HomeMy WebLinkAbout20131300 Ver 1_401 Application_20131213Dennison, Laurie
From: Dana A. Lutheran <dlutheran @segi.us>
Sent: Wednesday, December 18, 2013 11:01 AM
To: 'Bailey, David E SAW'
Cc: Steenhuis, Joanne; Dennison, Laurie
Subject: RE: [EXTERNAL] RE: Holly Ridge Townhomes PCN, Onslow Co., SAW- 2013 -01441
(UNCLASSIFIED)
Attachments: Holly Ridge Townhomes PCN Revised 12- 18- 13.pdf
David,
I think I got all the kinks worked out... formatting ... ARGH!! With that said, please replace the previously submitted PCN
with the attached. I attached the entire PCN because there were two additional items that needed to be corrected. They
are:
Section E(4b) Stormwater permit submittal date and Section F (4a) sewer disposal by ONWASA.
If I don't speak with you before, I hope you have a very merry Christmas and a happy New Year.
Dana
Southern Environmental Group, Inc.
5315 South College Road, Suite E
Wilmington, NC 28412
Phone: 910.452.2711
Mobile: 910.228.1841
www.seei.us
- - - -- Original Message---- -
From: Bailey, David E SAW [ mailto: David.E.Bailev2@usace.armv.mil]
Sent: Tuesday, December 17, 2013 3:27 PM
To: Dana A. Lutheran
Subject: RE: [EXTERNAL] RE: Holly Ridge Townhomes PCN, Onslow Co.,
SAW- 2013- 01441(UNCLASSIFIED)
Classification: UNCLASSIFIED
Caveats: NONE
Thanks.
David E. Bailey
Regulatory Specialist
US Army Corps of Engineers
CE- SAW -RG -L
69 Darlington Avenue
Wilmington, North Carolina 28403 -1343
Phone: (910) 251 -4469
Fax: (910) 251 -4025
Email: David.E.Bailev2 @usace.army.mil
< mailto: David. E.Bailey2 @usace.army.mil>
We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is
located at:
http: // pert .nwp.usace.army.mil /survey.htmi
< httr):// Per2 .nwp.usace.army.mil /survey.html>
Thank you for taking the time to visit this site and complete the survey.
- - - -- Original Message---- -
From: Dana A. Lutheran [mailto:dlutheran @seei.usl
Sent: Tuesday, December 17, 2013 3:23 PM
To: Bailey, David E SAW
Cc: 'Steenhuis, Joanne'; 'Dennison, Laurie'
Subject: [EXTERNAL] RE: Holly Ridge Townhomes PCN, Onslow Co.,
SAW- 2013- 01441(UNCLASSIFIED)
Thank you, David. I will get it over to you as soon as possible.
Dana
Southern Environmental Group, Inc.
5315 South College Road, Suite E
Wilmington, NC 28412
Phone: 910.452.2711
Mobile: 910.228.1841
www.seei.us
- - - -- Original Message---- -
From: Bailey, David E SAW [ mailto: David.E.Bailey2 @usace.armv.mil]
Sent: Tuesday, December 17, 2013 3:18 PM
To: Dana A. Lutheran
Cc: 'Steenhuis, Joanne'
Subject: Holly Ridge Townhomes PCN, Onslow Co., SAW- 2013 -01441
(UNCLASSIFIED)
Classification: UNCLASSIFIED
Caveats: NONE
Dana,
Thanks for your PCN and attached plans dated 12/16/2013, received 12/17/2013, for the above referenced project. I
have reviewed the information and offer the following comments to be addressed before your application can be
processed further:
1) The majority of Section D seems to have been deleted from your re- formatted PCN form. Please resend the PCN with
this information included. At the moment we have no Avoidance and Minimization information or Compensatory
Mitigation proposal.
Please submit the above information within 30 days of receipt of this Notification or we will consider your application
withdrawn and close the file. You can submit the above information via email if you'd like. If you have any questions
please let me know.
-Dave Bailey
David E. Bailey
Regulatory Specialist
US Army Corps of Engineers
CE- SAW -RG -L
69 Darlington Avenue
Wilmington, North Carolina 28403 -1343
Phone: (910) 251 -4469
Fax: (910) 251 -4025
Email: David.E.Bailev2 @usace.army.mil
< mailto: David. E.Bailev2 @usace.army.mil>
We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is
located at:
http:// pert .nwp.usace.army.mil /survey.html
<http: // pert .nwp.usace.army.mil /survey.html>
Thank you for taking the time to visit this site and complete the survey.
Classification: UNCLASSIFIED
Caveats: NONE
Classification: UNCLASSIFIED
Caveats: NONE
OF W ATF9
ti
o
20 13 130 0
Office use Only
Corps action ID no.
