Loading...
HomeMy WebLinkAbout20131296 Ver 1_More Info Received_20131218LwT�L--U^g 13 - 12..q � 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or Yes © No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act O Yes © No Impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. ' 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes Q No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation 0 Yes No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? 8. Flood Zone Designation (Corps Requirement) Be. Will this project occur in a FEMA- designated 100 -year floodplaln? ❑x Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: DEVELOPMENT IS ONLY PROPOSED ABOVE THE 100 YEAR ZONE AND ELEVATION Sc. What source(s) did you use to make the floodplain determination? FEMA FIRM PANEL 3720328200J CRAIG SMITH Applicant/Agents Printed Name p icant/Agent Signature (Agents signature Is valid only if an authorization Date letter from the applicant is provided.) Q6�OMQ Page 10 of 10 1 1 DEC 1 8 2013