HomeMy WebLinkAbout20211823 Ver 1_401 Application_20211214Staff Review Form
NORTH CAROLINA
Ertrlmnmertlrtl Quality
Updated September 4, 2020
Staff Review
Does this application have all the attachments needed to accept it into the review process?*
Yes No
ID# *
20211823
Version* 1
Is this project a public transportation project?*
Reviewer List:*
Select Reviewing Office: *
Submittal Type:*
Yes
No
Holley Snider:eads\hasnider
Wilmington Regional Office - (910) 796-7215
401 Application
Does this project require a request for payment to be sent?*
Yes
No
How much is owed?* $240.00
$570.00
Project Submittal Form
Please note: fields marked with a red asterisk * below are required. You will not be able to submit the form until all
mandatory questions are answered.
Project Type: *
For the Record Only (Courtesy Copy)
New Project
Modification/New Project with Existing ID
More Information Response
Other Agency Comments
Pre -Application Submittal
Re-Issuance\Renewal Request
Stream or Buffer Appeal
Project Contact Information
Name: Dana Lutheran
Who is submitting the information?
Email Address: dlutheran@segi.us
Project Information
........................................................................................................................................................................................
Project Name: Coastal Marine Storage Center
Is this a public transportation project?
Yes
No
Is the project located within a NC DCM Area of Environmental Concern (AEC)?
Yes No Unknown
County (ies)
Pender
Please upload all files that need to be submited.
Click the upload button or drag and drop files here to attach document
Coastal Marine Storage Center PCN Packet 12-13-
21.pdf
Only pdf or kmz files are accepted.
Describe the attachments or
comments:
10.28MB
PCN with accompanying attachments
Sign and Submit
............................................................................................................................................................................................................................
By checking the box and signing box below, I certify that:
• I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the
best of my knowledge and belief.
• I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401
certification request within the applicable reasonable period of time.
• I agree that submission of this online form is a "transaction" subject to Chapter 66, Article 40 of the NC General
Statutes (the "Uniform Electronic Transactions Act");
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General
Statutes (the "Uniform Electronic Transactions Act");
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a
written signature; AND
• I intend to electronically sign and submit the online form.
Signature:
ar2.�r& o�2.,ze
Submittal Date: Is filled in automatically.
NORTH CAROLINA
Environmental Quality
Water Resources
Office Use Only
Corps Action ID no. SAW-2009-00366 (see attached) Date received:
lick to enter.
DWR project no. ,lick enter.] Date received: 3Iick to enter.]
Site Coordinates:
Latitude (DD.DDDDDD): 34.4277
Longitude (DD.DDDDDD): -77.6332
Form Version 4, April 4, 2021
Pre -Construction Notification (PCN) Form
(Ver. 4, April 4, 2021))
For Nationwide Permits and Regional General Permits and corresponding Water Quality Certifications
Please note: fields marked with a red asterisk are required. The form is not considered complete until all
mandatory questions are answered.
The online help file may be found at this link:
https://edocs.deg.nc.qov/WaterResources/0/edoc/624704/PCN%20Help%20File%202018-1-30.pdf
The help document may be found at this link:
http://www.saw.usace.army.mil/M issions/Regulatory-Permit-Program/Permits/2017-Nationwide-
Permits/Pre-construction-Notification/
Before submitting this form, please ensure you have submitted the Pre -Filing Meeting Request Form as
DWR will not be able to accept your application without this important first step. The Pre -Filing Meeting
Request Form is used to satisfy 40 C.F.R. Section 121.4(a) which states "At least 30 days prior to
submitting a certification request, the project proponent shall request a pre -filing meeting with the certifying
agency." In accordance with 40 C.F.R. Section 121.5(b)(7), and (c)(5), all certification requests must
include documentation that a pre -filing meeting request was submitted to the certifying authority at least 30
days prior to submitting the certification request.
Attach documentation of Pre -Filing Meeting Request to this Application.
Date of Pre -filing Meeting Request (MM/DD/YYYY) : 7/22/2021
DWR ID # NA Version 1 (If applicable)
Page 1 of 22 PCN Form - Version 1.5, September 2020
A. Processing Information
County (counties) where project is located:
Pender Additional (if needed).
Is this a NCDMS project?
(Click yes only if NCDMS is the applicant or co-
applicant)
❑ Yes ❑x No
Is this a public transportation project?
(Publicly funded municipal, state, or federal road, rail,
or airport project)
❑ Yes ❑x No
Is this a NCDOT project?
❑ Yes ❑x No
If yes, NCDOT TIP or state project number:
Click to enter.
If yes, NCDOT WBS number:
Click to ent
la. Type(s) of approval sought from the Corps:
❑x Section 404 Permit (wetlands, streams, waters,
Clean Water Act)
❑ Section 10 Permit (navigable waters, tidal
waters, Rivers and Harbors Act)
Has this PCN previously been submitted?
❑ Yes ❑x No
Please provide the date of the previous submission.
Click to PntPr a rfatP
1 b. What type(s) of permit(s) do you wish to seek
authorization?
❑x Nationwide Permit (NWP)
El Regional General Permit (RGP)
❑ Standard (IP)
This form may be used to initiate the standard/ individual permit process with the USACE. Please contact your Corps
representative concerning submittals for standard permits. All required items can be included as attachments and
submitted with this form.
lc. Has the NWP or GP number been verified by the Corps?
►': Yes ❑ No
NWP number(s) (list all numbers ):
39
RGP number(s) (list all numbers ):
Click to enter.
Are you a federal applicant?
❑ Yes ❑x No
If yes, please provide a statement concerning compliance with the Coastal Zone Management Act
Click to enter texi
1d. Type(s) of approval sought from DWR (check all that apply): *
❑x 401 Water Quality Certification — Regular ❑ 401 Water Quality Certification— Express
❑ Non-404 Jurisdictional General Permit ❑ Riparian Buffer Authorization
❑ Individual 401 Water Quality Certification
Page 2 of 22 PCN Form - Version 1.5, September 2020
Pre -Filing Meeting Information
Before submitting this form please ensure you have submitted the Pre -Filing Meeting Request Form as we will not be
able to accept your application without this important first step. The Pre -Filing Meeting Request Form is used in
accordance with 40 C.F.R. Section 121.4(a) "At least 30 days prior to submitting a certification request, the project
proponent shall request a pre -filing meeting with the certifying agency" and in accordance with 40 C.F.R. Section
121.5(b)(7), and (c)(5) all certification requests shall include documentation that a pre -filing meeting request was
submitted to the certifying authority at least 30 days prior to submitting the certification request.
To read more information on when this form is needed prior to application submission:
https://www.epa.gov/sites/production/files/2020-07/documents/clean water act section 401 certification rule.pdf
To view the form: https://edocs.deq.nc.gov/Forms/DWR-Pre-Filing-Meeting-Request
Is this a courtesy copy notification
❑ Yes ❑x No
1 e.
Is this notification solely for the record because written approval is not required? *
For the record only for DWR 401 Certification: *
❑ Yes ❑x No
For the record only for Corps Permit: *
❑ Yes ❑x No
1f.
Is this an after -the -fact permit/certification application? *
0 Yes ❑x No
1g.
Is payment into a mitigation bank or in -lieu fee program proposed for
mitigation of impacts?
0 Yes ❑ No
If yes, attach the acceptance letter from mitigation bank or in -lieu fee program.
1 h.
Is the project located in any of NC's twenty coastal counties? *
0 Yes ❑ No
1 i.
Is the project located within an NC DCM Area of Environmental
Concern (AEC)? *
El Yes ❑x No El Unknown
1j.
Is the project located in a designated trout watershed? *
❑ Yes ❑x No
If yes, you must attach a copy of the approval letter from the appropriate Wildlife Resource Commission Office.
Trout information may be found at this link: http://www.saw.usace.army.mil/Missions/Regulatory-Permit-
Program/Agencv-Coordination/Trout.aspx
Page 3 of 22 PCN Form - Version 1.5, September 2020
B. Applicant Information
la.
Who is the primary contact?
Dana A. Lutheran
1b.
Primary Contact Email:
dlutheran@segi.us
lc.
Primary Contact Phone: (###)###-####
(910)228-1841
1 d.
Who is applying for the permit/certification?
all that apply)
(check
0 Owner El Applicant (other than owner)
1 e.
Is there an agent/consultant for this project?
0 Yes ❑ No
2. Landowner Information
2a. Name(s) on Recorded Deed:
Coastal Marine Properties, LLC
2b. Deed Book and Page No.:
4628/2380
2c. Contact Person (for corporations):
Tom Bowman
2d. Address
Street Address:
104 Wyndham Way
Address line 2:
Click to enter .
City:
Wilmington
State/ Province/ Region:
NC
Postal/ Zip Code:
28411
Country:
US
2e. Telephone Number: (###)###-####
(410) 924-1091
2f. Fax Number: (###)###-####
Click to enter.
2g. Email Address:
coastalmarinestorage@gmail.com &
bowken100@gmail.com
3.
Applicant Information (if different from owner)
3a.
Name:
Same as owner
3b.
Business Name (if applicable):
Click to enter.
3c.
Address:
Street Address:
Click to enter.
Address line 2:
Click to enter.
City:
Click to enter.
State/ Province/ Region:
Click to enter.
Postal/ Zip Code:
Click to enter.
Country
Click to enter.
3d.
Telephone Number: (###)###-####
Click to enter.
3e
Fax Number: (###)###-####
Click to enter.
Page 4 of 22
PCN Form - Version 1.5, September 2020
3f. Email Address:
Click to enter.
4. Agent/ Consultant (if applicable)
4a. Name:
Dana Lutheran
4b. Business Name:
Southern Environmental Group, Inc. (SEGi)
4c. Address:
Street Address:
5315 South Collge Road
Address line 2:
Suite E
City:
Wilmington
State/ Province/ Region:
NC
Postal/ Zip Code:
28412
Country:
US
4d. Telephone Number: (###)###-####
(910)228-1841
4e Fax Number: (###)###-####
Click to ent
4f. Email Address:
dlutheran@segi.us
Agent Authorization Letter:
Attach a completed/signed agent authorization form or letter. A sample form may be found at this link:
https://www.saw.usace.army.mil/Missions/Regulatory-Permit-Program/Permits/2017-Nationwide-Permits/Pre-
construction-Notification/
Page 5 of 22 PCN Form - Version 1.5, September 2020
C. Project Information and Prior Project History
1.
Project Information
1 a.
Name of project: *
Coastal Marine Storage Center
1 b.
Subdivision name (if appropriate):
NA
lc.
Nearest municipality/town: *
Hampstead/Surf City
2.
Project Identification
2a.
Property identification number (tax PIN or parcel ID):
Easement: 4215-10-5199-0000 Main Parcel: 4214-29-
2426-0000
2b.
Property size (in acres):
20 +/-
2c.
Project Address:
Street Address:
20822 US Highway 17 North
Address line 2:
Click to enter
City:
Hampstead
State/ Province/ Region:
NC
Postal/ Zip Code:
Click to enter.
Country:
US
2d.
Site coordinates in decimal degrees (using 4-6 digits
after the decimal point): *
Latitude (DD.DDDDDD): * 34.4277
Longitude (-DD.DDDDDD): *--77.6332
3.
Surface Waters
3a.
Name of nearest body of water to proposed project: *
UT to Virginia Creek
3b.
Water Resources Classification of nearest receiving
water: *
C
The Surface Water Classification map may be found at this link:
https://ncdenr. maps.arcgis.com/apps/webappviewer/index. html?id=6e 125ad7628f494694e259c80dd64265
3c.
In what river basin(s) is your project located? *
White Oak
Choose additional (if needed)
3d.
