Loading...
HomeMy WebLinkAboutNC0028916_Performance Annual Report_20000831TOWN OF TROY SEP -3 2000 FME.:T1EILIE REG. OFF CE li'� IISS .• I��' 1 I SEP - 6 2000 . DENR - WATER 01.W.►TY POINT SOURCE B '. ':C4-i System Performance Annual Report North Carolina Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 Dear Sir: Report. August 31, 2000 l'[Coo 2 Bqi M pnJ af' ROY MANESS MAYOR H.V. MASSENGILL MAYOR PRO-TEM COMMISSIONERS: BRUCE HAMILTON PAIGE HARRIS JAMES HURLEY CHRIS WATKINS JAMES E. JUSTICE TOWN MANAGER CATHY M. MANESS TOWN CLERK Enclosed is the Town of Troy Wastewater Treatment Plant Performance Annual A If you have any questions, please contact Gray Walls at 910-572-9226. enclosure Sincerely, Cathy M. Maness, Clerk 444 NORTH MAIN STREET TROY, NC 27371 PHONE: (910) 572-3661 FAX: 572-3663 www.troy.nc.us Performance Annual Report I. General Information Facility/System Name: Town of Troy Wastewater Treatment Plant Responsible Entity: Town of Troy Person in Charge/Contact: Gray Walls Applicable Permit(s): NC0028916 Description of Treatment Process and Collection System: rrn n 1 S FP - 6 2000 `' L'! Fir - GUAL1iY PJ;r•!; SU :);iCE ii ,NCH The wastewater treatment plant is permitted for .84 MGD (built for 1.2 Mgd). The plant is an extended aeration system with dual oxidation ditches running in series, two final clarifiers and chlorine disinfection. The sewer collection system is comprised of 6", 8" 10" 15" 18" and 21" clay, cast iron, and pvc sewer piping. The piping system is predominately 6" and 8" diameter pipe with brick and precast manholes. The Town of Troy owns a sewer jet machine capable of washing 600 L.F. of sew collection pipe. H. Performance System Performance from July 1, 1999 through June 30, 2000. WASTEWATER TREATMENT PLANT: The WWTP has performed essentially to the standards of a plant with sand filtration installed after final clarification. NPDES monitored pollutants have been discharged well below permitted limits. The plant has had no spills and only two notice of violations. The November NOV was for testing frequency during last winter's snow storm and the January cyanide was due in total to the EPA's unrealistic testing criteria for cyanide as is well known throughout the wastewater industry. Monthly violation history: Month Violation Environmental Impacts Corrective Measures July None N/A N/A August None N/A N/A September None N/A N/A October None N/A N/A November Cyanide None None December None N/A N/A January Sampling None None February None N/A N/A March None N/A N/A April None N/A N/A May None N/A N/A June None N/A N/A SEWER COLLECTION SYSTEM: The sewer collection system has performed very well with no reportable spills having occurred during the previous year. Monthly violation history: Month Violation Environmental Impacts Corrective Measures July None N/A N/A August None N/A N/A September None N/A N/A October None N/A N/A November None N/A. N/A December None N/A N/A January None N/A N/A February None N/A N/A March None N/A N/A April None N/A N/A May None N/A N/A June None N/A N/A III. Notification This Report will be put on public display at the Troy Town Hall. Copies will be made available to any user or customer upon request. Notice of the availability of the report will be placed in the September water billing. IV. Certification I certify under penalty of law that this report is complete and accurate to the best of my knowledge. I further certify that this report will be made available to the users or customers of the Town of Troy system and that those users will be notified of its availability. bu'apd2A) E. Gray Walls Town Engineer and Public Services Director Town of Troy Date: 09/31/00