DWR project no
Form Version 1.4 January 2009
Pre - Construction Notification (PCN) Form
A. Applicant Information �4� r
1. Processing
la Type(s) of approval sought from the Corps:
® Section 404 Permit ❑ Section 10 Permit
1b. Specify Nationwide Permit (NWP) number, 29 or General Permit (GP) number NA
1c. Has the NWP or GP number been verified by the Corps?
❑Yes ®No
1 d. Type(s) of approval sought from the DWR (check all that apply):
❑401 Water Resources Certification — Regular ❑Non -404 Jurisdictional General Permit
❑401 Water Resources Certification — Express ❑Riparian Buffer Authorization
1e. Is this notification solely for the record
because written approval is not required?
For the record only for DWR
401 Certification-
®Yes ❑No
For the record only for Corps Permit:
❑ Yes ® No
1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of
impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee
program.
❑ Yes ®No
1g. Is the project located in any of NC's twenty coastal counties If yes, answer 1 h
below.
®Yes []No
1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)?
❑Yes ®No
2. Project Information
2a. Name of project:
Holly Ridge Townhomes
2b. County:
Onslow
2c. Nearest municipality / town:
Holly Ridge
2d. Subdivision name.
NA
2e. NCDOT only, T.I.P. or state project no:
NA
3. Owner Information
3a. Name(s) on Recorded Deed:
TTHR, Inc. (see Appendix A)
3b Deed Book and Page No
4053/624
3c Responsible Party (for LLC if applicable).
Mr. David DeMoss (see Appendix B)
3d. Street address:
561 Ashton Lake Road
3e City, state, zip:
Burgaw, NC 28425
3f Telephone no.:
910.805.1598
3g Fax no.:
NA
3h. Email address:
NA
I D!D [R@[R0W' ffl)l
a L9
DEC 1 C, 2013
4. Applicant Information (if different from owner) -
4a. Applicant is:
[-]Agent ❑Other, specify:
4b. Name:
1b. Site coordinates (in decimal degrees):
4c. Business name
(if applicable):
1c Property size:
4d. Street address:
2. Surface Waters
4e. City, state, zip:
2a. Name of nearest body of water to proposed project:
4f. Telephone no.:
2b. Water Quality Classification of nearest receiving water
4g. Fax no.:
2c. River basin.
4h. Email address:
3. Project Description
5. Agent/Consultant Information (if applicable)
5a. Name:
Dana A. Lutheran
5b. Business name (if applicable):
Southern Environmental Group, Inc. (SEGi) (see Appendix C)
5c. Street address:
5315 South College Road Suite E
5d. City, state, zip:
Wilmington, NC 28412
5e. Telephone no.:
910.452.2711
5f. Fax no.:
910.452.2899
5g. Email address:
duutheran@segi.us
B. Project Information and Prior Project History
1. Property Identification
la Property identification no. (tax PIN or parcel ID):
011749 and 061906
1b. Site coordinates (in decimal degrees):
Latitude: 34.4874 ON Longitude: 77.5652 °W
1c Property size:
2.99 and 3.01 acres respectively
2. Surface Waters
2a. Name of nearest body of water to proposed project:
Cypress Branch
2b. Water Quality Classification of nearest receiving water
SA;HQW
2c. River basin.
White Oak (03030001)
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
Historically the site served as part of an old army base. Today, the site is mostly wooded and undeveloped. Approximately
44,700 square feet of asphalt roads still remain within the property boundaries (see Appendix D).
3b. List the total estimated acreage of all existing wetlands on the property: 0.10 acre
3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: NA
3d. Explain the purpose of the proposed project:
The purpose of the project is to construct a multi- family townhouse community, with infrastructure and amenities (see
Appendix E).
3e. Describe the overall project in detail, including the type of equipment to be used:
The project area will be cleared of vegetation. Prior to land disturbing commencing, sedimentation and erosion control
structures will be erected. Large machinery, such as backhoes, dump trucks, and graders, will be used to construct the
proposed roads and install utility lines.
4. Jurisdictional Determinations
4a Have jurisdictional wetland or stream
®Yes ❑No ❑Unknown
determinations by the Corps or State been
Comments:
requested or obtained for this property / project
P -1
4b. If the Corps made the jurisdictional determination,
❑Preliminary ®Final
what type of determination was made?
404
4c. If yes, who delineated the jurisdictional areas?
Agency /Consultant Company: SEGi
Name (if known) David Scibetta
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
(see Appendix F).
5. Project History
5a Have permits or certifications been requested or
❑Yes ®No ❑Unknown
obtained for this project (including all prior phases)
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
in the past?
5b. If yes, explain in detail according to "help file" instructions. NA
6. Future Project Plans
6a Is this a phased project?
