HomeMy WebLinkAbout20201371 Ver 1_ePCN Application_20211216DWR Division of Water Resources Initial Review Pre -Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) December 6, 2021 Ver 4.2 Has this project met the requirements for acceptance in to the review process?* Yes No Is this project a public transportation project?* Yes No Change only if needed. BIMS # Assigned* Version#* 20201371 1 Is a payment required for this project?* No payment required Fee received Fee needed - send electronic notification Select Project Reviewer* Kevin Mitchell:eads\rkmitchell Information for Initial Review 1a. Name of project: Corridor K A-0009C la. Who is the Primary Contact?* Dave McHenry Reviewing Office* Asheville Regional Office - (828) 296-4500 1 b. Primary Contact Email: * lc. Primary Contact Phone: * dgmchenry@ncdot.gov (828)586-2141 Date Submitted 12/16/2021 Nearest Body of Water Sweetwater Creek Basin Little Tennessee Water Classification WS-III Tr Site Coordinates Latitude: 35.341110 A. Processing Information Longitude: -83.747249 County (or Counties) where the project is located: Graham Is this a NCDMS Project Yes No Is this project a public transportation project? * Yes No Is this a NCDOT Project?* Yes No (NCDOT only) T.I.P. or state project number: A-0009C WBS # (?) 32572 la. Type(s) of approval sought from the Corps: Section 404 Permit (wetlands, streams and waters, Clean Water Act) Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) Has this PCN previously been submitted?* Yes No 1 b. What type(s) of permit(s) do you wish to seek authorization? Nationwide Permit (NWP) Regional General Permit (RGP) Standard (IP) lc. Has the NWP or GP number been verified by the Corps? Yes No Are you a federal applicant?* Yes No If yes, please provide a statement concerning compliance with the Coastal Zone Management Act. * NCDOT is not a federal applicant. The project is also well beyond CAMA zones. Nationwide Permit (NWP) Number: NWP Numbers (for multiple NWPS): ld. Type(s) of approval sought from the DWR: 401 Water Quality Certification - Regular Non-404 Jurisdictional General Permit Individual 401 Water Quality Certification le. Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: lf. Is this an after -the -fact permit application?* Yes No lg. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No lg. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No 1 h. Is the project located in any of NC's twenty coastal counties? Yes No 1j. Is the project located in a designated trout watershed? Yes No B. Applicant Information ld. Who is applying for the permit? Owner Applicant (other than owner) le. Is there an Agent/Consultant for this project?* Yes No 2. Owner Information 2a. Name(s) on recorded deed: NCDOT, Division 14 2b. Deed book and page no.: 2c. Contact Person: Wanda H. Austin 401 Water Quality Certification - Express Riparian Buffer Authorization Yes No Yes No 2d. Address Street Address 253 Webster Road Address Line 2 City State / Province / Region Sylva NC Postal / Zip Code Country 28779 USA 2e. Telephone Number: 2f. Fax Number: (828)586-2141 2g. Email Address: * whaustin@ncdot.gov 3. Applicant Information (if different from owner) 3a. Name: NCDOT Division 14 3b. Business Name: 3c. Address Street Address 253 Webster Road Address Line 2 City Sylva Postal / Zip Code 28779 3d. Telephone Number: (828)586-2141 3f. Email Address: * dgmchenry@ncdot.gov 4. Agent/Consultant (if applicable) 4a. Name: Jimmy L. Terry 4b. Business Name: TGS Engineers 4c. Address Street Address 201 W. Marion Street, Suite 200 Address Line 2 City Shelby Postal / Zip Code 28150 4d. Telephone Number: (704)476-0003 4f. Email Address: * jterry@tgsengineers.com C. Project Information and Prior Project History State / Province / Region NC Country USA 3e. Fax Number: State / Province / Region NC Country USA 4e. Fax Number: 1. Project Information 1 b. Subdivision name: (if appropriate) lc. Nearest municipality / town: Robbinsville 2. Project Identification 2a. Property Identification Number: 2b. Property size: 2c. Project Address Street Address NC 28, NC 143, US 129 Address Line 2 City Robbinsville Postal / Zip Code 28771 3. Surface Waters 3a. Name of the nearest body of water to proposed project: * Sweetwater Creek 3b. Water Resources Classification of nearest receiving water: * WS-III Tr 3c. What river basin(s) is your project located in?* Little Tennessee 3d. Please provide the 12-digit HUC in which the project is located. 060102040102 4. Project Description and History State / Province / Region NC Country USA 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: * The existing conditions are two lane primary roads connecting generally east -west from Robbinsville east to the 4-lane Section of NC 28 towards Swain County. The general land use adjacent to the roadways is mixed agricultural and residential with mostly forested conditions more distant from the road. The majority of the watersheds in the project area are forested. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past? * Yes No Unknown 4b(2). Is Any Portion of the Work Already Complete?* Yes No If yes, describe the completed work. 4c. List of Other Certificates or Approvals/Denials received from other Federal, State, or Local Agencies for Work Described in This Application. not related to the 404 or 401. A trout buffer variance will be applied for. A US Forest Service special use permit will be issued for construction on USFS property. Both of these have yet to be acted upon by the applicable agency. 