Loading...
HomeMy WebLinkAbout20131296 Ver 1_401 Application_20131213�ot WALA9 O� >_ -i O 't 20 13 1 2 9 6 Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Pre - Construction Notification (PCN) Form A. Applicant Information 1. Processing 1a. Type(s) of approval sought from the Corps: ❑ Section 404 Permit ❑ Sectio6'10 Permit 1 b. Specify Nationwide Permit (NWP) number: or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ❑ Yes ❑ No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ❑ 401 Water Quality Certification — Regular © Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization le. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ❑X No For the record only for Corps Permit: ❑ Yes ❑ No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ® No 1g. is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ® Yes ❑ No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes © No 2. Project Information 2a. Name of project: HAMPSTEAD LANDING 2b. County: PENDER 2c. Nearest municipality / town: HAMPSTEAD D 2d. Subdivision name: HAMPSTEAD LANDING 2e. NCDOT only, T.I.P. or state project no: 3. owner Information 4 013 3a. Name(s) on Recorded Deed: HAMPSTEAD LANDING DEVELOPMENT, LLC 3b. Deed Book and Page No. DB 4191 PG 050 1Y 3c. Responsible Party (for LLC if applicable): CRAIG SMITH 3d. Street address: 609 MORRIS LANDING ROAD 3e. City, state, zip: HOLLY SPRINGS, NC 28445 3f. Telephone no.: 843 345 2308 3g. Fax no.: 910 324 4447 3h. Email address: CRAIG @70WESTBUILDERS.COM Pagel of 10 PCN Form — Version 1.4 January 2009 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑ Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: JAMES H FENTRESS JR. 5b. Business name (if applicable): STROUD ENGINEERING, PA 5c. Street address: 102 SUITE D CINEMA DRIVE 5d. City, state, zip: WILMINGTON, NC 28403 5e. Telephone no.: 910 815 0775 5f. Fax no.: 910 815 0593 5g. Email address: JFENTRESS @STROUDENGINEER.COM Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 3282 -72- 4000 -0000 1b. Site coordinates (in decimal degrees): I Latitude: 34.355556 Longitude: 77.7175 1c. Property size: 60 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: Mill Creek 2b. Water Quality Classification of nearest receiving water: SA;HQW 2c. River basin: Cape Fear 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Property has been cleared for development activities. Adjoining land uses are strictly residential. 3b. List the total estimated acreage of all existing wetlands on the property: 2.34 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 3d. Explain the purpose of the proposed project: RESIDENTIAL SUBDIVISION 3e. Describe the overall project in detail, including the type of equipment to be used: Land clearing and grading using bull dozers and track excavators 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? ® Yes ❑ No ❑ Unknown Comments: 4b. If the Corps made the jurisdictional determination, what type of determination was made? ❑ Preliminary ® Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): ARM Agency /Consultant Company: Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. RECONFIRMED 12/11/13 BY CRYSTAL AMSCHLER 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ® Yes ❑ No ❑ Unknown 5b. If yes, explain in detail according to "help file" instructions. delineation