Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20071481 Ver 6_401 Application_20131213
ENvIRONMFNTAL SFRVICF.S, INC 524 SOUTH NEW HOPE ROAD RALEIGH, NORTH CAROLINA 27610 (919) 212 -1760 December 18, 2013 Ms. Karen Higgins NCDENR - DWR 1650 Mail Service Center Raleigh, NC 27699 -1650 Re: The Enclave at Trackside Apex, NC Ms. Higgins: 01 -1�%I V 14 l A IT c7 Enclosed please find the PCN submitted on behalf of Apex First Development, LLC for a water line crossing resulting in temporary stream impacts and riparian buffer impacts. Please let me know if you have any questions or comments during your review of this application. Thank you for your assistance. Sincerely, Environmental Services, Inc. Jeff Harbour Senior Manager �s�F wATF9 pG Office Use Only: 3 Corps action ID no. o < DWQ project no. Form Version 1.4 January 2009 Pre - Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ® Section 404 Permit y� ❑ Section 10 Permit 1 b. Spe* Nationwide Permit (NWP) number. 12 or General Permit (GP) number ic. Has the NWP or GP number been verified by the Corps? ❑ Yes ® No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ® Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ® Yes ❑ No For the record only for Corps Permit: ❑ Yes ® No 1f. Is payment Into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ® No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes ® No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2. Project Information 2a. Name of project: The Enclave at Trackside - Water Line 2b. County: Wake 2c. Nearest municipality / town: Apex 2d. Subdivision name: The Enclave at Trackside 2e. NCDOT only, T.I.P. or state project no: 3. Owner information 0 3a. Name(s) on Recorded Deed: Apex First Development, LLC 3b. Deed Book and Page No. 10902; 0190 DE 3c. Responsible Party (for LLC If applicable): Mike Howington P.O. Box 1197 W r Branch Apex, NC 278502 3d. Street address: 3e. City, state, zip: 3f. Telephone no.: 919- 7964425 3g. Fax no.: 3h. Email address: mhowington @hallecompanies.com Page 1 of 10 PCN Form — Version 1.4 January 2009 4 Applicant Information (if different from owner) 4a. Applicant Is: ❑ Agent ❑ Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address. 5. AgentlConsultant Information (If applicable) 5a. Name: Jeff Harbour 5b. Business name (!f applicable): ESI Sc. Street address: 524 South New Hope Road 5d. City, state, zip. Raleigh, NC 27610 5e. Telephone no.: 919- 212 -1760 5f. Fax no.: 919- 212 -1707 5g. Email address: jharbour @esinc.cc Page 2 of 10 B. Project Information and Prior Project History 1. Property identification 1a. Property identification no. (tax PIN or parcel ID): 0742575201 1b. Site coordinates (in decimal degrees): I Latitude: 35.748 Longitude: -78.8467 1c. Property size: 8.16 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: Williams Creek 2b. Water Quality Classification of nearest receiving water. WS -Ill; NSW 2c. River basin: lNeuse 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The property is currently undeveloped but Is proposed for residential homes. Surrounding land use is residential and commercial. 3b. List the total estimated acreage of all existing wetlands on the property: 0.5 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 800 3d. 1= xplain the purpose of the proposed project The purpose of the proposed activity is install a water line, which must cross a stream and buffer. 