4f. List the total estimated acreage of all existing wetlands on the property: 10 4g. List the total estimated linear feet of all existing streams on the property: 135,000 4h. Explain the purpose of the proposed project: * The purpose of the project is to increase the mobility and reliability of travel between Robbinsville and areas to the east. 41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used: * The project involves improvements of the existing roadway alignments with a 2+1 typical section that will add roadway width, tuming lanes, passing lanes, and climbing lanes at many locations to reduce traffic conflicts and constrictions. The project will also use a land bridge to address historic concerns associated with the Appalachian Trail crossing. Typical heavy earth moving equipment will be used including dozers, track -hoes, dump trucks, drill rigs, and cranes. 4k. Will this activity involve dredging in wetlands or waters?* Yes No If yes, Describe the type of dredging, the composition of the dredged material and the location of disposal area. 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* Yes Comments: No Unknown 5b. If the Corps made a jurisdictional determination, what type of determination was made?* Preliminary Approved Not Verified Unknown N/A Corps AID Number: 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 6. Future Project Plans Amber Coleman and staffs with STV STV 6a. Is this a phased project?* Yes No 6b. If yes, explain. This project is part of the Appalachian Development Highway System; a system of future roads that Congress established in 1965. Corridor K, the current project, is among the last of those roads. Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? Future permits are likely to be needed for any remaining corridors, but are unknown and cannot be characterized at this time. 7. Addresses of Adjoining Property Owners, Lessees, Etc., Whose Property Adjoins the Waterbody (if more than can be entered here, please attach a supplemental list) Address have been provided earlier for the merger application process, however they can be provided again as requested. 8. Scheduling of Activity: The Corridor K project is expected to be let in September 2022 with construction to commence shortly thereafter. Construction is expected to take several years (5+) to complete the entire project. D. Proposed Impacts Inventory 1. Impacts Summary la. Where are the impacts associated with your project? (check all that apply): Wetlands Streams -tributaries Open Waters Pond Construction 2. Wetland Impacts Buffers 2a. Site #* (?) 2a1 Reason (?) 2b. Impact type* (?) 2c. Type of W.* 2d. W. name* 2e. Forested* 2f. Type of Jurisdicition* (?) 2g. Impact area* A4 road P Headwater Forest WG Yes Both 0.010 (acres) A13 pipe outlet P Headwater Forest WN Yes Both 0.010 (acres) A13 pipe outlet P Headwater Forest WN Yes Both 0.010 (acres) A13 pipe outlet T Headwater Forest WN Yes Both 0.030 (acres) A13 pipe outlet P Headwater Forest WO Yes Both 0.070 (acres) A13 pipe outlet P Headwater Forest WO Yes Both 0.010 (acres) A13 pipe outlet T Headwater Forest WO Yes Both 0.020 (acres) A13 pipe outlet T Headwater Forest WO Yes Both 0.030 (acres) A14 road P Headwater Forest WP Yes Both 0.020 (acres) A14 road T Headwater Forest WP Yes Both 0.010 (acres) A14 road T Headwater Forest WP Yes Both 0.010 (acres) A16 road P Headwater Forest WR Yes Both 0.090 (acres) A18 road P Floodplain Pool WV No Both 0.010 (acres) A21 road T Non -Tidal Freshwater Marsh WY No Both 0.010 (acres) A23 road P Non -Tidal Freshwater Marsh WAB No Both 0.020 (acres) A23 road P Non -Tidal Freshwater Marsh WAD No Both 0.070 (acres) A23 road T Non -Tidal Freshwater Marsh WAD No Both 0.110 (acres) A23 road P Non -Tidal Freshwater Marsh WAD No Both 0.010 (acres) A23 road T Non -Tidal Freshwater Marsh WAD No Both 0.010 (acres) A23 road T Non -Tidal Freshwater Marsh WAD No Both 0.050 (acres) A24 road T Non -Tidal Freshwater Marsh WAD No Both 0.020 (acres) B5 road T Non -Tidal Freshwater Marsh WAI No Both 0.010 (acres) B6 road P Non -Tidal Freshwater Marsh WAJ No Both 0.060 (acres) B6 road T Non -Tidal Freshwater Marsh WAJ No Both 0.010 (acres) B6 road P Non -Tidal Freshwater Marsh WAJ No Both 0.010 (acres) B6 road T Non -Tidal Freshwater Marsh WAJ No Both 0.010 (acres) B10 road P Seep WAN No Both 0.030 (acres) B12 road P Seep WAO No Both 0.080 (acres) B12 road T Seep WAO No Both 0.010 (acres) B12 road T Seep WAO No Both 0.010 (acres) B15 road P Seep WAQ Yes Both 0.040 (acres) B15 road P Seep WAQ Yes Both 0.020 (acres) B15 road T Seep WAQ Yes Both 0.010 (acres) B19 road P Headwater Forest WAX Yes Both 0.010 (acres) B19 road T Headwater Forest WAX Yes Both 0.010 (acres) B19 road P Headwater Forest WAX Yes Both 0.010 (acres) B21 road P Non -Tidal Freshwater Marsh WAY No Both 0.040 (acres) B21 road P Non -Tidal Freshwater Marsh WAZ No Both 0.020 (acres) C1 road P Headwater Forest WBB Yes Both 0.010 (acres) C1 road T Headwater Forest WBB Yes Both 0.010 (acres) C7 road P Non -Tidal Freshwater Marsh WBV No Both 0.010 (acres) C7 road T Non -Tidal Freshwater Marsh WBV No Both 0.010 (acres) C7 road T Non -Tidal Freshwater Marsh WBV No Both 0.020 (acres) C22 road P Headwater Forest WBR Yes Both 0.070 (acres) C22 road P Headwater Forest WBR Yes Both 0.010 (acres) C22 road T Headwater Forest WBR Yes Both 0.010 (acres) 2g. Total Temporary Wetland Impact 2g. Total Permanent Wetland Impact 0.420 0.750 2g. Total Wetland Impact 1.170 2h.Type(s) of Material Being Discharged and the Amount of Each Type in Cubic Yards: soil 2i. Comments: Accurate volumes of fill are not available however coarse estimates could be generated if needed for permanent fills if requested. 