❑Yes ®No
[6b If yes, explain. NA
C. Proposed Impacts Inventory
I. Impacts Summary
la Which sections were completed below for your project (check all that apply):
®Wetlands ❑Streams — tributanes ❑Buffers ❑Open waters ❑Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted
2a.
Wetland impact
number Permanent
(P) or Temporary (T)
2b.
Type of impact
2c.
Type of wetland
2d.
Forested
2e.
Type of jurisdiction
Corps (404,10) or
DWR (401, other)
2f.
Area of impact
(acres)
P -1
Road Crossing
Linear wetland
Yes
404
0.03
2g Total Permanent Wetland Impacts:
0.03
2h. Comments: Temporary impacts are not anticipated to take place with this project. Please see Appendix E.
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a.
3b.
3c.
3d.
3e.
3f.
3g
Stream impact
Type of impact
Stream name
Perennial (PER) or
Type of
Average
Impact
number
Permanent (P) or
Type of impact
Water body type
intermittent (INT)?
jurisdiction
stream
width
length
(linear
Temporary (T)
4f. Total open water Impacts
S. Pond or Lake Construction
(feet)
feet)
5b.
5c.
5d.
5e. Upland
Pond ID
Proposed use or
Wetland Impacts (acres)
Stream Impacts (feet)
3h. Total stream and tributary Impacts
NA
3i. Comments.
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the
U.S. then individually list all open water impacts below
4a.
4b.
4c.
4d.
4e.
Open water impact
Area of impact
number Permanent (P) or
Name of water body
Type of impact
Water body type
(acres)
Temporary (T)
(if applicable)
4f. Total open water Impacts
S. Pond or Lake Construction
If pond or lake construction proposed, then complete the chart below. NA
5a.
5b.
5c.
5d.
5e. Upland
Pond ID
Proposed use or
Wetland Impacts (acres)
Stream Impacts (feet)
(acres)
number
purpose of pond
Flooded
Filled
Excavated
Flooded
Filled
Excavated
5f Total:
5g. Comments:
5h. Is a dam high hazard permit required?
Dyes ❑No If yes, permit ID No. NA
51. Expected pond surface area (acres):
NA
5j. Size of pond watershed (acres):
NA
5k. Method of construction-
NA
6. Buffer Impacts (for DWR)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below.
If any impacts require mitigation, then you MUST fill out Section D of this form.
6a. Project is in which protected basin?
Neuse Tar - Pamlico Catawba Randleman Other
6b.
6c.
6d.
6e.
6f.
6g.
Buffer Impact number-
Reason for impact
Stream name
Buffer Mitigation
Zone 1 impact
Zone 2 impact
Permanent (P) or
required?
(square feet)
(square feet)
Temporary (T)
61
6h. Total Buffer Impacts:
NA
6i. Comments:
D. Impact Justification and Mitigation
1. Avoidance and Minimization
la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project
Based on the wetland feature bisects the property from east to west, and from property boundary to property boundary, avoidance is
not possible. However, the impact has been limited to a single road crossing.
2b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
Strict sediment and erosion control and stormwater measures will be in place prior to beginning work associated with the feature. This
will ensure that the adjacent unnamed tributary will be protected from sediment and pollutant filled stormwater runoff from the site.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
Compensatory mitigation is not being proposed with this permit application. The feature exhibits poor functional value. Therefore, the
Applicant and SEGi believe the discharge of fill material will not significantly remove chemical, biological, and physical processes from
the system, to a degree that deserves to be offset with compensatory mitigation.
2a. Does the project require Compensatory Mitigation for
impacts to Waters of the U.S or Waters of the State?
❑Yes ®No
2b. If yes, mitigation is required by (check all that apply).
❑DWR ❑Corps
2c. If yes, which mitigation option will be used for this
project?
❑Mitigation bank
❑Payment to in -lieu fee program
❑ Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank: NA
3b. Credits Purchased (attach receipt and letter)
Type.
Quantity.
3c. Comments:
4. Complete if Making a Payment to In -lieu Fee Program
4a. Approval letter from in -lieu fee program is attached.
NA
4b. Stream mitigation requested:
4c. If using stream mitigation, stream temperature:
4d. Buffer mitigation requested (DWR only):
4e. Riparian wetland mitigation requested:
4f. Non - riparian wetland mitigation requested:
4g. Coastal (tidal) wetland mitigation requested:
4h. Comments
S. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. NA
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires
❑Yes ®No
buffer mitigation?
1b If yes, then is a diffuse flow plan included? If no, explain why.
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount
of mitigation required.
2a. What is the overall percent of impervious area of this project?
6c.
6d.
®Yes ❑No
6e.
Zone
Reason for impact
Total impact
Multiplier
Required mitigation
NA
3b Which of the following locally- implemented stormwater management programs
apply (check all that apply)-
(square feet)
3c Has the approved Stormwater Management Plan with proof of approval been
attached?