3e. Describe the overall project in detail, Including the type of equipment to be used: The project will entail crossing a creek and Neuse buffer zone. Typical construction equipment will be used for this project. 4, Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ro ect (including all prior phases) in the past? ❑ Yes ❑ No ® Unknown Comments: stream was delineated and surveyed by others 4b. If the Corps made the jurisdictional determination, what type of determination was made? [3 Preliminary [3 Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency /Consultant Company. Unknown I Other. 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. Unknown 5. Project History 5a. Have permits or certifications been requested or obtained for this project (Including all prior phases) In the past? ❑ Yes ❑ No IN Unknown 5b. If yes, explain in detail according to 'help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ® No 6b. if yes, explain. Page 3 of 10 PCN Form — Version 1.4 January 2009 C. Proposed Impacts Inventory I. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑ Wetlands ® Streams —tributaries ® Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area Impacted. 2a. Wetland impact number Permanent (P) or Temporary 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of Impact (acres) W1 - Choose one Choose one Yes/No - W2 - Choose one Choose one Yesft W3 - Choose one Choose one Yes/No - W4 - Choose one Choose one Yes/No W5 - Choose one Choose one Yes/No We - Choose one Choose one Yes/No 2g. Total Wetland Impacts: 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites Impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) $1 T Other UTto Williams Creek PER Corps 3 20 S2 - Choose one - S3 - Choose one S4 - Choose one S5 - Choose one - Se - Choose one 3h. Total stream and tributary impacts 20 31. Comments: Temporary impact from water line crossing. Page 4 of 10 PCN Form — Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then indiv dually list all open water Impacts below. 4a. Open water impact number Permanent (P) or Temporary 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of Impact (acres) 01 - Choose one Choose 02 - Choose one Choose 03 - Choose one Choose 04 - Choose one Choose 4f. Total open water impacts U 4g. Comments: 5. Pond or Lake Construction If oond or lake construction proDosed. the complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (ass) Flooded Fllled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: 5h. is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 51. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitt ation then you MUST fill out Section D of this form. 6a. Project Is in which protected basin? ® Neuse ❑ Tar - Pamlico [] Catawba ❑ Randleman ❑ Other. 6b. Buffer Impact number— Permanent (P) or Temporary 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 Impact (square feet ) 6g. Zone 2 impact (square feet B1 P water Me crossing UT to Williams Creek No 1,468 885 B2 - Yes/No B3 - Yes/No B4 - Yes/No B5 - Yes/No B6 - YeslNo 6h. Total Buffer Impacts: 1,466 885 8i. Comments: 20-4 wide Town of Apex util'dy easement; no fill materiah, just clearing Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed Impacts in designing project. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State? ❑ Yes ® No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank El Payment to in -lieu fee program ❑ Permittee Responsible Mtigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type: Choose one Type: Choose one Type: Choose one Quantity: Quantity: Quantity: 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -Ileu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non - riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires [3 Yes ® No buffer mitigation? 6b. If yes, then Identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: ro ect does not require compensal ry buffer mi igabon. Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified ® Yes ❑ No within one of the NC Riparian Buffer Protection Rules? 1b. If yes, then is a diffuse flow plan included? If no, explain why. Buffer Impacts will be reviewed by Town of Apex ❑ Yes ® No 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? % 2b. Does this project require a Stormwater Management Plan? ® Yes ❑ No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: The stornwater will be reviewed and approved by the Town of Apex. 2e. Who will be responsible for the review of the Stormwater Management Plan? Town of Apex 3. Certified Local Government Stormwater Review 3a. In which local governmenCs ludsdiction Is this ro ect? Town of Apex ❑ Phase II 3b. Which of the following locally - implemented stormwater management programs ❑ NSW ❑ USMP apply (check all that apply): ❑ Water Supply Watershed ❑ Other. 3c. Has the approved Stormwater Management Plan with proof of approval been ❑Yes ❑ No attached? 4. DWQ Stormwater Program Review Coastal counties ❑HQW 4a. Which of the following statemimplemented stormwater management programs apply ORW (check all that apply): OSesslon Law 2006 -246 ❑Other. 4b. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ®No attached? 5. DWQ 401 Unit Stormwater Review Sa. Does the Stormwater Management Plan meet the appropriate requirements? ® Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 10 PCN Form — Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1a. Does the project involve an expenditure of public (federal /state/local) funds or the Yes ® No use of public (federal /state) land? 1b. if you answered yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State []Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered yes" to the above, has the document review been finalized by the State Clearing House? (if so, attach a copy of the NEPA or SEPA final approval letter.) ❑ Yes ❑ No Comments: 2. Violations (DWQ Requirement) 2a. 1s the site in violation of DWQ Wetland Rules (1 SA NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑Yes © No or Riparian Buffer Rules (1 SA NCAC 2B .0200)? 2b. Is this an after - the -fact permit application? ❑Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violatlon(s) 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in []Yes ®No additional development, which could impact nearby downstream water quality? 3b. If you answered yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered 'no; provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Municipal sewer will service the homes assoclated with this project. Page 9 of 10 PCN Form — Version 1.4 January 2009 S. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or Yes ® No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act 0 Yes ® No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Onsite review by ESl staff Identified no habitat for any federal protected species listed by USFWS for Wake County plus NCNHP database query S. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b. What data sources did you use to determine whether your site would Impact Essential Fish Habitat? List of EFH Waterbodles published b NOAA 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation (� Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? NC SHPO 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA- designated 100 year floodplain? ❑ Yes ® No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? NC Floodmaps MiVE Wowi11V\ W — I '-�/ 1 -7 Applicant/Agent's Printed Name Applica ent's Signature Date (Agents signature is valid only if an authorization latterfrom the applicant is rovided. Page 10 of 10 f � J 1p WY yam. M �f C F/k - �1 4 A �ii QL CrC2 �' ` +{ °' crC2 � i rC _ ;, Church Gf i fM02 Gr CrE CrG -- YGrE3� CrE �" -- _ + CI I 1 P '¢r rC = �.= /' GrC �tif p 4 .. Wyk ; y i I � , ;� ° ��„�` �; �• 1 � � x�' . �, �-, GrG �f t -arc GrC2 X l r3 f 2 rB ?v ,,� t o r � i` h4gB;- C• �' � '.s,��a � txg� T•• ' 11: f VC2 fir, ' i � r of 1)2 \Cr8?,� tAfB J� -a, ML2 Crf WD2 GrC �x w • < Y - QProjectBoundary riMfC° °'r': ^- �� Gr Q NRCS Soil Boundary rf, ,g Soil Mapping Units GrB Granville sandy loam, 2-6% slopes GrB2 Granville sandy loam, 2 -6% slopes, eroded Gr r GrC2 Granville sandy loam, 6 -10% slopes, eroded J Wy Worsham sandy loam Wy_' 0 500 1000'. Feet Sources. NRCS Soil Survey of Wake County. 1970, Project Boundary provided by Wake County / f GIS parcel data, June 2013 Disclaimer. The information depicted on this fgure is for informational purposes only and was not prepared not suitable for legal or engineering purposes. This J.�) B information presented is not for regulatory review and is _ - ' • Q g intended for use only by a Professional Land Surveyor prior 4J - ENVIRONMENTAL NRCS Soils Project: ER13156.00 SERVICES, INC. Date: Dec 2013 Raleigh, Ralh, Norlh Carolina 27610 Enclave (919) 212 -1760 Drwn /Chkd: KT /JH (919212 -1707 Fax Wake County, North Carolina www enwronmentalsetvicesinc. cram Figure: 2 Path: P: lGeoGralProiects @01311561GISlsoilsf.mxd Date: 121112013 9 55.08 AM I - -- I ay RAILROAD / W R Mh CM in E I — =E —1- i- — _ G WIRE • 2a Top, 5 1 _ OVERLIE 5 8 / POWER LINES AND ISVE NT •owER � E la Eal EASEMENT �"'7+ �t �� ��• - - - - / - Rr E l �R - EXISTING / ---- / wrrLAND5. EX. CHANNI I � � �1 • . ��` •. OP OF BANK . . v �-- a I--- EXISTING I 5TORMWATER BMP I I I I� I -------------------------------------------- EXISTING ALLLY (TYPICAL) {lives 1f f f• _ to Lo- � I I I I I s I I I I 4 I I+ I I I I I I [ � ,• I I I I I a HGI NE , � , I I— I I I I I I 'y , fR •••• pS�•� I I I I I I I ••.fffff f•N {{ % II II I I �315 I 31 312 I 311 I 310 I I Jones & Cnosm I I� AX P4 ENGINEERING, PLLC /.711 221 N m Ki 001 Po Box i Ape& NC 27W2 �ZI I - I, NOTM /) H //H '�� _ _ �_ _ - .-..� 3 ALL MATERIALS AND MEtWO9 a G05lftCleON 5N « w ACCORDANCE WM 70" Of AM -'- ` `'� 1 IIVI 1 qy 1 2 SDQINVARY ArAND O GRMN�,V/ORMATION TARES rrDM A OWAL Of PROMW 6Y OlNGIMAS _ -- - - -i - -- -� - - r-- _� ' -. {T {7 µA W10wRVCYNAPHIY --- I 1� =--- - -� --� ---- _ - _- -� / \ • ! DIG RAJ. J. TAX V W MRUR T Dr4CLND KMND, a dRRUWAl. TMD. FROM A RUMPI ED i l B&I PROVIDED OY MC TREE OCVdAHtNT. 