3. Stream Impacts 3a. Reason for impact (?) 3b.Impact type* 3c. Type of impact* 3d. S. name* 3e. Stream Type* (?) 3f. Type of Jurisdiction* 3g. S. width* 3h. Impact length* S1 Al culvert Permanent Culvert SE UT Talullah Creek Intermittent Both 5 Average (feet) 39 (linear feet) S2 Al culvert Temporary Culvert SE UT Talullah Creek Intermittent Both 5 Average (feet) 20 (linear feet) S3 I Al culvert Permanent Culvert SE UT Talullah Creek Intermittent Both 5 Average (feet) 24 (linear feet) S4 Al rip rap Permanent Bank Stabilization Talullah Creek Perennial Both 30 Average (feet) 12 (linear feet) S5 Al rip rap Temporary Dewatering Talullah Creek Perennial Both 30 Average (feet) 20 (linear feet) S6 A2 rip rap Permanent Bank Stabilization Tallulah Creek Perennial Both 30 Average (feet) 30 (linear feet) S7 A3 rip rap Permanent Bank Stabilization Tallulah Creek Perennial Both 30 Average (feet) 26 (linear feet) S8 A3 rip rap Temporary Dewatering Tallulah Creek Perennial Both 30 Average (feet) 15 (linear feet) S9 A4 pipe outlet Permanent Bank Stabilization Sweetwater Creek Perennial Both 20 Average (feet) 18 (linear feet) Si0 A4 pipe outlet Temporary Dewatering Sweetwater Creek Perennial Both 20 Average (feet) 20 (linear feet) Si1 A4 pipe outlet Permanent Rip Rap Fill SG UT Sweetwater Creek Intermittent Both 10 Average (feet) 18 (linear feet) S12 A5 RCBC extension Permanent Culvert Sweetwater Creek Perennial Both 20 Average (feet) 15 (linear feet) S13 A5 culvert outlet Permanent Bank Stabilization Sweetwater Creek Perennial Both 20 Average (feet) 48 (linear feet) S14 A5 culvert outlet Temporary Dewatering Sweetwater Creek Perennial Both 20 Average (feet) 10 (linear feet) S15 A5 RCBC extension Permanent Culvert Sweetwater Creek Perennial Both 20 Average (feet) 44 (linear feet) S16 A5 culvert inlet Permanent Bank Stabilization Sweetwater Creek Perennial Both 20 Average (feet) 48 (linear feet) S17 A5 bank stabilization Permanent Bank Stabilization Sweetwater Creek Perennial Both 20 Average (feet) 93 (linear feet) S18 A5 bank stabilization Temporary Dewatering Sweetwater Creek Perennial Both 20 Average (feet) 10 (linear feet) S19 A6 culvert Permanent Culvert SI UT Sweetwater Creek Perennial Both 5 Average (feet) 18 (linear feet) S20 A6 pipe outlet Permanent Bank Stabilization SI UT Sweetwater Creek Perennial Both 5 Average (feet) 56 (linear feet) S21 A6 pipe outlet Temporary Dewatering SI UT Sweetwater Creek Perennial Both 5 Average (feet) 8 (linear feet) S22 A6 culvert Permanent Culvert SI UT Sweetwater Creek Perennial Both 5 Average (feet) 14 (linear feet) S23 A6 pipe inlet Permanent Bank Stabilization SI UT Sweetwater Creek Perennial Both 5 Average (feet) 91 (linear feet) S24 A6 pipe inlet Temporary Dewatering SI UT Sweetwater Creek Perennial Both 5 Average (feet) 50 (linear feet) S25 A7 pipe outlet Permanent Rip Rap Fill SJ UT Sweetwater Creek Intermittent Both 2 Average (feet) 45 (linear feet) S26 A7 pipe outlet Temporary Dewatering SJ UT Sweetwater Creek Intermittent Both 2 Average (feet) 11 (linear feet) S27 A8 culvert Temporary Dewatering SK UT Sweetwater Creek Intermittent Both 1 Average (feet) 3 (linear feet) S28 A8 pipe outlet Permanent Rip Rap Fill SI UT Sweetwater Creek Perennial Both 5 Average (feet) 13 (linear feet) S29 A8 pipe outlet Temporary Dewatering SI UT Sweetwater Creek Perennial Both 5 Average (feet) 20 (linear feet) S30 A9 base ditch Temporary Dewatering Sweetwater Creek Perennial Both 20 Average (feet) 20 (linear feet) S31 A9 RCBC extension Permanent Culvert Slaybacon Branch Perennial Both 7 Average (feet) 18 (linear feet) S32 A9 culvert inlet Permanent Bank Stabilization Slaybacon Branch Perennial Both 7 Average (feet) 22 (linear feet) S33 A9 culvert inlet Temporary Dewatering Slaybacon Branch Perennial Both 7 Average (feet) 91 (linear feet) S34 A9 culvert outlet Permanent Bank Stabilization Slaybacon Branch Perennial Both 7 Average (feet) 29 (linear feet) S35 A9 culvert outlet Temporary Dewatering Sweetwater Creek Perennial Both 20 Average (feet) 37 (linear feet) S36 A10 culvert outlet Permanent Bank Stabilization Sweetwater Creek Perennial Both 15 Average (feet) 50 (linear feet) S37 A10 culvert outlet Temporary Dewatering Sweetwater Creek Perennial Both 15 Average (feet) 10 (linear feet) S38 A10 RCBC extension Permanent Culvert Sweetwater Creek Perennial Both 15 Average (feet) 35 (linear feet) S39 A10 culvert inlet Permanent Bank Stabilization Sweetwater Creek Perennial Both 15 Average (feet) 32 (linear feet) S40 A10 culvert inlet Temporary Dewatering Sweetwater Creek Perennial Both 15 Average (feet) 10 (linear feet) S41 All drain Temporary Dewatering SO UT Sweetwater Creek Intermittent Both 1 Average (feet) 10 (linear feet) S42 Al2 pipe outlet Permanent Bank Stabilization Sweetwater Creek Perennial Both 20 Average (feet) 12 (linear feet) S43 Al2 pipe outlet Temporary Dewatering Sweetwater Creek Perennial Both 20 Average (feet) 18 (linear feet) S44 Al2 RCP Temporary Dewatering SO UT Sweetwater Creek Intermittent Both 1 Average (feet) 16 (linear feet) S45 Al2 RCP Temporary Dewatering SM UT Sweetwater Creek Perennial Both 2 Average (feet) 20 (linear feet) S46 Al2 RCP Temporary Dewatering SN UT Sweetwater Creek Intermittent Both 2 Average (feet) 53 (linear feet) S47 A13 pipe outlet Permanent Rip Rap Fill Pigpen Branch Perennial Both 6 Average (feet) 39 (linear feet) S48 A13 pipe outlet Temporary Dewatering Pigpen Branch Perennial Both 6 Average (feet) 10 (linear feet) S49 A13 pipe Permanent Culvert Pigpen Branch Perennial Both 6 Average (feet) 10 (linear feet) S50 A13 pipe Permanent