Please provide the 12-digit HUC in which the project is
located: *
030203020402
The Find Your HUC map may be found at this link:
https://ncdenr. maps.arcgis.com/apes/Publiclnformation/index.html?appid=ad3a85a0c6d644a0b97cd069db238ac3
Page 6 of 22 PCN Form - Version 1.5, September 2020
4. Project Description and History
4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of
this application:
The easement area has been cleared of trees, except within the required buffer, and a gravel road has been
installed. This work was performed in 2018 and impacted 0.03-acre of a remnant wetland. The main parcel has
consists of five upland areas that are surrounded by Pocosin type wetlands. Upland Area 1 contains the
office/service building, a covered boat/ry storage building, gravel parking lot, for uncovered boat/ry storage, and
stormwater detention basin. All of this was done in 2018-2019. Since then and with the excessive growth the
area is experiencing, the need for boat/ry stoage has increased exponentially. Without thinking about it, the
Applicant extended the gravel road, through two areas of wetlands, to gain access to Upland Areas 2 and 3. The
road is approximately 22' wide and contains pipes, that ensure hydrologic connection. He also created additional
boat/ry storage, parking area around the perimeter of Upland Area 2. At this time, he is preparing Upland Area 3
to serve as additional boat/ry storage area. According to their estimates and preliminary survey work,
approximately 0.32-acre of wetland has taken place without authorization (please see attached site plan for
details of unauthorized wetland fill). Wetlands have been cleared of large tres and shrubs, outside the fill area,
but it is not believed that they have been impacted as a result. Upland Areas 4 and 5 and the wetlands that are
between these two areas have not been cleared of trees. Residential and some commercial are the general land
uses in the vicinity of the project.
4b. Have Corps permits or DWR certifications been obtained for this
project (including all prior phases) in the past?
►_ Yes ❑ No El Unknown
If yes, please give the DWR Certification number and/or Corps
Action ID (ex. SAW-0000-00000):
SAW-2009-00366 (see attached)
jClick to enter.]
Attach any pertinent project history documentation
4b2. Is any portion of the work already complete?
►_ Yes ❑ No
If yes, describe the completed work.
At this time, approximately 0.28-acre of wetland fill has taken place, without authorization. The work consist of
creating a gravel road, that provides access to Upland Areas 2 and 3, and lot fill, which provides for additional
boat/ry storage (please see attached site plan for details)
4c. List of other certifications or approvals/denials received from other federal, state or local agencies for work
described in this application not related to the 404 or 401.
A state stormwater permit was secured for the upland development that took place on Upland Area 1.
4d. Attach an 8% x 11" excerpt from the most recent version of the USGS topographic map indicating the location of
the project site.
4e. Attach an 8% x 11" excerpt from the most recent version of the published County NRCS Soil Survey map
depicting the project site.
4f. List the total estimated acreage of all existing wetlands on the
property:
10 +/- acres
4g. List the total estimated linear feet of all existing streams (intermittent
and perennial) on the property:
0 linear feet
4g1. List the total estimated acreage of all existing open waters on the
property:
0 acres
4h. Explain the purpose of the proposed project:
The purpose of the project is to gain access to buildable uplands, and create additional boat/ry storage area, to
meet market demand.
Page 7 of 22 PCN Form - Version 1.5, September 2020
4i. Describe the overall project in detail, including the type of equipment to be used:
The project consists of installing four road crossings and expanding the existing upland, to allow for additional
storage area. Impact Area 2 (0.32-acre ATF) is a 22' x 136' gravel road, with 18" and 15" pipes, and fill for
increased storage capacity. Impact Area 3 (0.07 proposed) entails expanding Upland Area 3, for additional
storage capacity. Impact Area 4 (0.01-acre proposed) includes installing a 22' x 23' gravel road crossing, with 15"
pipe, to gain access to Upland Area 4. Impact Area 5 (0.07-acre proposed) is the last road crossing, which
provides access to Upland Area 5, and measures 22' x 132'. Three (3) 15" pipes will be installed along the run of
the roadway. A bush hog, backhoe, tractor and large trucks will be used to complete the work.
4j. Attach project drawings/site diagrams/depictions of impact areas for the proposed project.
4k. Will this activity involve dredging in wetlands or waters?
❑ Yes ❑x No
If yes, describe the type of dredging, the composition of the dredged material, and the locations of disposal area.
Click to enter text
Page 8 of 22 PCN Form - Version 1.5, September 2020
5. Jurisdictional Determinations
5a. Have the wetlands or streams been delineated on the property or in
proposed impact areas?
►_ Yes ❑ No El Unknown
Comments:
Click to enter text.
5b. If the Corps made a jurisdictional determination,
what type of determination was made? *
❑x Preliminary ❑ Approved ❑ Emailed concurrence
❑ Not Verified ❑ Unknown ❑ n/a
Corps AID number (ex. SAW-0000-00000):
SAW-2009-00366 (see attached)
5c. If 5a is yes, who delineated the jurisdictional
areas?
Name (if known): David Scibetta
Agency/Consultant Company: SEGi
Other: Click to enter.
5d. List the dates of the Corps jurisdictional determination or State determination if a determination was made by
either agency.
July 20, 2018. The PJD does not expire. A site visit to evaluate the wetland line is being sought with this application.
5d1. Attach jurisdictional determinations.
6.
Future Project Plans
6a.
Is this a phased project?
►_ Yes ❑ No
6b.
If yes, explain.
This is a two phase project. The first phase consisted of gaining access to Upland Area 1. Phase 2 consists of
gaining access to remaining upland areas (i.e., 2, 3, 4 and 5).
Are any other NWP(s), regional general permit(s), or individual permit(s) used, or intended to be used, to
authorize any part of the proposed project or related activity? This includes other separate and distant crossings
for linear projects that require Department of the Army authorization but don't require pre -construction
notification.
A NWP 18, for 0.03-acre of fill, was issued to facilitate the installation of the access road (see attached).
7.
Addresses of adjoining property owners, lessees, etc. whose property adjoins the waterbody (if more than can be
entered here, please attach a supplemental list)
See attached
8.
Scheduling of activity:
The fill associated with Impact Area 2 has already taken place. The Applicant intends to perform the work as
soon as the permits are secured.
Page 9 of 22 PCN Form - Version 1.5, September 2020
D. Proposed Impacts Inventory
1. Impacts Summary
1 a. Where are the impacts associated with your project
(check all that apply):
❑x Wetlands ❑ Streams - tributaries
❑ Buffers ❑ Open Waters
❑ Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, complete this table for each wetland area impacted.
2a.
Site #
2a1.
Impact
Reason/Type
2b.
Impact
Duration
2c.
Wetland Type
2d.
Wetland Name
2e.
Forested
?
2f.
Jurisdiction
Type
2g.
Impact Area
(ac)
W1
Road/
Driveway
Crossing
Permanent
Pocosin
B
No
Corps
0.03 (2018)
W2
Road/
Driveway
Crossing
Permanent
Pocosin
B
No
Corps
0.32 (2021
ATF)
W3
Fill (Incl.
Riprap)
Permanent
Pocosin
B
No
Corps
0.07
(proposed)
W4
Road/
Driveway
Crossing
Permanent
Pocosin
B
Yes
Corps
0.01
(proposed)
W5
Road/
Driveway
Crossing
Permanent
Pocosin
B
Yes
Corps
0.07
(proposed)
W6
Choose one
Temp/ Perm
Choose one
Click to enter
Y/N
Choose one
Click to enter
W7
Choose one
Temp/ Perm
Choose one
Click to enter
Y/N
Choose one
Click to enter
W8
Choose one
Temp/ Perm
Choose one
Click to enter
Y/N
Choose one
Click to enter
W9
Choose one
Temp/ Perm
Choose onE
Click to enter
Y/I
Choose one
Click to enter
W10
Choose one
Temp/ Perm
Choose one
Click to enter
Y/N
Choose one
Click to enter
W11
Choose one
Temp/ Perm
Choose one
Click to enter
Y/N
Choose one
Click to enter
W12
Choose one
Temp/ Perm
Choose one
Click to enter
Y/N
Choose one
Click to enter
W13
Choose one
Temp/ Perm
Choose one
Click to enter
Y/N
Choose one
Click to enter
W14
Choose one
Temp/ Perm
Choose one
Click to enter
Y/N
Choose one
Click to enter
W15
Choose one
Temp/ Perm
Choose onE
:,lick to enter
Y/N
Choose one
Click to enter
2g1. Total temporary wetland impacts
0 ac
2g2. Total permanent wetland impacts
0.50 ac
2g3. Total wetland impacts
0.50 ac
Page 10 of 22
PCN Form - Version 1.5, September 2020
2h. Type(s) of material being discharged and the amount of each type in cubic yards:
Approximately 150 cy of clean earthen fill will be placed within wetlands.
2i. Comments:
Click to enter text.
Page 11 of 22 PCN Form - Version 1.5, September 2020
3. Stream Impacts
If there are perennial or intermittent stream/ tributary impacts (including temporary impacts) proposed on the site,
complete this table for all stream/ tributary sites impacted.
** All Perennial or Intermittent streams must be verified by DWR or delegated local government
Site #
3a
Impact
Reason*
3b.
Impact
Duration
3c.
Impact Type
3d.
Stream Name
3e.
Stream
Type
3f.
Jurisdiction
Type
3g.
Stream Width
(avg ft)
3h.
Impact length
(linear ft)
S1
Click to enter
Temp/ Perm
Choose one
Click to enter
Per/Int
Choose one
Click to enter
Click to enter
S2
Click to enter
Temp/ Perm
Choose one
Click to enter
Per/Int
Choose one
Click to enter
Click to enter
S3
Click to enter
Temp/ Perm
Choose one
Click to enter
Per/Int
Choose one
Click to enter
Click to enter
S4
Click to enter
Temp/ Perm
Choose one
Click to enter
Per/Int
Choose one
Click to enter
Click to enter
S5
slick to enter
Temp/ Perm
Choose one
Click to enter
Per/Int
Choose one
Click to enter
Click to enter
S6
;lick to enter
Temp/ Perm
Choose one
Click to enter
Per/Int
Choose one
Click to enter
Click to enter
S7
slick to enter
Temp/ Perm
Choose one
Click to enter
Per/Int
Choose one
Click to enter
Click to enter
S8
slick to enter
Temp/ Perm
Choose one
Click to enter
Per/Int
Choose one
Click to enter
Click to enter
S9
Click to enter
Temp/ Perm
Choose one
Click to enter
Per/Int
Choose one
Click to enter
Click to enter
S10
Click to enter
Temp/ Perm
Choose one
Click to enter
Per/Int
Choose one
Click to enter
Click to enter
S11
Click to enter
Temp/ Perm
Choose one
Click to enter
Per/Int
Choose one
Click to enter
Click to enter
S12
lick to enter
Temp/ Perm
Choose one
Click to enter
Per/Int
Choose one
Click to enter
Click to enter
S13
lick to enter
Temp/ Perm
Choose one
Click to enter
Per/Int
Choose one
Click to enter
Click to enter
S14
;lick to enter
Temp/ Perm
Choose one
Click to enter
Per/Int
Choose one
Click to enter
Click to enter
S15
lick to enter
Temp/ Perm
Choose one
Click to enter
Per/Int
Choose one
Click to enter
Click to enter
S16
Click to enter
Temp/ Perm
Choose one
Click to enter
Per/Int
Choose one
Click to enter
Click to enter
S17
Click to enter
Temp/ Perm
Choose one
Click to enter
Per/Int
Choose one
Click to enter
Click to enter
S18
Click to enter
Temp/ Perm
Choose one
Click to enter
Per/Int
Choose one
Click to enter
Click to enter
S19
Click to enter
Temp/ Perm
Choose one
Click to enter
Per/Int
Choose one
Click to enter
Click to enter
S20
Click to enter
Temp/ Perm
Choose one
Click to enter
Per/Int
Choose one
Click to enter
Click to enter
3i1. Total jurisdictional ditch
impact:
0 linear ft
3i2. Total permanent stream
impacts:
0 linear ft
3i3. Total temporary stream
impacts:
0 linear ft
3i4. Total stream and ditch
impacts:
0 linear ft
3j. Comments:
UIICK to enter.