11L. T« [NNrdN2ttAL RATUtb ARE R[COROrD CN EM 2000 x0141 --'_- I ��- / I - -__ \ -- -� -- - i - _ - - _ _ -- - _ _ -1 - - - ♦ ROPERT MK/37200'7♦2WI WT[002 WY2000711[RLONO C00.KAR ROORWNON rr1[ 7 - fRaIRK 1 '�-- -- - -_- -- " --- --- - ANrMOTIMORMLfQWn fW%XL W f TAINDO OROWO TNSTRLClON DRAWING APPROVAL OTHEROJW5zm AGOIOG,MLL «OOTANCNrRR]RTOCdDN FORTH MALAY OFAP LL Ir 1 I, G 710.5 rR00 PA NNi A O L OPEN NOAQOM610 ASSOCIATION FOR TK WUW Or wrDt TENT ALSO OM1S AND MAIMTADD ALL USE OP ? () BO. CE COM PONDS T WIT AREAS __- -__ - = = -= _ 7 APEX 5TCM ATM RZO91YGTT USE Of INRR (110W[RNIION rQV, TO LRfTIR 70Mll Of q/' ArO1,TOCM1•A1CR aoIDt2.aNq. •---- l - O TMS rRpMGf SMALL CC RLONRD TO AOMM ro ALL ArPUCASRC STORAM'ATM RCOARENCNIS I' NR]A0.NG WOTWG T«COST-0Nr10M01T RM10R 7O DOM OR tq, T1VW THE r1ZAM70g2NT ' -___ -- «_ -_ _ -_--- _ _ -_ ( �� _ =- == R!M-0TIOR TIJEM 10-KARA1D ZSRN1 DRAINAGE WEIMENT ROr ACCESS TO ADTOMQT I I fTy 1 r J -- �'_ -- JT �h20 TOA �• —_ -- - TMESOFFr ARC. CI. YeA luu «wAND25YmNAOrMNACeweAOONATER PUBUC TOW �_ _ \ E= - e nrc,a OVTM MOW, 111W G„IVII« SlrrTOaNTED WIN ADD11101ML MAW045 Or WBLOLLY rrrr�a � ` I/ ~('yie xA—_- FWD AM MAGNOLIAS IN TIZ IAGMI•AYU RAN BLW= TO THE APPROVAL Or AN erCFJWMWMr j I I 1' jll R 1 1 1 1 1 r sr n a 1 Lm _ _ _�_ \ I \ 0 TALC wrSTEON Sd 01-FM SMALL «RE- VEGETATED M,TN A COMB.IIATIDN Or ON MAPLE CIA. NQ 1 r 7 1 / ' r♦ r� Lramn `- -' - --- AND WAM TrnMwoT OWNING 7 �{ MONOrOt2 ( 1I Tree PROM 51w�PR VIDE A�flLaSroT Ea COL TQKR t=TED 110RTMC57 Or M,RE I �� P au7owa {I �y1 "M ROCOmNG A 20 COL rowDe ACCESS JDA,O•oO 1 III 11 �' TI AL 0"',Nc r \ sxzo j1- I 1 2 AG1tma.Nr a1 flON�il loR�ooNSnu�N.wAUw�G APPROVAL. rn w ma I Ilk-- fn°p��7f_- 1 1 rARRacrAO 1 1 1 I 1 - r� I �I I ♦ ' S 'J�gt��lm BY L45TM«iATON OF Led INC w�mx«APE MA Olt FtNO w e mMC wms sNAU « alt 14 TM W MGM. MOOD BNWGR FENCE HANG ThC BOOTH PROPCRT' 9Wl CC INSTALLED ro W= A I I ( CQ@TM7N a w5=SILOOm0101i PAN APPROVAL GY TO" GauMW. I II � ►�I � ' � 1 I [�q•itp�i S rowN REOMRID,UBDMSIp1INOlp� I I I I I 21'p4l REE 1 i 1 1 I I I I I / I NO SITE UVE.OHOM ACTIVITY OMLLVIW BIT NOT DOTED TO TESTING. CLEARING. OC.TMIATOM Or w . 1(` I 1 sa TArASwES aR 4RAD -IC ,T1AU ocuAe uNm REDMRED ncirL'rIDN r2aM:11w5 em1 C NGK 1o00DD1/ ST ^ / dOdTVMMNAY _ l - �- I' 1 �/ �MU1�O1f. m�ARJLa�ir OM er uL. Cis , 2121[ -1426 MLAnw raaur MY «oaTAeRO AT ne I I I I I 1 ( 1 t «/ Z I TDC5 Mx7W as cac�A71w AREA. 5 N A'AS BW wi LAWITm TOYHSTO ucCew400110 AND 2 rROTBCMOM ITSMEM C MST «PIA® AIVAY FROM ANYSAVED T= ONE COOT 1011 fAC1 NCH Or evc STOP / - 7 j 1 / I / // ,IRUCIIRCI. wnLMM, AM FONDS PROTECTION PENDING Msr «PACED HANG TIME OIn1« 1 1 1 a 4p SYN TIC / !7 S' O P C/ LDO Or C 9T-" TIC" PEN LNG M070EMN. NRDIN OTHER LOCATIONS C ADGC w L05C T M .'5 Thr mN MtUW NR12A1. WA 0Y MY TOQDWIIA aN PRO E LINES Oe1 EAnLMW AAREAS, rs ALL GRADING AND sLTORT B7A/LICS ASSOCIATED WITH MI REARNG sr RLL7IRE,IW01N1C NOT GRAVC ! L E /�dK I f+ '^rye 1 J CMCTIOACM W ONE RO r TR M ' FUMt OR UTY EA DAARM pIN FJ N LIT NOT WANED MA RG MD � ENTEMY ON sm • HAfUC vmm rASO.oes Mo wTT,•ar wAn AND s1Tw « /L ual 1z 1 1 --t / , J { , 5" — R=OARED TO SATISPP as tAT DNAL RI'D1/R2.OR5 5" AS aD MOT LOOTED TO M CC Y NODS A GREfNN%Y. AMD MOD WrAUr ASSOCRIED COAL TOA MMOM5. TRASI OF APEX _� I -•�C _ % Y A/ / /// / / ST�Mw�n WCOLFFWATIiON5 oroeTRACrcN«rA- sriNNDD IM RP em afTMTOM Or / APO rMw AND aaMTroN DWARIAOR ' . Ic of / //// i / s TAR SCREENM G Of LW WIG 0=5 IRA'M WNTwKRS DtM3NPNG DWVS70C AND WILLQ/T I I I gppgO /y, 5 ` � rARROC / O Ei 31 % / EXTRA, ORM Y [ORAL O1rt000R,iduG[ MBOIAMCAL AND MVACEDpuort, AND 50" rATSMMSO T. ' 1 I I III I R"•11F / 1 _ / �� / - , I 2 I MO. 1z OP�THE o SPICOFKALLrOxR K"T«EDOOE 50TT Iaze 1 J /I RR P 1 I MO NWt1ORAlCO ORO TZ WMWDES GN,MWEOr,lO 012lOOf AND LANDSCAPE I `/1 I✓ j it / �r9 // 1 I 1 I I /f DC WA 1p1 / M OR UN�WGFL AND ARE IN&ATEEA AND TO led WEB N, Of TIME CLIMOING • /L I �I j- ---�'�- /® �J / / 1 - i L =2y�izo Lxj-a ?