approved July 8, 2008 6. Future Project Plans 6a. Is this a phased project? ® Yes ❑ No 6b. If yes, explain. This is the first phase. Second phase is 27.8 ac. Page 3 of 10 PCN Form — Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑X Wetlands ❑ Streams — tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 Fill SmaMasin WeUand No DWQ 0.4 W2 - Choose one Choose one Yes/No - W3 - Choose one Choose one Yes/No - W4 - Choose one Choose one Yes/No - W5 - Choose one Choose one Yes/No - W6 - Choose one Choose one Yes/No - 2g. Total Wetland Impacts: 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 - Choose one - - S2 - Choose one - - S3 - Choose one S4 - Choose one - - S5 - Choose one _ - S6 - Choose one - - 3h. Total stream and tributary impacts 31. Comments: Page 4 of 10 PCN Form — Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. Open water impact number Permanent (P) or Temporary 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 - Choose one Choose 02 - Choose one Choose 03 - Choose one Choose 04 - Choose one Choose 4f. Total open water Impacts 4g. Comments: S. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWO) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? ❑ Neuse ❑ Tar - Pamlico ❑ Catawba ❑ Randleman ❑ Other: 6b. Buffer Impact number — Permanent (P) or Temporary 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet ) 6g. Zone 2 impact (square feet B1 - Yes/No B2 - Yes/No B3 - Yes/No B4 - Yes/No B5 - Yes/No 86 - Yes/No 6h. Total Buffer Impacts: 6i. Comments: Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑ Yes ® No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank ❑ Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type: Choose one Type: Choose one Type: Choose one Quantity: Quantity: Quantity: 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non - riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittes Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? Yes No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ® No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes ❑ No 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 25% 2b. Does this project require a Stormwater Management Plan? © Yes ❑ No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: STORMWATER PERMIT # SW08 071228 2e. Who will be responsible for the review of the Stormwater Management Plan? PERMITTED BY NCDENR 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? PENDER COUNTY ❑ Phase II 3b. Which of the following locally- implemented stormwater management programs ❑ NSW USMP apply (check all that Apply): Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been []Yes ❑ No attached? 4. DWQ Stormwater Pro ram Review ®Coastal counties ❑HOW 4a. Which of the following state - implemented stormwater management programs apply ORW (check all that apply): HSession Law 2006 -246 []Other: 4b. Has the approved Stormwater Management Plan with proof of approval been ® Yes ❑ No attached? S. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8of10 PCN Form — Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federaUstateAocal) funds or the ❑ Yes ® No use of public (federal/state) land? 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (if so, attach a copy of the NEPA or SEPA final approval ❑ Yes ❑ No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ®Yes ❑ No or Riparian Buffer Rules (15A NCAC 2B.0200)? 