Page 12 of 22 PCN Form - Version 1.5, September 2020
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other
open water of the U.S., individually list all open water impacts in the table below.
4a.
Site #*
4a1.
Impact Reason
4b.
Impact
Duration*
4c.
Waterbody Name*
4b.
Activity Type*
4e.
Waterbody
Type*
4f.
Impact area
(ac)*
01
slick to ent(
Temp/ Perm
Click to enter.
Choose one
:hoose one
Click to enter.
02
Click to enter.
Temp/ Perm
Click to enter.
Choose one
:hoose one
Click to enter.
03
Click to enter.
Temp/ Perm
Click to enter.
Choose one
Choose one
Click to enter.
04
Click to enter.
Temp/ Perm
Click to enter.
Choose one
Choose one
Click to enter.
05
Click to enter.
Temp/ Perm
Click to enter.
Choose one
Choose one
Click to enter.
4g. Total temporary open water impacts
0 ac
4g. Total permanent open water impacts
0 ac
4g. Total open water impacts
0 ac
4h. Comments:
Click to enter.
5. Pond or Lake Construction
If pond or lake construction is proposed, complete the table below. (*This does NOT include offline stormwater
management ponds.)
5a.
Pond ID
#
5b.
Proposed use or
purpose of pond
5c.
Wetland Impacts (ac)
5d.
Stream Impacts (ft)
5e.
Upland
Impacts (ac)
Flooded
Filled
Excavated
Flooded
Filled
Excavated
P1
Choose one
Click to
enter.
Click to
enter.
Click to
enter.
Click to
enter.
Click to
enter.
Click to
enter.
Click to
enter.
P2
Choose one
Click to
enter.
Click to
enter.
Click to
enter.
Click to
enter.
Click to
enter.
Click to
enter.
Click to
ente
P3
Choose one
Click to
enter.
Click to
enter.
Click to
enter.
Click to
enter.
Click to
enter.
Click to
enter.
Click to
ente.-
5f. Total
Click to
enter.
Click to
enter.
Click to
enter.
Click to
enter.
Click to
enter.
Click to
enter.
Clicl
ent
5g. Comments:
Click to enter.
5h. Is a dam high hazard permit required?
❑ Yes ❑ No
If yes, permit ID no.:
Click to enter.
5i. Expected pond surface area (acres):
0
5j. Size of pond watershed (acres):
0
5k. Method of construction:
Click to enter.
Page 13 of 22 PCN Form - Version 1.5, September 2020
6. Buffer Impacts (DWR requirement)
If project will impact a protected riparian buffer, then complete the chart below. Individually list all buffer impacts.
6a. Project is in which protected basin(s)?
(Check all that apply.)
❑ Neuse ❑ Tar -Pamlico ❑ Catawba
❑ Jordan ❑ Goose Creek ❑ Randleman
❑ Other: Click to ente
Site #*
6b.
Impact Type*
6c.
Impact Duration*
6d.
Stream Name*
6e.
Buffer
Mitigation
Required?*
6f.
Zone 1 Impact*
(sq ft)
6g.
Zone 2 Impact*
(sq ft)
B1
Choose one
Temp/ Perm
Click to enter.
Y/N
Click to enter.
Click to enter
B2
Choose one
Temp/ Perm
Click to enter.
Y/N
Click to enter.
Click to enter
B3
Choose one
Temp/ Perm
Click to enter.
Y/N
Click to enter.
Click to enter
B4
Choose one
Temp/ Perm
Click to enter.
Y/N
Click to enter.
Click to enter
B5
Choose one
Temp/ Perm
Click to enter.
Y/N
Click to enter
Click to enter.
B6
Choose one
Temp/ Perm
Click to enter.
Y/N
Click to enter.
Click to enter.
B7
Choose one
Temp/ Perm
Click to enter.
Y/N
Click to enter.
Click to enter.
B8
Choose one
Temp/ Perm
Click to enter.
Y/N
Click to enter.
Click to enter.
B9
Choose one
Temp/ Perm
Click to enter.
Y/N
Click to enter.
Click to enter.
B10
Choose one
Temp/ Perm
Click to enter.
Y/N
Click to enter.
Click to enter.
B11
Choose one
Temp/ Perm
Click to enter.
Y/N
Click to enter.
Click to enter.
B12
Choose one
Temp/ Perm
Click to enter.
Y/N
Click to enter
Click to enter.
B13
Choose one
Temp/ Perm
Click to enter.
Y/N
Click to enter.
Click to enter.
B14
Choose one
Temp/ Perm
Click to enter.
Y/N
Click to enter.
Click to enter.
B15
Choose one
Temp/ Perm
Click to enter.
Y/N
Click to enter.
Click to enter.
B16
Choose one
Temp/ Perm
Click to enter.
Y/N
Click to enter.
Click to enter.
B17
Choose one
Temp/ Perm
Click to enter.
Y/N
Click to enter.
Click to enter.
B18
Choose one
Temp/ Perm
Click to enter.
Y/N
Click to enter.
Click to enter.
B19
Choose one
Temp/ Perm
Click to enter.
Y/N
Click to enter.
Click to enter.
B20
Choose one
Temp/ Perm
Click to enter.
Y/N
Click to enter.
Click to enter.
6h. Total temporary impacts:
Zone 1: 0 sq ft
Zone 2: 0 sq ft
6h. Total permanent impacts:
Zone 1: 0 sq ft
Zone 2: 0 sq ft
6h. Total combined buffer impacts:
Zone 1: 0 sq ft
Zone 2: 0 sq ft
6i. Comments:
UIICK to enter.
Please attach supporting documentation (impact maps, plan sheets, etc.) for the proposed project.
Page 14 of 22 PCN Form - Version 1.5, September 2020
E. Impact Justification and Mitigation
1.
Avoidance and Minimization
1a.
Specifically describe measures taken to avoid or minimize the proposed impacts through project design:
The Applicant first had the wetlands delineated by a professional Wetland Biologist. Then he positioned the
roads to cross perpendicular to the wetlands and at the narrowest points. Lastly, impacts for boat/ry storage
capacity was limited to that needed to make the project feasible.
1 b.
Specifically describe measures taken to avoid or minimize proposed impacts through construction techniques:
The Applicant installed silt fence along the limits of fill, to ensure that sediment does not discharge into the
adjacent wetlands.
2. Compensatory Mitigation for Impacts to Waters of the U.S., Waters of the State, or Riparian Buffers
2a. If compensatory mitigation is required, by whom is it required?
(check all that apply)
❑x DWR ❑x Corps
2b. If yes, which mitigation option(s) will be used for this
project? (check all that apply)
Mitigation Bank
❑ In Lieu Fee Program
❑ Permittee Responsible Mitigation
3.
Complete if using a Mitigation Bank (Must satisfy NC General Statute143-214.11 (d1).)
3a.
Name of mitigation bank:
NE Cape Fear Umbrella Mitigation Bank (Holly Shelter)
3b.
Credits purchased/requested:
Type: Non -riparian
Wetland
Quantity 1.0
Type: Choose one
Quantity Click to enter.
Type: Choose one
Quantity 'ick to enter.
Attach receipt and/or approval letter.
3c.
Comments:
Once the mitigation bank is approved, SEGi will request the credit reservation letter.
4. Complete if Using an In Lieu Fee Program
4a. Attach approval letter from in lieu fee program.
4b. Stream mitigation requested:
Click to enter. linear feet
4c. If using stream mitigation, what is the stream temperature:
Choose one
NC Stream Temperature Classification Maps can be found under the Mitigation Concepts tab on the Wilmington
District's RIBITS website: (Please use the filter and select Wilmington district)
https://ribits.usace.army.mil/ribits apex/f?p=107:27:2734709611497::NO:RP:P27 BUTTON KEY:0
4d. Buffer mitigation requested (DWR only):
Click to enter. square feet
4e. Riparian wetland mitigation requested:
Click to enter. acres
4f. Non -riparian wetland mitigation requested:
Click to enter. acres
4g. Coastal (tidal) wetland mitigation requested:
Click to enter. acres
Page 15 of 22
PCN Form - Version 1.5, September 2020
4h. Comments:
lick to enter.
5. Complete if Providing a Permittee Responsible Mitigation Plan
5a. If proposing a permittee responsible mitigation plan, provide a description of the proposed mitigation plan,
including mitigation credits generated.
'lick to enter
5b. Attach mitigation plan/documentation.
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — DWR requirement
6a. Will the project result in an impact within a protected riparian buffer
that requires buffer mitigation?
❑ Yes ❑ No
If yes, please complete this entire section — please contact DWR for more information.
6b. If yes, identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required in the table below.
Zone
6c.
Reason for impact
6d.
Total impact
(square feet)
Multiplier
6e.
Required mitigation
(square feet)
Zone 1
Click to enter.
Click to enter.
Choose one
Click to enter.
Zone 2
Click to enter.
Click to enter.
Choose one
Click to enter.
6f. Total buffer mitigation required
Click to enter.
6g. If buffer mitigation is required, is payment to a mitigation bank or
NC Division of Mitigation Services proposed?
❑ Yes ❑ No
6h. If yes, attach the acceptance letter from the mitigation bank or NC Division of Mitigation Services.
6i. Comments:
Click to enter.
Page 16 of 22 PCN Form - Version 1.5, September 2020
F. Stormwater Management and Diffuse Flow Plan (DWR requirement)
1.
Diffuse Flow Plan
1 a.
Does the project include or is it adjacent to protected riparian buffers
identified within one of the NC Riparian Buffer Protection Rules?
❑ Yes ❑x No
1 b.
All buffer impacts and high ground impacts require diffuse flow or other form of stormwater treatment. If the
project is subject to a state implemented riparian buffer protection program, include a plan that fully documents
how diffuse/dispersed flow will be maintained.
All Stormwater Control Measures (SCM) must be designed in accordance with the NC Stormwater Design
Manual (https://deq.nc.gov/about/divisions/energy-mineral-land-resources/energy-mineral-land-permit-
quidance/stormwater-bmp-manual).
Associated supplement forms and other documentation must be provided.
What Type of SCM are you
providing?
(Check all that apply)
❑ Level Spreader
ElW Vegetated Conveyance (lower seasonal high water table- SHT)
❑ Wetland Swale (higher SHWT)
❑ Other SCM that removes minimum 30% nitrogen
❑ Proposed project will not create concentrated stormwater flow through the
buffer
For a list of options to meet the diffuse flow requirements, click here.
Attach diffuse flow documentation.
2.
Stormwater Management Plan
2a.
Is this an NCDOT project subject to compliance with NCDOT's
Individual NPDES permit NCS000250?
El Yes ❑x No
2b.
Does this project meet the requirements for low density projects as
defined in 15A NCAC 02H .1003(2)?
❑x Yes El No
To look up low density requirements, click here:
http://reports.oah.state.nc.us/ncac/title%2015a%20-%20environmental%20quality/chapter%2002%20-
%20environ mental%20management/subchapter%20h/15a%20ncac%2002h%20.1003.pdf
2c.
Does this project have a stormwater management plan (SMP)
reviewed and approved under a state stormwater program or state -
approved local government stormwater program?
❑x Yes ❑x No
❑ n/a — project disturbs < 1 acre
Note: Projects that have vested rights, exemptions, or grandfathering from state or locally implemented
stormwater programs or projects that satisfy state or locally -implemented stormwater programs through use of
community in -lieu programs should answer "no" to this question.
2d.
Which of the following stormwater management program(s) apply?
(Check all that apply.)
❑ Local Government
❑x State
If you have local government approval, please include the SMP on their overall impact map.
Local Government Stormwater Programs
❑Phase II El USMP
❑ NSW ❑ Water Supply
Page 17 of 22
PCN Form - Version 1.5, September 2020
Please identify which local government stormwater program you are using.
Click to enter.
