HomeMy WebLinkAboutGW1-2021-07527_Well Construction - GW1_20210903 WELL CONSTRUCTION RECORD(GW-1) For Internal Use Only:
1.Well Contractor Information:
Chris C. Russell A4.WATER ZONES
'
FROM TO DESCRIPTION
Well Contractor Name
3254 A 40 fL 405 ft•
ft. ft.
NC Well Contractor Certification Number 15.OUTER CASING for malti�ased wells OR LINER if a licable
Russell Well Drilling, Inc. FROM TO DIAMETER THICKNESS MATERIAL
0 fL 32 ft• 6.25 SDR21 JPVC
Company Name
16.INNER CASING OR TUBING eotbermal closed-loop)
2.Well Construction Permit#: 830 FROM To DIAMETER THICKNESS MATERIAL
List all applicable well construction permits(i.e.UIC,County,State, Variance,etc) ft. ft. in.
3.Well Use(check well use): rL ft in.
Water Supply Well: 17.SCREEN
PP y FROM TO DIAMETER SLOT SIZE THICKNESS I MATERIAL
❑Agricultural ❑Municipal/Public ft fL in.
❑Geothermal(Heating/Cooling Supply) OResidential Water Supply(single) ft. ft. in.
❑lndustrial/Commercial ❑Residential Water Supply(shared) 18.GROUT
Oirfigation ❑Wells>100,000 GPD FROM TO MATERIAL EMPLACEMENT METHOD&AMOUNT
Non-Water Supply Well: 0 fL 20 f• Grout Poured
❑Monitoring ❑Recovery ft. ft.
Injection Well: ft. ft
❑Aquifer Recharge ❑Groundwater Remediation
49.SAND/GRAVEL PACK(if applicable)
❑Aquifer Storage and Recovery ❑Salinity Barrier FROM TO MATERIAL EMPLACEMENT METHOD
❑Aquifer Test ❑Stormwater Drainage fL fL
❑Experimental Technology ❑Subsidence Control ft. ft.
❑Geothermal(Closed Loop) ❑Tracer 20.DRILLING LOG attach additional sheets if necessary)
FROM TO DESCRIPTION color,hardness,soil reek e, in size,etc.)
❑Geothermal(Heating/Cooling Return) ❑Other(explain under#21 Remarks) 0 ft 27 ff• Dirt
4.Date Well(s)Completed: 8-24-21 Well um 27 ff 405 ft Rock
ft. fL
5a.Well Location:
Garry & Lola Bradshaw fL fL
Facility/Owner Name Facility ID#(if applicable) ft. ft.
1149 Millers Creek Rd, Lenoir, NC 28645 fL fL
Physical Address,City,and Zip
Caldwell 21.REMARKS ,
County ParcelldentificationNo.(PIN) 1nJo(f�3, S86On
5b.Latitude and longitude in degrees/minutes/seconds or decimal degrees:
(if well field,one lat/long is sufficient) 22.Certification:
35' 54.425' N 081' 27.949' W 8/25/2021
6.Is(are)the well(s): ClPermanent or ❑Temporary Si ure of Certified Well ntractor Date
By signing this form,I hereby certify that the well(s)was(were)constructed in accordance with
7.Is this a repair to an existing well: ❑Yes or (tNo ISA NCAC 01C.0100 or ISA NCAC 02C.0100 Well Construction Standards and that a copy
If this is a repair,fill out known well construction information and explain the nature of the of this record has been provided to the well owner.
repair under#11 remarks section or on the back of this form.
23.Site diagram or additional well details:
8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well construction info
construction,only 1 GW-1 is needed. Indicate TOTAL NUMBER of wells (add'See Over'in Remarks Box).You may also attach additional pages if necessary.
drilled: 24.SUBMITTAL INSTRUCTIONS
9.Total well depth below land surface: 405 (ft) Submit this GW-1 within 30 days of well completion per the following:
For multiple wells list all depths if different(example-3@100'and 2@100�
24a. For All Wells: Original form to Division of Water Resources (DWR),
10.Static water level below top of casing: 4 (ft.) Information Processing Unit,1617 MSC,Raleigh,NC 27699-1617
If water level is above casing,use"+"
It.Borehole diameter: 6.25 (in.) 24b.For Injection Wells: Copy to DWR,Underground Injection Control(TUC)
Program,1636 MSC,Raleigh,NC 27699-1636
12.Well construction method:Air Drilled
24c.For Water Supply and Open-Loop Geothermal Return Wells:Copy to the
(i.e.auger,rotary,cable,direct posh,etc.) county environmental health department of the county where installed
FOR WATER SUPPLY WELLS ONLY: 24d.For Water Wells -ducinp over 100,000 GPD:Copy to DWR,CCPCUA
13a.Yield(gpm)4 u u Method of test:Ai r
Permit Program,1611 MSC,Raleigh,NC 27699-1611
13b.Disinfection type: HTu Amount: 1 Cup
Form GW-I North Carolina Department of Environmental Quality-Division of Water Resources Revised 6-6-2018