Culvert Pigpen Branch Perennial Both 6 Average (feet) 32 (linear feet) S51 A13 pipe inlet Permanent Bank Stabilization Pigpen Branch Perennial Both 6 Average (feet) 42 (linear feet) S52 A13 pipe inlet Temporary Dewatering Pigpen Branch Perennial Both 6 Average (feet) 10 (linear feet) S53 A15 pipe outlet Permanent Bank Stabilization Harwood Branch Perennial Both 5 Average (feet) 32 (linear feet) S54 A15 pipe outlet Temporary Dewatering Harwood Branch Perennial Both 5 Average (feet) 10 (linear feet) S55 A15 pipe Permanent Culvert Harwood Branch Perennial Both 5 Average (feet) 3 (linear feet) S56 A15 pipe Permanent Culvert Harwood Branch Perennial Both 5 Average (feet) 11 (linear feet) S57 A15 pipe inlet Permanent Bank Stabilization Harwood Branch Perennial Both 5 Average (feet) 27 (linear feet) S58 A15 pipe inlet Temporary Dewatering Harwood Branch Perennial Both 5 Average (feet) 16 (linear feet) S59 A17 pipe outlet Permanent Rip Rap Fill SR UT Sweetwater Creek Perennial Both 3 Average (feet) 24 (linear feet) S60 A17 pipe outlet Temporary Dewatering SR UT Sweetwater Creek Perennial Both 3 Average (feet) 11 (linear feet) S61 A17 culvert Permanent Culvert SR UT Sweetwater Creek Perennial Both 3 Average (feet) 18 (linear feet) S62 A17 culvert Permanent Culvert SR UT Sweetwater Creek Perennial Both 3 Average (feet) 6 (linear feet) S63 A17 pipe inlet Permanent Rip Rap Fill SR UT Sweetwater Creek Perennial Both 3 Average (feet) 38 (linear feet) S64 A17 pipe inlet Temporary Dewatering SR UT Sweetwater Creek Perennial Both 3 Average (feet) 5 (linear feet) S65 A17 pipe inlet Permanent Rip Rap Fill SS UT Sweetwater Creek Intermittent Both 2 Average (feet) 24 (linear feet) S66 A17 pipe inlet Temporary Dewatering SS UT Sweetwater Creek Intermittent Both 2 Average (feet) 11 (linear feet) S67 A19 pipe outlet Permanent Rip Rap Fill ST UT Sweetwater Creek Perennial Both 4 Average (feet) 18 (linear feet) S68 A19 pipe outlet Temporary Dewatering ST UT Sweetwater Creek Perennial Both 4 Average (feet) 14 (linear feet) S69 A19 pipe Permanent Culvert ST UT Sweetwater Creek Perennial Both 4 Average (feet) 25 (linear feet) S70 A19 pipe inlet Permanent Rip Rap Fill ST UT Sweetwater Creek Perennial Both 4 Average (feet) 41 (linear feet) S71 A19 pipe inlet Temporary Dewatering ST UT Sweetwater Creek Perennial Both 4 Average (feet) 9 (linear feet) S72 A19 pipe inlet Permanent Rip Rap Fill SU UT Sweetwater Creek Perennial Both 3 Average (feet) 23 (linear feet) S73 A19 pipe inlet Temporary Rip Rap Fill SU UT Sweetwater Creek Perennial Both 3 Average (feet) 87 (linear feet) S74 A20 pipe outlet Permanent Rip Rap Fill SV UT Sweetwater Creek Intermittent Both 4 Average (feet) 25 (linear feet) S75 A20 pipe outlet Temporary Dewatering SV UT Sweetwater Creek Intermittent Both 4 Average (feet) 13 (linear feet) S76 A20 pipe Permanent Culvert SV UT Sweetwater Creek Intermittent Both 4 Average (feet) 23 (linear feet) S77 A20 pipe Temporary Dewatering SV UT Sweetwater Creek Intermittent Both 4 Average (feet) 8 (linear feet) S78 A21 stabilization Permanent Bank Stabilization Sweetwater Creek Perennial Both 15 Average (feet) 62 (linear feet) S79 A21 culvert outlet Permanent Rip Rap Fill Sweetwater Creek Perennial Both 15 Average (feet) 64 (linear feet) $81) A21 culvert outlet Temporary Dewatering Sweetwater Creek Perennial Both 15 Average (feet) 105 (linear feet) S81 A21 RCBC Permanent Culvert Sweetwater Creek Perennial Both 15 Average (feet) 10 (linear feet) S82 A21 RCBC Permanent Culvert Sweetwater Creek Perennial Both 15 Average (feet) 10 (linear feet) 883 A21 culvert inlet Permanent Bank Stabilization Sweetwater Creek Perennial Both 15 Average (feet) 68 (linear feet) S84 A21 culvert inlet Temporary Dewatering Sweetwater Creek Perennial Both 15 Average (feet) 10 (linear feet) S85 A21 Temporary Dewatering SW UT Sweetwater Creek Intermittent Both 2 Average (feet) 11 (linear feet) S86 A22 pipe outlet Permanent Rip Rap Fill SX UT Sweetwater Creek Perennial Both 4 Average (feet) 21 (linear feet) S87 A22 pipe outlet Temporary Dewatering SX UT Sweetwater Creek Perennial Both 4 Average (feet) 11 (linear feet) S88 A22 pipe Permanent Culvert SX UT Sweetwater Creek Perennial Both 4 Average (feet) 25 (linear feet) S89 A23 culvert outlet Permanent Rip Rap Fill Beech Creek Perennial Both 12 Average (feet) 27 (linear feet) S90 A23 culvert outlet Temporary Dewatering Beech Creek Perennial Both 12 Average (feet) 14 (linear feet) S91 A23 RCBC Permanent Culvert Beech Creek Perennial Both 12 Average (feet) 6 (linear feet) S92 A23 RCBC Permanent Culvert Beech Creek Perennial Both 12 Average (feet) 6 (linear feet) S93 A23 inlet Permanent Bank Stabilization Beech Creek Perennial Both 12 Average (feet) 66 (linear feet) S94 A23 inlet Temporary Dewatering Beech Creek Perennial Both 12 Average (feet) 62 (linear feet) S95 B2 inlet Permanent Rip Rap Fill SY UT Sweetwater Creek Perennial Both 2 Average (feet) 4 (linear feet) S96 L B2 inlet Temporary Dewatering SY UT Sweetwater Creek Perennial Both 2 Average (feet) 14 (linear feet) S97 B2 outlet Permanent Rip Rap Fill SY UT Sweetwater Creek Perennial Both 2 Average (feet) 15 (linear feet) S98 B2 stabilization Permanent Bank Stabilization Sweetwater Creek Perennial Both 10 Average (feet) 17 (linear feet) S99 B2 stabilization Temporary Dewatering Sweetwater Creek Perennial Both 10 Average (feet) 20 (linear feet) S100 B3 pipe inlet Temporary Dewatering SZ UT Sweetwater Creek Perennial Both 3 Average (feet) 22 (linear feet) S101 B3 pipe outlet Permanent Rip Rap Fill SZ UT Sweetwater Creek Perennial Both 3 Average (feet) 16 (linear