State Stormwater Programs
❑ Phase II ❑ HOW or ORW
❑x Coastal Counties ❑ Other
Comments:
The applicant secured a high density permit for Phase 1 and is working on securing a low density stormwater permit for
Phase 2.
Page 18 of 22 PCN Form - Version 1.5, September 2020
G. Supplementary Information
1.
Environmental Documentation
la.
Does the project involve an expenditure of public (federal/state/local)
funds or the use of public (federal/state) land?
❑ Yes
❑x No
1 b.
If you answered "yes" to the above, does the project require
preparation of an environmental document pursuant to the
requirements of the National or State (North Carolina) Environmental
Policy Act (NEPA/SEPA)?
❑ Yes
El No
1 c.
If you answered "yes" to the above, has the document review been
finalized by the State Clearing House? (If so, attach a copy of the
NEPA or SEPA final approval letter.)
❑ Yes
❑ No
Comments:
Click to enter.
2. Violations (DWR Requirement)
2a. Is the site in violation of DWR Water Quality Certification Rules (15A
NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300),
Federally Non -Jurisdictional Wetlands /Classified Surface Waters
(15A NCAC 2H. 1400) DWR Surface Water or Wetland Standards or
Riparian Buffer Rules (15A NCAC 2B .0200)?
Yes ❑ No
2b. If you answered "yes" to the above question, provide an explanation of the violation(s):
The Applicant fill approximately 0.32-acre of non -riparian wetlands, with the completion of two road crossings
and expansion of Upland Area 2 (see attached plan for details).
3.
Cumulative Impacts (DWR Requirement)
3a.
Will this project (based on past and reasonably anticipated future
impacts) result in additional development, which could impact nearby
downstream water quality?
►_ Yes ❑ No
3b.
If you answered "no", provide a short narrative description:
Phase 1 required 0.03-acre of wetland fill for the access road. Phase 2 will require 0.47-acre of non -riparian
wetland fill for the purpose of access the remaining uplands, within the property, and expanding uplands to
increase boat/ry storage capacity.
3c.
If yes, provide a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWR
policy. (Attach .pdf)
4. Sewage Disposal (DWR Requirement)
4a. Is sewage disposal required by DWR for this project?
® Yes ❑ No ❑ N/A
Page 19 of 22
PCN Form - Version 1.5, September 2020
4b. If yes, describe in detail the treatment methods and dispositions (non -discharge or discharge) of wastewater
generated from the proposed project. If the wastewater will be treated at a treatment plant, list the capacity
available at that plant.
Sewage is handled by on -site septic
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected
species or habitat? (IPAC weblink: https://www.fws.gov/ipac/ [fws.govl) *
❑ Yes ❑x No
5b. Have you checked with the USFWS concerning Endangered Species
Act impacts? *
❑ Yes ❑x No
5c. If yes, indicate the USFWS Field Office you have contacted.
Choose one
5d. Is another federal agency involved? *
❑ Yes ❑x No ❑ Unknown
If yes, which federal agency?
Click to enter.
5e. Is this a DOT project located within Divisions 1-8? *
❑ Yes ❑x No
5f. Will you cut any trees in order to conduct the work in waters of the
U.S.?
_, Yes El No
5g. Does this project involve bridge maintenance or removal? *
❑ Yes ❑x No
5g1. If yes, have you inspected the bridge for signs of bat use such as
staining, guano, bats, etc.? Representative photos of signs of bat use
can be found in the NLEB SLOPES, Appendix F, pages 3-7.
❑ Yes ❑ No
Representative photos of signs of bat use can be found in the NLEB SLOPES, Appendix F, pages 3-7. Link to
NLEB SLOPES document: http://saw-rep.usace.armv.mil/NLEB/1-30-17-signed NLEB-SLOPES&apps.pdf
If you answered yes to 5g1, did you discover any signs of bat use? *
❑ Yes ❑ No ❑ Unknown
If yes, please show the location of the bridge on the permit drawings/ project plans
5h. Does this project involve the construction/ installation of a wind
turbine(s)? *
El Yes ❑x No
If yes, please show the location of the wind turbine(s) on the permit drawings/ project plans (attach .pdf)
5i. Does this project involve blasting and /or other percussive activities
that will be conducted by machines, such as jackhammers,
mechanized pile drivers, etc.? *
❑ Yes ❑x No
If yes, please provide details to include type of percussive activity, purpose, duration, and specific location of this
activity on the property (attach .pdf)
5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated
Critical Habitat? *
Previous USFWS and NHP occurrences reports.
Attach consultation documentation.
6. Essential Fish Habitat (Corps Requirement)
Page 20 of 22
PCN Form - Version 1.5, September 2020
6a.
Will this project occur in or near an area designated as
an Essential Fish Habitat?
El Yes
❑x No
Is there submerged aquatic vegetation (SAV) around
the project vicinity? *
El Yes
❑x No
El Unknown
Will this project affect submerged aquatic vegetation? *
❑ Yes
❑x No
❑ Unknown
Explain: Click to enter.
6b.
What data source(s) did you use to determine whether your site would impact Essential Fish Habitat? *
This project does not include work within a waterbody that would support EFH or SAV.
7.
Historic or Prehistoric Cultural Resources (Corps Requirement)
Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data):
http://qis. ncdcr.gov/hpoweb/
7a.
Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural
preservation status (e.g., National Historic Trust designation or
properties significant in North Carolina history and archaeology)? *
❑Yes ❑x No
7b.
What data source(s) did you use to determine whether your site would impact historic or archeological
resources? *
Previous SHPO report
7c.
Attach historic or prehistoric documentation.
8. Flood Zone Designation (Corps Requirement)
Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search
8a. Will this project occur in a FEMA-designated 100-year floodplain? *
❑ Yes
❑x No
8b. If yes, explain how the project meets FEMA requirements.
Click to enter.
8c. What source(s) did you use to make the floodplain determination?
Pender County GIS Flood Map
H. Miscellaneous
Comments:
Click to enter.
Attach pertinent documentation or attachments not previously requested
Page 21 of 22 PCN Form - Version 1.5, September 2020
I. Signature*
❑x By checking the box and signing below, I, as the project proponent, certify to the following:
• The project proponent hereby certifies that all information contained herein is true, accurate, and complete, to
the best of my knowledge and belief;
• The project proponent hereby requests that the certifying authority review and take action on this CWA 401
certification request within the applicable reasonable period of time;
• The project proponent hereby agrees that submission of this PCN form is a "transaction" subject to Chapter
66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• The project proponent hereby agrees to conduct this transaction by electronic means pursuant to Chapter 66,
Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• The project proponent hereby understands that an electronic signature has the same legal effect and can be
enforced in the same way as a written signature; AND
• As the project proponent, I intend to electronically sign and submit the PCN/online form.
Full Name: Dana A. Lutheran
Signature: Dana A. Lutheran
Date: 12/13/2021
Page 22 of 22 PCN Form - Version 1.5, September 2020
SEG
AGENT AUTHORIZATION FORM
18.86AC PB 33/85 AJ SHEPARD HRS, .85 AC OFF N/S 17 AT
PROPERTY LEGAL DESCRIPTION: WOODSIDE PB 24/51
LOT NO. PLAN NO. PARCEL I.D. 4214-29-2426-0000.4215-10-5199-0000
STREET ADDRESS: 20822 US HWY 17
Property Owner (please print): Coastal Marine Properties, LLC c/o Kenny Moore
The undersigned, registered property owner of the above noted property, does hereby authorize
Southern Environmental Group, Inc. (SEGi) to act on their behalf in matters regarding areas of
environmental concern.
Property Owner's Address (if different than property above):
104 Wyndham Way
Wilmington, NC 28411
Telephone:
910-232-2272
We hereby certify the above information su
our knowledte.
fitted in this application is true and accurate to the best of
Property Owner Authorized Si nature SEGi Authorized Signature
T4ames f fi2oonj(
Print Name
Ogh
Date
Lindsey Stone
Print Name
Date
04/21/2017
Hampstead Coastal Marine PCN Attachments (SAW-2009-00366)
,5r (3-i
Appendix A
Coastal Marine Storage Center Site Plan
& Wetland impact Map
1 (13 December 2021)
MAP •OF
LOCATION MAP
( NOT TO SCALE )
STUMP SOUND TOWNSHIP
FENDER : COUNTY
NORTH : CAROLINA
\\*.o.,„,_ TRACT A
MB 51 PG 17
WILLIAM SHEPARD
D8 3830 PG 008
N: 250, 514.2 7
E:2,411,501.87
OWNER:
COASTAL MARINE PROPERTIESC
104 WYNDHAM WAY
WILMINCTON NC 28411
TOTAL AREA - 18.65 ACRES
WETLANDS - 10..58. ACRES
UPLANDS _ 8.07 ACRES
(ZAP -Zpa
[fk
13 .;
0
LEGEND
H5
H6
N 23'49'59" W
28.28'
\
Impact Area 1 \
See Sheet 2
\
thorized in 2018 \
and I nstalle
:L7
0.09/ Ac.:e..
�L8•. .• •'
•
DENISE MARIE' JACO
DB 2461 PG 245
S
H9
N: 250,236.52
E: 2, 411, 543.27
S 21'46'50"
1
36948 SF
0.85 Ac.
6
8.46'
N 23'40'446„
E.I.P. = EXISTING IRON PIPE
E.I. = EXISTING IRON
E.C.M. = EXISTING CONCRETE MONUMENT
R\W = RIGHT OF WAY
C.P. = COMPUTED POINT
PROPERTY LINE
BUILDING SETBACK
CENTERLINE
EASEMENT
COMPUTED PROPERTY LINE
NOTES
ROPERTI.:ES, LLC
REBECCA OENFIELD
DB 3336 PG 111
EMPIE SIOBURY
DB 442 PG 38
EMPIE SIOBURY
DB 3361 PG 268
TRACT 8
MB 51 PG 17
HAZEL SHEPARD
DB 3830 PG 010
574.09'
1. AREA COMPUTED BY COORDINATE METHOD
2. ALL DISTANCES ARE HORIZONTAL
3. FOR REFERENCE SEE DB 4628 PG 2380 & DB 4628 PG 2382
4. SURVEYED DEC. 2016
5. WETLAND DELINEATION BY SEGi.
6, LINES FROM POINT A TO POINT B NOT SURVEYED TAKEN FROM
MAP BOOK 33 PAGE 85
POINT A
£!1
N: 250,183.81
E: 2,412,183.85
M
c.,
vs
cn
Z
Ut
a)
z
cn
co
1v
rn
ALBERT SIMPSON
DB 4007 PG 298
S 00' 13'42" W.24' 18'35" E
52.73' 50,65'
17 •
4':'-• 17
S 06'31'33" W
30.49'
S 03'39'09" E
35.40' S 16'25'57" E
78.74' S 08'44'53" E
22.35'
.
•h.. ,- i
17 • . , n.• - 17•
•^
•
1y
• • •
M" •
17
•
17
A2 M • •L55 L54' ,L53 LS2^ 1CS''•
t7
1
A3 A4 A5 A6 A7
A8
A13
0
-J
A14
A9
17 .
A10
A11
Al2$
L46
Al
S 36'29'45" W
19.44'
5 00'18'30" E
29.45'
7
17
17 ` •
f7 '
•
17
7
17
17
S 17'49'03" W
41.49'
WETLAND IMPACT TABLE:
IMPACT AREA 1: 0.03 AC
IMPACT AREA 2: 0.32 AC
IMPACT AREA 3: 0.07 AC
IMPACT AREA 4: 0.01 AC
IMPACT AREA 5: 0.07 AC
(2018)
2021 ATF
PROPOSED
PROPOSED
PROPOSED
TOTAL 2018:
TOTAL 2021 ATF:
TOTAL PROPOSED:
TOTAL IMPACT:
CARSON SMITH
S 18-36'07" W De 4201 PG 194
28.35'
17
. • •' 'Y •
A
;'=162.68,1
' 17
f7 '
•
7 •
7• . • h.
