Loading...
HomeMy WebLinkAbout20211838 Ver 1_ePCN Application_20211220DWR Division of Water Resources Initial Review Pre -Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) June 1, 2021 Ver 4.1 Has this project met the requirements for acceptance in to the review process?* Yes No Is this project a public transportation project?* Yes No Change only if needed. BIMS # Assigned* Version#* 20211838 1 Is a payment required for this project?* No payment required Fee received Fee needed - send electronic notification Select Project Reviewer* Reviewing Office* Washington Regional Office - (252) 946-6481 Garcy Ward:eads\gpward Information for Initial Review la. Name of project: R-4705 Widening NC 125/SR 1142 (Prison Camp Road) from NC 903 to SR 1182 (East College Road) la. Who is the Primary Contact?* Paul Williams 1 b. Primary Contact Email: * lc. Primary Contact Phone: * pcwilliams2@ncdot.gov (252)482-1861 Date Submitted 12/20/2021 Nearest Body of Water UT to Tranters Creek, UT to Collie Swamp, UT to Turkey Swamp, Ready Branch, Dog Branch, UT to Ready Creek, UT to Dog Branch Basin Tar -Pamlico; Roanoke Water Classification UT to Tranters Creek (C;Sw,NSW), UT to Collie Swamp (C;Sw,NSW), UT to Turkey Swamp (C;Sw,NSW), Ready Branch (C), Dog Branch (C), UT to Ready Creek (C), UT to Dog Branch (C) Site Coordinates Latitude: 35.7985 A. Processing Information Longitude: -77.1584 County (or Counties) where the project is located: Martin Is this a NCDMS Project Yes No Is this project a public transportation project? * Yes No Is this a NCDOT Project? * Yes No (NCDOT only) T.I.P. or state project number: R-4705 WBS # (?) 38932.1.FD1 Pre -Filing Meeting Information Is this a courtesy copy notification?* Yes No ID# 20211838 Pre -fling Meeting or Request Date 4/18/2019 Attach documentation of Pre -Filing Meeting Request here: Click the upload button or drag and drop files here to attach document R-4705 Martin County 4C meeting Minutes.pdf File type roust be PDF la. Type(s) of approval sought from the Corps: Section 404 Permit (wetlands, streams and waters, Clean Water Act) Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) Has this PCN previously been submitted?* Yes No 1 b. What type(s) of permit(s) do you wish to seek authorization? Nationwide Permit (NWP) Regional General Permit (RGP) Standard (IP) lc. Has the NWP or GP number been verified by the Corps? Yes No Version 1 81.88KB Regional General Permit (RGP) Number: 198200031 - NCDOT Bridges, Widening Projects 2015 RGP Numbers (for multiple RGPS): Id. Type(s) of approval sought from the DWR: 401 Water Quality Certification - Regular Non-404 Jurisdictional General Permit Individual 401 Water Quality Certification le. Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: 1f. Is this an after -the -fact permit application?* Yes No lg. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No lg. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No 1 h. Is the project located in any of NC's twenty coastal counties? Yes No 1j. Is the project located in a designated trout watershed? Yes No 401 Water Quality Certification - Express Riparian Buffer Authorization Yes No Yes No B. Applicant Information ld. Who is applying for the permit? Owner Applicant (other than owner) le. Is there an Agent/Consultant for this project?* Yes No 2. Owner Information 2a. Name(s) on recorded deed: NCDOT Right-of-way NC 125/SR 1142 Prison Camp Road 2b. Deed book and page no.: 2c. Contact Person: Paul Williams 2d. Address Street Address 113 Airport Dr. Address Line 2 City Edenton Postal / Zip Code 27932 2e. Telephone Number: (252)482-1861 2g. Email Address:* pcwilliams2@ncdot.gov State / Province / Region NC Country USA 2f. Fax Number: (252)482-8722 C. Project Information and Prior Project History u 1. Project Information 1b. Subdivision name: (if appropriate) lc. Nearest municipality / town: Robersonville, Williamston 2. Project Identification 2a. Property Identification Number: 2b. Property size: 352.2 2c. Project Address Street Address NC 125/SR 1142 (Prison Camp Road) from NC 903 to SR 1182 (East College Road) Address Line 2 City State / Province / Region Robersonville, Williamston NC Postal / Zip Code Country 27871 /27892 USA 3. Surface Waters 3a. Name of the nearest body of water to proposed project: * UT to Tranters Creek, UT to Collie Swamp, UT to Turkey Swamp, Ready Branch, Dog Branch, UT to Ready Creek, UT to Dog Branch 3b. Water Resources Classification of nearest receiving water: * UT to Tranters Creek (C;Sw,NSW), UT to Collie Swamp (C;Sw,NSW), UT to Turkey Swamp (C;Sw,NSW), Ready Branch (C), Dog Branch (C), UT to Ready Creek (C), UT to Dog Branch (C) 3c. What river basin(s) is your project located in?