feet) S102 B3 pipe outlet Temporary Dewatering SZ UT Sweetwater Creek Perennial Both 3 Average (feet) 16 (linear feet) S103 B4 pipe Permanent Culvert SAA UT Sweetwater Creek Perennial Both 2 Average (feet) 12 (linear feet) S104 B4 pipe outlet Permanent Bank Stabilization SAA UT Sweetwater Creek Perennial Both 2 Average (feet) 8 (linear feet) S105 B4 pipe outlet Temporary Dewatering SAA UT Sweetwater Creek Perennial Both 2 Average (feet) 6 (linear feet) S106 B7 pipe Permanent Culvert SAB UT Sweetwater Creek Perennial Both 4 Average (feet) 6 (linear feet) S107 B7 pipe inlet Permanent Bank Stabilization SAB UT Sweetwater Creek Perennial Both 4 Average (feet) 15 (linear feet) S198 B7 pipe inlet Temporary Dewatering SAB UT Sweetwater Creek Perennial Both 4 Average (feet) 17 (linear feet) S109 B7 stabilization Permanent Bank Stabilization Sweetwater Creek Perennial Both 8 Average (feet) 13 (linear feet) S110 B7 stabilization Temporary Dewatering Sweetwater Creek Perennial Both 8 Average (feet) 21 (linear feet) S111 B8 easement Temporary Dewatering SAC UT Sweetwater Creek Intermittent Both 2 Average (feet) 27 (linear feet) S112 B8 stabilization Permanent Bank Stabilization Sweetwater Creek Perennial Both 8 Average (feet) 17 (linear feet) S113 B8 stabilization Temporary Dewatering Sweetwater Creek Perennial Both 8 Average (feet) 20 (linear feet) S114 B9 culvert Temporary Dewatering SAD UT Sweetwater Creek Perennial Both 6 Average (feet) 30 (linear feet) S115 B9 road Permanent Fill SAE UT Sweetwater Creek Perennial Both 2 Average (feet) 89 (linear feet) S116 B9 culvert outlet Permanent Rip Rap Fill SAD UT Sweetwater Creek Perennial Both 6 Average (feet) 20 (linear feet) S117 B9 stabilization Permanent Bank Stabilization Sweetwater Creek Perennial Both 8 Average (feet) 14 (linear feet) S118 B9 stabilization Temporary Dewatering Sweetwater Creek Perennial Both 8 Average (feet) 7 (linear feet) S119 B10 bank stabilization Temporary Dewatering Sweetwater Creek Perennial Both 8 Average (feet) 21 (linear feet) S120 B11 stabilization Permanent Bank Stabilization Sweetwater Creek Perennial Both 8 Average (feet) 58 (linear feet) S121 B12 pipe inlet Permanent Culvert SAF UT Sweetwater Creek Perennial Both 2 Average (feet) 14 (linear feet) S122 B12 pipe inlet Temporary Culvert SAF UT Sweetwater Creek Perennial Both 2 Average (feet) 5 (linear feet) S123 B12 pipe outlet Permanent Rip Rap Fill SAF UT Sweetwater Creek Perennial Both 2 Average (feet) 10 (linear feet) S124 B12 pipe outlet Temporary Dewatering SAF UT Sweetwater Creek Perennial Both 2 Average (feet) 6 (linear feet) S125 B13 pipe inlet Permanent Rip Rap Fill SAG UT Sweetwater Creek Perennial Both 3 Average (feet) 41 (linear feet) S126 B13 pipe inlet Temporary Dewatering SAG UT Sweetwater Creek Perennial Both 3 Average (feet) 55 (linear feet) S127 B13 outlet Permanent Fill SAG UT Sweetwater Creek Perennial Both 3 Average (feet) 2 (linear feet) S128 B13 outlet Permanent Bank Stabilization SAG UT Sweetwater Creek Perennial Both 3 Average (feet) 12 (linear feet) S129 B13 outlet Temporary Dewatering SAG UT Sweetwater Creek Perennial Both 3 Average (feet) 10 (linear feet) S130 B14 culvert Permanent Culvert Sweetwater Creek Perennial Both 5 Average (feet) 53 (linear feet) S131 B14 stabilization Permanent Bank Stabilization Sweetwater Creek Perennial Both 5 Average (feet) 68 (linear feet) S132 B14 dewater Temporary Dewatering Sweetwater Creek Perennial Both 5 Average (feet) 9 (linear feet) S133 B14 culverts/stabilization Permanent Bank Stabilization SAJ UT Sweetwater Creek Perennial Both 3 Average (feet) 22 (linear feet) S134 B14 stabilization Temporary Dewatering SAJ UT Sweetwater Creek Perennial Both 3 Average (feet) 26 (linear feet) S135 B14 culvert outlet Permanent Culvert Sweetwater Creek Perennial Both 5 Average (feet) 34 (linear feet) S136 B14 culvert outlet Permanent Bank Stabilization Sweetwater Creek Perennial Both 5 Average (feet) 37 (linear feet) S137 B14 culvert outlet Temporary Dewatering Sweetwater Creek Perennial Both 5 Average (feet) 33 (linear feet) S138 B15 culvert and channel Permanent Culvert SAH UT Sweetwater Creek Intermittent Both 5 Average (feet) 127 (linear feet) S139 B15 culvert and channel Temporary Dewatering SAH UT Sweetwater Creek Intermittent Both 5 Average (feet) 25 (linear feet) S140 B16 inlet Permanent Culvert SAK UT Sweetwater Creek Perennial Both 3 Average (feet) 24 (linear feet) S141 B16 inlet Temporary Culvert SAK UT Sweetwater Creek Perennial Both 3 Average (feet) 22 (linear feet) S142 B16 outlet Permanent Rip Rap Fill SAK UT Sweetwater Creek Perennial Both 3 Average (feet) 29 (linear feet) S143 B16 outlet Permanent Bank Stabilization SAK UT Sweetwater Creek Perennial Both 3 Average (feet) 10 (linear feet) S144 B16 outlet Temporary Dewatering SAK UT Sweetwater Creek Perennial Both 3 Average (feet) 10 (linear feet) S145 B17 inlet Temporary Dewatering SAM UT Sweetwater Creek Perennial Both 3 Average (feet) 31 (linear feet) S146 B17 outlet Permanent Culvert SAM UT Sweetwater Creek Perennial Both 3 Average (feet) 93 (linear feet) S147 B17 outlet Temporary Dewatering SAM UT Sweetwater Creek Perennial Both 3 Average (feet) 50 (linear feet) S148 B18 inlet Permanent Fill Stillhouse Branch Perennial Both 5 Average (feet) 14 (linear feet) S149 B18 inlet Temporary Dewatering Stillhouse Branch Perennial Both 5 Average (feet) 28 (linear feet) S150 B18 outlet pipe Permanent Culvert Stillhouse Branch Perennial Both 5 Average (feet) 10 (linear feet) S151 B18 outlet pipe Permanent Bank Stabilization Stillhouse Branch Perennial Both 5 Average (feet) 20 (linear