•
•
ry .
•
•
•
17 '.t'..;
ice- :f_r
40 •:A' _ • •
• •M'•A17
•
Eg A.
•
• 17
A21 \15 . :A20• :
A16 A22 \-51
10
A23
A24
ii
Upland Area #1
See Sheet 2 for as built conditions
N 23'42'48" W 330.30'
DENISE MARIE JACOBS
DB 2461 PG 245
A.. .' 17
17 •
A25
LINE
BEARING
DISTANCE LINE
BEARING
DISTANCE
30,46'
LINE
BEARING
DISTANCE
LINE
BEARING
DISTANCE
L81
N 39'39'06" Imo,
22.56"L122
N 61'51'53" E
1.1
N 36'50'58" E
36.40'
L41
S 69'51'38" E
33,19"L82
N 47'27'46" E
30.17
L 123
N 44'14'45" E
34.15'
L2
N 17'19'52" W
48.56'
L42
S 79'15'42" E
24.32'
L83
N 16'51'52" E
22.21'
L124
N 84'46'34" E
27.48'
28.96f
37.59'
L3
N 25'15'53" W
63.03'
L43
S 20'37'46" E
33.04'
L84
N 39'06'08" E
20.92'
L125
S 63'53'41' E
L4
N 40'47'45' W
44.93'
L44
S 04'38'01 " W
26.05'
L85
N 54' 14'31 " E
21.33
L 126
S 08'33'04" W
L5
S 59'22'31 " W
16.93'
L45
S 64.18'33" W
18.83'
L86
N 84'28'03" E
26.06"
L6
S 49'35'51 " E
30.57'
L46
N 39'46'36' W
29.04'
L87
S 65'15'42" E
58.23'
L7
S 10'08'50" E
33.93'
L47
N 79'36'10" W
24.71'
L88
S 44'00'09' E
40.87'
L8
S 17'24'59" E
55.78'148
S 45'50'38" W
25.59'
L89
S 25'35r45" E
30.03'
19.85'
18.81'
28.46'
27.89'
L9
S 18'47'23' E
54.33'
L49
S 00'43'53" W
24.02'
L90
S 69'03'56" E
LIO
N 50'25'27'1 W
42.98rL50
S 2313'33'r4
25.691191
N 63'48'02" E
L 11
N 79'23'08" W
38.78'
L51
S 03' 17'27" E
17.98
L92
S 89'38' 14" E
L12
S 89'23'34" W
38.60'
L52
S 25'02'05" E
22.23'
L93
N 75'34'42" E
L13
S 38'56'19" W
45.21 `L53
S 14'59'44" E
21.34'
L94
S 84'47'16" E
33.90'
25.09'
L14
5 24'36'52" W
37.92'
L54
S 35'37'56" E
22.05'
L95
S 73'27'14" E
L 15
S 35'37'31" W
33.07'
L55
S 29'56'29" E
32.22'
L96
S 46'28' 13° E
25.02'
29.43'
L16
S 35'18'44" W
37.31'1_56
S 12'14'29" E
36.52'L97
5 32'50'22" E
L17
N 46'41 '06" W
29.62'
L57
S 09'12'33" W
46.89'
L98
5 02' 10' 14" E
35.12
L18
N 65'23'14" W
27.39'158
S 58'38'54" E
18. 71 '
L99
S 23'31'24" W
41.28'
L19
S 63'24'37" W
23.51'
L59
S 88'41 '34" E
24.17'
L100
5 34'55'40" W
41.77
L20
S 59'36'39" W
26.02'
L60
S 062911" W
22.25'
L101
S 61'26'09" W
44.77'
27.55'
31.02'
22.57'
L21
S 06'28'21" E
43.15'
L61
S 38'18'30" W
24.27'
L102
S 37'51'39" W
L22
S 30'27'07" E
25.58'
L62
N 63'42-'45" E
25.34
L103
S 77'55'05" W
L23
5 40'43'44" E
33.26'
L63
N 37'48'29" E
20.12'
L104
N 72'19'39" W
L24
S 65'00137" E
31.52.164
N 62'27'28" E
29.96'
1.105
N 87'26'25" W
28.11'
36.52'
13.84'
L25
S 88'02'51" E
- 28.01'IL65
N 70'11'30" E
18.73`L106
N 59'11'23" W
L26
S 76'05' 15" E
39.10''
L66
N 70' 15'44" E
20.75'
L.107
S 80' 11 '58" W
L27
S 53'54'57" .E
30.20'
L67
S 78'15'32" E
24.05'
L108
S 71'30'58" E
13,06'
46.02'
27.05'
L28
S 00'37'51" W
26.01'
L68
S 32'40'13" E
18.14'
L109
S 55'49'57' E
L29
N 81'20'31 " W
32.15'
L69
S 52'52' 10" E
22.85'
L 110
S 10'53'09" E
L30
N 86'58'34" W
28.64'
L70
S 60'45'04" E
33.20'
L111
S 18'48'49" W
26.20'
131
S 14'20'16" W
27.19'
171
S 22'17'25" E
22.08'
L 1 12
S 25'26'43" E
21.3,3'
29.24'
L32
S 20.05'09' W
27.03'
1_72
S 47'25'54" W
31.5211113
S 86'27'41" E
L33
S 19'22'24" W
33.153173
S 71'11'50" W
15.63'
L114
N 86'12'20" E
35.04'
L34
S 04'57'52" W
46.63'
L74
S 82'11'33' W
22.19
L115^S
71'46'37" E
42.57'
30.27'
72.62'
27.78'
18.87'
L35
5 40'32'45" W
26.79'
L75
S 52'32'58" W
.33.70'
L116
S 50'14'08" E
L36
S 61'31'29" W
26.48'
L76
S 79'51'44" W
18,10'
L1 17
S 67'26'58" E
L37
N 51'27'31" W
29.29'L77
S 70'51'17" W
22.77'
L118
N 26'25'52" W
L38
N 67'04'34" W
27.91'
L78
S 56'07'24" W
31.92'
L1 19
N 04'43'22" E
L39
S 45'43'38" W
27.53'
L79
S 62'26'16" W
22.26'
L120
N 01'59'45" W
28.85'
L40
S 14'06'51" E
27.38'
L80
S 17'31'14" W
18.02L121
N 78'35'03" E
23.95'
17
A26
A30
• h. - •-• • j,
.• 1?
17 .
• 17
17
.
• A.
. . t7 :.
17
f7 ;
A. •
n.
17 •
•
. •
17
•
A27 -.•- 17
A28Arr
• ..
A. •
A29
A31
A32
f7
c
• f7
A34
A33
17 :
•
•
17
A.
0
1) C • .
,-• 1y
17
A36 A37
A35
E: 2,411,884.50
N
17
A39
A40
ir
0.03
0.32
0.15
0.50
AC
AC
AC
AC
tr
•
•
•
17
17
17
•
•
17
17 r
•
•
•
17
•
17
9
A45
A46
A47
'4,- impactArea'
•
•
E: 2,411,910.63
DB 468 PG 10
•
•
•
Upland Area #2
Boat & RV Storage Area
2
CNI
CI
7
GARY CLAY
DB 702 PG 252
49.83'
De 693 PG 37
THIS CERTIFIES THAT THIS COPY OF THIS PLAT ACCURATELY DEP/CTS THE
BOUNDARY OF THE JURISDICTION OF SECTION 404 OF THE CLEAN WATER
ACT AS DETERMINED BY THE UNDERSIGNED ON 'THIS DATE. UNLESS THERE
IS A CHANGE IN THE LAW OR OUR PUBLISHED REGULATIONS, THIS
DETERMINATION OF SECTION 404 MAY BE REL/ED UPON FOR A PERIOD
NOT TO EXCEED FIVE YEARS FROM THIS DATE. THIS DETERMINATION WAS
MADE UTILIZING THE APPROPRIATE REGIONAL SUPPLEMENT TO THE 1987
CORPS OF ENGINEERS WETLANDS DELINEATION MANUAL.
SIGNATURE U.S. ARMY CORPS OF ENGINEERS OFFICIAL TiTLE
EXPIRATION DATE OF DELINEATION:
USACE ACT/ON ID:
DATE
C15
C19
•
•
03
17
24" Connector Pipe
•
20
1,3
N: 249,150.94
N 67'24'49" W
\27.65'
•
c.
Dll
17
•
•
•
•
17
17
17
•
•
17
Upland Area #3
Boat & RV Storage Area
PROPOSED TOE OF SLOPE
E: 2,412,167_64
Impact Area 4
500 SF / 0.01 AC
DB 38/6 PG 317
60' 30' 0 60'
SCALE IN FEET
60 FT,
•
•
•
E3
17
•
tr
12" Connector Pipe
N: 248,938.54
:2,412,171.59
E5
•
17
67.73'
•
37
Upland Area #5
Storage Area
N: 248,838.27
17
POINT B
FIO
N:248,777.92
E: 2,412,422.79
•
•
E8
Boat & RV Storage Area
N: 248,681.02
E: 2,412,235.28
SHEET 1 OF 3
0
0.1
07,
-1171
IX co
2" Gonne
(-HANOVER D SIGN SERVICES, P.A.
LAND SURVEYORS ENGINEERS LAND PLANNERS
1123 FLORAL PARKWAY
WILMINGTON, N.C. 28403
PHONE: (910) 343-8002
FIRM CERTIFICATE C-0597
tor Pipes
HAMPSTEAD MARINE CENTER
COMMERCIAL SITE PLAN
PENDER COUNTY, NORTH GAROLINA
DATE: JANUARY2017'
SCALE: 1 "z 50'
OWNER DEVELOPER:
Last Detail LLC
104 Wyndham Way
Wilmington, NC 28411
910-232-2272'
AREA .TO B
INSIDE NCDO
SEE DETAIL
GENERAL. SITE DATA
TAX PARCEL No. 4214-29-2426-0000
TAX PARCEL No. 4215-10-5199-0000
DEED BOOK 4628 PAGE 2380-2384
ZONED GB, GENERAL BUSINESS
EXISTING USE: VACANT LAND
PROPOSED USE: COMMERCIAL: BOAT DETAIL / REPAIR
FACILITY WITH 4 SERVICE BAYS
PROJECT AREA: 5.71 ACRES
TOTAL PROPERTY AREA: 18.65 ACRES
ESTIMATED. TRAFFIC GENERATED BY SITE
AM PEAK - 6 PM PEAK - 6
AVERAGE DAILY (SATURDAY)- 50
PARKING REQUIRED: 12 = (3 PER SERV. BAY *4 BAYS)
PARKING: 12 TOTAL VEHICLE SPACES
PARKING: 60 TOTAL BOAT PARKING BAYS
SEWER SEPTIC (OWNER)
WATER: PRIVATE WELL (OWNER)
ELECTRIC: DUKE ENERGY PROGRESS
1451 Military Cutoff Rd, Wilmington, NC 28403
(800)452-2777
LIGHTING SHALL MEET THE REQUIREMENTS OF SEC.
7.11 OF THE PENDER COUNTY UDC.
OUTDOOR TRASH RECEPTACLES SHALL MEET THE
THE REQUIREMENTS OF SEC: 7.13 OF THE PENDER
COUNTY UDC.
SIGN LOCATION AND DESIGN SHALL MEET THE
THE REQUIREMENTS .OF SEC. 9 OF THE PENDER
COUNTY UDC.
REQUIRED SET BACKS
FRONT: 25'
SIDE: 10'
CORNER: 12'
REAR: 10'
MINIMUM BUILDING. SPACING: •20'
MAXIMUM BUILDING HEIGHT: 40'
REQUIRED • BUFFERS
ALONG ROW:
NON -STREET BOUNDARIES•ADJ.
TO RESIDENTIAL. DISTRICTS:
ALL OTHER BOUNDARIES:
BUFFER A
BUFFER C
BUFFER B
OWNER/DEVELOPER SHALL MEET OR EXCEED ALL
PENDER COUNTY. ZONING REQUIREMENTS
AVED
ROW
EXISTING POWER POLE
TO BE RELOCATED
79.03'
R-20'
25' SET BACK
r LEGEND
IRON IN EXIST. CONC. MON.