_o 4 / / / '�I• N vMmrn Aa ,5OMe5 A01CM Anwnrt FNOmcrvs Mn nnlc s7ram. AND w N ANY "MID INK OR OMCR 1OpVWCM OR I11111Y 0011nN01T MOW TALL OR LW TM DICLOB�MeSr TOAww amxrzbODS Pups Tlur MST «A MST MW4MT TALL OK The! Tawrrt w me ow,m WaeYR D rMlu AND «enr or MA50W ALL 11MAXED r Pwa rza o�CCwA SPIOM WYYat NMe m W DIMG�wmRMT1AT rNAW A l 7 SITE OLEO9U01 AS - ft ALOE'ODIED70. Lr.1TT-1G• LMmBfMNG IDIO LONG WANO PARK04 IG Ib / �� . .;/ / !' ` ,�Lv -/ / I I / my OIILSSIEC/TRASP M0 COMPLETED TED rp eT TO !NM 50sMIRGA re"2 Wit 00AND0101 AND rAVI RE APPROVED RODE« ART Or T rNgRro,o AL 11S wrwM,IGN MOWN ND,IGID ARE MASTERS 11 FARE I TU MN APPROVAL AROVALTe,IGM rAR-T NMf« oerM1® w wsme s1GN nM1 MIST «,uelmED FUR M+RwAL. 7y / /"'� T ]� Dr,Or BANK . 1- 01r iCAI �! I►111 I III - ; ,� % - . � I.. VXTLAIM Ali � . . ! �- II I IIII I a or /NOWARFONOtLY IMPACT AREA '- / / �� ` t0 1 ` \ A PeN NO, .zscssAee� I J j ,TDRMwMER MO _ _--- -- ---- - _____ -__= = = ___'_ =' = -- - - -- ----------------------------------- _ / / I EDSnn4 Ausr mncMl — — lU,, — — - a s sIDCwMR -- — — — — — — — — — — — — -- — — — T------ ------ ------ ------ r -----T - - - --i ----T - ---- YAREYCVRD i AAMMDtl 9Si0CwMl[ i I I 0 20 40 80 DOSING ALLEY(T1TGI - _ -- 1--- - -- GRAPHIC SCALE T. S• SIR . (TYP 1 1 , y I J IL Z L IA.I w Z_ W 721 N. SAM ST. SSBEE 001 PO BOO( 7062 APEX NC 71600 ON= 9194W -1174 hyRntl -n: 80161 LLJ 1) Uz Q QZ U-1 0 g� U� z W W U z g I' -40 I PDC NOVEMBER 4, 2013 IN n. HI \HV AY _ - 1 -_ _ - _ _ - _ -- ___ " -- _ . _ _ - 4 _T 1- fi r 1 j. 7 ............... .. . . . .. .................. . ... ... EX 15T; �?Q. TOA ........ 7.7 —7 -7— PROPERTY LINE (TYP) POLE 2-7— 2, 7. 7' MONO all .... .. CELL TOWER T' 'y E'- CHANLINK F 9'X 2 0' _�NCE nyp) A PARKING PAD L G 561 A IPIO-BETE ON POND 21 SHEET 9) ........... 41 j/ T RAMP \ t i _ I ,° STREET A STOP SIGN *VEWAY G' HIG1, WOOD HIC ICAL BAR.R.ICADE ONCE P H/C Ga� ! `� J I I i / J ! rl J ': RAMP ---I ------ — I / r 4 1 STOP /F_ -7 SIGN H/C 37.5' BOC_ RAMP I/ M�i 5'51DEWALK Lo K)O K (TYPICALl cn flCCTI G GRAVEL (Di it RIVE � ! I �.:�. "" .. j`V � � ! ' t 1 �ml � l ;�� � 1 %I � �° J � i" �' ai ... z L 2_2 o' f J, 0 NJ in a)... U 8'x 10' c\j L41 ........ (rYPICAL) GUEST Now OR fOF4vIf_ us )l- < ........ EXTRA Ol< 6 u •11 RA IC 5ELF MOYAZE U-1 2 ui 15 z L !� FIN NO.: 0742- G-0859 l 1 ! C)*00,6 (D ONED+ OU F USE: NI-WA H lb j a_ 0 BIO-RETENTION G I . ! l / J '' o/ / -"' 1 _ (SEE 519EET 9) 75.2 'tie BIO-RETENTION too, POND I ON N q5X RAILROAD (5EE SHE > %_i 02-3, t��etlt' EX -CHANNEL ATE AC 055 EM NT fOR ICAL) 7 E55 0 7� 30 POWER TO K 20 CE t r/6F BANK JTYPICA A CE LL TOWS I /---" _ 5 EA52 219- #'tg) CELL jwf� NEW I C DE r 'GRAVEL ACCE55 E7 EX15TING WETLANDS SO50, . . . USE U5E SuFf=t CUR�17) ------- 30"-,VAUJ�� R EXISTING CAL) WETLAISID5. EX. CHANNEL (TYPICAL) (TYP15!