles of streets
implementation. Make adjustments if
Sweeping activity
swept.
necessary. Enhance documentation
protocols and miles of
materials,
streets swept
2. Document leaf
2. Annually
2. Report volume of
collection time periods
leaves collected,
and volume collected.
41.
Catch Basin Cleaning
Create a written schedule for catch
1. Document how many
1. See BMP #40
1. See BMP 940
basin inspection and cleaning.
basins were inspected
Document when it was done, (See
and how many cleaned
BMP #40).
out.
42.
Vehicle Spill Cleanup
Maintain a document for procedures
1. Create a document for
1. Permit Year 2.
1. Yes/No/Status
of spill clean-up in emergency
spill procedure on streets
situations such as vehicle accidents.
in emergency situations.
And documentation for each event.
(See BMP 435).
2. Document each event
2. Annually.
2. Yes/No/Status
and how the issue was
How many events.
taken care of including
dates.
NCS000424 SWMP
Town of Fletcher
December 6, 2021
Page 36