DROP INLET
- M M N STORM DRAIN
E.LP. = EXISTING IRON PIPE
E.LR. = EXISTING IRON REBAR
E.C.M. = EXISTING CONCRETE MONUMENT
I.S. = IRON SET
W/V = EXISTING WATER VALVE
W/M = EXISTING WATER METER
F/H = EXISTING FIRE HYDRANT
P/P = POWER POLE
C/O = EXISTING CLEAN OUT
RETAINING WALL
Canopy Tree
OVERHEAD POWER
0 Understory Tree
LP
3C LIGHT POLE (APPROX. LOCATION)
Grassed Area
Concrete Sidewalk
+49.0 INDICATES SPOT ELEVATION
WETLANDS
SIGN SIGN
4 4 4 w
4 4 i
4 * 4 4 4 4
TRACT A
MB 51 PG 17
WILLIAM SHEPARD
DB 3830 PG 008
4215-10-5484-0000
ZONING: GB
COMMERCIAL
TO B, RELOCATED"' �. ED
PROPOSED"
GRAVEL DRIVE
/-
INDEX TO DRAWINGS '
SHEET No.
DESCRIPTION
DRAWING Na
1 OF 9
COVER SHEET AND GENERAL NOTES
14212-1
2 OF 9
SITE PLAN
14212-2
3 OF 9
GRADING AND STORMWATER
14212-3
4 OF 9 .
DRAINAGE AREAS
14212-4
5 OF 9 •
POND PLANS
14212-5
6 OF 9
EROSION CONTROL-1
14212-6
7 OF 9
EROSION CONTROL-2
14212-7
8 OF 9
DETAIL SHEET 1
14212-8
9 OF 9
DETAIL SHEET2
14212-9
10 OF 10
LANDSCAPING AND BUFFER DETAIL
14212-10 )
k
k k
\
Wetland Impact 1 (2018)
0.03 AC
\
DENISE MARIE JACOBS
TO BE RELOCATED DB 2461 PG 245
4215-10-4285-0000
ZONING: GB
t, �.
dot :.
��3 EX. P4P
EX. FIBER MARKER
o
•E fIsmNG CULVE
rSTABILIZATION TIME FRAMES:
SITE AREA DESCRIPTION
STABILIZATION
Per I meter d i Ices, swo.Les, d t tches and s lopes
7 DAYS
High Qua tity Water LHQW) Zones
7 DAYS
Slopes steeper.than 311
7 DAYS
Slopes 311 or ftatter
14 DAYS
All other areas with slopes flatter than 411
14 DAYS
NOTE WELL:
ANY AREAS ON -SITE WITHOUT ACTIVITY SHALL BE STABILIZED WITHIN
15 WORKING DAYS OR 21 CALENDAR DAYS AND AS ABOVE, ALL SLOPES
MUST BE STABILIZED WITHIN 21 CALENDAR DAYS OF CEASE OF ANY
ACTIVITY.
DETAILS SHOWN ARE TYPICAL OF INSTALLATIONS REQUIRED BY THE TOWN AND COUNTY.
THIS SHEET DOES NOT PURPORT TO SHOW ALL REQUIRED CONSTRUCTION DETAILS, stir
RATHER SERVES AS A GUIDE. THE CONTRACTOR IS RESPONSIBLE FOR ADHERING TO ALL
CITY, COUNTY AND STATE CODES AND CONSTRUCTION STANDARDS.
No geotechnlcal testing has been performed on site. No warranty
is made for suitability of subgrade, and undercut and any required
replacement with suitable material shall be the responsibility
of the contractor.
10.0'
REBECCA BENFIELD
DB 3336 PG 111
4215-20-1529-0000
ZONING: RP
VACANT LAND
EMPIE SIDBURY
DB442PG38
4215-10-9336-000L
ZONING: GB
SINGLE FAMILY
EMPIE SIDBURY
DB 3361 PG 268
4215-10-8142-0000
ZONING: GB
VACANT LAND
TRACT B
MB 51 PG 17
HAZEL SHEPARD
DB 3830 PG 010
4215-10-7114-0000
ZONING: GB
VACANT LAND
CL SWALE
OVERHPIO.1?Pl jER LINES
NOTE WELL:
1. All storm water runoff from built upon areas
(I.e. Impervious surfaces & roof drainage) to be
directed to the storm sewer collection system
(Le. storm Inlets or ponds) by swales, overland flow,
additional grading, or landscaping inlets.
f GENERAL NOTES:
1. This map is not for conveyance, recordation, or sales.
J
��k A- ! A, -V ' A, ,A.-; -V-, .„-k.. k - ' .< :
1:.,
liv,,,, 1..,,; '�, PROPERTY
A , :\-1%-k. „,. ',..‘ :\ ,... . : A., : :‘ A-
k.. ,,, : k,
DARyi1-. t�r{" A,. •"'�iy-."V -'•' A" ti` -V ' -1 --V A l "i ; i .,, ,-,c 'I A, : _a-
, k , A
A- kk •: k k
PROPOSED t . irk '
RETAINING WALL \-- t
DESIGNED BY t ` • •' "-'
OTHERS , a '`
kT,
,.. kk
..
:. GRAVEL
k
70 0' \PROPOSED ` �N .: a
RETAINING WALL I _A.. -k r
DESIGNED BY i - "'�`
OTHERS i .v k ,
.;
10.0'
SIDE SETBACK
PROP.
CONC.
SIDEWALK
PARKING AREA
TO BE PAVED
SEE DETAIL
BOUNDARY
PROP.
GATE
DENISE MARIE JACOBS
DB 2461 PG 245
4214-19-7722-0000
ZONING: RP
VACANT LAND
SIDE SETBACK
PROPOSED
CONCRETE
DUMPSTER PAD
•
•
•
`,
POSSIBLE WELL `%
LOCATION
PROPOSED
EDGE OF GRAVEL
•
i`
1
i
i
GRAVEL AREA
PARKING AREA
TO BE PAVED
GRAVEL AREA SEE DETAIL
PROPOSED
STORM SEWER
TYPICAL
ROPOSED
DROP INLET
TYPICAL
NOTE WELL:
SEPTIC AND WELL LOCATIONS ARE SHOWN FOR APPROX. POSSIBLE LOCATIONS ONLY.
CONTRACTOR/OWNER IS REQUIRED TO COMPLY WITH ALL LOCAL AND STATE CODES INCLUDING
MINIMUM SET BACK REQUIREMENTS.
NOTE WELL:
DRIVEWAY PROFILE
ALL DRIVEWAYS SHALL HAVE A GRADE THAT SLOPES AWAY FROM THE HIGHWAY SURFACE AT A
RATE EQUAL TO THE SLOPE OF THE SHOULDER, BUT NO LESS THAN 114"PER FOOT
OR GREATER THAN ONE INCH PER FOOT IN A NORMAL CROWN TYPICAL SECTION. THE SLOPE
SHALL CONTINUE FOR A DISTANCE EQUAL TO THE PREVAILING SHOULDER WIDTH OR LONGER SO
AS NOT TO CAUSE A HUMP OR A DEPRESSION IN THE SHOULDER AREA. THE SLOPES OF DRIVES
SHALL BE COMPATIBLE WITH PROVISIONS FOR DRAINAGE OF THE DESIGNED CROSS-SECTION.
NOTE: DELINEATED 404 WETLANDS LINE
HAS BEEN SUBMITTED FOR APPROVAL
BY ARMY CORPS OF ENGINEERS.
:•:::•�I�'t'raiNil�it3•ilall�l:i::::
DESTGNE5i!Y_....-.
OTHER
FUTURE ACCESS
DGE OF GRAVEL
50 0 25 50 100 200
1"=50'
1.
Revised Per Pender County Comments
2I6I17
4.
Revised driveway entrance
6/5/17
5.
Revised Per Pender County Comments
6/28/17
6.
Revised Building Spacing and Grading
7/19/17
REV. NO.
REVISIONS
DATE
CcPYlQ Hanover Qwlgn Senecas, PA. AA doles roamed. Ropy an or ow of the contents ofthis document, or additions or deletion* to this
document MwhW°orpert %revelwritten Cermet or rho Lend Surveyor Or Enginoor. rss:40444. Orsy melee from the Original Mlles deo-mord,
marked with the od In J signature and originoriginer seal of die Surveyor or Engineer, steel be considered to be valid end Into wire.
WETLANDS
Impact Area 2
See Sheet 3
ALEXANDER BOWENS
DB 468 PG 10
GARY CLAY
DB 702 PG 252
SITE PLAN
HAIUIPSTEAD MARINE CENTER
LOCATED IN TOPSAIL TOWNSHIP, PENDER COUNTY, NORTH CAROLINA
agrady@hdsIim.com
OWNER: Last Detail LLC
104 Wyndham Way
Wilmington, NC 28411
HANOVER DESIGN SERVICES, P.A.
LAND SURVEYORS, ENGINEERS & LAND PLANNERS
1123 FLORAL PARKWAY
W€LMINGTON, N.C. 28403
PHONE: (910) 343-8002
LICENSE # C-0597
Date:
1-23-17
Scale:
HORZ:
Drawn:
AHG
Checked:
GW
Project No:
14212
Sheet No:
2
14212 ENG base 2-1-2017 REVISED BUILDING SPACINGS-15-2017.dwg SITE PLAN 7119I2017 07:59:581 : 50
SURVEY FOR
Coastal Marine Properties, LLC
Wetland Impact Drawing
STUMP SOUND TOWNSHIP, PENDER COUNTY
NORTH CAROLINA
DATE. AUG. 3, 2021
Preliminary Exhibit
UPLAND
#1
ECM
\ Tgt r1 ilt"\" It"��� IfsR 2
ItTIGRAVEL /r1,
I iT #T / I fT 4I tT C Ifit
1 WETLAND IMPACT
a \\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\
WETLANDS ARE FROM 12/2016 SURVEY.
WETLAND IMPACTS LOCATED 8/2/2021.
PARTIAL WETLAND RESTAKE 8/2/2021.
A 43
A 44
SURVEYED TOE
OF SLOPE
S 23'42'15" E 298.06'
A45
A47
B1
A 46
ALEXANDER BOWENS
DB 468 PG 10
SURVEYED TOE
OF SLOPE,
WETLAND
B
EXISTING PIPE
B5
GARY CLAY
DB 702 PG 252
EIP
Wetland Impact Area 2 (ATF)
13,790 SF / 0.32 AC
2
EIP
N 14'53'21 " E
49.83'
MICHAEL REDD
DB 693 PG 37
C20
EIP
SURVEYED TOE
OF SLOPE
D7
D6
D5
D4
S 67'24'49" E
27.65'
EIP
SHEET 3 0O\3
D8
XISTING PIPE
D3
D2
APPROX. TOE
OF SLOPE
40'
D9
D12
D11
D10
D13
Wetland Impact Area 3
3155 SF / 0.07 AC
Proposed
UPLAND
#3
20'
0
EIP
40'
SCALE IN FEET
1 INCH = 40' FEET
THIS MAP IS NOT FOR RECORDATION
HANOVER DESIGN SERVICES, P.A.