* Tar -Pamlico Roanoke 3d. Please provide the 12-digit HUC in which the project is located. 030201030502, 030201030501, 030201030504, 030101070402 4. Project Description and History 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: * The land use in the area is primarily agriculture and silviculture with rural residential housing. Existing NC 125/SR 1142 is a two-lane roadway with 12 foot wide travel lanes and 4-foot grass shoulders. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past? * Yes No Unknown 4f. List the total estimated acreage of all existing wetlands on the property: 4.75 4g. List the total estimated linear feet of all existing streams on the property: 3,391 4h. Explain the purpose of the proposed project: * The purposed project consists of widening Prison Camp Road to an improved two-lane road with 12-foot lanes and eight -foot shoulders (four -foot paved) from NC 903 to just west of SR 1141 (Allen Williams Road). In addition to the widening, the road will be shifted slightly in some locations to improve curvature. From Allen Williams Road to SR 1182 (East College Road), a three -lane curb and gutter cross section is proposed with 12-foot lanes and a ten -foot berm behind the curb. Additional right-of-way will required to accommodate the proposed improvements. The proposed project is approximately 9.645 miles long. The purpose of the project is to improve safety and traffic operation on NC 125/1142 (Prison Camp Road). 4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used: * Widening to an improved two-lane road with 12-foot lanes and eight -foot shoulders (four -foot paved). Multiple culverts will be replaced throughout the project. Project will result in 0.45 acre of permanent fill in wetlands, <0.01 acre of excavation in wetlands, 0.72 acre of hand clearing in wetlands, 630 linear feet of permanent stream impacts, 182 linear feet of temporary stream impacts, and 198 linear feet of bank stabilization. Standard road building equipment, such as trucks, pavers, excavators, and bulldozers will be used. 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* Yes Comments: No 5b. If the Corps made a jurisdictional determination, what type of determination was made?* Preliminary Approved Not Verified Unknown N/A Corps AID Number: SAW-2017-01753 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: Greg Price, Rob Crowther Carolina Ecosystems Unknown 5d. List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR 6. Future Project Plans 6a. Is this a phased project?* Yes No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? D. Proposed Impacts Inventory 1. Impacts Summary la. Where are the impacts associated with your project? (check all that apply): Wetlands Open Waters 2. Wetland Impacts Streams -tributaries Pond Construction Buffers 2a. Site #* (?) 2a1 Reason (?) 2b. Impact type* (?) 2c. Type of W.* 2d. W. name* 2e. Forested* 2f. Type of Jurisdicition* (?) 2g. Impact area* 3A Roadway fill and culvert replacement P Bottomland Hardwood Forest WC Yes Corps 0.056 (acres) 3A Temp. Hand Clearing for Roadway Construction T Bottomland Hardwood Forest WC Yes Corps 0.130 (acres) 3B Roadway fill and culvert replacement P Bottomland Hardwood Forest WE Yes Corps 0.064 (acres) 3B Temp. Hand Clearing for Roadway Construction T Bottomland Hardwood Forest WE Yes Corps 0.148 (acres) 4 Roadway fill and culvert replacement P Riverine Swamp Forest WF Yes Corps 0.214 (acres) 4 Temp. Hand Clearing for Roadway Construction T Riverine Swamp Forest WF Yes Corps 0.260 (acres) 5 Roadway fill and culvert replacement P Bottomland Hardwood Forest WH Yes Corps 0.075 (acres) 5 Temp. Hand Clearing for Roadway Construction T Bottomland Hardwood Forest WH Yes Corps 0.060 (acres) 6 Roadway fill and culvert replacement P Bottomland Hardwood Forest WG Yes Corps 0.041 (acres) 6 Temp. Hand Clearing for Roadway Construction T Bottomland Hardwood Forest WG Yes Corps 0.055 (acres) 9 Roadway fill and culvert replacement P Non -Tidal Freshwater Marsh WK Yes Corps 0.001 (acres) 9 Temp. Hand Clearing for Roadway Construction T Non -Tidal Freshwater Marsh WK Yes Corps 0.002 (acres) 10 Ditch construction P Small -Basin Wetland WM Yes Corps 0.009 (acres) 10 Temp. Hand Clearing for Roadway Construction T Small -Basin Wetland WM Yes Corps 0.064 (acres) 2g. Total Temporary Wetland Impact 0.719 2g. Total Wetland Impact 1.179 2i. Comments: All listed on Impact Summary included with Permit Drawings. 3. Stream Impacts 2g. Total Permanent Wetland Impact 0.460 3a. Reason for impact (?) 3b.Impact type* 3c. Type of impact* 3d. S. name* 3e. Stream Type* (?) 