Loading...
HomeMy WebLinkAboutGW1-2021-07430_Well Construction - GW1_20210921 � *10WATERIZONES [ae �`: e:' FROM TO DESCRIMON ellComractor ame i< /. ✓ems NCI e Certificetio nNbumer y ti CIS POUTER CASINGf foP,m 'MOM R{ —bk ZZ `._ / TO D TIDCKNESS MATERIAL IL,2 0 Z� & I to 5� yo UG yN J _�. 2.Well Comstructlon P C•'S FROMERfCASDNG:OR}TUB>DIAMETER � MATERIAL r stint#: fQ � lam. List all�ipplleable well conshucNon permits r.e.UIC,Coun K Van etc:)., n• tt in. 3.Well Use(check well use): ft tt ( is Water Supply Well: . aViSE Fgoty . TO DIAMETER, sLOT sI7E THICKNESS MATERIAL Lam` ❑Agricultural ❑Municipal/Public 2 ft I%, Ze ❑Geothermal(Heating/Cooling Supply) 'residential Water Supply(single) ft tt in Olndustrial/Commercial ❑Residential Water Supply(shared) 1&KGROUTaNEENW, 01rrigatidn ❑Wells>100 000 GPD FROM TO MATERIAL EMMACEP4ENT NnrMOD e AMOUNT Non-Water Supply Well: O tt. ft Y +' ❑Monitoring ❑Recovery ft. ft. Injection Well: ft. ft. ❑Aquifer Recharge ❑Groundwater Remediation ,a9.4SAND/GRAVEL&A- k J66111a eWWI ❑Aquifer Storage and Recovery ❑Salinity Barrier FROM TO MATERIAL EMPLACEMENTMETHOD ❑Aquifer Test OStormwater Drainage ft 3-P OExperimental Technology ❑Subsidence Control ft. R OGeothermal(Closed Loop) ❑Tracer a20hDRII1LING;LOGIith`ebVddidbit7d?ibap`if,aaea OGeothermal ea' Coolin Return OOther(explain under#21 Remarks) FROM TO DESCRIPTION color,hardn sotVtoeli etc fL ft 4.Date Weil(s)Completed: _ Weu ID# tt. n Y /�,5a.W u Lyocad n: R e/7G� //` !< ft. j Facility/ er Name Facility lD#(if applicable) ft. It. ,,��yy,, ft. ft. Physi 1 Ad City,and Zip �_ R R• ,- Y-sS2�? u,20RE ARKS imty Parcel Identification No.(PIN) 5b.Latitude and longitude In degrees/minutes/seconds or decimal degrees: (ifwweqell field,one latnong is sufficient) 22.CertIfl on: ^J�� �� 53 1, N 7" w 6.Is(are)the wells): ermanent or ❑Temporary oi'Cestified Weil Comractor Date By signing"form I hereby certify that the xpll(t)xns(were)constructed in accordance with 7.Is thin a repair to an existing well: ❑Y¢$ OrVO 1 SA A'CAC 02C.0100 or 15A NCAC 01C.0200 Well Construction Standards and that a copy If this is a repair,fill out known well construction biformation and explain the nature of the of thus record has been provided to the '•ell owner: repair under#21 remarks section or on the back of this form. 23.Site diagram or additional well details: 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well construction info construction,only 1 GW 1 is needed. Indicate TOTAL NUMBER of wells (add'See Over•in Remarks Box).You may also attach-additional pages if necessary. dolled: 2 24.SUBMITTAL INSTRUCTIONS 9.Total well depth below land surface: Lev, 2 3a (ft) For mula'pk wells list all depths!f different(example-3@200'and 2@100) Submit this GW-1 within 30 days of weB completion per the following: Z D• 24a. For All Wells: Original form to Division of Water Resources (DWR), 10.Static water level below top of casing: (B) Information Processing Unit,1617,MSC,Raleigh,NC 27699-1617 If water level is above casing,use 11.Boreh�le diameter: 7 (in.) Program, For Injection Wells:Copy to DWR,Underground-Injection Control(TUC) I Program,1636 MSC,Raleigh,NC 27699-1636 12.Well lonstruction method: 24c.For Water Supply and Oven'-Loop Geothermal Return Wells:Copy to the (Le.auger,rotary,cable,direct push,etc.) county environmental health delatizYent of the county ere MOW FOR WATER SUPPLY WELLS ONLY: 24d.For Water Wells proctor lit over 100,000 GPD:Copy to DWR,CCPCUA 13a.Yield(gpm) Method of test: Permit Program,1611 MSC,Raleigh,NC 27699-1611 � /� 13b.Disinfection type: Amount: c.� Z 6 Form OW-1^ North Carolina Department of Enviromnentfil Quality-Division of Water Resources' ' Revised 6-6-2019