(square feet)
Zone 1
NA
NA
3 (2 for Catawba)
NA
Zone 2
NA
NA
15
NA
6f. Total buffer mitigation required:
NA
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund).
NA
6h. Comments:
E. Stormwater Management and Diffuse Flow Plan (required by DWR)
1. Diffuse Flow Plan
la. Does the project include or is it adjacent to protected riparian buffers identified
within one of the NC Riparian Buffer Protection Rules?
❑Yes ®No
1b If yes, then is a diffuse flow plan included? If no, explain why.
❑Yes ®No
2. Stormwater Management Plan
2a. What is the overall percent of impervious area of this project?
39.4%
2b Does the project require a Stormwater Management Plan?
®Yes ❑No
2c If this project DOES NOT require a Stormwater Management Plan, explain why: NA
2d If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan -
The development will be high density with stormwater pipes and retention ponds.
2e Who will be responsible for the review of the Stormwater Management Plan?
3. Certified Local Government Stormwater Review
3a. Which local governments jurisdiction is this project located?
NA
3b Which of the following locally- implemented stormwater management programs
apply (check all that apply)-
❑Phase II
❑ NSW USMP
❑Water Supply Watershed
❑Other.
3c Has the approved Stormwater Management Plan with proof of approval been
attached?
❑Yes ❑No
4. DWR Stormwater Program Review
1. Environmental Documentation (DWR Requirement)
®Coastal counties
❑Yes ®No
❑HQW
4a. Which of the following state - implemented stormwater management programs apply
❑ORW
(check all that apply):
[]Session Law 2006 -246
❑Yes ❑No
❑Other:
4b. Has the approved Stormwater Management Plan with proof of approval been
[]Yes ®No
attached? The stormwater application was submitted 10/16/13 to NCDENR
Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter)
5. DWR 401 Unit Stormwater Review
5a. Does the Stormwater Management Plan meet the appropriate requirements?
®Yes ❑No
5b. Have all of the 401 Unit submittal requirements been met?
®Yes []No
F. Supplementary Information
1. Environmental Documentation (DWR Requirement)
la Does the project involve an expenditure of public (federal/state /local) funds or the use
❑Yes ®No
of public (federal /state) land?
1b. If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State
❑Yes ❑No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1c. If you answered "yes" to the above, has the document review been finalized by the State
Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter)
rnmmAnts-
[]Yes []No
2. Violations (DWR Requirement)
2a. Is the site in violation of DWR Wetland Rules (15A NCAC 2H 0500), Isolated Wetland
Rules (15A NCAC 2H. 1300), DWR Surface Water or Wetland Standards, or Riparian
❑Yes ®No
Buffer Rules (15A NCAC 2B .0200)?
2b. Is this an after - the -fact permit application?
[]Yes ®No
2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s),
NA
3. Cumulative Impacts (DWR Requirement)
3a Will this project (based on past and reasonably anticipated future impacts) result in _T
❑Yes ®No
additional development, which could impact nearby downstream water quality?
3b If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most
recent DWR po;icy. If you answered "no," provide a short narrative description.
The construction of this road crossing would not result in development outside of the proposed project area.
Furthermore, sedimentation and erosion control measures will be implemented, which if installed correctly, will assist in
reducing the potential for pollutants to enter North Carolina's waterbodies. Future impacts are not anticipated.
4. Sewage Disposal (DWR Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from the
proposed project, or available capacity of the subject facility.
Sewer will be treated by ONWASA
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a Will this project occur in or near an area with federally protected species or habitat?
[]Yes ®No
5b. Have you checked with the USFWS concerning Endangered Species Act impacts?
❑Yes ®No
5c. If yes, indicate the USFWS Field Office you have contacted
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
Reconnaissance and knowledge of the area and the fact that the site was previously developed, SEGi concluded that there
would be no impact to Endangered Species or Designated Critical Habitat.
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat?
❑Yes ®No
6b What data sources did you use to determine whether your site would impact Essential Fish Habitat?
The site is not located on a water course that supports essential fish habitat.
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a Will this project occur in or near an area that the state, federal or tribal governments have
designated as having historic or cultural preservation status (e.g., National Historic Trust
❑ Yes No
designation or properties significant in North Carolina history and archaeology)?
7b What data sources did you use to determine whether your site would impact historic or archeological resources?
There are no structures within the property boundaries.
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA- designated 100 -year floodplain?
❑Yes ®No
8b. If yes, explain how project meets FEMA requirements: NA
8c. What source(s) did you use to make the floodplain determination?
Onslow County GIS
Dana A. Lutheran�
16 December 2013
Applicant/Agent's Printed Name
Applicant/Agents Signature
(Revised 12/18/13)
(Agent's signature is valid only if an authorization letter
Date
from the applicant is provided.)