Loading...
HomeMy WebLinkAboutNCC217021_NOI Application_20211220Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 12/16/2021 10:23:54 AM (NCG01 NOI Submission) Approve by Broussard, Brooklyn C 12/17/2021 7:59:56 AM (Review - Construction NOI 75929) • The task was assigned to Broussard, Brooklyn C by round robin distribution 12/16/2021 10:24 AM • The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: December 20, 2021 5:00 PM 12/16/2021 10:24 AM Submit by Evans, Shaundra M 12/20/2021 7:42:42 AM (Payment Verification for NCC217021) * Stacey Distefano • Evans, Shaundra M assigned the task to Evans, Shaundra M 12/20/2021 7:42 AM The task was assigned to DEMLR NCG01 Payment Team. The due date is: January 28, 2022 5:00 PM 12/17/2021 8:00 AM NORTH CAROLINA Rrf OmFkm&tral Qualrly A. Project Information Part A. Project Location and Waterbody Information Are you submitting No an NOI that was Yes rejected before? la. Project Name* Trinity Forest Lots 1,2, & 8 1 b. Specific Lot This field may be used to list specifc lot numbers. Numbers 1, 2, 8 1 c. Parcel ID List all PINs associated with this project. Number(s) (PIN) 1812252050 1812243803 1812255084 2. County* Wake 3. Highway or Street 8621, 8617, 8616 Bishop Pine Ln Address* Street name only is acceptable if no address number assigned yet 4. City or Township* Wake Forest 5. State* NC 6. Zip Code* 27587 7. Latitude* Enter the latitude in decimal degrees 36.0164 8. Longitude* Enter the longitude in decimal degrees (MUST be negative) -78.6195 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 01/03/2022 Estimated Construction Project Start Date 10. Date to End* 12/31/2022 Estimated Construction Project End Date 11. SIC (Primary)* Residential, Single Family Houses (SFE) (1521) Standard Industrial Classification for Development 12. Acres to be 2.50 disturbed* (including off -site borrow and waste areas) 13. Total site area 3.33 (acres) * 14. Post -construction 0.37 impervious area (Estimated) (acres) * Project Tracking ID NCC-WAKE-2022-Trinity Forest Lots 1,2, & 8 Assigned automatically (not used) Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Neuse River Waterbody* Name of waterbody into which stormwater runoff will discharge 15b. Waterbody Index 27-(5.5) No. * NC Waterbody Index Number Stormwater No discharges will flow Yes to additional waters* 16a. Is this project • Yes subject to the NC No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. Permittee Information - Legally Responsible Entity and Individual ........................................................................................................................................................................ Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form must be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCGO10000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Permittee* Legally Responsible Entity Cantiere Homes Inc. If permittee is an individual, enter first and last name in this field. Otherwise, enter organization/business name. Note: If the permittee is a business, the business must be registered with the NC Secretary of State. You can verify the registration here. Permittee must be the same entity that is responsible for the land -disturbing activity as listed on the NC SPCA Financial Responsibility/Ownership (FRO) Form. 2. First Name* Stacey If Corporation, enter Registered Agent First Name 3. Last Name* Di Stefano If Corporation, enter Registered Agent Last Name 3b. Title President 4. Permitee E-mail cantierehomes@gmail.com Address* 5. Permittee 919-285-8986 Telephone No.* 6. Permittee Mailing Street Address Address* 8505 Alden Lane Address Line 2 City State / Province / Region Wake Forest NC Postal / Zip Code Country 27587-3522 US Check box if the Yes street address the same as mailing address 7. Permittee Street Street Address Address * 8505 Alden Lane Address Line 2 City State / Province / Region Wake Forest NC Postal / Zip Code Country 27587-3522 US 8. Type of Ownership is only individual if an individual is named in B.1. above. Ownership* Non -Government C. Site Contact Information Part C. Project Site Contact Information 1. Primary Site Stacey Contact - First Name* 2. Primary Site Di Stefano Contact - Last Name* 3. Title 4. Site Contact E-mail cantierehomes@gmail.com Address* 5. Site Contact 919-285-8986 Telephone No.* 6. Organization Name 7. Site Contact Street Address Mailing Address* 8505 Alden Lane Address Line 2 City Wake Forest Postal / Zip Code 27587-3522 8. Consultant Name (optional) First and Last name 9. Consultant E-mail This person will be copied on all correspondence. 10. Consultant Telephone No. 11. Billing E-mail (For Annual Fee correspondence) cantierehomes@gmail.com Default is legally responsible person e-mail 12. Billing Telephone (For Annual Fee correspondence) 919-285-8986 Default is legally responsible person telephone State / Province / Region NC Country us D. E&SC Plan Part D. Erosion & Sediment Control (E&SC) Plan Approval Information 1. Date E&SC Plan 12/13/2021 Approved * 2. E&SC Plan Project SEC-070641-2021 Number/ID* Assigned by agency or local program 3. E&SC Plan State DEQ Office Approved by* Local Program 4. Local Program* Wake County Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. Please also upload a site map showing the overall extent of the project (for linear projects, can include the beginning point and end point coordinates in the "Notes" box below). 5. E&SC Plan SEC-070641-2021_Approval w Modification - Approval letter or 277.65KB S&EConstructionPlanReview_12-13-21. pdf Grading Permit Must be PDF format 6. Signed FRO Financial Responsibility/Ownership Form Financial Responsibility Form.pdf 832.93KB Must be PDF format 7. Site Location Map Must be PDF format (limit 20 MB) Trinity Forest S&E-Lots 1,2,8.pdf 14.11MB Please do not upload entire set of E&SC plans. 8. Notes (Optional) Provide any additional information that might help the reviewer better understand how uploaded documents support the application. Include additional waterbodies if necessary. 9. NOI Certification Notice of Intent (NOI) Certification Form.pdf 389.81 KB Form Must be PDF format This is an Express No Review Project* Yes E. Certification North Carolina General Statute 143-215.613 (i) provides that: Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: * I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. * The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * If the Erosion and Sediment Control Plan approved by the delegated program is not compliant with Part II (Stormwater Pollution Prevention Plan) of the NCG010000 General Permit, I will nonetheless ensure that all conditions of Part II of the permit are met on the project at all times. * I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* The Legally Responsible Person named on this Notice of Intent Authorized Responsible Person* (signing on behalf of Legally Responsible Person named in Part B) Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name* Stacey Di Stefano Title President Organization Legally Responsible Entity Cantiere Homes Inc. Date * 12/16/2021 F. Tracking and COC Info NOI Tracking No. 75929 NC Reference No. NCG01-2021-7021 Uses'count_numb& variable (incremented by SP) Certificate of NCC217021 Coverage (COC) No.* Uses'count_number' variable (incremented by SP) Count Number 7021 Sequential number for submittal that is incremented by Stored Procedure COC Year 2021 Year of date reviewed (used to assign YY digits after "NCC" in COC no.) Initial Invoice No. NCC217021-2021 Invoice Due Date 1/16/2022 Initial Fee $ 100.00 Invoice Status OPEN