HomeMy WebLinkAboutNCC205207_Annual Fee NOD Letter_20211216RCY COOPER
Gownor
ELIZABETH S. BISER
5"'fnry
BRIAN WRENN
vrrq�-Xr
12/16/2021
Matthew C. Erich
Attn: Matthew Erich
P.O. Box 774
Cornelius, NC 28031-4550
Subject: Notice of Deficiency - Failure to Pay Annual Fee
Invoice No. NCC205207-2021
Dear Permittee:
You are receiving a Notice of Deficiency because the annual fee of $100.00 for coverage under NPDES General Stormwater
Permit NCG010000 for Construction Activities has not been paid as required by N.C. General Statute 143-215.3D(a)(4). The
annual fee was billed on 11/1/2021 and was due on 12/1/2021. The annual fee applies to the following construction site:
Statesville Mini -storage
Wall Street, Statesville, NC
Iredell County
Certificate of Coverage No. NCC205207
NC Reference No. NCG01-2020-5207
If the project was closed out prior to the invoice date, please request a Notice of Termination. Follow the instructions on the
NPDES Construction Program website (deq.nc.gov/NCG01). If the project was not closed out or sold prior to the invoice date,
please pay the permit fee using the Stormwater ePayment website (deq.nc.gov/SW-ePayments).
Failure to address this deficiency within 30 calendar days could result in the issuance of a Notice of Violation and potential civil
penalty assessment of up to $25,000 per day for failing to maintain permit coverage. If you have any questions or concerns,
please contact Aziza Selkane at aziza.selkane@ncdenr.gov or me at toby.vinson@ncdenr.gov.
Sincerely,
William E. Vinson, Jr.
Chief of Program Operations
Division of Energy, Mineral, and Land Resources
+ NNIh Carallna Oe"wemc or Fnritimm agpellt¢ I DMMtn of Energy. S.9neral aM UrA Resources
■' 512 Nonh Salisbury 5Lr t 116R Mail Se MN Cemn I RaWoi. NorthC d1na 276XR-1612
ar�u
714.347.420D