2b. Is this an after - the -fact permit application? ®Yes ❑ No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): AREA WAS NOT UNDERSTOOD TO BE A WETLAND. AREA WAS NOT REPRESENTED ON WETLAND DELINEATION APPROVED IN 2008 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. SEWAGE DISPOSAL WILL BE BY ONSITE SEPTIC TANKS AND CONVENTIONAL DRAINFIELDS Page 9 of 10 PCN Form — Version 1.4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑ Yes © No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ® No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. -7 - 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? TO Yes © No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ®No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA- designated 100 -year floodplain? ® Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: DEVELOPMENT IS ONLY PROPOSED ABOVE THE 100 YEAR ZONE AND ELEVATION 8c. What source(s) did you use to make the floodplain determination? FEMA FIRM PANEL 3720328200J CRAIG SMITH Applicant/Agent's Printed Name Applicant/Agent's Signature Date (Agents signature is valid only if an authorization letter from the applicant is provided.) Page 10 of 10 Steenhuis, Joanne From: Amschler, Crystal C SAW [ Crystal .C.Amschier@usace.army.miq Sent: Friday, September 20, 201311:40 AM To: Steenhuis, Joanne Subject: hamsptead landing (UNCLASSIFIED) Classification: UNCLASSIFIED Caveats: NONE 7oanne, Based on my rough mearuments the impact at hampstead landing to the isolated wetlands is approximately 0.4 acres. Crystal C. Amschler Regulatory Specialist Wilmington Regulatory Field Office 69 Darlington Ave, Wilmington, NC 28403 (910)- 251 -4170 Classification: UNCLASSIFIED Caveats: NONE 1 tI 9 ti DEED MK TO PAGE 129 SURVEY CERTIFICATE 11 AM III I. ARKS • ONEU a , CUITIFT WALT TIAIS RAT an CONTAIN SKCIAL FLOW ULM MIAMI MWIER IS RT LOCATED IN A FLDKrT 4E KLINEATO T THE FEKAE EKNOWT INNNE4NEAT ACT TNE STRO111SIOA 94M ON THIS RAT DOES NOT CA1141N AREAS OF O1VINeNENTAL 19401 AS KLINEATEO BY ONE P91M Cowin COASTAL KSWNE COMMISSION. THIS SMOKY CKATES A SENCIVISION OF LAD FEWER THE ANA OF A CONIC a WAICIPALITI TNATHAS AN MINYEE THAT NE/KANS PARalt O CYO. EACH TRACT IS wMiNr To A "TURK OYIWAK HA1 AD FRONT A MM YINTAIKD ROD WITNESS A AW 0 AL I.`;Ml OFtt, -j------ - -Delta 4 36'00' 73.40'46' 3-30'37: 10.15'30' 5' 10' ' 1'05' 22'36'30' t�� -Cdv�l A /A/ -32EL -- 7Z - CERTIFICATE OF REGISTRATION BY REGISTER OF DEEDS CERTIFICATE OF FINAL PLAT APPROVAL NOtIM CARD IRA FF/it CORWI A"e"ED T M RDHI CWP" RAmtNG K►ARIW%T nAm rY YntErrlNl K t Y. III, PrA ee �'v e. 1 _ Yri�r APPROVEDL•Q13,pA1E \ "\ PARCEL IDENTIFIER CERTIFICATE PANCEL IDLNT IERS HAVE MEEK ISSUED F9 ALL PMKCLS SDY Oi THIS RAT. u 4 [[�.i+ I t tb ?/A: 3m.11 -xm- o o ----------- r 1 STATE OF NORTH CAROLINA 3 COAU.NT�Y� OFP�ENDER q I. aRq.f REVIER OF TOP TOP a PENKR C"IT. LC.. TIFT THAT TIME a AT rO WHICH THIS CERTIF ICATIOT IS YFINEO NEET L fIA KDYIRENENIS FOR IECABID. MTE, REVIEW OFFICER "x_!'I TRACT -M' 11416101- - - .