feet) S152 B18 outlet pipe Temporary Dewatering Stillhouse Branch Perennial Both 5 Average (feet) 10 (linear feet) S153 B19 pipe Temporary Dewatering SED UT Sweetwater Creek Intermittent Both 3 Average (feet) 3 (linear feet) S154 B19 stabilization Permanent Bank Stabilization SAT UT Sweetwater Creek Perennial Both 3 Average (feet) 12 (linear feet) S155 B19 stabilization Temporary Dewatering SAT UT Sweetwater Creek Perennial Both 3 Average (feet) 23 (linear feet) S156 B19 pipe Permanent Culvert SAT UT Sweetwater Creek Perennial Both 3 Average (feet) 51 (linear feet) S157 B19 pipe Temporary Dewatering SAT UT Sweetwater Creek Perennial Both 3 Average (feet) 14 (linear feet) S158 B21 inlet Permanent Culvert Sweetwater Creek Perennial Both 4 Average (feet) 12 (linear feet) S159 B21 inlet Temporary Dewatering Sweetwater Creek Perennial Both 4 Average (feet) 20 (linear feet) S160 B21 outlet Permanent Culvert Sweetwater Creek Perennial Both 4 Average (feet) 32 (linear feet) S161 B21 outlet Temporary Dewatering Sweetwater Creek Perennial Both 4 Average (feet) 18 (linear feet) S162 B22 inlet Permanent Culvert SAY UT Sweetwater Creek Perennial Both 3 Average (feet) 26 (linear feet) S163 B22 outlet Permanent Culvert SAY UT Sweetwater Creek Perennial Both 3 Average (feet) 35 (linear feet) S164 822 outlet Permanent Bank Stabilization SAY UT Sweetwater Creek Perennial Both 3 Average (feet) 12 (linear feet) S165 B22 outlet Temporary Dewatering SAY UT Sweetwater Creek Perennial Both 3 Average (feet) 11 (linear feet) S166 B23 inlet Temporary Dewatering SAX UT Sweetwater Creek Perennial Both 2 Average (feet) 11 (linear feet) S167 B23 stabilization Permanent Bank Stabilization SAX UT Sweetwater Creek Perennial Both 2 Average (feet) 16 (linear feet) S168 B23 stabilization Temporary Dewatering SAX UT Sweetwater Creek Perennial Both 2 Average (feet) 11 (linear feet) S169 C1 pipe and ditch Permanent Culvert SBB UT Cody Branch Intermittent Both 2 Average (feet) 38 (linear feet) S170 C1 pipe and ditch Temporary Dewatering SBB UT Cody Branch Intermittent Both 2 Average (feet) 54 (linear feet) S171 C2 pipe inlet Temporary Dewatering SBC UT Carver Branch Perennial Both 3 Average (feet) 69 (linear feet) S172 C2 pipe outlet Permanent Culvert SBC UT Carver Branch Perennial Both 3 Average (feet) 18 (linear feet) S173 C2 pipe outlet Temporary Dewatering SBC UT Carver Branch Perennial Both 3 Average (feet) 17 (linear feet) S174 C3 pipe inlet Temporary Dewatering Carver Branch Perennial Both 4 Average (feet) 16 (linear feet) S175 C3 pipe outlet Permanent Rip Rap Fill Carver Branch Perennial Both 4 Average (feet) 12 (linear feet) S176 C3 pipe outlet Temporary Dewatering Carver Branch Perennial Both 4 Average (feet) 20 (linear feet) S177 C4 pipe inlet Temporary Dewatering Johnson Gap Branch Perennial Both 3 Average (feet) 27 (linear feet) S178 C4 pipe outlet Permanent Bank Stabilization Johnson Gap Branch Perennial Both 3 Average (feet) 12 (linear feet) S179 C4 pipe outlet Temporary Dewatering Johnson Gap Branch Perennial Both 3 Average (feet) 24 (linear feet) 6180 C4 pipe outlet Temporary Dewatering SEY UT Johnson Gap Branch Intermittent Both 2 Average (feet) 18 (linear feet) S181 C4 pipe outlet Temporary Dewatering SEZ UT Johnson Gap Branch Intermittent Both 2 Average (feet) 24 (linear feet) S182 C5 pipe outlet Temporary Dewatering Johnson Gap Branch Perennial Both 3 Average (feet) 83 (linear feet) S183 C6 roadway Permanent Fill SEZ UT Johnson Gap Branch Intermittent Both 2 Average (feet) 43 (linear feet) S184 C8 pipe inlet Permanent Culvert Carver Branch Perennial Both 5 Average (feet) 22 (linear feet) S185 C8 pipe inlet Temporary Dewatering Carver Branch Perennial Both 5 Average (feet) 21 (linear feet) S186 C8 pipe outlet Permanent Rip Rap Fill Carver Branch Perennial Both 5 Average (feet) 47 (linear feet) S187 C8 pipe outlet Temporary Dewatering Carver Branch Perennial Both 5 Average (feet) 11 (linear feet) 5188 C9 pipe inlet Permanent Culvert SBC UT Carver Branch Perennial Both 4 Average (feet) 50 (linear feet) S189 C9 pipe inlet Permanent Bank Stabilization SBC UT Carver Branch Perennial Both 4 Average (feet) 8 (linear feet) S190 C9 pipe inlet Temporary Dewatering SBC UT Carver Branch Perennial Both 4 Average (feet) 19 (linear feet) $191 C9 pipe outlet Permanent Rip Rap Fill SBC UT Carver Branch Perennial Both 4 Average (feet) 14 (linear feet) S192 C9 pipe outlet Temporary Dewatering SBC UT Carver Branch Perennial Both 4 Average (feet) 14 (linear feet) S193 C10 pipe outlet Permanent Bank Stabilization SBD UT Carver Branch Perennial Both 3 Average (feet) 23 (linear feet) S194 C10 pipe outlet Temporary Dewatering SBD UT Carver Branch Perennial Both 3 Average (feet) 26 (linear feet) S195 C11 channel change Permanent Fill SFT UT Carver Branch Intermittent Both 2 Average (feet) 4 (linear feet) S196 C11 channel change Temporary Dewatering SFT UT Carver Branch Intermittent Both 2 Average (feet) 16 (linear feet) S197 C11 channel change Permanent Relocation SFP UT Carver Branch Perennial Both 5 Average (feet) 288 (linear feet) S198 C11 channel change Temporary Dewatering SFP UT Carver Branch Perennial Both 5 Average (feet) 29 (linear feet) $199 C11 pipe inlet Permanent Culvert SFH UT Carver Branch Perennial Both 5 Average (feet) 37 (linear feet) S200 C11 pipe inlet Permanent Bank Stabilization SFH UT Carver Branch Perennial Both 5 Average (feet) 20 (linear feet) S201 C11 pipe inlet Temporary Dewatering SFH UT Carver Branch Perennial Both 5 Average (feet) 38 (linear feet) S202 C11 pipe and channel change Permanent Culvert SFH UT Carver Branch Perennial