�t1-- 7� CNN . . . . . . . .. ------- 'o TOP Of BANK (TYPIC 0 RIVER . . . . /NOW OR FORMERLY is) 5Q - i VER a Uprz 'EX FIRST DEVELOPMEN PIN NO.; 0742-5S-a6j.2 .APEX fP, LLC ZON -CZ'-- P: PUP, Z ----------- N 0 VkkR, V 0 L E Ly AIWA AM FIRST ELOPMENT, LLC IMPACT j t � j � __ /_ /-- '"°`°- � ''"``... _ PIN NO.: 0142-5G-9588 'x- ZONED: IUD-CZ USE: I�CA^ _ ` X, 5TORMWATER 5MP ' _ _ _ . _______ - ° �1 li EX15TING EXTEND 15T. PAV14ME *G AN 5'51DEWAIr, — — — — — — — — — — — — — — — — — — — — — — — — — _ ® ®— — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — -- — — — — — — — — — — — 35' ACCE55 35'ACCt '55 7 / z EXISTING ALLEY ("ICAL) EX. 5'51DEWALK EX15TING ALLEY (TYPICAL) EASEMENT (TYPICAL) EASEMENT -- - - - -- ` ✓ i 1 - i 1 � ! i ( 1 / � I I I I I I I I ( I I ( I I I I I I I I I I I I II ( ' I I I } I I ` EX. 5 O'R1W -------------- ------- F --- --- - 1 1 — EXIST. 30" 1 1-- �11_x"2715-13 VALLEY CURB EX. 5' 51DEIALK (TYP) UYPICAL 51 I —_ _— i I - - - - -� I f I I I' f _ __ _ m I . ALL MATERIALS AND METHODS Of CON5TRUCTION SHALL BE IN ACCORDANCE WITH TOWN Of APEX STANDARDS AND SPECIFICATIONS. 2. BOUNDARY AND TOPOGRAPHIC INFORMATION TAKEN FROM A DIGITAL FILE PROVIDED BY ELINGBURG LANE) SURVEY COMPANY. 3. ENVIRONMENTAL FEATURES INCLUDING STREAMS, WETLANDS AND BUFFERS WERE TAKEN FROM A DIGITAL FILE PROVIDED BY APEX FIRST DEVELOPMENT, LLC. THE ENVIRONMENTAL FEATURES ARE RECORDED IN BM 2008, PG I G44. 4. PER fEMA MAP #3720074200J DATED 02 MAY 200G, THERE 15 NO I 00-YEAR fLOODPLAIN ON THE PROPERTY. 5. ANY ENVIRONMENTAL PERMITS REQUIRED FROM NCDENR, DWQ, THE ARMY CORPS OF ENGINEERS OR OTHER AUTHORIZED AGENCIES SHALL BE OBTAINED PRIOR TO CONSTRUCTION DRAWING APPROVAL. G. TH15 PROJECT SHALL JOIN THE EXISTING HOMEOWNERS ASSOCIATION FOR THE VILLAGES OF APEX THAT AL50 OWNS AND MAINTAINS ALL OPEN SPACE AND RESOURCE CONSERVATION AREAS. 7. TH15 PROJECT 15 PROPOSING THE USE Of THREE (3) 1310-RETENTION PONDS TO MEET THE TOWN Of APEX STORMWATER REQUIREMENTS. 5. THIS PROJECT SHALL BE REQUIRED TO ADHtERE TO ALL APPLICABLE 5TORMWATER REQUIRE MENT5 INCLUDING LIMITING THE POST - DEVELOPMENT RUNOFF TO EQUAL OR LE55 THAN THE PRE-DEVELOPMENT RUN-Off FOR THE I -YEAR, I O-YEAR AND 25-YEAR STORMS. THE 5TORMWATER DEVICES USED TO MEET THESE REQUIREMENTS SHALL BE LOCATED,.tVITHIN A DRAINAGE EASEMENT WITH ACCE55 TO A PUBLIC Rb✓. 9. THE 40' BUFFER ALONG HWY. G4 SHALL BE SUPPLEMENTED WITH ADDITIONAL PLANTINGS OF LOBLOLLY PINE5 AND MAGNOLIAS IN THE HIGHWAY G4 RiW SUBJECT TO THE APPROVAL Of AN ENCROACHMENT AGREEMENT BY NCDOT. 10. THE WESTERN 30' BUFFER SHALL BE RE-VEGETATED WITH A COMBINATION OF OAF, MAPLE, ELM, PINE AND WAX MYRTLE PLANTINGS IF DISTURBED BY GRADING. 11. THIS PROJECT SHALL PROVIDE ACCESS TO THE EXISTING CELL TOWER LOCATED NORTHWEST Of THE SITE BY RECORDING A 20 CELL TOWER ACCESS- EASEMENT. 12. THE EASEMENT FOR THE PROPOSED POWER LINE RELOCATION 5HALL BE SECURED BY WRITTEN AGREEMENT OK RECORDATION PRIOR TO CONSTRUCTION DRAWING APPROVAL. 13. HVAC UNITS SHALL BE LOCATED IN THE REAR OF THE TOWNHOME UNITS. THE HVAC UNITS SHALL BE SCREENED BY INSTALLATION OF EITHER LANDSCAPE PLANTINGS OR FENCING. 14. THE G' HIGH, WOOD BARRICADE FENCE ALONG THE BOOTH PROPERTY SHALL BE INSTALLED TO MEET A CONDITION Of MASTER 5UBDIV15ION PLAN APPROVAL BY TOWN COUNCIL. TOWN REQUIRED SUBDIVISION NOTES: NO 51TE DEVELOPMENT ACTIVITY INCLUDING- BUT NOT LIMITED TO TESTING, CLEARING, INSTALLATION Of 5*E MEASURES, OR GRADING, 5HALL OCCUR UNTIL REQUIRED PROTECTION FENCING HAS BEEN INSTALLED AND INSPECTED. A PKOTECTIOt,8j FENCING INSTALLATION PERMIT MAY BE OBTAINED AT THE PLANNING DEPARTMENT OR BY CALLING 91 e 249-3426. 