Loading...
HomeMy WebLinkAboutNC0028916_Performance Annual Report_20140224DENR®FRS..: Town of Troy FEB z 8 ,P} MVO incorporated 7852 -w 2/24/14 Fayetteville Regional Office NC/DWQ 225 Green St. Suite 714 Fayetteville, NC 28301 Atten: Mark Brantley 2013 annual Performance Report Mark Enclosed is the 2013 Annual Performance Report for Troy's Wastewater and Collections Departments. Hopefully you will find it satisfactory if not let me know and we will make it so. Roy maness Mayor James Hurley Mayor pro-tem Commissioners: Angela Elkins -Bruce Hamilton Wallace Jones Chris Watkins Thank you AA'4AL 5L4L Joseph Shields Director Troy POTW 910-220-0159 Public Works Dept - Wastewater Division 315 North Main Street, Troy, North Carolina 27371 phone: (910) 220-0159 facsimile: (910) 572-3663 www.troywwtp650@yahoo.com Performance Annual Report 2013 I. General Information Facility/System Name: Town of Troy Wastewater Treatment Plant Responsible Entity: Town of Troy Person in Charge/Contact: Benny Dennis Applicable Permits NC0028916, WQCS00134 Description of Treatment Process and Collection System: The wastewater treatment plant is permitted for 1.2 MGD. The plant is an extended aeration system with dual oxidation ditches running in series, two fmal clarifiers and ultraviolet disinfection. The sewer Collection system is comprised of 6" 8" 10" 15" 18" and 21" clay cast iron and pvc sewer piping. The piping system is predominately 6" and 8" diameter pipe with brick and precast manholes. The Town Of Troy owns a sewer jet machine capable of washing 600 L.F. of sewer collection pipe. II. Performance Wastewater Treatment Plant The WWTP has performed essentially to the standards of a plant with sand filtration installed after fmal clarification. NPDES monitored pollutants have been discharged well below permitted limits. The WWTP Director reported the equalization lagoon dam was leaking, it was estimated as much as 3 million gallons may have been realized to Densons Creek. The leak was stopped and the dam repaired. Sewer Collection System Public Services Dept. reported a spill at the Wadeville Rd. lift station. An estimated 900 gallons was spilled some of which reached surface waters. The PS Dept. cleaned 25,000 ft of sewer line. III. Notification This report will be put on public display at the Troy Town Hall. Copies will made available to any user or customer upon request. Notice of the availability of the report will be placed in the April water billing. IV. Certification I certify under penalty of law that this report is complete and accurate to the best of my knowledge. I further certify that this report will be made available to the users or customers of the Town of Troy system and that those users will be notified of its availability Benny Ir. Dennis Public Services Director Town of Troy