3f. Type of Jurisdiction* 3g. S. width* 3h. Impact length* S1 Site 1 - culvert installation Permanent Culvert SA Intermittent Corps 6 Average (feet) 33 (linear feet) S2 Site 1 - culvert installation Temporary Dewatering SA Intermittent Corps 6 Average (feet) 10 (linear feet) S3 Site 1 - Bank Stabilization Permanent Bank Stabilization SA Intermittent Corps 6 Average (feet) 14 (linear feet) S4 Site 2 - culvert installation Permanent Culvert SB Perennial Corps 5 Average (feet) 49 (linear feet) S5 Site 2 - culvert installation Temporary Dewatering SB Perennial Corps 5 Average (feet) 27 (linear feet) S6 Site 2 - Bank Stabilization Permanent Bank Stabilization SB Perennial Corps 5 Average (feet) 14 (linear feet) S7 Site 3 - culvert installation Permanent Culvert SC Perennial Corps 15 Average (feet) 10 (linear feet) S8 Site 3 - culvert installation Temporary Dewatering SC Perennial Corps 15 Average (feet) 10 (linear feet) S9 Site 3 - Bank Stabilization Permanent Bank Stabilization SC Perennial Corps 15 Average (feet) 46 (linear feet) St0 Site 7 - culvert installation Permanent Culvert SE Perennial Corps 5 Average (feet) 16 (linear feet) S11 Site 7 - culvert installation Temporary Dewatering SE Perennial Corps 5 Average (feet) 10 (linear feet) S12 Site 7 - Bank Stabilization Permanent Bank Stabilization SE Perennial Corps 5 Average (feet) 12 (linear feet) S13 Site 8 - culvert installation Permanent Culvert SI Perennial Corps 4 Average (feet) 97 (linear feet) S14 Site 8 - culvert installation Temporary Dewatering SI Perennial Corps 4 Average (feet) 20 (linear feet) S15 Site 8 - Bank Stabilization Permanent Bank Stabilization SI Perennial Corps 4 Average (feet) 14 (linear feet) S16 Site 11 - culvert installation Permanent Culvert SK Perennial Corps 7 Average (feet) 5 (linear feet) S17 Site 11 - culvert installation Temporary Dewatering SK Perennial Corps 7 Average (feet) 7 (linear feet) S18 Site 11 - Bank Stabilization Permanent Bank Stabilization SK Perennial Corps 7 Average (feet) 16 (linear feet) S19 Site 12 - culvert installation Permanent Culvert Ready Branch Perennial Corps 7 Average (feet) 44 (linear feet) S20 Site 12 - culvert installation Temporary Dewatering Ready Branch Perennial Corps 7 Average (feet) 20 (linear feet) S21 I Site 12 - Bank Stabilization Permanent Bank Stabilization Ready Branch Perennial Corps 7 Average (feet) 20 (linear feet) S22 Site 13 - culvert installation Permanent Culvert SL Perennial Corps 8 Average (feet) 4 (linear feet) S23 Site 13 - culvert installation Temporary Dewatering SL Perennial Corps 8 Average (feet) 10 (linear feet) S24 Site 13 - Bank Stabilization Permanent Bank Stabilization SL Perennial Corps 8 Average (feet) 16 (linear feet) S25 Site 14 - Ditch Relocation Permanent Relocation SN Intermittent Corps 3 Average (feet) 313 (linear feet) S26 Site 14 - Ditch Relocation Temporary Dewatering SN Intermittent Corps 3 Average (feet) 17 (linear feet) S27 Site 15 - culvert installation Permanent Culvert SM Perennial Corps 12 Average (feet) 55 (linear feet) S28 Site 15 - culvert installation Temporary Dewatering SM Perennial Corps 12 Average (feet) 30 (linear feet) S29 Site 15 - Bank Stabilization Permanent Bank Stabilization SM Perennial Corps 12 Average (feet) 20 (linear feet) S30 Site 16 - culvert installation Temporary Dewatering SP Intermittent Corps 6 Average (feet) 14 (linear feet) S31 Site 16 - Bank Stabilization Permanent Bank Stabilization SP Intermittent Corps 6 Average (feet) 12 (linear feet) S32 Site 17 - culvert installation Permanent Culvert Dog Branch Perennial Corps 6 Average (feet) 4 (linear feet) 833 Site 17 - culvert installation Temporary Dewatering Dog Branch Perennial Corps 6 Average (feet) 7 (linear feet) S34 Site 17 - Bank Stabilization Permanent Bank Stabilization Dog Branch Perennial Corps 6 Average (feet) 14 (linear feet) 3i. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 828 3i. Total stream and ditch impacts: 1010 3j. Comments: All listed on Impact Summary included with Permit Drawings. 6. Buffer Impacts (for DWR) 6a. Project is in which protect basin(s)? Check all that apply. Neuse Catawba Goose Creek Other 3i. Total temporary stream impacts: 182 Tar -Pamlico Randleman Jordan Lake 6b. Impact Type 6c. Per or Temp 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact 6g. Zone 2 impact Site 1 - Culvert Installation P SB - UT to Tranters Creek No 5,058 3,695 Site 2 - Culvert Installation P SC - UT to Collie Swamp No 3,457 2,261 Site 3 - Culvert Installation P SK - UT to Turkey Swamp No 1,505 1,209 6h. Total buffer impacts: Total Temporary impacts: Total Permanent impacts: Total combined buffer impacts: 6i. Comments: Zone 1 0.00 Zone 1 10,020.00 Zone 1 10,020.00 Road crossing impacts for construction access to culvert installations. E. Impact Justification and Mitigation Zone 2 0.00 Zone 2 7,165.00 Zone 2 7,165.00 1. Avoidance and Minimization la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: Avoidance and Minimization has been addressed through the Merger Process. Proposed fill slopes in wetlands have been set at 3:1 or less, to reduce the impact foot print. Utility relocations will result in no impacts to jurisdictional streams or wetlands. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: The project will follow NCDOT guidelines and BMP's for culvert installation and we will implement an erosion control plan prior to any land disturbing activities. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? Yes No 2c. If yes, mitigation is required by (check all that apply): DWR Corps 2d. If yes, which mitigation option(s) will be used for this project? Mitigation bank Payment to in -lieu fee program Permittee Responsible Mitigation 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. Yes No 4b. Stream mitigation requested: (linear feet) 828 4d. Buffer mitigation requested (DWR only): (square feet) 0 4f. Non -riparian wetland mitigation requested: (acres) 0.009 4h. Comments Approval letter will be submitted when received from DMS. 4c. If using stream mitigation, what is the stream temperature: warm 4e. Riparian wetland mitigation requested: (acres) 0.451 4g. Coastal (tidal) wetland mitigation requested: (acres) 0 6. Buffer mitigation (State Regulated Riparian Buffer Rules) - required by DWR 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? If yes, you must fill out this entire form - please contact DWR for more information. Yes No F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan la. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes No What type of SCM are you providing? Level Spreader Vegetated Conveyance (lower SHWT) Wetland Swale (higher SHWT) Other SCM that removes minimum 30% nitrogen Proposed project will not create concentrated stormwater flow through the buffer 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? * Yes No Comments: G. Supplementary Information 1. Environmental Documentation la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? * Yes No 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)?* Yes No lc. If you answered "yes" to the above, has the document review been finalized by the State Clearing House?* Yes No Comments: * Project is covered by Type IB Categorical Exclusion. 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)?* Yes No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* Yes No 3b. If you answered "no," provide a short narrative description. Project is for highway modernization and safety improvements. Project will not increase traffic or development for the surrounding area. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* Yes No N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* Yes No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* Yes No 5d. Is another Federal agency involved?* Yes 5e. Is this a DOT project located within Division's 1-8? Yes No No Unknown 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? NRTR dated 7/2017, current IPaC resource list, NC Natural Heritage Program. PBO for NLEB will be followed. PBO for Neuse River Waterdog will be followed. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* Yes No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat? * Essential Fish Habitat Mapper 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* Yes No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* CE Documentation, Archaeological Resources Survey Report dated August 18, 2017, Assessment of Effects dated May 2017 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain?* Yes No 8b. If yes, explain how project meets FEMA requirements: NCDOT Hydraulics Unit coordination with FEMA Sc. What source(s) did you use to make the floodplain determination?* FEMA Maps Miscellaneous Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred. Click the upload button or drag and drop files here to attach document AR15-02-0014NoSitesPresent.pdf 13.78MB R4705EffectsMay2017.pdf 7.31 MB R-4705_Permit Drawings_08312021.pdf 15.56MB R-4705_Permit Drawings_Buffer_02222019.pdf 2MB R-4705 Martin County 4C meeting Minutes.pdf 81.88KB SAW-2017-01753 NCDOT R-4705.pdf 138.02KB R4705_VicMap.pdf 1.88MB R-4705_HYD_SMPv2.08_(20190228) (Apr 2018).pdf 105.81KB File must be PDF or KMZ Comments Signature By checking the box and signing below, I certify that: • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief'; and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true, accurate, and complete information on this form; I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND I intend to electronically sign and submit the PCN form. Full Name: Paul Collins Williams, Jr. Signature cr4. Date 12/20/2021