LAND SURVEYORS ENGINEERS & LAND PLANNERS
1123 FLORAL PARKWAY
WILMINGTON, N.C. 28403
PHONE: (910) 343-8002
FAX: (910) 343-9941
FIRM CERTIFICATE C-0597
14212
Hampstead Coastal Marine PCN
,`5LCI
Appendix B
Pender County Parcel Information
2 (13 December 2021)
PIN: 4215-10-5199-0000
Owner: COASTAL MARINE PROPERTIES LLC
104 WYNDHAM WAY
WILMINGTON, NC 28411
Deed Ref: 4628/2382
Property
Address: 20822 US HWY 17
Description: .85 AC OFF N/S 17 AT WOODSIDE PB 24/51
Sale Price: $
Sale Date: 2016-09-22
Plat: 00240051
Account No: 972585
Township: TOPSAIL
Subdivision:
Tax Codes: G01 F22 R40
Acres: 0.85
Land Value: $148,104
Building Value: $0
Total value: $148,104
Deferred Value: $0
Exempt Amount:
PCL Class: R
Heated Sq Feet:
Pender County
1:5,055
0 0.0375 0.075
r , ti r
0 0.05 0.1
1 inch = 421 feet
March 21, 2018
0.15 mi
0.2 km
PIN: 4214-29-2426-0000
Owner: COASTAL MARINE PROPERTIES LLC
104 WYNDHAM WAY
WILMINGTON, NC 28411
Deed Ref: 4628/2380
Property
Address: 20822 US HWY 17
Description: 18.86AC PB 33/85 AJ SHEPARD HRS
Sale Price: $
Sale Date: 2016-09-22
Plat: 00330085
Account No: 972712
Township: TOPSAIL
Subdivision:
Tax Codes: GO1 F22 R40
Acres: 18.86
Land Value: $48,093
Building Value: $
Total value: $48,093
Deferred Value: $
Exempt Amount:
PCL Class: R
Heated Sq Feet:
Hampstead Coastal Ma
1:5,055
0 0.0375 0.075 0.15 mi
i r 1 L. 1 1. 1
0 0.05 0.1 0.2 km
1 inch = 421 feet
March 12, 2018
Hampstead Coastal Marine PCN
Appendix C
NC DWR Water Classification Map
(1of2) ■ ❑x
Surface Water Classifications:
Stream index: 18-87-9-1
Stream Name: Mullet Run
Description: From source to
Virginia Creek
Classification: SA»QW
Date of Class.: August 8. 1981
River Bas;n: White Oak
What does this Class_ More info
mean?
Z c om t:
3 (13 December 2021)
rjamFstead Coastal Marine PCN 5 LC i
Appendix D
LiDAR, USGS Topographic and Soils Maps
4 (13 December 2021)
0 260 520
1,040
1,560
2,080
Feet
1 inch = 1,000 feet
USGS Topo Map
Kenny Moore Boat Yard
Hampstead, Pender Co., N.C.
4/25/2017 016-130.01
W/E
S
Map Source: The USGS National Map Server
0 50 100
200
300
1 inch = 200 feet
Map Source: NCOneMap Orthoimagery,
Soil Survey of Pender Co.
400
Feet
Soils Map
Kenny Moore Boat Yard
Hampstead, Pender Co., N.C.
4/25/2017 016-130.01
Pender Elevation
Value
High : 65
Property Line
Approximate Wetlands
0 50 100
200
300
1 inch = 200 feet
400
Feet
LiDAR Map
Kenny Moore Boat Yard
Hampstead, Pender Co., N.C.
4/25/2017 016-130.01
Map Source: NCOneMap Orthoimagery
Hampstead Coastal Marine PCN
5LGi
Attachment E
2018 Nationwide Permit 18 & Preliminary Jurisdictional Determination
5 (13 December 2021)
U.S. ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Action Id. SAW-2009-00366 County: Pender County U.S.G.S. Quad: Topsail
GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION
Permittee: Tom Moore
Coastal Marine Center
Address: 104 Wyndham Way
Wilmington NC, 28411
Telephone Number:
Size (acres) 18.65 Nearest Town Hampstead
Nearest Waterway Onslow Bay River Basin Onslow Bay
USGS HUC 03020302 Coordinates Latitude: 34.4277
Longitude: -77.6332
Location description: The property is located on the south side of Highway 17 lust east of Union Bethel Road and west of Sloop
Point Road in Hampstead, Pender County, NC.
Description of projects area and activity: This after -the -fact verification authorizes the filling of 0.03-ac of wetland for the
purpose of constructing a 20-ft wide access road for a commercial business. Sedimentation was removed, the area stabilized,
and some fill left in place for the roadbed.
Applicable Law: ® Section 404 (Clean Water Act, 33 USC 1344)
❑ Section 10 (Rivers and Harbors Act, 33 USC 403)
Authorization: Regional General Permit Number and/or Nationwide Permit Number: NWP 39
SEE ATTACHED RGP or NWP GENERAL, REGIONAL AND/OR SPECIAL CONDITIONS
Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached
conditions and your submitted application signed March 21, 2018 and the attached information dated 11/22/2016 and
12/08/2016. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a
stop work order, a restoration order, a Class I administrative penalty, and/or appropriate legal action.
This verification will remain valid until the expiration date identified below unless the nationwide and/or regional general permit
authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide and/or regional
general permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below,
provided it complies with all requirements of the modified nationwide permit. If the nationwide and/or regional general permit
authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and
conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to
commence in reliance upon the nationwide and/or regional general permit, will remain authorized provided the activity is completed
within twelve months of the date of the nationwide and/or regional general permit's expiration, modification or revocation, unless
discretionary authority has been exercised on a case -by -case basis to modify, suspend or revoke the authorization.
Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You
should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements.
For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA),
prior to beginning work you must contact the N.C. Division of Coastal Management in Wilmington, NC, at (910) 796-7215.
This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal,
State or local approvals/permits.
If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory
program, please contact Emily Greer at (910) 251-4567 or Emily.C.Greer(dusace.army.mil.
GREER.EMILY.C.1385325
Corps Regulatory Official: 300
Date: July 20, 2018
oicUSk Cn=€REER.EM111,1385325Sao
SAW-2009-00366
Expiration Date of Verification: March 18, 2022
A. Determination of Jurisdiction:
1. ® There are wetlands on the above described project area that may be subject to Section 404 of the Clean Water Act (CWA)
(33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). This preliminary determination is not
an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 331). However, you
may request an approved JD, which is an appealable action, by contacting the Corps district for further instruction. Please note,
if work is authorized by either a general or nationwide permit, and you wish to request an appeal of an approved JD, the appeal
must be received by the Corps and the appeal process concluded prior to the commencement of any work in waters of the United
States and prior to any work that could alter the hydrology of waters of the United States.
2. ❑ There are Navigable Waters of the United States within the above described project area subject to the permit requirements
of Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403) and Section 404 of the Clean Water Act (CWA) (33 USC §
1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to
exceed five years from the date of this notification.
3. ❑ There are waters, including wetlands, within the above described project area that are subject to the permit requirements of
Section 404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our published regulations,
this determination may be relied upon for a period not to exceed five years from the date of this notification.
4. ❑ A jurisdiction determination was not completed with this request. Therefore, this is not an appealable action. However, you
may request an approved JD, which is an appealable action, by contacting the Corps for further instruction.
5. ❑ The aquatic resources within the above described project area have been identified under a previous action. Please reference
the approved jurisdictional determination issued . Action ID: SAW-
B. Basis For Jurisdictional Determination: See signed Preliminary Jurisdictional Determination dated 7/20/2018.
C. Remarks:
D. Attention USDA Program Participants
This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site
identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security
Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request
a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work.
E. Appeals Information for Approved Jurisdiction Determinations (as indicated in A2 and A3 above).
If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed
you will find a Notification of Appeal Process (NAP) fact sheet and Request for Appeal (RFA) form. If you request to appeal this
determination you must submit a completed RFA form to the following address:
US Army Corps of Engineers
South Atlantic Division
Attn: Jason Steele, Review Officer
60 Forsyth Street SW, Room 10M15
Atlanta, Georgia 30303-8801
Phone: (404) 562-5137
In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal
under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you
decide to submit an RFA form, it must be received at the above address by NA
It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this
correspondence. GREER.EMILY.C.13853253 Digitally signed
DoD,ou3PKl,
ou=USA, cn=GREER.EMILY.C.1385325300
Corps Regulatory Official: 00 Date: 2018.07.20 12:39:25 -04'00'
SAW-2009-00366
Emily Greer
Date of JD: July 20, 2018 Expiration Date of JD: NA
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we
continue to do so, please complete our Customer Satisfaction Survey, located online at
http://corpsmapu.usace.army.mil/cm apex/f?p=136:4:0.
Copy furnished:
David Scibetta dscibetta@SEGI.us
Dana Lutheran dlutheran@SEGI.us
SAW-2009-00366
Action ID Number: SAW-2009-00366 County: Pender County
Permittee: Tom Moore
Coastal Marine Center
Project Name: Robert Shepard-Empie Sidbury-Biberstein-Rouse-Shepard v Sidbury-wetland
delineation -Andrew Jackson Lane -PIN 4214-19-8782
Date Verification Issued: July 20, 2018
Project Manager: Emily Greer
Upon completion of the activity authorized by this permit and any mitigation required by the permit,
sign this certification and return it to the following address:
US ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Attn: Emily Greer
69 Darlington Avenue
Wilmington, NC 28403
Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of
Engineers representative. Failure to comply with any terms or conditions of this authorization may
result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I
administrative penalty, or initiating other appropriate legal action.
I hereby certify that the work authorized by the above referenced permit has been completed in
accordance with the terms and condition of the said permit, and required mitigation was completed in
accordance with the permit conditions.
Signature of Permittee Date
NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND
REQUEST FOR APPEAL
Ai
Applicant: Tom Moore Coastal Marine Center
File Number: SAW-2009-00366
Date: July 20, 2018
Attached is:
See Section below
INITIAL PROFFERED PERMIT (Standard Permit or Letter of permission)
A
PROFFERED PERMIT (Standard Permit or Letter of permission)
B
PERMIT DENIAL
C
APPROVED JURISDICTIONAL DETERMINATION
D
ix
PRELIMINARY JURISDICTIONAL DETERMINATION
E
SECTION
Additional
Corps
I - The following identifies your rights and options regarding an administrative appeal of the above decision.
information may be found at http://www.usace.army.mil/Missions/CivilWorks/RegulatoryProgramandPermits.aspx or
regulations at 33 CFR Part 331. N
A:
•
•
INITIAL PROFFERED PERMIT: You may accept
ACCEPT: If you received a Standard Permit, you may sign
or object to the permit.
the permit document and return
you may accept the LOP and your
you accept the permit in its entirety,
determinations associated
it to the district engineer for final
work is authorized. Your signature
and waive all rights to appeal the
with the permit.
therein, you may request that the
to the district engineer. Your
or you will forfeit your right to appeal
and may: (a) modify the
or (c) not modify the permit
objections, the district engineer
authorization. If you received a Letter of Permission (LOP),
on the Standard Permit or acceptance of the LOP means that
permit, including its terms and conditions, and approved jurisdictional
OBJECT: If you object to the permit (Standard or LOP)
because of certain terms and conditions
II of this form and return the form
60 days of the date of this notice,
engineer will evaluate your objections
to address some of your objections,
written. After evaluating your
as indicated in Section B below.
permit be modified accordingly. You must complete Section
objections must be received by the district engineer within
the permit in the future. Upon receipt of your letter, the district
permit to address all of your concerns, (b) modify the permit
having determined that the permit should be issued as previously
will send you a proffered permit for your reconsideration,
B:
•
•
PROFFERED PERMIT: You may accept or appeal
ACCEPT: If you received a Standard Permit, you may sign
the permit
the permit document and return
you may accept the LOP and your
you accept the permit in its entirety,
determinations associated
it to the district engineer for final
work is authorized. Your signature
and waive all rights to appeal the
with the permit.
terms and conditions therein, you
by completing Section II of this form
within 60 days of the date of
authorization. If you received a Letter of Permission (LOP),
on the Standard Permit or acceptance of the LOP means that
permit, including its terms and conditions, and approved jurisdictional
APPEAL: If you choose to decline the proffered permit
may appeal the declined permit under the Corps of Engineers
and sending the form to the division engineer. This form must
this notice.