Both 5 Average (feet) 240 (linear feet) S203 C11 pipe and channel change Temporary Dewatering SFH UT Carver Branch Perennial Both 5 Average (feet) 16 (linear feet) S204 C12 roadway Permanent Rip Rap Fill SFM UT Carver Branch Intermittent Both 3 Average (feet) 191 (linear feet) S205 C12 roadway Permanent Rip Rap Fill SFM UT Carver Branch Intermittent Both 3 Average (feet) 16 (linear feet) S206 C12 roadway Temporary Dewatering SFM UT Carver Branch Intermittent Both 3 Average (feet) 8 (linear feet) S207 C13 roadway Permanent Fill SFN UT Carver Branch Intermittent Both 3 Average (feet) 72 (linear feet) S208 C13 roadway Temporary Dewatering SFN UT Carver Branch Intermittent Both 3 Average (feet) 15 (linear feet) S209 C14 RCBC inlet Temporary Dewatering Carver Branch Perennial Both 6 Average (feet) 19 (linear feet) S210 C14 RCBC outlet Permanent Culvert Carver Branch Perennial Both 6 Average (feet) 84 (linear feet) S211 C14 RCBC outlet Temporary Dewatering Carver Branch Perennial Both 6 Average (feet) 20 (linear feet) S212 C15 stream restore Temporary Dewatering SBJ UT Carver Branch Perennial Both 4 Average (feet) 20 (linear feet) S213 C15 pipe Permanent Culvert SBJ UT Carver Branch Perennial Both 4 Average (feet) 67 (linear feet) S214 C16 pipe inlet Temporary Dewatering SBN UT Carver Branch Perennial Both 3 Average (feet) 22 (linear feet) S215 C17 easement Temporary Dewatering SBP UT Carver Branch Intermittent Both 2 Average (feet) 21 (linear feet) S216 C17 bench Permanent Fill SBO UT Carver Branch Intermittent Both 2 Average (feet) 6 (linear feet) S217 C17 bench Temporary Dewatering SBO UT Carver Branch Intermittent Both 3 Average (feet) 419 (linear feet) S218 C17 bench Temporary Dewatering Carver Branch Perennial Both 6 Average (feet) 50 (linear feet) S219 C18 ditch outlet Temporary Dewatering Edwards Branch Perennial Both 3 Average (feet) 16 (linear feet) S220 C19 pipe and channel change Permanent Culvert SBV UT Edwards Branch Perennial Both 3 Average (feet) 67 (linear feet) S221 C19 pipe and channel change Permanent Relocation SBV UT Edwards Branch Perennial Both 3 Average (feet) 77 (linear feet) 5222 C19 pipe and channel change Temporary Dewatering SBV UT Edwards Branch Perennial Both 3 Average (feet) 42 (linear feet) S223 C20 RCBC Permanent Bank Stabilization Carver Branch Perennial Both 6 Average (feet) 50 (linear feet) S224 C20 RCBC Temporary Dewatering Carver Branch Perennial Both 6 Average (feet) 20 (linear feet) S225 C21 RCBC inlet Permanent Culvert Edwards Branch Perennial Both 3 Average (feet) 30 (linear feet) S226 C21 RCBC inlet Permanent Bank Stabilization Edwards Branch Perennial Both 3 Average (feet) 24 (linear feet) S227 C21 RCBC inlet Temporary Dewatering Edwards Branch Perennial Both 3 Average (feet) 3 (linear feet) S228 C21 RCBC outlet Permanent Bank Stabilization Edwards Branch Perennial Both 3 Average (feet) 10 (linear feet) S229 C21 bench Permanent Bank Stabilization Carver Branch Perennial Both 6 Average (feet) 23 (linear feet) S230 C21 bench Temporary Dewatering Carver Branch Perennial Both 6 Average (feet) 20 (linear feet) S231 C22 roadway and channel change Permanent Fill SCB UT Stecoah Creek Perennial Both 2 Average (feet) 209 (linear feet) S232 C22 roadway and channel change Temporary Dewatering SCB UT Stecoah Creek Perennial Both 2 Average (feet) 12 (linear feet) S233 C22 bank stabilization Permanent Bank Stabilization Stecoah Creek Perennial Both 10 Average (feet) 31 (linear feet) S234 C22 bank stabilization Temporary Dewatering Stecoah Creek Perennial Both 10 Average (feet) 20 (linear feet) S235 C24 channel change Permanent Relocation SCD UT Stecoah Creek Perennial Both 3 Average (feet) 226 (linear feet) S236 C24 channel change Temporary Dewatering SCD UT Stecoah Creek Perennial Both 3 Average (feet) 66 (linear feet) S237 C25 bench Temporary Dewatering Stecoah Creek Perennial Both 15 Average (feet) 361 (linear feet) S238 C26 stabilization Permanent Bank Stabilization Stecoah Creek Perennial Both 15 Average (feet) 31 (linear feet) S239 C26 stabilization Temporary Dewatering Stecoah Creek Perennial Both 15 Average (feet) 31 (linear feet) S240 C26 RCBC outlet Permanent Culvert Stecoah Creek Perennial Both 20 Average (feet) 35 (linear feet) S241 C26 RCBC outlet Permanent Bank Stabilization Stecoah Creek Perennial Both 20 Average (feet) 54 (linear feet) S242 C26 RCBC outlet Temporary Dewatering Stecoah Creek Perennial Both 20 Average (feet) 65 (linear feet) S243 C27 pipe inlet Permanent Culvert SDT UT Stecoah Creek Perennial Both 4 Average (feet) 43 (linear feet) S244 C27 pipe inlet Permanent Bank Stabilization SDT UT Stecoah Creek Perennial Both 4 Average (feet) 9 (linear feet) S245 C27 pipe inlet Temporary Dewatering SDT UT Stecoah Creek Perennial Both 4 Average (feet) 16 (linear feet) S246 C27 pipe outlet Permanent Culvert SDT UT Stecoah Creek Perennial Both 4 Average (feet) 91 (linear feet) S247 C27 pipe outlet Temporary Dewatering SDT UT Stecoah Creek Perennial Both 4 Average (feet) 11 (linear feet) 3i. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 5,118 3i. Total stream and ditch impacts: 8478 3i. Total cubic yard stream impacts: * 1570 3j. Comments: This was an estimate based on 8478 feet of total impacts x 5 feet x 1 foot depth. 