2. PROTECTION FENCING MUST BE PLACED Alt AY FROM ANY SAVED TREE ONE FOOT FOR EACH INCH OF TREE CALIPER. PROTECTION FENCING MU57 BE PLACED AT LEAST 10 FEET AWAY FROM ANY OTHER X51GNATED RE50URCE CONSERVATION AREA, SUCH A5 BUT NOT LIMITED TO HISTORIC BUILDINGS AND STRUCTURES, WETLANDS, AND PONDS. PROTECTION FENCING MUST BE PLACED ALONG THE OUTSIDE LINE OF THE 100 -YEAR I'LOODPLAIN, AND THE OUTSIDE EDGE OF ANY RIPARIAN BUFFER. ADDITIONAL PROTECTION FENCING MAY BE REQUIRED IK OTHER LOCATIONS CL05E TO CONSTRUCTION ACTIVITY WHERE IT 15 DEEMED NECESSARY BY THE 2LONING ENFORCEMENT OFFICER; SUCH AREAS MAY INCLUDE BUT ARE NOT LIMITED TO COMMON PROP15UY LINES OR NEAR PUBLIC AREAS (SIDEWALKS. ETC.). 3. ALL GRADING AND SUPPORT 5TRUCTURE5 A55OCIATED WITH ANY RETAINING STRUCTURE SHALL NOT ENCROACH INTO ANY REQUIRED BUFFER OR PROTECTED AREA (SUCH AS BUT NOT LIMITED TO, RCA AND CRITICAL ROOT ZONES OF TREES, PUBLIC UTILITY EASEMENTS AND RIGHTS -OF -WAY), AND SHALL BE CONTAINED ENTIRELY ON SITE. 4. SITE ELEMENTS REQUIRED TO SATISFY RECKFATIONAL REQUIREMENTS SUCH AS BUT NOT LIMITED TO PLAY FIELDS AND GREENWAY TRAILS AND ITfM5 TYPICALLY ASSOCIATED WITH THEM (BENCHES. TRASH CONTAINERS, SIGNS, ETC.) MUST MEET ANuAPPLICA13LE STANDARDS FOUND IN THE TOWN OF APEX STANDARD SPECIFICATIONS AND CON5TRL�CTION DETAILS AND THE REQUIREMENTS OF THE TOWN Of APEX PARKS AND RECREATION DEPARTMENT. 5. THE SCREENING OF LOADING DOCKS, TRA5,.tJ'CONTAJNER5 (INCLUDING DUMP5TER5 AND ROLL-OUT CART5), OUTDOOR STORAGE, MECHANICAL. AND HVAC EQUIPMENT, AND SIMILAR FACILITIES ON THE ROOF, ON THE GROUND, OR ON BUILDING= 5HALL MEET THE REQUIREMENTS FOUND IN SECTION 8.2.5 OF THE UNIFIED DEVELOPMENT ORDINANCE; SPECIFICALLY SCREENING MUST BE DONE 50 THAT: I. IT 15 INCORPORATED INTO THE OVERALL DESIGN THEME OF THE BUILDING AND LANDSCAPE. 11, SCREENING MATERIALS ARE NOT DIFFERENT FROM OR INFERIOR TO THE PRINCIPAL MATERIALS Of THE BUILDING OR LANDSCAPE, AND ARE SIMILAR IN MATERIALS AND COLOR. III. SCREENED ITEMS ARE OUT OF VIEW FROM ADJACENT PROPERTIES AND PUBLIC STREETS, AND A TOTALLY OPAQUE SCREEN 15 ACHIEVED. IV. ANY GROUND-MOUNTED HVAC OR OTHER MECHANICAL OR UTILITY EQUIPMENT 51X-FEET TALL OR HIGHER MUST BE FENCED AND LANDSCAPED. V. DUMF5TER ENCLOSURES MUST MEET T,',' A130VF: REQUIREMENTS PLUS THEY MUST BE AT LEAST EIGHT FEET TALL OR THE HEIGHT OF THEDUMP5TER, WHICHEVER 15 TALLER; AND BE BUILT Of MA50NRY MATERIAL. G. ALL REQUIRED 51TE ELEMENTS SHOWN WITIMN A PARTICULAR PHASE MUST BE INSTALLED BEFORE A FINAL CERTIFICATE Of OCCUPANCY MAY BE ISSUED FOR ANY BUILDING WITHIN THAT PHASE. 7. SITE ITEMS SUCH AS BUT NOT LIMITED TO 'IGHTING, LANDSCAPING (INCLUDING MULCH), SCREENING (I.E.; DUMP5TER5lTRA5H, MECHANICAUHVAC, ETC.), SITE STABILIZATION (SEEDING), AND PARKING AND PAVEMENT MARKING MUST BE COMPLETED 3R(OR TO SCHEDULING A FINAL SITE INSPECTION. 5. NO 51GN5 ARE APPROVED AS PART Of SITE PLAN APPROVAL. A SEPARATE SIGN PERMIT MUST BE ObTAI NED. A MASTER SIGN PLAN MUST BE SUBMITTED FOR APPROVAL. 0 20 40 80 GRAPHIC SCALE 221 N. SALEM ST. SUITE 001 PO BOX 1062 APES, NC 27502 OfRcw. 919387 -1174 Registration: P40151 YY vw 1 ___�.com imfw; z _j 0 02 U Lu 0 z 0 Z v (n . Uzi z C) < 0 u.j > Q) < C Ll z 7 o LLJ 11 1 U- 0 z 0 I_ lcmrolm�� NOVEMBER 4, 2013 V CL 0 (5 z cz LU LLJ Z Qf 0 Z .0 Lu uj 221 N. SALEM ST. SUITE 001 PO BOX 1062 APES, NC 27502 OfRcw. 919387 -1174 Registration: P40151 YY vw 1 ___�.com imfw; z _j 0 02 U Lu 0 z 0 Z v (n . Uzi z C) < 0 u.j > Q) < C Ll z 7 o LLJ 11 1 U- 0 z 0 I_ lcmrolm�� NOVEMBER 4, 2013