Loading...
HomeMy WebLinkAbout20210244 Ver 1_Pre-Filing Meeting Information_20211216Strickland, Bev From: laserfiche@ncdenr.gov Sent: Thursday, February 4, 2021 4:15 PM To: Dilday, Jason L Cc: Mitchell, Robert K Subject: Pre -Filing Meeting Request Acknowledgement - Broadband installation along US 74 from Wilmington to Asheville - 20210244 Ver 1 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Broadband installation along US 74 from Wilmington to Asheville that you submitted on (date). The ID number for that project is 20210244, Version 1. Reviewer Contact Information: Reviewer: Robert Mitchell Reviewer Email: kevin.mitchell@ncdenr.gov Reviewing Office: Asheville Regional Office - (828) 296-4500 When you submit your application please upload a copy of the attached document in this email. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. i DWR Pre -Filing Meeting Request Form NORTH CAROLINA EnOnonfrwera Qumftry ID#* Regional Office * Reviewer List* 20210244 Version * 1 Asheville Regional Office - (828) 296-4500 Kevin Mitchell Pre -Filing Meeting Request submitted 2/4/2021 Contact Name * Contact Email Address* Project Name* Project Owner* Project County* Owner Address: Jason Dilday jldilday@ncdot.gov Broadband installation along US 74 from Wilmington to Asheville NCDOT Union Street Address 1000 Birch Ridge Drive Address Line 2 Oty State / Rovince / Region Raleigh NC Fbstal / Zip Code Country 27604 USA Is this a transportation project?* 6 Yes ( No Type(s) of approval sought from the DWR: I� 401 Water Quality Certification - I— 401 Water Quality Certification - Regular Express I— Individual Permit I— Modification I— Shoreline Stabilization Does this project have an existing project ID#?* c Yes 6- No Do you know the name of the staff member you would like to request a meeting with? Kevin Mitchell Please give a brief project description below.* NCDOT proposes to install three 1.25" diameter conduits containing broadband fiber optic cable in the right-of-way of the 280-mile US 74 corridor from 1-140 near Wilmington to 1-40 in Asheville. Please give a couple of dates you are available for a meeting. Please attach the documentation you would like to have the meeting about. pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. . I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. . I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 2/4/2021