4. Open Water Impacts 3i. Total temporary stream impacts: 3,360 4a. Site # 4a1. Impact Reason 4b. Impact type 4c. Name of waterbody 4d. Activity type 4e. Waterbody type 4f. Impact area C23 roadway P unnamed pond Fill Pond 0.12 4g. Total temporary open water Impacts: 0.00 4g. Total open water impacts: 0.12 4g. Total cubic yard open water impacts: * 694 4h. Comments: 250 feet x 15 feet x 5 feet water depth. E. Impact Justification and Mitigation 4g. Total permanent open water impacts: 0.12 1. Avoidance and Minimization la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: The project has went through 4C in merger and been designed to avoid impacts to the maximum extent practicable. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: The work will be conducted in accordance with NCDOT best management practices for construction and with supervision by trained staff under the delegated state stormwater program. Excavation will be avoided in flowing water. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? Yes No 2c. If yes, mitigation is required by (check all that apply): DWR Corps 2d. If yes, which mitigation option(s) will be used for this project? Mitigation bank Payment to in -lieu fee program Permittee Responsible Mitigation 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. Yes No 4b. Stream mitigation requested: (linear feet) 3489 4c. If using stream mitigation, what is the stream temperature: cold 4d. Buffer mitigation requested (DWR only): 4e. Riparian wetland mitigation requested: (square feet) (acres) none 1.14 4f. Non -riparian wetland mitigation requested: 4g. Coastal (tidal) wetland mitigation requested: (acres) (acres) 0 0 4h. Comments 6. Buffer mitigation (State Regulated Riparian Buffer Rules) - required by DWR 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? If yes, you must fill out this entire form - please contact DWR for more information. Yes No F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan la. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes No If no, explain why: This project is not within a protected riparian buffer area. 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? * Yes No Comments: G. Supplementary Information 1. Environmental Documentation la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* Yes No 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)?* Yes No lc. If you answered "yes" to the above, has the document review been finalized by the State Clearing House?* Yes No 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)?* Yes No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* Yes No 3b. If you answered "no," provide a short narrative description. This project is not adding through lanes that could add capacity or increasing access to existing undeveloped areas. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* Yes No N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* Yes No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* Yes No 5c. If yes, indicate the USFWS Field Office you have contacted. Asheville 5d. Is another Federal agency involved?* Yes What Federal Agency is involved? FHWA 5e. Is this a DOT project located within Division's 1-8? Yes No No Unknown 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? Yes No 5g. Does this project involve bridge maintenance or removal? Yes No 5g(1). If yes, have you inspected the bridge for signs of bat use such as staining, guano, bats, etc.? Yes No If you answered "Yes" to 5g(1), did you discover any signs of bat use? Yes No Unknown 5h. Does this project involve the construction/installation of a wind turbine(s)?* Yes No 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? Yes No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Site surveys and coordination with the USFWS Asheville office. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* Yes No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat? * NMFS data. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* Yes No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* The project has an MOA for cultural resource evaluation as design continues. There are eligible properties such as the Appalachian Trail that will be affected by the project as well. 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain?* Yes No 8b. If yes, explain how project meets FEMA requirements: The project has proceeded through design in coordination with Floodplain management in accordance with NCDOTs MOA with FEMA. Sc. What source(s) did you use to make the floodplain determination?* Project hydraulic reports Miscellaneous Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred. Click the upload button or drag and drop files here to attach document 1 _A-0009C_I P_Appl ication_Cover. pdf 2_A-0009C_IP_1325298_prefiling form aknowledgement.pdf 3_A-0009CA_Permit Drawings_20211213.pdf 4_A-0009CB_Permit Drawings_20211213.pdf 5_A-0009CC_Permit Drawings_20211207.pdf 6_A-0009C_Final EA_8-26-20.pdf 7_A-0009C_FO N S I _fi n a I_S i g n ed. p d f 8_21-068 DOT A9 Concurrence Graham Co - Final.pdf 9_21-068_NCDOT_updated A9 Concurrence_GrahamCo.pdf 10_A0009C_EffectsSigned_Aug2020_pdf 11_A-0009C_Final_Programmatic Agreement_April 6 2021_allsigs.pdf 12_Accept_A-0009C_Div 14.pdf A-0009C_PJD_forms signed.pdf EBCI 401 for A-0009C_scan_garysnee_2021-12-14-09-13-03.pdf EBCI 404 comments for A-0009C_scan_garysnee_2021-12-14-09-13-20.pdf File must be PDF or KMZ Comments Signature 278.67KB 923.78KB 28.2MB 17.83MB 22.97MB 9.48MB 2.59MB 269.94KB 304.68KB 294.02KB 2.47MB 210.34KB 250.73KB 499.32KB 500.6KB By checking the box and signing below, I certify that: • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief'; and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true, accurate, and complete information on this form; I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND I intend to electronically sign and submit the PCN form. Full Name: Dave McHenry Signature Date 12/16/2021