(Standard or LOP) because of certain
Administrative Appeal Process
be received by the division engineer
C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative
Appeal Process by completing Section II of this form and sending the form to the division engineer. This form
must be received by the division engineer within 60 days of the date of this notice.
D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or
provide new information.
• ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of
this notice means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD.
• APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative
Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by
the division engineer within 60 days of the date of this notice.
E: PRELIMINARY JURISDICTIONAL DETERMINATION:
You do not need to respond to the Corps
not appealable. If you wish, you may request an approved
district for further instruction. Also you may provide new
reevaluate the JD.
TO AN INITIAL PROFFERED PERMIT
regarding the preliminary JD. The Preliminary JD is
JD (which may be appealed), by contacting the Corps
information for further consideration by the Corps to
SECTION II - REQUEST FOR APPEAL or OBJECTIONS
REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your
objections to an initial proffered permit in clear concise statements. You may attach additional information to
this form to clarify where your reasons or objections are addressed in the administrative record.)
ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps
memorandum for the record of the appeal conference or meeting, and any supplemental information that the
review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps
may add new information or analyses to the record. However, you may provide additional information to clarify
the location of information that is already in the administrative record.
POINT OF CONTACT FOaUESTIONS OR INFORMATION:
If you have questions regarding this decision and/or the
appeal process you may contact:
District Engineer, Wilmington Regulatory Division,
If you only have questions regarding the appeal process you may
also contact:
Mr. Jason Steele, Administrative Appeal Review Officer
CESAD-PDO
U.S. Army Corps of Engineers, South Atlantic Division
60 Forsyth Street, Room 10M15
Atlanta, Georgia 30303-8801
Phone: (404) 562-5137
Attn: Emily Greer
69 Darlington Avenue
Wilmington, North Carolina 28403
RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government
consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day
notice of any site investigation, and will have the opportunity to participate in all site investigations.
Date:
Telephone number:
Signature of appellant or agent.
For appeals on Initial Proffered Permits send this form to:
District Engineer, Wilmington Regulatory Division, Attn: Emily Greer, 69 Darlington Avenue, Wilmington, North Carolina
28403
For Permit denials, Proffered Permits and approved Jurisdictional Determinations send this form to:
Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Jason Steele, Administrative
Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room 10M15, Atlanta, Georgia 30303-8801
Phone: (404) 562-5137
COASTAL MARINE PROPERTIES, LLC
WETLAND SURVEY
FENDER COUNTY
NCO; rN CARCL+NA
OWNER: COASTAL MARNE PROPERTIES, !LC
tO6 WYNDHAM WAY
MLMINGTON NC 28411
DATE. DEC. B. 206
iOT.c APE.. - 1a a] AfAft
n.rns - o.ea .sa+as
iur...ms - :oy .40OS
oo
-----------------------
---------------------
op 3.3mi PG AY
--------------------
tt .d Illapact
MaNa
- RCMP AN AK
PPR Pr Ear
Edrinue. PPM. MG PM
LDPieI VW • rql &.*W ....el FAo
LOVIT Pr
nr.
•
•
p.o
rt op I. um EP PER pup.. ReNurofnel.
CLAM Cr VarEST
sw.+us „s ..e&. ,pars a n"atac anau
1:t,:a,j
m m co'
r a�
PPL PIP
LOCATION MAP
t-SSa1
(HANOVER DESIGN SERVICES, A.R.
LAND s0J00E0 r.s (NONCOM war RIMERS
13 FL04Al PAAKWAY
an (A. •C law!
re ro) 30
roan31.3-119.1
PWx. [W IP..,cx.[ [-¢s9>•
WIs.J4
PRELIMINARY JURISDICTIONAL DETERMINATION (PJD) FORM
BACKGROUND INFORMATION
A. REPORT COMPLETION DATE FOR PJD: July 20, 2018
B. NAME AND ADDRESS OF PERSON REQUESTING PJD: Coastal Marine Properties, LLC c/o Tom Moore, 104
Wyndham Way, Wilmington, NC 28411
C. DISTRICT OFFICE, FILE NAME, AND NUMBER: Wilmington, Robert Shepard-Empie Sidbury-Biberstein-
Rouse-Shepard v Sidbury-wetland delineation -Andrew Jackson Lane -PIN 4214-19-8782, SAW-2009-00366
D. PROJECT LOCATION(S) AND BACKGROUND INFORMATION:
(USE THE TABLE BELOW TO DOCUMENT MULTIPLE AQUATIC RESOURCES AND/OR
AQUATIC RESOURCES AT DIFFERENT SITES)
State: NC County/parish/borough: Pender County City Hampstead
Center coordinates of site (lat/long in degree decimal format): Lat.: 34.4277° Long.: -77.6332°
Universal Transverse Mercator:
Name of nearest waterbody: Onslow Bay
E. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT APPLY):
❑ Office (Desk) Determination. Date:
® Field Determination. Date(s): August 8, 2017
TABLE OF AQUATIC RESOURCES INREVIEW AREA WHICH "MAY BE" SUBJECT TO REGULATORY
JURISDICTION.
Site
Number
Latitude (decimal
degrees)
Longitude
(decimal degrees)
Estimated amount of
aquatic resources in
review area (acreage
and linear feet, if
applicable
Type of aquatic
resources (i.e.,
wetland vs. non-
wetland waters)
Geographic authority to
which the aquatic resource
"may be" subject (i.e.,
Section 404 or Section
10/404)
Wetland A
34.43006
-77.63525
0.09-ac
Wetland
404
Wetland B
34.42883
-77.63279
10.49
Wetland
404
1) The Corps of Engineers believes that there may be jurisdictional aquatic resources in the
review area, and the requestor of this PJD is hereby advised of his or her option to request
and obtain an approved JD (AJD) for that review area based on an informed decision after
having discussed the various types of JDs and their characteristics and circumstances when
they may be appropriate.
2) In any circumstance where a permit applicant obtains an individual permit, or a Nationwide
General Permit (NWP) or other general permit verification requiring "pre- construction
notification" (PCN), or requests verification for a non -reporting NWP or other general permit,
and the permit applicant has not requested an AJD for the activity, the permit applicant is
hereby made aware that: (1) the permit applicant has elected to seek a permit authorization
based on a PJD, which does not make an official determination of jurisdictional aquatic
resources; (2) the applicant has the option to request an AJD before accepting the terms and
conditions of the permit authorization, and that basing a permit authorization on an AJD could
possibly result in less compensatory mitigation being required or different special conditions;
(3) the applicant has the right to request an individual permit rather than accepting the terms
and conditions of the NWP or other general permit authorization; (4) the applicant can accept
a permit authorization and thereby agree to comply with all the terms and conditions of that
permit, including whatever mitigation requirements the Corps has determined to be necessary;
(5) undertaking any activity in reliance upon the subject permit authorization without
requesting an AJD constitutes the applicant's acceptance of the use of the PJD; (6) accepting a
permit authorization (e g , signing a proffered individual permit) or undertaking any activity in
reliance on any form of Corps permit authorization based on a PJD constitutes agreement that
all aquatic resources in the review area affected in any way by that activity will be treated as
jurisdictional, and waives any challenge to such jurisdiction in any administrative or judicial
compliance or enforcement action, or in any administrative appeal or in any Federal court;
and (7) whether the applicant elects to use either an AJD or a PJD, the JD will be processed
as soon as practicable. Further, an AJD, a proffered individual permit (and all terms and
conditions contained therein), or individual permit denial can be administratively appealed
pursuant to 33 C.F.R. Part 331. If, during an administrative appeal, it becomes appropriate to
make an official determination whether geographic jurisdiction exists over aquatic resources
in the review area, or to provide an official delineation of jurisdictional aquatic resources in
the review area, the Corps will provide an AJD to accomplish that result, as soon as is
practicable. This PJD finds that there "may be" waters of the U.S. and/or that there "may be"
navigable waters of the U.S. on the subject review area, and identifies all aquatic features in
the review area that could be affected by the proposed activity, based on the following
information:
SUPPORTING DATA. Data reviewed for PJD (check all that apply)
Checked items should be included in subject file. Appropriately reference sources below where
indicated for all checked items:
® Maps, plans, plots or plat submitted by or on behalf of the PJD requestor: Maps
Map:
® Data sheets prepared/submitted by or on behalf of the PJD requestor.
® Office concurs with data sheets/delineation report.
❑ Office does not concur with data sheets/delineation report. Rationale:
❑ Data sheets prepared by the Corps:
❑ Corps navigable waters' study:
❑ U.S. Geological Survey Hydrologic Atlas:
❑ USGS NHD data.
❑ USGS 8 and 12 digit HUC maps.
® U. S. Geological Survey map(s). Cite scale & quad name: 1:24k, Topsail, NC
® Natural Resources Conservation Service Soil Survey. Citation: NRCS Web Soil Survey_
❑ National wetlands inventory map(s). Cite name:
❑ State/local wetland inventory map(s):
❑ FEMA/FIRM maps:
❑ 100-year Floodplain Elevation is: (National Geodetic Vertical Datum of 1929)
® Photographs: ❑Aerial (Name & Date): ESRI, NC One Map 4/25/2017
or ❑Other (Name & Date):
['Previous determination(s). File no. and date of response letter:
❑ Other information (please specify):
IMPORTANT NOTE: The information recorded on this form has not necessarily been
verified by the Corps and should not be relied upon for later jurisdictional
determinations.
GREER.EMILY.C.1
385325300
Digitally signed by GREER.EMILY.C.1385325300
DN: c=US, o=U.S. Govemment, ou=DoD, ou=PKI,
ou=USA, cn=GREER.EMILY.C.1385325300
Date: 2018.07.20 12:39:52 -04'00'
Signature and date of Regulatory
staff member completing PJD
Signature and date of person
requesting PJD (REQUIRED,
unless obtaining the signature
is impracticable) t
I Districts may establish timeframes for requester to return signed PJD forms. If the requester does not respond within the
established time frame, the district may presume concurrence and no additional follow up is necessary prior to finalizing
an action.
Property Line
1771 Approximate Wetlands
0 50 100
200
300
1 inch = 200 feet
400
Feet
Field Sketch of Wetlands
Kenny Moore Boat Yard
Hampstead, Pender Co., N.C.
11/22/2016
Map Source: NCOneMap Orthoimagery
Hampstead Coastal Marine FCN
5 LC]
Attachment F
Adjacent Property Owner Information
Map #
PID
Owner
Mailing Address
1
4215-10-5484-0000
SHEPARD, WILLIAM H HEIRS
20864 US 17 HWY, Hampstead, NC 28443
2
4215-10-7114-0000
SHEPARD, HAZEL
308 S Dyson Street, Holly Ridge, NC 28445
3
4215-10-8142-0000
SIDBURY, EMPIE H
20900 US HWY 17 N, Hampstead, NC 28443
4
4215-10-9336-000L
SIDBURY, EMPIE H
Same
5
4215-20-1529-0000
BENFIELD, REBECCA
70 Grey Feather Drive, Las Vegas, NV 89135
6
4215-20-5207-0000
SIMPSON, ALBERT F
PO Box 1611, Elizabethtown, NC 28337
7
4215-20-8253-0000
SMITH, CARSON HENRY SR L/E
25 Hidden Bluff Trail, Hampstead, NC 28443
8
4214-39-0536-0000
SMITH, CARSON HENRY SR L/E
Same
9
4214-18-9914-0000
SIDBURY, HERBERT F
661 St. Johns Church Rd., Hampstead, NC 28443
10
4214-19-6694-0000
BOWENS, ALEXANDER W
11426 Cypresswood Trail Dr., Houston, TX 77070
11
4214-19-7722-0000
JACOBS, DENISE MARIE
20 Eleni Way, Berkley Heights, NJ 07922
12
4215-10-4285-0000
JACOBS, DENISE MARIE
Same
6 (13 December 2021)
Hampstead Coastal Marine PCN
5LGI
Attachment G
Pender County GIS Flood Mapping
;11:P+
)N\s !Li?"
7 (13 December 2021)