>1. :NAP BBOK 37 PACE 11 'TRACT fp J.C. TUOIIA57MNWON YAP 888E 31 PACE IN 1 A PORTION OF THIS PROPERTY IS WITHIN THE 100 YEAR FLOOD ZONE AS SHOWN ON FEMA COMMUNITY PANEL 3720 3282 OOJ. 200 100 0 200 400 GRAPHIC SCALE: 1'- 200' EASEMENT NOTE: ALL MEN ACCESS IYLIK THE 7RY6fAS[A OtSMf (" I IO I�It��EiCRYEgMtTtiryl NOTE T I r5 ERRNKES AO IXT5 call ACCESS FOR ENERKNEY RERSONEL IRE Ia. FIRE. a RESCK1 AMD FOR USE T PENN! COINTI E FLOIEES FOR AWAIT" 1101 OF ALL REAKR CANT, aDINNNEI 21 TRANSFER OF AN "WENT TO PAWL IC ENTITIES AD "SITE KNARa 11115 0 ltp THE SEKR EIS[CKIC�N�OLIICOWN[tliq LINES. HASTE WATER DISPOSAL NOTE: THESE POUTS CANNOT K USED FOR IUILDINE DEEELOKWr. ILLESS A KW RAT Is AFFRDKD YID RECCIKO As REDIRED ome THE FEWER CWY UNIFIER KtELPKNr O TInICE. PHASE LINE ALIGNMENT PI - P2 S 88'52'20' E 364.22 RIGHT CURVE P2 - P3 Chard: 0168.68' N 71.48' 50' E Ta Mt " x.77' P3 P4 '0 80.28' PA PS S 28'4211 E 611.80' PS - P6 S 18.17'13' E 184.80' P6 - P7 S 19.15'21' N 73.89' PT - PB S 29'56'16' E 220.78' PIT - P9 S 79.44'02" W 261.97' P9 - PIO S 32.0600 W 50.57' P10 - P11 S 11.00'17' E 157.54' P11 - P12 S 24.12'04' E 112.13' P12 - P13 S 23.44'46' W 116.22' P13 - P14 S 67.10'57' E 194.50' P14 - P15 5 44.5802 E 164.79' PIS - P16 N 52.21'54' E 103.61' P16 - PlI N 34.02'45' E 96.08' P 1 7 - P I a S 80.14'05' E 567.10' r'1^ WASNIO ON ACRES SRTION IT MAP BOOM 22 PACE 16 -- L1 - - - S 38.04'15 " E - - 26.35 L2 5 41.19130' E 123.80 L3 5 46.41'30' E 123. pQ L4 L5 S 52.03'30" E A S 57.25'30" E 123.86 123.80 L6 S 62.44'30' E 123.80 LT S 68'09'30" E 1 ?3.80 L8 S 73•.31`30' E 123.80 L9 S 80148'30' E - 37.24 L1Q N'78.14'24' N 37.12 L11 N 87.42'16' ■ .32.14 L12 N 80.1('43' 11 82..94 L13 N ED, 38'49` ■ 76.51 L14 N 80.141 -05: W 57.10 L15 S 71.2237" W. 45.82 L16 S 71.22'37" W 12.00 411 S 6•,22'18" W 48.16 L18 S S9.24'44" W 86.50 L19 S 84'35'55" R - $2.10 L20 N W ' 1.21 486.231'21' N 217 1.56,20 0461 L22 N 81.25'46' 8 26.70 L23 N T3.58'30' .W 102.47 L24 S 65.46'23' W 92.08 L25 S 5'10'32" E 54.36 1.26 S 20.56'58' E - 50.00 L21 S 5.34'57' W 56.85 L28 S 28.26'SB' E 51.22 L29 N 60.47'15' E 90.92 L30 S 27.46'01' E 168.72 L31 S 32.31'45' E 53.45 L32 S 40'18'38" W 100.00 L33 S 30.27'30' W 85.41 L34 N ?3.11'45' W 95.15 L35 N 36'48'00' M - 26.61 L36 N 36.46'00' M 170.81 L37 N 0.21'10' W 19.15 L36 N 9116'20' M 23.66 L39 N 5.23'28' W 26.93 L40 N 10'16'53' E 110.44 LAt N 19.41'13' W 121.08 lA2 N 9.16'20' W 131.69 L43 N 57.31'00' E 135.03 L44 N 62.11'00' E 62.10 L45 N 17'38'30" E 29.53 L46 S 69.02'00' E �p 3373 1A7. S 39.53'00' E 153 :66 CERTIFICATE OF ONMERSNIP OEOICATION AND JURISDICTION K KKT CERTIFY THAT ME ARREp1 one eE T11Y�55 KaaNpSl�Lwv l[lspIE,ME ACOd(rt YYIa 1DEDIUiC Ali 1S'�f(If[�(. OI YAIE(A�10 pf1WRR'INEiSSi AS NADTK(D. j( YO paN1MIYAq�SUSE yY�(l 'ILL IN[ Ut II IfY NPII'Df[SSaiNl it �.FE aR11FY TK lYW AS 51Ay HERE I a P�ENKR CQMI1. WIT" W INY fK SYpIY ISIOI II IS 1I0yi YICi�1�PP -K.ti" OF OWN THIS NAP REVISES AND SUPERCEDES NAP BOOK 54 AT PAGE 74 IN THE PENDER COUNTY REGISTRY. THIS NAP REMOVES THE FORMER LOTS 104 -119 OF WASHINGTON ACRES, SECTION 9 FROM TRACT CI AND SHOWS THEM AS TRACT C3 AS WELL AS DISPLAYING THE OFF-SITE SEPTIC AREAS FOR TRACT C3. NO OTHER CHANCES HAVE BEEN MADE TO THIS MAP. '3461 111NI3NE' I A ft"m i WASHINGTON ACRES rvuittomuiol FMR CWT Nam CRM41n OWNER: P. K"s C/0: COLEMAN PARES " DESIGNED: X ADDRESS: 214 BARNACLE CIRCLE gTAMN: PHONE: LEXINGTON. SC 29072 aRRr WNE @mom DAY 4Ntl SIEIR APPROVED: X DATE: IIW,,3 SCALE: 1'480' SIILET 1OF'1 �`• 4) 1 n 16 41 F .. z_ Ib: L� t yY c /y 1 f